Attachment (2) 23R3600 J-0200000-14 ELINS FINAL.xlsx

XLSX spreadsheet 78 KB Posted

Attached to
Wastewater Treatment Plant (WWTP) Operation and Maintenance (O&M) Services, White Beach, Okinawa, Japan
Solicitation number
N4008423R3600
Issued by

About this file

This document contains a request for proposal for operation and maintenance services for a wastewater treatment plant in Okinawa, Japan. The solicitation seeks proposals for services including operation of the wastewater treatment plant, sewage pipelines, manholes, wet wells, wastewater instrumentation systems, and sewage sump pumps. The performance period is for a base year with four one-year option periods. Proposals are due by 12 December 2022 and shall be submitted to Ms. Yukiko Shimabukuro of the Naval Facilities Engineering Command. Offerors must be registered in the System for Award Management at the time of proposal submission to be eligible for award. The services will be performed at the White Beach wastewater treatment plant in Okinawa, Japan for the Department of the Navy.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN SUMMARY SHEET

CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
SCHEDULE OF WORK
(TO BE COMPLETED AND SUBMITTED WITH THE OFFER)
ITEM NO.SUPPLIES/SERVICESAMOUNT
0001RECURRING WORK (Base Period)
Price to perform Recurring work (includes Mobilization), for the 12-month Base Period, in accordance with all the terms of this contract.¥-
0002NON-RECURRING (Base Period)
Price to perform non-recurring work, for the 12-month Base Period, in accordance with all the terms of this contract.NTE¥50,000,000
0003RECURRING WORK (Option Period One)
Price to perform Recurring work, for the 12-month Option Period One, in accordance with all the terms of this contract.¥-
0004NON-RECURRING (Option Period One)
Price to perform non-recurring work, for the 12-month Option Period One, in accordance with all the terms of this contract.NTE¥50,000,000
0005RECURRING WORK (Option Period Two)
Price to perform Recurring work, for the 12-month Option Period Two, in accordance with all the terms of this contract.¥-
0006NON-RECURRING (Option Period Two)
Price to perform non-recurring work, for the 12-month Option Period Two, in accordance with all the terms of this contract.NTE¥50,000,000
0007RECURRING WORK (Option Period Three)
Price to perform Recurring work, for the 12-month Option Period Three, in accordance with all the terms of this contract.¥-
0008NON-RECURRING (Option Period Three)
Price to perform non-recurring work, for the 12-month Option Period Three, in accordance with all the terms of this contract.NTE¥50,000,000
0009RECURRING WORK (Option Period Four)
Price to perform Recurring work, for the 12-month Option Period Four, in accordance with all the terms of this contract.¥-
0010NON-RECURRING (Option Period Four)
Price to perform non-recurring work, for the 12-month Option Period Four, in accordance with all the terms of this contract.NTE¥50,000,000

TOTAL (CLINS 0001 THROUGH 0010) ¥ 250,000,000

CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
SCHEDULE OF WORK
(TO BE COMPLETED AND SUBMITTED WITH THE OFFER)
ITEM NO.SUPPLIES/SERVICESAMOUNT
9000Exhibit Line Items (ELINS) Base Period
See Attachment J-0200000-14, Exhibit Line Item Numbers, Recurring and Non-Recurring Work¥50,000,000
9001Exhibit Line Items (ELINS) Option Period One
See Attachment J-0200000-14, Exhibit Line Item Numbers, Recurring and Non-Recurring Work¥50,000,000
9002Exhibit Line Items (ELINS) Option Period Two
See Attachment J-0200000-14, Exhibit Line Item Numbers, Recurring and Non-Recurring Work¥50,000,000
9003Exhibit Line Items (ELINS) Option Period Three
See Attachment J-0200000-14, Exhibit Line Item Numbers, Recurring and Non-Recurring Work¥50,000,000
9004Exhibit Line Items (ELINS) Option Period Four
See Attachment J-0200000-14, Exhibit Line Item Numbers, Recurring and Non-Recurring Work¥50,000,000

TOTAL PRICE FOR CONTRACT LINE ITEMS 0001 THROUGH 0010 ¥ 250,000,000

CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

Base Recurring

CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

ATTACHMENT J-0200000-14

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT # N40084-23-R-3600

EXHIBIT A - CLIN 9000 Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.

Line Item 0001 Recurring Work - Base Period

PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3

ELINs A001 through A006

ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
0600000 - Port Operations
A001 - CFAO Spec Item 3
A001AACHT Hook-up and Disconnects11MO¥ -¥ -
A001ABCHT Hose Equipment Maintenance11MO¥ -¥ -
Port Operations SUB TOTAL¥ -
1501000 Facility Management
A002 - CFAO Spec Item 3
A002AAInfrastructure Condition Assessment Program (ICAP) Services9MO¥ -¥ -
Facility Management SUB TOTAL¥ -
1502000 Facility Investment
A003 - CFAO Spec Item 3
Integrated Maintenance Program (IMP)
A003AAHVAC Systems9MO¥ -¥ -
A003ABFire Protection Systems9MO¥ -¥ -
A003ACLightning Arrestors and Grounding Devices9MO¥ -¥ -
A003ADRoll-Up Doors9MO¥ -¥ -
A003AERooftop Ventilation/Exhaust Ventilation Systems9MO¥ -¥ -
A003AFEye Wash Stations9MO¥ -¥ -
A003AGUninterruptible Power Systems (UPS)9MO¥ -¥ -
A003AHAuxiliary Generators9MO¥ -¥ -
A003AJWeight Handling Equipment (WHE)9MO¥ -¥ -
Facility Investment SUB TOTAL¥ -
1601000 Utility Management
A004 - CFAO Spec Item 3
A004AAUtility Operations Support9MO¥ -¥ -
A004ABUtility Infrastructure Condition Assessment (UICAP) Support9MO¥ -¥ -
Utility Management SUB TOTAL¥ -
1604000 Wastewater
A005 - CFAO Spec Item 3
A005AAOperation of Wastewater System9MO¥ -¥ -
Integrated Maintenance Program (IMP)
A005ABWastewater Treatment Plant9MO¥ -¥ -
A005ACSewage Pipelines9MO¥ -¥ -
A005ADManholes9MO¥ -¥ -
A005AEWet Wells9MO¥ -¥ -
A005AFWastewater Instrumentation Systems9MO¥ -¥ -
A005AGSewage Sump Pumps9MO¥ -¥ -
Wastewater SUB TOTAL¥ -
A006 - Mobilization
A006AAMobilization (Period of Performance, approximately two - three months)1LS¥ -¥ -
Mobilization SUB TOTAL¥ -
TOTAL COST LINE ITEM 0001 RECURRING WORK & MOBILIZATION (A001 through A006)
(This amount entered into Schedule of Work, Item No. 0001 RECURRING WORK)¥ -
CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

Base Non-recurring

CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

ATTACHMENT J-0200000-14

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/ CONTRACT # N40084-23-R-3600

EXHIBIT A - CLIN 9000

Line Item 0002 Non-Recurring Work - Base Period PROVIDE PRICES FOR - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs A700 through A709

ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
A700Labor Work for 0600000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order labor cost will be negotiated.N/ALSNot To Exceed (NTE)¥300,000
A701Material and Equipment Costs for 0600000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order material and equipment cost will be negotiated. Use with ELIN A700.N/ALSNTE¥2,200,000
A702Labor Work for 1501000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order labor cost will be negotiated.N/ALSNTE¥3,500,000
A703Material and Equipment Costs for 1501000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order material and equipment cost will be negotiated. Use with ELIN A702.N/ALSNTE¥1,500,000
A704Labor Work for 1502000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order labor cost will be negotiated.N/ALSNTE¥8,000,000
A705Material and Equipment Costs for 1502000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order material and equipment cost will be negotiated. Use with ELIN A704.N/ALSNTE¥9,500,000
A706Labor Work for 1601000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order labor cost will be negotiated.N/ALSNTE¥3,500,000
A707Material and Equipment Costs for 1601000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order material and equipment cost will be negotiated. Use with ELIN A706.N/ALSNTE¥1,500,000
A708Labor Work for 1604000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order labor cost will be negotiated.N/ALSNTE¥7,000,000
A709Material and Equipment Costs for 1604000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order material and equipment cost will be negotiated. Use with ELIN A708.N/ALSNTE¥13,000,000
TOTAL NON-RECURRING WORK PRICE - A700 THROUGH A709¥50,000,000
CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

OPT1 Recurring

CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

ATTACHMENT J-0200000-14

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT # N40084-23-R-3600

EXHIBIT B - CLIN 9001 Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.

Line Item 0003 Recurring Work - Option Period One

PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3

ELINs B001 through B005

ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
0600000 - Port Operations
B001 - CFAO Spec Item 3
B001AACHT Hook-up and Disconnects12MO¥ -¥ -
B001ABCHT Hose Equipment Maintenance12MO¥ -¥ -
Port Operations SUB TOTAL¥ -
1501000 Facility Management
B002 - CFAO Spec Item 3
B002AAInfrastructure Condition Assessment Program (ICAP) Services12MO¥ -¥ -
Facility Management SUB TOTAL¥ -
1502000 Facility Investment
B003 - CFAO Spec Item 3
Integrated Maintenance Program (IMP)
B003AAHVAC Systems12MO¥ -¥ -
B003ABFire Protection Systems12MO¥ -¥ -
B003ACLightning Arrestors and Grounding Devices12MO¥ -¥ -
B003ADRoll-Up Doors12MO¥ -¥ -
B003AERooftop Ventilation/Exhaust Ventilation Systems12MO¥ -¥ -
B003AFEye Wash Stations12MO¥ -¥ -
B003AGUninterruptible Power Systems (UPS)12MO¥ -¥ -
B003AHAuxiliary Generators12MO¥ -¥ -
B003AJWeight Handling Equipment (WHE)12MO¥ -¥ -
Facility Investment SUB TOTAL¥ -
1601000 Utility Management
B004 - CFAO Spec Item 3
B004AAUtility Operations Support12MO¥ -¥ -
B004ABUtility Infrastructure Condition Assessment (UICAP) Support12MO¥ -¥ -
Utility Management SUB TOTAL¥ -
1604000 Wastewater
B005 - CFAO Spec Item 3
B005AAOperation of Wastewater System12MO¥ -¥ -
Integrated Maintenance Program (IMP)
B005ABWastewater Treatment Plant12MO¥ -¥ -
B005ACSewage Pipelines12MO¥ -¥ -
B005ADManholes12MO¥ -¥ -
B005AEWet Wells12MO¥ -¥ -
B005AFWastewater Instrumentation Systems12MO¥ -¥ -
B005AGSewage Sump Pumps12MO¥ -¥ -
Wastewater SUB TOTAL¥ -
TOTAL COST LINE ITEM 0003 RECURRING WORK (B001 through B005)
(This amount entered into Schedule of Work, Item No. 0003 RECURRING WORK)¥ -
CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

OPT1 Non-recurring

CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

ATTACHMENT J-0200000-14

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/ CONTRACT # N40084-23-R-3600

EXHIBIT B - CLIN 9001

Line Item 0004 Non-Recurring Work - Option Period One PROVIDE PRICES FOR - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs B700 through B709

ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
B700Labor Work for 0600000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order labor cost will be negotiated.N/ALSNot To Exceed (NTE)¥300,000
B701Material and Equipment Costs for 0600000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order material and equipment cost will be negotiated. Use with ELIN B700.N/ALSNTE¥2,200,000
0
B702Labor Work for 1501000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order labor cost will be negotiated.N/ALSNTE¥3,500,000
B703Material and Equipment Costs for 1501000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order material and equipment cost will be negotiated. Use with ELIN B702.N/ALSNTE¥1,500,000
B704Labor Work for 1502000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order labor cost will be negotiated.N/ALSNTE¥8,000,000
B705Material and Equipment Costs for 1502000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order material and equipment cost will be negotiated. Use with ELIN B704.N/ALSNTE¥9,500,000
B706Labor Work for 1601000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order labor cost will be negotiated.N/ALSNTE¥3,500,000
B707Material and Equipment Costs for 1601000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order material and equipment cost will be negotiated. Use with ELIN B706.N/ALSNTE¥1,500,000
B708Labor Work for 1604000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order labor cost will be negotiated.N/ALSNTE¥7,000,000
B709Material and Equipment Costs for 1604000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order material and equipment cost will be negotiated. Use with ELIN B708.N/ALSNTE¥13,000,000
TOTAL NON-RECURRING WORK PRICE - B700 THROUGH B709¥50,000,000
CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

OPT2 Recurring

CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

ATTACHMENT J-0200000-14

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT # N40084-23-R-3600

EXHIBIT C - CLIN 9002 Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.

Line Item 0005 Recurring Work - Option Period Two

PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3

ELINs C001 through C005

ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
0600000 - Port Operations
C001 - CFAO Spec Item 3
C001AACHT Hook-up and Disconnects12MO¥ -¥ -
C001ABCHT Hose Equipment Maintenance12MO¥ -¥ -
Port Operations SUB TOTAL¥ -
1501000 Facility Management
C002 - CFAO Spec Item 3
C002AAInfrastructure Condition Assessment Program (ICAP) Services12MO¥ -¥ -
Facility Management SUB TOTAL¥ -
1502000 Facility Investment
C003 - CFAO Spec Item 3
Integrated Maintenance Program (IMP)
C003AAHVAC Systems12MO¥ -¥ -
C003ABFire Protection Systems12MO¥ -¥ -
C003ACLightning Arrestors and Grounding Devices12MO¥ -¥ -
C003ADRoll-Up Doors12MO¥ -¥ -
C003AERooftop Ventilation/Exhaust Ventilation Systems12MO¥ -¥ -
C003AFEye Wash Stations12MO¥ -¥ -
C003AGUninterruptible Power Systems (UPS)12MO¥ -¥ -
C003AHAuxiliary Generators12MO¥ -¥ -
C003AJWeight Handling Equipment (WHE)12MO¥ -¥ -
Facility Investment SUB TOTAL¥ -
1601000 Utility Management
C004 - CFAO Spec Item 3
C004AAUtility Operations Support12MO¥ -¥ -
C004ABUtility Infrastructure Condition Assessment (UICAP) Support12MO¥ -¥ -
Utility Management SUB TOTAL¥ -
1604000 Wastewater
C005 - CFAO Spec Item 3
C005AAOperation of Wastewater System12MO¥ -¥ -
Integrated Maintenance Program (IMP)
C005ABWastewater Treatment Plant12MO¥ -¥ -
C005ACSewage Pipelines12MO¥ -¥ -
C005ADManholes12MO¥ -¥ -
C005AEWet Wells12MO¥ -¥ -
C005AFWastewater Instrumentation Systems12MO¥ -¥ -
C005AGSewage Sump Pumps12MO¥ -¥ -
Wastewater SUB TOTAL¥ -
TOTAL COST LINE ITEM 0003 RECURRING WORK (C001 through C005)
(This amount entered into Schedule of Work, Item No. 0005 RECURRING WORK)¥ -
CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

OPT2 Non-recurring

CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

ATTACHMENT J-0200000-14

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/ CONTRACT # N40084-23-R-3600

EXHIBIT C - CLIN 9002

Line Item 0006 Non-Recurring Work - Option Period Two PROVIDE PRICES FOR - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs C700 through C709

ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
C700Labor Work for 0600000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order labor cost will be negotiated.N/ALSNot To Exceed (NTE)¥300,000
C701Material and Equipment Costs for 0600000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order material and equipment cost will be negotiated. Use with ELIN C700.N/ALSNTE¥2,200,000
C702Labor Work for 1501000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order labor cost will be negotiated.N/ALSNTE¥3,500,000
C703Material and Equipment Costs for 1501000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order material and equipment cost will be negotiated. Use with ELIN C702.N/ALSNTE¥1,500,000
C704Labor Work for 1502000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order labor cost will be negotiated.N/ALSNTE¥8,000,000
C705Material and Equipment Costs for 1502000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order material and equipment cost will be negotiated. Use with ELIN C704.N/ALSNTE¥9,500,000
C706Labor Work for 1601000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order labor cost will be negotiated.N/ALSNTE¥3,500,000
C707Material and Equipment Costs for 1601000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order material and equipment cost will be negotiated. Use with ELIN C706.N/ALSNTE¥1,500,000
C708Labor Work for 1604000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order labor cost will be negotiated.N/ALSNTE¥7,000,000
C709Material and Equipment Costs for 1604000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order material and equipment cost will be negotiated. Use with ELIN C708.N/ALSNTE¥13,000,000
TOTAL NON-RECURRING WORK PRICE - C700 THROUGH C709¥50,000,000
CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

OPT3 Recurring

CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

ATTACHMENT J-0200000-14

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT # N40084-23-R-3600

EXHIBIT D - CLIN 9003 Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.

Line Item 0007 Recurring Work - Option Period Three

PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3

ELINs D001 through D005

ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
0600000 - Port Operations
D001 - CFAO Spec Item 3
D001AACHT Hook-up and Disconnects12MO¥ -¥ -
D001ABCHT Hose Equipment Maintenance12MO¥ -¥ -
Port Operations SUB TOTAL¥ -
1501000 Facility Management
D002 - CFAO Spec Item 3
D002AAInfrastructure Condition Assessment Program (ICAP) Services12MO¥ -¥ -
Facility Management SUB TOTAL¥ -
1502000 Facility Investment
D003 - CFAO Spec Item 3
Integrated Maintenance Program (IMP)
D003AAHVAC Systems12MO¥ -¥ -
D003ABFire Protection Systems12MO¥ -¥ -
D003ACLightning Arrestors and Grounding Devices12MO¥ -¥ -
D003ADRoll-Up Doors12MO¥ -¥ -
D003AERooftop Ventilation/ Exhaust Ventilation Systems12MO¥ -¥ -
D003AFEye Wash Stations12MO¥ -¥ -
D003AGUninterruptible Power Systems (UPS)12MO¥ -¥ -
D003AHAuxiliary Generators12MO¥ -¥ -
D003AJWeight Handling Equipment (WHE)12MO¥ -¥ -
Facility Investment SUB TOTAL¥ -
1601000 Utility Management
D004 - CFAO Spec Item 3
D004AAUtility Operations Support12MO¥ -¥ -
D004ABUtility Infrastructure Condition Assessment (UICAP) Support12MO¥ -¥ -
Utility Management SUB TOTAL¥ -
1604000 Wastewater
D005 - CFAO Spec Item 3
D005AAOperation of Wastewater System12MO¥ -¥ -
Integrated Maintenance Program (IMP)
D005ABWastewater Treatment Plant12MO¥ -¥ -
D005ACSewage Pipelines12MO¥ -¥ -
D005ADManholes12MO¥ -¥ -
D005AEWet Wells12MO¥ -¥ -
D005AFWastewater Instrumentation Systems12MO¥ -¥ -
D005AGSewage Sump Pumps12MO¥ -¥ -
Wastewater SUB TOTAL¥ -
TOTAL COST LINE ITEM 0003 RECURRING WORK (D001 through D005)
(This amount entered into Schedule of Work, Item No. 0007 RECURRING WORK)¥ -
CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

OPT3 Non-recurring

CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

ATTACHMENT J-0200000-14

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/ CONTRACT # N40084-23-R-3600

EXHIBIT D - CLIN 9003

Line Item 0008 Non-Recurring Work - Option Period Three PROVIDE PRICES FOR - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs D700 through D709

ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
D700Labor Work for 0600000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order labor cost will be negotiated.N/ALSNot To Exceed (NTE)¥300,000
D701Material and Equipment Costs for 0600000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order material and equipment cost will be negotiated. Use with ELIN D700.N/ALSNTE¥2,200,000
D702Labor Work for 1501000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order labor cost will be negotiated.N/ALSNTE¥3,500,000
D703Material and Equipment Costs for 1501000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order material and equipment cost will be negotiated. Use with ELIN D702.N/ALSNTE¥1,500,000
D704Labor Work for 1502000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order labor cost will be negotiated.N/ALSNTE¥8,000,000
D705Material and Equipment Costs for 1502000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order material and equipment cost will be negotiated. Use with ELIN D704.N/ALSNTE¥9,500,000
D706Labor Work for 1601000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order labor cost will be negotiated.N/ALSNTE¥3,500,000
D707Material and Equipment Costs for 1601000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order material and equipment cost will be negotiated. Use with ELIN D706.N/ALSNTE¥1,500,000
D708Labor Work for 1604000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order labor cost will be negotiated.N/ALSNTE¥7,000,000
D709Material and Equipment Costs for 1604000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order material and equipment cost will be negotiated. Use with ELIN D708.N/ALSNTE¥13,000,000
TOTAL NON-RECURRING WORK PRICE - D700 THROUGH D709¥50,000,000
CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

OPT4 Recurring

CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

ATTACHMENT J-0200000-14

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT # N40084-23-R-3600

EXHIBIT E - CLIN 9004 Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.

Line Item 0009 Recurring Work - Option Period Four

PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3

ELINs E001 through E006

ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
0600000 - Port Operations
E001 - CFAO Spec Item 3
E001AACHT Hook-up and Disconnects12MO¥ -¥ -
E001ABCHT Hose Equipment Maintenance12MO¥ -¥ -
Port Operations SUB TOTAL¥ -
1501000 Facility Management
E002 - CFAO Spec Item 3
E002AAInfrastructure Condition Assessment Program (ICAP) Services12MO¥ -¥ -
Facility Management SUB TOTAL¥ -
1502000 Facility Investment
E003 - CFAO Spec Item 3
Integrated Maintenance Program (IMP)
E003AAHVAC Systems12MO¥ -¥ -
E003ABFire Protection Systems12MO¥ -¥ -
E003ACLightning Arrestors and Grounding Devices12MO¥ -¥ -
E003ADRoll-Up Doors12MO¥ -¥ -
E003AERooftop Ventilation/ Exhaust Ventilation Systems12MO¥ -¥ -
E003AFEye Wash Stations12MO¥ -¥ -
E003AGUninterruptible Power Systems (UPS)12MO¥ -¥ -
E003AHAuxiliary Generators12MO¥ -¥ -
E003AJWeight Handling Equipment (WHE)12MO¥ -¥ -
Facility Investment SUB TOTAL¥ -
1601000 Utility Management
E004 - CFAO Spec Item 3
E004AAUtility Operations Support12MO¥ -¥ -
E004ABUtility Infrastructure Condition Assessment (UICAP) Support12MO¥ -¥ -
Utility Management SUB TOTAL¥ -
1604000 Wastewater
E005 - CFAO Spec Item 3
E005AAOperation of Wastewater System12MO¥ -¥ -
Integrated Maintenance Program (IMP)
E005ABWastewater Treatment Plant12MO¥ -¥ -
E005ACSewage Pipelines12MO¥ -¥ -
E005ADManholes12MO¥ -¥ -
E005AEWet Wells12MO¥ -¥ -
E005AFWastewater Instrumentation Systems12MO¥ -¥ -
E005AGSewage Sump Pumps12MO¥ -¥ -
Wastewater SUB TOTAL¥ -
E006 - Demobilization
E006AAMobilization (Period of Performance, two months)1LS¥ -¥ -
Demobilization SUB TOTAL¥ -
TOTAL COST LINE ITEM 0003 RECURRING WORK & DEMOBILIZATION (E001 through E006)
(This amount entered into Schedule of Work, Item No. 0009 RECURRING WORK)¥ -
CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

OPT4 Non-recurring

CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

ATTACHMENT J-0200000-14

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/ CONTRACT # N40084-23-R-3600

EXHIBIT E - CLIN 9004

Line Item 0010 Non-Recurring Work - Option Period Four PROVIDE PRICES FOR - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs E700 through E709

ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
E700Labor Work for 0600000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order labor cost will be negotiated.N/ALSNot To Exceed (NTE)¥300,000
E701Material and Equipment Costs for 0600000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order material and equipment cost will be negotiated. Use with ELIN E700.N/ALSNTE¥2,200,000
E702Labor Work for 1501000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order labor cost will be negotiated.N/ALSNTE¥3,500,000
E703Material and Equipment Costs for 1501000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order material and equipment cost will be negotiated. Use with ELIN E702.N/ALSNTE¥1,500,000
E704Labor Work for 1502000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order labor cost will be negotiated.N/ALSNTE¥8,000,000
E705Material and Equipment Costs for 1502000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order material and equipment cost will be negotiated. Use with ELIN E704.N/ALSNTE¥9,500,000
E706Labor Work for 1601000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order labor cost will be negotiated.N/ALSNTE¥3,500,000
E707Material and Equipment Costs for 1601000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order material and equipment cost will be negotiated. Use with ELIN E706.N/ALSNTE¥1,500,000
E708Labor Work for 1604000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order labor cost will be negotiated.N/ALSNTE¥7,000,000
E709Material and Equipment Costs for 1604000 - MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order material and equipment cost will be negotiated. Use with ELIN E708.N/ALSNTE¥13,000,000
TOTAL NON-RECURRING WORK PRICE - E700 THROUGH E709¥50,000,000
CUI//FEDCON [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]

NAVFAC UOMs

FEDCON

ATTACHMENT J-0200000-14

NAVFAC UNITS OF MEASURE

ACAcreFRFramePDPad
AMAmpouleFTFootPGPackage
ATAssortmentFVFivePIPillow
AYAssemblyFYFiftyPMPlate
BABallGGGreat GrossPRPair
BDBundleGIGillPTPint
BEBaleGLGallonPXPellet
BFBoard FootGMGramPZPacket
BGBagGNGrainQTQuart
BKBookGPGroupRARation
BLBarrelGRGrossRDRound
BOBoltHDHundredRLReel
BQBriquetHFHundred FeetRMReam
BRBarHKHankRORoll
BTBottleHPHundred PoundsRXThousand Rounds
BXBoxHRHoursSBSquare Mile
CACartridgeHSHundred Square FeetSCSquare Centimeters
CBCarboyHWHundred WeightSDSkid
CCCubic CentimeterHYHundred YardsSESet
CDCubic YardINInchSFSquare Foot
CEConeJRJarSHSheet
CFCubic FootKGKilogramSISquare Inch
CGCentigramKMKilometerSKSkein
CICubic InchKRCaratSLSpool
CKCakeKTKitSMSquare Meter
CLCoilLBPoundSOShot
CMCentimeterLFLinear FootSPStrip
CNCanLGLengthSQSquare
COContainerLHLabor HoursSXStick
CUCurieLILiterSYSquare Yard
CYCylinderLMLinear MeterTCTruckload
CZCubic MeterLOLotTDTwenty-Four
DADaysLSLump SumTETen
DCDecagramLYLinear YardTFTwenty-Five
DEDecimeterMCThousand Cubic FeetTGGross Ton
DGDecigramMEMealTNTon
DLDeciliterMFThousand FeetTOTroy Ounce
DMDramMGMilligramTSThirty-Six
DODollarsMIMileTTTablet
DRDrumMLMilliliterTUTube
DWPennyweightMMMillimeterUNUnit
DZDozenMOMonthsUOMUnit of Measure
EAEachMRMeterUSUS U.S.P Unit
ENEach CollectionMXThousandVIVial
EXExposureNTENot to ExceedWKWeek
FDFoldOTOutfitYDYard
OZOunceYRYears
FEDCON