This document is an Infection Control Risk Assessment and Permit form used to evaluate and control infection risks during construction or maintenance work in healthcare facilities.

The form establishes a four-tier classification system (Types A through D) based on project scope and dust generation, combined with four risk group categories (Low, Medium, Medium High, and Highest) based on work location. Type A projects involve inspection and non-invasive activities with minimal dust, while Type D encompasses major demolition and new construction requiring consecutive work shifts. Risk groups range from office and storage areas (Low Risk) to operating rooms, intensive care units, and sterile compounding areas (Highest Risk). The form requires users to determine the appropriate class level (I through IV) by cross-referencing project type with risk group location, which then dictates the specific infection control protocols required.

Each class level specifies detailed control measures: Class I requires minimizing dust and replacing displaced ceiling tiles; Class II mandates water misting, sealing doors and vents, HVAC isolation, and HEPA vacuuming; Class III adds negative air pressure maintenance and anteroom requirements; and Class IV represents the most stringent protocols, including mandatory shoe covers, protective coveralls, HEPA filtration, and Infection Control inspection before barrier removal. The form requires identification of adjacent high-risk areas and specifies whether the permit must be posted onsite, with signature lines for both the permit requester and Infection Control authorization.

View the file

Other files

File Type Posted
Attachment 2 - Price Schedule_v2.xlsx XLSX spreadsheet
QnA_v2.docx DOCX document
QnA.docx DOCX document
Attachment 1c - Floorplans Labeled.pdf PDF
Attachment 1e - Points List.pdf PDF
Attachment 3 - Wage Determination.pdf PDF
Attachment 2 - Price Schedule.xlsx XLSX spreadsheet
Attachment 1b - FACP Report.pdf PDF
Synopsis.pdf PDF
Attachment 1a - Campus Buildings.pdf PDF
Attachment 4 - IHS Indian Economic Enterprise Representation form.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

Infection Control Risk Assessment and Permit

Work Location/Description:

Start Date End Date

Project Manager Name / Phone Number :

TYPE A:

TYPE B:

TYPE C:

TYPE D:

Low Risk

Medium Risk

High Risk

Highest Risk

Identify Any Adjacent High Risk Areas:

Above Below Front Behind Lateral NA

CLASS 1 1 Minimize raising dust from construction operations 2 Immediately replace any ceiling tile displaced for visual inspection.

CLASS II 1 Minimize raising dust by water misting work surfaces to control dust while cutting.

2 Seal unused doors with duct tape.

3 Block off and seal air vents with plastic or impervious material.

4 Wipe surfaces with cleaner/disinfectant.

5 Isolate HVAC system in areas where work is being performed

6 Contain construction waste prior to transport in tightly covered containers.

7 Wet mop and/or vacuum with HEPA-filtered vacuum prior to leaving area.

8 Remove critical barrier(s) carefully to minimize spread of dirt/debris.

9 Use hospital-approved disinfectant 10 Place dust mat at entrance and exit of work area.

11 Restore HVAC when work completed.

CLASS III 1 Isolate HVAC system in area of work to prevent contamination of the duct system.

2 Complete all critical barriers or implement control cube or other method prior to work.

3 Maintain negative air pressure within work environment with HEPA-equipment.

4 Do not remove barriers from site until completed project is checked by infection Control.

5 Environmental Services thoroughly cleans.

6 Vacuum work with HEPA-filtered vacuum.

7 Wet mop with hospital approved cleaner/disinfectant.

8 Remove barrier materials carefully to minimize spread of dirt/debris.

9 Contain construction waste prior to transport in tightly covered containers.

10 Cover transport receptacles or carts.

11 Tape coverings.

12 When complete, restore HVAC system where work was performed.

CLASS IV 1 Isolate HVAC system in work area to prevent contamination of duct system.

2 Complete all critical barriers or use control cube method prior to start of construction.

3 Maintain negative air pressure within work site – utilizing HEPA-equipped air filtration units.

4 Seal holes, pipes, conduits, and punctures.

5 Construct anteroom and require all personnel to pass through this room so they can be vacuumed off using a HEPA vacuum cleaner before leaving work site, or wear protective paper coveralls (bunny suit) that is removed each time leaving the work site.

6 Require all personnel entering work site to wear shoe covers.

7 Do not remove barriers from work site until project is checked by Infection Control; and is thoroughly cleaned by environmental services.

8 Vacuum work area with HEPA-filtered vacuums.

9 Wet mop with hospital–approved disinfectant.

10 Remove barrier(s) carefully to minimize spread of dirt/debris associated with construction.

11 Contain construction waste prior to transport in tightly covered containers.

12 Cover transport receptacles or cart.

13 Tape coverings.

14 At completion, restore HVAC system where work was performed.

Is permit required to be posted onsite? _________YES _________NO

Permit Requested By Signature / Date Infection Control Signature / Date

2 | P a g e

Class Determination

RISK GROUP TYPE A TYPE B TYPE C TYPE D

LOW Risk Class 1 Class II Class II Class III/IV

MEDIUM Risk Class 1 Class II Class III Class IV

HIGH Risk Class 1 Class II Class III/IV Class IV

HIGHEST Risk Class II Class III/IV Class III/IV Class IV

Risk Groups

Low Risk

Office areas, Maintenance, Housekeeping, Storage Areas, Stairwells, Storage buildings, Warehouse, Library, Meeting Rooms, Staff Lounges, Empty Patient Rooms

Medium Risk Clinical Areas (Not Otherwise Listed), Outpatient Services (Not Otherwise Listed), Physical Therapy, Radiology, Dental, Behavioral Health, Same Day Surgery, Cafeteria, Snack Bar

Medium High Risk

Emergency Room, Laboratories, Pharmacy, Occupied Patient Rooms, Inpatient Departments, Food Preparation Areas, Nursery, PACU, Above Ceiling Work in Open Interstitial Space within 100 Linear Feet of Group III/IV, Labor and Delivery, Medication Rooms.

Highest Risk Sterile Areas, Segregated Compound Area (IV Room), Containment Segregated Compounding Area (Chemo), Airborne Isolation, Sterile Supply, Operating Rooms, C- Section Operating Rooms, Endoscopy, Intensive Care, Oncology Infusion.

Project Type

TYPE A Inspection and non-invasive activities

Removal of ceiling tiles for visual inspection only ( limited to one tile per 50 square feet)

Painting, not sanding

Wallcovering, electrical trim work, minor plumbing, and activities that do not general dust or require cutting of walls or access to ceiling other than for visual inspection

TYPE B Small-scale, short duration activities that create minimal dust

Installation of telephone and computer cabling

Access to chase spaces

Cutting of walls or ceiling where dust migration can be controlled

TYPE C Work that generates moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Sanding of walls for painting or wall coverings

Removal of floor covering, ceiling tiles, and case work

New wall construction

Minor duct work or electrical work above ceiling

Major cabling activities

Activities that cannot be completed in a single work shift

TYPE D Major demolition and construction projects

Activities that require consecutive work shifts

Required heavy demolition or removal of a complete cabling system

New Construction

Untitled
Untitled
Untitled
Work LocationDescription:
Start Date:
End Date:
Project Manager Name Phone Number Row1:
fill_11:
fill_12:
fill_6:
CLASS 1:
1 Minimize raising dust from construction operations 2 Immediately replace any ceiling tile displaced for visual inspection:
CLASS II:
CLASS III:
CLASS IV:
YES:
NO:
undefined:
RISK GROUP:
TYPE A:
TYPE B:
TYPE C:
TYPE D:
LOW Risk:
Class 1:
Class II:
Class II_2:
Class IIIIV:
Class 1_2:
Class II_3:
Class III:
Class IV:
HIGH Risk:
Class 1_3:
Class II_4:
Class IV_2:
Class II_5:
Class IIIIV_3:
Class IIIIV_4:
Class IV_3:
Low Risk:
Medium Risk:
Medium High Risk:
Highest Risk:
TYPE A_2:
TYPE B_2:
TYPE C_2:
TYPE D_2:
2 P a g e:
Text1:
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box5: Off
Check Box18: Off
Check Box100: Off
Check Box98: Off
Check Box99: Off
Check Box97: Off
Check Box96: Off
Check Box95: Off
Check Box94: Off
Check Box93: Off
Check Box92: Off
Check Box91: Off
Check Box90: Off
Check Box89: Off
Check Box87: Off
Check Box86: Off
Check box85: Off
Check Box84: Off
Check Box83: Off
Check Box82: Off
Check Box81: Off
Check Box80: Off
Check Box79: Off
Check Box78: Off
Check Box77: Off
Check Box76: Off
Check Box75: Off
Check Box74: Off
Check Box73: Off
Check Box72: Off
71:
Check Box70: Off
Check Box69: Off
Check Box68: Off
Check Box67: Off
Check Box66: Off

File details come from the government source that posted it. Updated .