CLIN SUMMARY SHEET
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
| SCHEDULE OF WORK | | | |
| (TO BE COMPLETED AND SUBMITTED WITH THE OFFER) | | | |
| ITEM NO. | SUPPLIES/SERVICES | | AMOUNT |
| 0001 | RECURRING WORK (Base Period) | | |
| Price to perform Recurring work (includes Mobilization), for the 12-month Base Period, in accordance with all the terms of this contract. | ¥ | - |
| 0002 | NON-RECURRING (Base Period) | | | |
| Price to perform non-recurring work, for the 12-month Base Period, in accordance with all the terms of this contract. | NTE | ¥ | 50,000,000 |
| 0003 | RECURRING WORK (Option Period One) | | |
| Price to perform Recurring work, for the 12-month Option Period One, in accordance with all the terms of this contract. | ¥ | - |
| 0004 | NON-RECURRING (Option Period One) | | | |
| Price to perform non-recurring work, for the 12-month Option Period One, in accordance with all the terms of this contract. | NTE | ¥ | 50,000,000 |
| 0005 | RECURRING WORK (Option Period Two) | | |
| Price to perform Recurring work, for the 12-month Option Period Two, in accordance with all the terms of this contract. | ¥ | - |
| 0006 | NON-RECURRING (Option Period Two) | | | |
| Price to perform non-recurring work, for the 12-month Option Period Two, in accordance with all the terms of this contract. | NTE | ¥ | 50,000,000 |
| 0007 | RECURRING WORK (Option Period Three) | | |
| Price to perform Recurring work, for the 12-month Option Period Three, in accordance with all the terms of this contract. | ¥ | - |
| 0008 | NON-RECURRING (Option Period Three) | | | |
| Price to perform non-recurring work, for the 12-month Option Period Three, in accordance with all the terms of this contract. | NTE | ¥ | 50,000,000 |
| 0009 | RECURRING WORK (Option Period Four) | | |
| Price to perform Recurring work, for the 12-month Option Period Four, in accordance with all the terms of this contract. | ¥ | - |
| 0010 | NON-RECURRING (Option Period Four) | | | |
| Price to perform non-recurring work, for the 12-month Option Period Four, in accordance with all the terms of this contract. | NTE | ¥ | 50,000,000 |
TOTAL (CLINS 0001 THROUGH 0010) ¥ 250,000,000
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
| SCHEDULE OF WORK | | |
| (TO BE COMPLETED AND SUBMITTED WITH THE OFFER) | | |
| ITEM NO. | SUPPLIES/SERVICES | AMOUNT |
| 9000 | Exhibit Line Items (ELINS) Base Period | | |
| See Attachment J-0200000-14, Exhibit Line Item Numbers, Recurring and Non-Recurring Work | ¥ | 50,000,000 |
| 9001 | Exhibit Line Items (ELINS) Option Period One | | |
| See Attachment J-0200000-14, Exhibit Line Item Numbers, Recurring and Non-Recurring Work | ¥ | 50,000,000 |
| 9002 | Exhibit Line Items (ELINS) Option Period Two | | |
| See Attachment J-0200000-14, Exhibit Line Item Numbers, Recurring and Non-Recurring Work | ¥ | 50,000,000 |
| 9003 | Exhibit Line Items (ELINS) Option Period Three | | |
| See Attachment J-0200000-14, Exhibit Line Item Numbers, Recurring and Non-Recurring Work | ¥ | 50,000,000 |
| 9004 | Exhibit Line Items (ELINS) Option Period Four | | |
| See Attachment J-0200000-14, Exhibit Line Item Numbers, Recurring and Non-Recurring Work | ¥ | 50,000,000 |
TOTAL PRICE FOR CONTRACT LINE ITEMS 0001 THROUGH 0010 ¥ 250,000,000
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
Base Recurring
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-23-R-3600
EXHIBIT A - CLIN 9000 Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.
Line Item 0001 Recurring Work - Base Period
PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A006
| ELIN / | | | | | |
| Sub ELIN | | Description | Quantity | Unit of Issue | Unit Price | Total |
| | 0600000 - Port Operations | | | | |
| A001 - CFAO Spec Item 3 | | | | | | |
| A001 | AA | CHT Hook-up and Disconnects | 11 | MO | ¥ - | ¥ - |
| A001 | AB | CHT Hose Equipment Maintenance | 11 | MO | ¥ - | ¥ - |
| | Port Operations SUB TOTAL | | | | ¥ - |
| | 1501000 Facility Management | | | | |
| A002 - CFAO Spec Item 3 | | | | | | |
| A002 | AA | Infrastructure Condition Assessment Program (ICAP) Services | 9 | MO | ¥ - | ¥ - |
| | Facility Management SUB TOTAL | | | | ¥ - |
| | 1502000 Facility Investment | | | | |
| A003 - CFAO Spec Item 3 | | | | | | |
| | Integrated Maintenance Program (IMP) | | | | |
| A003 | AA | HVAC Systems | 9 | MO | ¥ - | ¥ - |
| A003 | AB | Fire Protection Systems | 9 | MO | ¥ - | ¥ - |
| A003 | AC | Lightning Arrestors and Grounding Devices | 9 | MO | ¥ - | ¥ - |
| A003 | AD | Roll-Up Doors | 9 | MO | ¥ - | ¥ - |
| A003 | AE | Rooftop Ventilation/Exhaust Ventilation Systems | 9 | MO | ¥ - | ¥ - |
| A003 | AF | Eye Wash Stations | 9 | MO | ¥ - | ¥ - |
| A003 | AG | Uninterruptible Power Systems (UPS) | 9 | MO | ¥ - | ¥ - |
| A003 | AH | Auxiliary Generators | 9 | MO | ¥ - | ¥ - |
| A003 | AJ | Weight Handling Equipment (WHE) | 9 | MO | ¥ - | ¥ - |
| | Facility Investment SUB TOTAL | | | | ¥ - |
| | 1601000 Utility Management | | | | |
| A004 - CFAO Spec Item 3 | | | | | | |
| A004 | AA | Utility Operations Support | 9 | MO | ¥ - | ¥ - |
| A004 | AB | Utility Infrastructure Condition Assessment (UICAP) Support | 9 | MO | ¥ - | ¥ - |
| | Utility Management SUB TOTAL | | | | ¥ - |
| | 1604000 Wastewater | | | | |
| A005 - CFAO Spec Item 3 | | | | | | |
| A005 | AA | Operation of Wastewater System | 9 | MO | ¥ - | ¥ - |
| | Integrated Maintenance Program (IMP) | | | | |
| A005 | AB | Wastewater Treatment Plant | 9 | MO | ¥ - | ¥ - |
| A005 | AC | Sewage Pipelines | 9 | MO | ¥ - | ¥ - |
| A005 | AD | Manholes | 9 | MO | ¥ - | ¥ - |
| A005 | AE | Wet Wells | 9 | MO | ¥ - | ¥ - |
| A005 | AF | Wastewater Instrumentation Systems | 9 | MO | ¥ - | ¥ - |
| A005 | AG | Sewage Sump Pumps | 9 | MO | ¥ - | ¥ - |
| | Wastewater SUB TOTAL | | | | ¥ - |
| A006 - Mobilization | | | | | | |
| A006 | AA | Mobilization (Period of Performance, approximately two - three months) | 1 | LS | ¥ - | ¥ - |
| | Mobilization SUB TOTAL | | | | ¥ - |
| | TOTAL COST LINE ITEM 0001 RECURRING WORK & MOBILIZATION (A001 through A006) | |
| (This amount entered into Schedule of Work, Item No. 0001 RECURRING WORK) | | | ¥ - |
| CUI//FEDCON [when filled in] | | |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] | | |
Base Non-recurring
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/ CONTRACT # N40084-23-R-3600
EXHIBIT A - CLIN 9000
Line Item 0002 Non-Recurring Work - Base Period PROVIDE PRICES FOR - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs A700 through A709
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| A700 | Labor Work for 0600000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order labor cost will be negotiated. | N/A | LS | Not To Exceed (NTE) | ¥ | 300,000 |
| A701 | Material and Equipment Costs for 0600000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order material and equipment cost will be negotiated. Use with ELIN A700. | N/A | LS | NTE | ¥ | 2,200,000 |
| A702 | Labor Work for 1501000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 3,500,000 |
| A703 | Material and Equipment Costs for 1501000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order material and equipment cost will be negotiated. Use with ELIN A702. | N/A | LS | NTE | ¥ | 1,500,000 |
| A704 | Labor Work for 1502000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 8,000,000 |
| A705 | Material and Equipment Costs for 1502000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order material and equipment cost will be negotiated. Use with ELIN A704. | N/A | LS | NTE | ¥ | 9,500,000 |
| A706 | Labor Work for 1601000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 3,500,000 |
| A707 | Material and Equipment Costs for 1601000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order material and equipment cost will be negotiated. Use with ELIN A706. | N/A | LS | NTE | ¥ | 1,500,000 |
| A708 | Labor Work for 1604000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 7,000,000 |
| A709 | Material and Equipment Costs for 1604000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order material and equipment cost will be negotiated. Use with ELIN A708. | N/A | LS | NTE | ¥ | 13,000,000 |
| TOTAL NON-RECURRING WORK PRICE - A700 THROUGH A709 | ¥ | 50,000,000 |
| CUI//FEDCON [when filled in] | | | |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] | | | |
OPT1 Recurring
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-23-R-3600
EXHIBIT B - CLIN 9001 Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.
Line Item 0003 Recurring Work - Option Period One
PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 through B005
| ELIN / | | | | | |
| Sub ELIN | | Description | Quantity | Unit of Issue | Unit Price | Total |
| | 0600000 - Port Operations | | | | |
| B001 - CFAO Spec Item 3 | | | | | | |
| B001 | AA | CHT Hook-up and Disconnects | 12 | MO | ¥ - | ¥ - |
| B001 | AB | CHT Hose Equipment Maintenance | 12 | MO | ¥ - | ¥ - |
| | Port Operations SUB TOTAL | | | | ¥ - |
| | 1501000 Facility Management | | | | |
| B002 - CFAO Spec Item 3 | | | | | | |
| B002 | AA | Infrastructure Condition Assessment Program (ICAP) Services | 12 | MO | ¥ - | ¥ - |
| | Facility Management SUB TOTAL | | | | ¥ - |
| | 1502000 Facility Investment | | | | |
| B003 - CFAO Spec Item 3 | | | | | | |
| | Integrated Maintenance Program (IMP) | | | | |
| B003 | AA | HVAC Systems | 12 | MO | ¥ - | ¥ - |
| B003 | AB | Fire Protection Systems | 12 | MO | ¥ - | ¥ - |
| B003 | AC | Lightning Arrestors and Grounding Devices | 12 | MO | ¥ - | ¥ - |
| B003 | AD | Roll-Up Doors | 12 | MO | ¥ - | ¥ - |
| B003 | AE | Rooftop Ventilation/Exhaust Ventilation Systems | 12 | MO | ¥ - | ¥ - |
| B003 | AF | Eye Wash Stations | 12 | MO | ¥ - | ¥ - |
| B003 | AG | Uninterruptible Power Systems (UPS) | 12 | MO | ¥ - | ¥ - |
| B003 | AH | Auxiliary Generators | 12 | MO | ¥ - | ¥ - |
| B003 | AJ | Weight Handling Equipment (WHE) | 12 | MO | ¥ - | ¥ - |
| | Facility Investment SUB TOTAL | | | | ¥ - |
| | 1601000 Utility Management | | | | |
| B004 - CFAO Spec Item 3 | | | | | | |
| B004 | AA | Utility Operations Support | 12 | MO | ¥ - | ¥ - |
| B004 | AB | Utility Infrastructure Condition Assessment (UICAP) Support | 12 | MO | ¥ - | ¥ - |
| | Utility Management SUB TOTAL | | | | ¥ - |
| | 1604000 Wastewater | | | | |
| B005 - CFAO Spec Item 3 | | | | | | |
| B005 | AA | Operation of Wastewater System | 12 | MO | ¥ - | ¥ - |
| | Integrated Maintenance Program (IMP) | | | | |
| B005 | AB | Wastewater Treatment Plant | 12 | MO | ¥ - | ¥ - |
| B005 | AC | Sewage Pipelines | 12 | MO | ¥ - | ¥ - |
| B005 | AD | Manholes | 12 | MO | ¥ - | ¥ - |
| B005 | AE | Wet Wells | 12 | MO | ¥ - | ¥ - |
| B005 | AF | Wastewater Instrumentation Systems | 12 | MO | ¥ - | ¥ - |
| B005 | AG | Sewage Sump Pumps | 12 | MO | ¥ - | ¥ - |
| | Wastewater SUB TOTAL | | | | ¥ - |
| | TOTAL COST LINE ITEM 0003 RECURRING WORK (B001 through B005) | |
| (This amount entered into Schedule of Work, Item No. 0003 RECURRING WORK) | | | ¥ - |
| CUI//FEDCON [when filled in] | | |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] | | |
OPT1 Non-recurring
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/ CONTRACT # N40084-23-R-3600
EXHIBIT B - CLIN 9001
Line Item 0004 Non-Recurring Work - Option Period One PROVIDE PRICES FOR - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs B700 through B709
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| B700 | Labor Work for 0600000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order labor cost will be negotiated. | N/A | LS | Not To Exceed (NTE) | ¥ | 300,000 |
| B701 | Material and Equipment Costs for 0600000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order material and equipment cost will be negotiated. Use with ELIN B700. | N/A | LS | NTE | ¥ | 2,200,000 |
| 0 | | | | | | | |
| B702 | Labor Work for 1501000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 3,500,000 |
| B703 | Material and Equipment Costs for 1501000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order material and equipment cost will be negotiated. Use with ELIN B702. | N/A | LS | NTE | ¥ | 1,500,000 |
| B704 | Labor Work for 1502000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 8,000,000 |
| B705 | Material and Equipment Costs for 1502000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order material and equipment cost will be negotiated. Use with ELIN B704. | N/A | LS | NTE | ¥ | 9,500,000 |
| B706 | Labor Work for 1601000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 3,500,000 |
| B707 | Material and Equipment Costs for 1601000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order material and equipment cost will be negotiated. Use with ELIN B706. | N/A | LS | NTE | ¥ | 1,500,000 |
| B708 | Labor Work for 1604000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 7,000,000 |
| B709 | Material and Equipment Costs for 1604000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order material and equipment cost will be negotiated. Use with ELIN B708. | N/A | LS | NTE | ¥ | 13,000,000 |
| TOTAL NON-RECURRING WORK PRICE - B700 THROUGH B709 | ¥ | 50,000,000 |
| CUI//FEDCON [when filled in] | | | |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] | | | |
OPT2 Recurring
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-23-R-3600
EXHIBIT C - CLIN 9002 Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.
Line Item 0005 Recurring Work - Option Period Two
PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs C001 through C005
| ELIN / | | | | | |
| Sub ELIN | | Description | Quantity | Unit of Issue | Unit Price | Total |
| | 0600000 - Port Operations | | | | |
| C001 - CFAO Spec Item 3 | | | | | | |
| C001 | AA | CHT Hook-up and Disconnects | 12 | MO | ¥ - | ¥ - |
| C001 | AB | CHT Hose Equipment Maintenance | 12 | MO | ¥ - | ¥ - |
| | Port Operations SUB TOTAL | | | | ¥ - |
| | 1501000 Facility Management | | | | |
| C002 - CFAO Spec Item 3 | | | | | | |
| C002 | AA | Infrastructure Condition Assessment Program (ICAP) Services | 12 | MO | ¥ - | ¥ - |
| | Facility Management SUB TOTAL | | | | ¥ - |
| | 1502000 Facility Investment | | | | |
| C003 - CFAO Spec Item 3 | | | | | | |
| | Integrated Maintenance Program (IMP) | | | | |
| C003 | AA | HVAC Systems | 12 | MO | ¥ - | ¥ - |
| C003 | AB | Fire Protection Systems | 12 | MO | ¥ - | ¥ - |
| C003 | AC | Lightning Arrestors and Grounding Devices | 12 | MO | ¥ - | ¥ - |
| C003 | AD | Roll-Up Doors | 12 | MO | ¥ - | ¥ - |
| C003 | AE | Rooftop Ventilation/Exhaust Ventilation Systems | 12 | MO | ¥ - | ¥ - |
| C003 | AF | Eye Wash Stations | 12 | MO | ¥ - | ¥ - |
| C003 | AG | Uninterruptible Power Systems (UPS) | 12 | MO | ¥ - | ¥ - |
| C003 | AH | Auxiliary Generators | 12 | MO | ¥ - | ¥ - |
| C003 | AJ | Weight Handling Equipment (WHE) | 12 | MO | ¥ - | ¥ - |
| | Facility Investment SUB TOTAL | | | | ¥ - |
| | 1601000 Utility Management | | | | |
| C004 - CFAO Spec Item 3 | | | | | | |
| C004 | AA | Utility Operations Support | 12 | MO | ¥ - | ¥ - |
| C004 | AB | Utility Infrastructure Condition Assessment (UICAP) Support | 12 | MO | ¥ - | ¥ - |
| | Utility Management SUB TOTAL | | | | ¥ - |
| | 1604000 Wastewater | | | | |
| C005 - CFAO Spec Item 3 | | | | | | |
| C005 | AA | Operation of Wastewater System | 12 | MO | ¥ - | ¥ - |
| | Integrated Maintenance Program (IMP) | | | | |
| C005 | AB | Wastewater Treatment Plant | 12 | MO | ¥ - | ¥ - |
| C005 | AC | Sewage Pipelines | 12 | MO | ¥ - | ¥ - |
| C005 | AD | Manholes | 12 | MO | ¥ - | ¥ - |
| C005 | AE | Wet Wells | 12 | MO | ¥ - | ¥ - |
| C005 | AF | Wastewater Instrumentation Systems | 12 | MO | ¥ - | ¥ - |
| C005 | AG | Sewage Sump Pumps | 12 | MO | ¥ - | ¥ - |
| | Wastewater SUB TOTAL | | | | ¥ - |
| | TOTAL COST LINE ITEM 0003 RECURRING WORK (C001 through C005) | |
| (This amount entered into Schedule of Work, Item No. 0005 RECURRING WORK) | | | ¥ - |
| CUI//FEDCON [when filled in] | | |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] | | |
OPT2 Non-recurring
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/ CONTRACT # N40084-23-R-3600
EXHIBIT C - CLIN 9002
Line Item 0006 Non-Recurring Work - Option Period Two PROVIDE PRICES FOR - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs C700 through C709
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| C700 | Labor Work for 0600000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order labor cost will be negotiated. | N/A | LS | Not To Exceed (NTE) | ¥ | 300,000 |
| C701 | Material and Equipment Costs for 0600000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order material and equipment cost will be negotiated. Use with ELIN C700. | N/A | LS | NTE | ¥ | 2,200,000 |
| C702 | Labor Work for 1501000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 3,500,000 |
| C703 | Material and Equipment Costs for 1501000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order material and equipment cost will be negotiated. Use with ELIN C702. | N/A | LS | NTE | ¥ | 1,500,000 |
| C704 | Labor Work for 1502000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 8,000,000 |
| C705 | Material and Equipment Costs for 1502000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order material and equipment cost will be negotiated. Use with ELIN C704. | N/A | LS | NTE | ¥ | 9,500,000 |
| C706 | Labor Work for 1601000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 3,500,000 |
| C707 | Material and Equipment Costs for 1601000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order material and equipment cost will be negotiated. Use with ELIN C706. | N/A | LS | NTE | ¥ | 1,500,000 |
| C708 | Labor Work for 1604000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 7,000,000 |
| C709 | Material and Equipment Costs for 1604000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order material and equipment cost will be negotiated. Use with ELIN C708. | N/A | LS | NTE | ¥ | 13,000,000 |
| TOTAL NON-RECURRING WORK PRICE - C700 THROUGH C709 | ¥ | 50,000,000 |
| CUI//FEDCON [when filled in] | | | |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] | | | |
OPT3 Recurring
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-23-R-3600
EXHIBIT D - CLIN 9003 Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.
Line Item 0007 Recurring Work - Option Period Three
PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs D001 through D005
| ELIN / | | | | | |
| Sub ELIN | | Description | Quantity | Unit of Issue | Unit Price | Total |
| | 0600000 - Port Operations | | | | |
| D001 - CFAO Spec Item 3 | | | | | | |
| D001 | AA | CHT Hook-up and Disconnects | 12 | MO | ¥ - | ¥ - |
| D001 | AB | CHT Hose Equipment Maintenance | 12 | MO | ¥ - | ¥ - |
| | Port Operations SUB TOTAL | | | | ¥ - |
| | 1501000 Facility Management | | | | |
| D002 - CFAO Spec Item 3 | | | | | | |
| D002 | AA | Infrastructure Condition Assessment Program (ICAP) Services | 12 | MO | ¥ - | ¥ - |
| | Facility Management SUB TOTAL | | | | ¥ - |
| | 1502000 Facility Investment | | | | |
| D003 - CFAO Spec Item 3 | | | | | | |
| | Integrated Maintenance Program (IMP) | | | | |
| D003 | AA | HVAC Systems | 12 | MO | ¥ - | ¥ - |
| D003 | AB | Fire Protection Systems | 12 | MO | ¥ - | ¥ - |
| D003 | AC | Lightning Arrestors and Grounding Devices | 12 | MO | ¥ - | ¥ - |
| D003 | AD | Roll-Up Doors | 12 | MO | ¥ - | ¥ - |
| D003 | AE | Rooftop Ventilation/ Exhaust Ventilation Systems | 12 | MO | ¥ - | ¥ - |
| D003 | AF | Eye Wash Stations | 12 | MO | ¥ - | ¥ - |
| D003 | AG | Uninterruptible Power Systems (UPS) | 12 | MO | ¥ - | ¥ - |
| D003 | AH | Auxiliary Generators | 12 | MO | ¥ - | ¥ - |
| D003 | AJ | Weight Handling Equipment (WHE) | 12 | MO | ¥ - | ¥ - |
| | Facility Investment SUB TOTAL | | | | ¥ - |
| | 1601000 Utility Management | | | | |
| D004 - CFAO Spec Item 3 | | | | | | |
| D004 | AA | Utility Operations Support | 12 | MO | ¥ - | ¥ - |
| D004 | AB | Utility Infrastructure Condition Assessment (UICAP) Support | 12 | MO | ¥ - | ¥ - |
| | Utility Management SUB TOTAL | | | | ¥ - |
| | 1604000 Wastewater | | | | |
| D005 - CFAO Spec Item 3 | | | | | | |
| D005 | AA | Operation of Wastewater System | 12 | MO | ¥ - | ¥ - |
| | Integrated Maintenance Program (IMP) | | | | |
| D005 | AB | Wastewater Treatment Plant | 12 | MO | ¥ - | ¥ - |
| D005 | AC | Sewage Pipelines | 12 | MO | ¥ - | ¥ - |
| D005 | AD | Manholes | 12 | MO | ¥ - | ¥ - |
| D005 | AE | Wet Wells | 12 | MO | ¥ - | ¥ - |
| D005 | AF | Wastewater Instrumentation Systems | 12 | MO | ¥ - | ¥ - |
| D005 | AG | Sewage Sump Pumps | 12 | MO | ¥ - | ¥ - |
| | Wastewater SUB TOTAL | | | | ¥ - |
| | TOTAL COST LINE ITEM 0003 RECURRING WORK (D001 through D005) | |
| (This amount entered into Schedule of Work, Item No. 0007 RECURRING WORK) | | | ¥ - |
| CUI//FEDCON [when filled in] | | |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] | | |
OPT3 Non-recurring
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/ CONTRACT # N40084-23-R-3600
EXHIBIT D - CLIN 9003
Line Item 0008 Non-Recurring Work - Option Period Three PROVIDE PRICES FOR - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs D700 through D709
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| D700 | Labor Work for 0600000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order labor cost will be negotiated. | N/A | LS | Not To Exceed (NTE) | ¥ | 300,000 |
| D701 | Material and Equipment Costs for 0600000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order material and equipment cost will be negotiated. Use with ELIN D700. | N/A | LS | NTE | ¥ | 2,200,000 |
| D702 | Labor Work for 1501000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 3,500,000 |
| D703 | Material and Equipment Costs for 1501000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order material and equipment cost will be negotiated. Use with ELIN D702. | N/A | LS | NTE | ¥ | 1,500,000 |
| D704 | Labor Work for 1502000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 8,000,000 |
| D705 | Material and Equipment Costs for 1502000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order material and equipment cost will be negotiated. Use with ELIN D704. | N/A | LS | NTE | ¥ | 9,500,000 |
| D706 | Labor Work for 1601000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 3,500,000 |
| D707 | Material and Equipment Costs for 1601000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order material and equipment cost will be negotiated. Use with ELIN D706. | N/A | LS | NTE | ¥ | 1,500,000 |
| D708 | Labor Work for 1604000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 7,000,000 |
| D709 | Material and Equipment Costs for 1604000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order material and equipment cost will be negotiated. Use with ELIN D708. | N/A | LS | NTE | ¥ | 13,000,000 |
| TOTAL NON-RECURRING WORK PRICE - D700 THROUGH D709 | ¥ | 50,000,000 |
| CUI//FEDCON [when filled in] | | | |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] | | | |
OPT4 Recurring
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-23-R-3600
EXHIBIT E - CLIN 9004 Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.
Line Item 0009 Recurring Work - Option Period Four
PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs E001 through E006
| ELIN / | | | | | |
| Sub ELIN | | Description | Quantity | Unit of Issue | Unit Price | Total |
| | 0600000 - Port Operations | | | | |
| E001 - CFAO Spec Item 3 | | | | | | |
| E001 | AA | CHT Hook-up and Disconnects | 12 | MO | ¥ - | ¥ - |
| E001 | AB | CHT Hose Equipment Maintenance | 12 | MO | ¥ - | ¥ - |
| | Port Operations SUB TOTAL | | | | ¥ - |
| | 1501000 Facility Management | | | | |
| E002 - CFAO Spec Item 3 | | | | | | |
| E002 | AA | Infrastructure Condition Assessment Program (ICAP) Services | 12 | MO | ¥ - | ¥ - |
| | Facility Management SUB TOTAL | | | | ¥ - |
| | 1502000 Facility Investment | | | | |
| E003 - CFAO Spec Item 3 | | | | | | |
| | Integrated Maintenance Program (IMP) | | | | |
| E003 | AA | HVAC Systems | 12 | MO | ¥ - | ¥ - |
| E003 | AB | Fire Protection Systems | 12 | MO | ¥ - | ¥ - |
| E003 | AC | Lightning Arrestors and Grounding Devices | 12 | MO | ¥ - | ¥ - |
| E003 | AD | Roll-Up Doors | 12 | MO | ¥ - | ¥ - |
| E003 | AE | Rooftop Ventilation/ Exhaust Ventilation Systems | 12 | MO | ¥ - | ¥ - |
| E003 | AF | Eye Wash Stations | 12 | MO | ¥ - | ¥ - |
| E003 | AG | Uninterruptible Power Systems (UPS) | 12 | MO | ¥ - | ¥ - |
| E003 | AH | Auxiliary Generators | 12 | MO | ¥ - | ¥ - |
| E003 | AJ | Weight Handling Equipment (WHE) | 12 | MO | ¥ - | ¥ - |
| | Facility Investment SUB TOTAL | | | | ¥ - |
| | 1601000 Utility Management | | | | |
| E004 - CFAO Spec Item 3 | | | | | | |
| E004 | AA | Utility Operations Support | 12 | MO | ¥ - | ¥ - |
| E004 | AB | Utility Infrastructure Condition Assessment (UICAP) Support | 12 | MO | ¥ - | ¥ - |
| | Utility Management SUB TOTAL | | | | ¥ - |
| | 1604000 Wastewater | | | | |
| E005 - CFAO Spec Item 3 | | | | | | |
| E005 | AA | Operation of Wastewater System | 12 | MO | ¥ - | ¥ - |
| | Integrated Maintenance Program (IMP) | | | | |
| E005 | AB | Wastewater Treatment Plant | 12 | MO | ¥ - | ¥ - |
| E005 | AC | Sewage Pipelines | 12 | MO | ¥ - | ¥ - |
| E005 | AD | Manholes | 12 | MO | ¥ - | ¥ - |
| E005 | AE | Wet Wells | 12 | MO | ¥ - | ¥ - |
| E005 | AF | Wastewater Instrumentation Systems | 12 | MO | ¥ - | ¥ - |
| E005 | AG | Sewage Sump Pumps | 12 | MO | ¥ - | ¥ - |
| | Wastewater SUB TOTAL | | | | ¥ - |
| E006 - Demobilization | | | | | | |
| E006 | AA | Mobilization (Period of Performance, two months) | 1 | LS | ¥ - | ¥ - |
| | Demobilization SUB TOTAL | | | | ¥ - |
| | TOTAL COST LINE ITEM 0003 RECURRING WORK & DEMOBILIZATION (E001 through E006) | |
| (This amount entered into Schedule of Work, Item No. 0009 RECURRING WORK) | | | ¥ - |
| CUI//FEDCON [when filled in] | | |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] | | |
OPT4 Non-recurring
| CUI//FEDCON [when filled in] |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] |
ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/ CONTRACT # N40084-23-R-3600
EXHIBIT E - CLIN 9004
Line Item 0010 Non-Recurring Work - Option Period Four PROVIDE PRICES FOR - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs E700 through E709
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| E700 | Labor Work for 0600000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order labor cost will be negotiated. | N/A | LS | Not To Exceed (NTE) | ¥ | 300,000 |
| E701 | Material and Equipment Costs for 0600000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 0600000. Each task order material and equipment cost will be negotiated. Use with ELIN E700. | N/A | LS | NTE | ¥ | 2,200,000 |
| E702 | Labor Work for 1501000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 3,500,000 |
| E703 | Material and Equipment Costs for 1501000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1501000. Each task order material and equipment cost will be negotiated. Use with ELIN E702. | N/A | LS | NTE | ¥ | 1,500,000 |
| E704 | Labor Work for 1502000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 8,000,000 |
| E705 | Material and Equipment Costs for 1502000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order material and equipment cost will be negotiated. Use with ELIN E704. | N/A | LS | NTE | ¥ | 9,500,000 |
| E706 | Labor Work for 1601000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 3,500,000 |
| E707 | Material and Equipment Costs for 1601000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order material and equipment cost will be negotiated. Use with ELIN E706. | N/A | LS | NTE | ¥ | 1,500,000 |
| E708 | Labor Work for 1604000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order labor cost will be negotiated. | N/A | LS | NTE | ¥ | 7,000,000 |
| E709 | Material and Equipment Costs for 1604000 - MUST BE NEGOTIATED BY KO. | Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order material and equipment cost will be negotiated. Use with ELIN E708. | N/A | LS | NTE | ¥ | 13,000,000 |
| TOTAL NON-RECURRING WORK PRICE - E700 THROUGH E709 | ¥ | 50,000,000 |
| CUI//FEDCON [when filled in] | | | |
| Source Selection Information--See FAR 2.10 and 3.104 [when filled in] | | | |
NAVFAC UOMs
FEDCON
ATTACHMENT J-0200000-14
NAVFAC UNITS OF MEASURE
| AC | Acre | FR | Frame | PD | Pad |
| AM | Ampoule | FT | Foot | PG | Package |
| AT | Assortment | FV | Five | PI | Pillow |
| AY | Assembly | FY | Fifty | PM | Plate |
| BA | Ball | GG | Great Gross | PR | Pair |
| BD | Bundle | GI | Gill | PT | Pint |
| BE | Bale | GL | Gallon | PX | Pellet |
| BF | Board Foot | GM | Gram | PZ | Packet |
| BG | Bag | GN | Grain | QT | Quart |
| BK | Book | GP | Group | RA | Ration |
| BL | Barrel | GR | Gross | RD | Round |
| BO | Bolt | HD | Hundred | RL | Reel |
| BQ | Briquet | HF | Hundred Feet | RM | Ream |
| BR | Bar | HK | Hank | RO | Roll |
| BT | Bottle | HP | Hundred Pounds | RX | Thousand Rounds |
| BX | Box | HR | Hours | SB | Square Mile |
| CA | Cartridge | HS | Hundred Square Feet | SC | Square Centimeters |
| CB | Carboy | HW | Hundred Weight | SD | Skid |
| CC | Cubic Centimeter | HY | Hundred Yards | SE | Set |
| CD | Cubic Yard | IN | Inch | SF | Square Foot |
| CE | Cone | JR | Jar | SH | Sheet |
| CF | Cubic Foot | KG | Kilogram | SI | Square Inch |
| CG | Centigram | KM | Kilometer | SK | Skein |
| CI | Cubic Inch | KR | Carat | SL | Spool |
| CK | Cake | KT | Kit | SM | Square Meter |
| CL | Coil | LB | Pound | SO | Shot |
| CM | Centimeter | LF | Linear Foot | SP | Strip |
| CN | Can | LG | Length | SQ | Square |
| CO | Container | LH | Labor Hours | SX | Stick |
| CU | Curie | LI | Liter | SY | Square Yard |
| CY | Cylinder | LM | Linear Meter | TC | Truckload |
| CZ | Cubic Meter | LO | Lot | TD | Twenty-Four |
| DA | Days | LS | Lump Sum | TE | Ten |
| DC | Decagram | LY | Linear Yard | TF | Twenty-Five |
| DE | Decimeter | MC | Thousand Cubic Feet | TG | Gross Ton |
| DG | Decigram | ME | Meal | TN | Ton |
| DL | Deciliter | MF | Thousand Feet | TO | Troy Ounce |
| DM | Dram | MG | Milligram | TS | Thirty-Six |
| DO | Dollars | MI | Mile | TT | Tablet |
| DR | Drum | ML | Milliliter | TU | Tube |
| DW | Pennyweight | MM | Millimeter | UN | Unit |
| DZ | Dozen | MO | Months | UOM | Unit of Measure |
| EA | Each | MR | Meter | US | US U.S.P Unit |
| EN | Each Collection | MX | Thousand | VI | Vial |
| EX | Exposure | NTE | Not to Exceed | WK | Week |
| FD | Fold | OT | Outfit | YD | Yard |
| | OZ | Ounce | YR | Years |
| FEDCON | | | | | |