This is a Self-Scoring Matrix for a federal solicitation (FA557025R0001) for RAF Fairford Fuels and Marshalling Services. The matrix is a comprehensive scoring document that allows offerors to self-evaluate their qualifications across five key categories: Relevant Marshalling Services Experience, Relevant Fuels Experience, Certifications/Innovation, Staffing, and Geographic Expertise. The maximum possible points are 19,400, with a minimum score requirement of 17,000 points.
The solicitation requires a contractor to provide operations and maintenance services for fuel storage facilities, hydrant facilities, fuels laboratory, fuel servicing center, and aircraft marshalling at RAF Fairford. Specific responsibilities include managing fuel storage, receipt, transfer, sampling, testing, and accountability of fuels and cryogenic products for the 510 CSW. The self-scoring matrix evaluates potential contractors on their experience with hydrant fuels operations, emergency support, staffing capabilities, certifications, safety protocols, and geographic proximity to the site. Offerors must demonstrate expertise across multiple technical domains including cryogenics, inventory management, dangerous goods handling, and various fuel-related operational capabilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1b_Appendix_B_Work_Sample_Cover_Sheet.docx | DOCX document | |
| Attachment_1e_Appendix_E_Past_Performance_Information_Sheet.docx | DOCX document | |
| Attachment_1_Section_L_Instructions_to_Offerors_Final.pdf | ||
| Attachment_2_Section_M_Evaluation_Criteria.pdf | ||
| Solicitation - FA557025R0001.pdf | ||
| Attachment_1a_Appendix_A_Corporate_Relationships_and_Structures.xlsx | XLSX spreadsheet | |
| Attachment 1d_Appendix D_M Cross_Reference.xlsx | XLSX spreadsheet | |
| Attachment_1f_Appendix_F_RAF Fairford Fuels MS PWS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Self-Score Sheet
| RAF FAIRFORD & WELFORD |
| Solicitation No.: FA557025R0001 |
Element Offeror to Fill This Column Only Point Value Score
Instruction to Offeror Paragraph Section 1 – RELEVANT MARSHALLING SERVICES (MS) EXPERIENCE
| Category 1 | Marshalling Experience | |||
| Section 1.2.1-1.2.1.10 | Identify Aircraft Arrival Services | 0-4 Projects | Point Value Each | Total Across |
| Prine Contractor Show prior/current Follow ME service to designated aircraft parking area | 100 | 0 | ||
| Prime Contractor Show prior/current Marshalling experience and quilfactions | 200 | 0 | ||
| Prime Contractor Show prior/current experience in ground equipment support for aircarft (powered and non-powers support equioment. | 300 | 0 | ||
| Category 2 | Staffing | |||
| Paragraph 1.1.2 -1.1.6 and 1.2.1.10 | Identify Marshalling Services Staffing | 0-4 Projects | Point Value Each | Total Across |
| Prime Contractor Provide qualified personnel to perform MS | 200 | 0 | ||
| Prime Contractor Provide support to show how staffing would meet support during normal working hours and surge support | 200 | 0 | ||
| Prime Contractor Provide experience in aircraft chute retrieval | 300 | 0 | ||
| Category 3 | Emergency | |||
| Paragraph 1.3.1 | Prime Contractor Show prior/current MS support for emergencies | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||
| Instruction to Offeror Paragraph | Section 2 - RELEVANT FUELS EXPERIENCE | |||
| Category 4 | Fuel Operations | |||
| Paragraph 2.4 | Submit a history of Hydrant Fuels experiance | 0-2 Projects | Point Value Each | Total Across |
| Prime Contractor Provide experience in Hydrant Fuels operations. | 400 | 0 | ||
| For experience above provide expamples for the following: | Yes or No | Point Value Each | Total Across |
| Paragraph 2.4 | Operations | 20 | 0 | |
| Paragraph 2.5 | Fuels Information Center (FISC) | 20 | 0 | |
| Paragraph 2.6 | Product Receipts | 20 | 0 | |
| Paragraph 2.7 | Return to Bulk (RTB) | 20 | 0 | |
| Paragraph 2.8 | Maintain Product storage | 20 | 0 | |
| Paragraph 2.9 | Conducting Product Issues | 20 | 0 | |
| Paragraph 2.10 | Conducting Flightline Issues/Defuels | 20 | 0 | |
| Proved experience for the following Cryogenics | ||||
| Paragraph 2.13 | Cryogenics issues | 40 | 0 | |
| Paragraph 2.20 | Cryogenics repair and maintenance | 40 | 0 | |
| Service Station and Organizational tank | ||||
| Paragraph 2.11 | Organizational tank issues | 40 | 0 | |
| Paragraph 2.12 | Maintain Service station operations | 40 | 0 | |
| Paragraph 2.12.3 | Show experience of Vehisle Purchase Medis Manager and Epos QR Codes | 40 | 0 | |
| Paragraph 2.12.4 | Conducting monthly tanks dips at Geographically Separated Units (GSU) | 40 | 0 | |
| Inventory Managemnent | ||||
| Paragraph 2.14.2 | Physical Inventory Management | |||
| Paragraph 2.14.3 | Accounting & Auditability | |||
| Paragraph 2.14.3 | DLA Policies | |||
| Laboratory | ||||
| Paragraph 2.15 | Knowledge of Technical Order 42B-1-1 for Air Force Fuel sampling | 200 | 0 | |
| Paragraph 2.15 | Show experience for International Carriage of Dangerous Goods by Road | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||
| Instruction to Offeror Paragraph | Section 3 - CERTIFICATIONS/INNOVATION | |||
| Category 5 | Does the Offeror have each or any of the following? Type the word Yes or No in Column C. | |||
| Paragraph 1.1 | Certification for Marshalling Services | Yes or No | Point Value Each | Total Across |
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 1.1. | Certification for Powered and Non-powered Support Equipment | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 2.21 | Certification for Fuels Operations | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 16.1 | Employment Safety Certification | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 2.21.5.2 | Certification for Laboratory, Accountant, Cryogenics and Terminal Manager | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Section 17 | Environmental Management | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 2.21 | Training Plan | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||
| Instruction to Offeror Paragraph | Section 4 - STAFFING | |||
| Category 6 | ||||
| Paragraph 1.1 | Marshalling Services | |||
| Submit number of personnel, pick only one | Yes or No | Point Value Each | Total Across | |
| 1 - 5 Workers: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| >5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts | 200 | 0 | ||
| Paragraph 2.3 | Fuels Operations | |||
| Submit number of personnel, pick only one | ||||
| 1 - 3 A/E: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||
| >3 A/E: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 16.1 | Certified Safety | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 2.3 | Certified Fuels/ Contract Manager | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 2.3 | Certified Terminal Manager, Accountant, Laboratory and Cryogenics | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Section 17 | Certified Training for Hazardous Material | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| Paragraph 3.3 | Staffing for Surge Hours | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||
| Instruction to Offeror Paragraph | Section 5 - GEOGRAPHIC EXPERTISE | |||
| Category 7 | Does the Offeror have each or any of the following? Type the word Yes or No in Column C. | |||
| Existing manned office within the United Kingdom | Yes or No | Point Value Each | Total Across | |
| Certificate: Only one Yes which = 50pts max /No = 0pts. | 50 | 0 | ||
| Existing manning to support Contingencies | ||||
| Certificate: Only one Yes which = 50pts max /No = 0pts. | 50 | 0 | ||
| Prime Contractor working and Operatating within the UK | ||||
| Certificate: Only one Yes which = 50pts max /No = 0pts. | 50 | 0 | ||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||
| TOTAL POINTS SCORED | - 0 | |||
| MAXIMUM POINTS | 19,400 | |||
| MINIMUM SCORE REQUIRED | 17,000 |
Example Max Pts.
| Ramstein AB and Spangdahlem AB MACC |
| Solicitation No.: FA561325R0001 |
| Appendix D to Section L, Self Scoring Matrix |
Element Offeror to Fill This Column Only Point Value Score
Instruction to Offeror Paragraph Section 1 – RELEVANT CONSTRUCTION EXPERIENCE
| Relevant Experience Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 10 years of the release date of the MACC solicitation, and at least 80% completed no later 31 Aug 2024) | ||||
| Category 1 | Commercial, Industrial & Residential Bldg. Multi Trade | |||
| Paragraph 4.6.1.1.1. | Submit a Project for each threshold, up to 4 total multiple trade projects for each | 0-4 Projects | Point Value Each | Total Across |
| Prime Contractor under €250K Multiple Trade: Note: each project submitted receives a max point value of 100pts. | 4 | 100 | 400 | |
| Prime Contractor €250K to €1.0M Multiple Trades: Note: each project submitted receives a max point value of 200pts | 4 | 200 | 800 | |
| Prime Contractor over €1.0M Multiple Trades: Note: each project submitted receives a max point value of 300pts. | 4 | 300 | 1200 | |
| Paragraph 4.6.1.1.2. | Identify the number of trades according STLB-Bau or European/US equivalent managed for each project above. | 0-12 Projects | Point Value Each | Total Across |
| Number of trades <5 Note: each project submitted receives a max point value of 50pts. | 0 | 50 | 0 | |
| Number of trades 5-10 Note: each project submitted receives a max point value of 200pts. | 0 | 200 | 0 | |
| Number of trades >10 Note: each project submitted receives a max point value of 300pts. | 12 | 300 | 3600 | |
| Category 2 | Construction for the US Government | |||
| Paragraph 4.6.1.2. | Submit a Project executed for the US Government for each threshold, up to 4 total projects for each | 0-4 Projects | Point Value Each | Total Across |
| Prime Contractor Under €1M: Note: each project submitted receives a max point value of 200pts. | 4 | 200 | 800 | |
| Prime Contractor Over €1M: Note: each project submitted receives a max point value of 300pts. | 4 | 300 | 1200 | |
| Category 3 | Multiple Construction Multi Trade | |||
| Paragraph 4.6.1.3. | Submit 2 to 5 Projects executed in parallel during a period of at least 6 months, with at least 10 trades according STLB-Bau or European/US equivalent for each | 2-5 Projects | Point Value Each | Total Across |
| Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a max point value of 100pts. | 5 | 100 | 500 | |
| Category 4 | Utility System Construction (e.g. distribution lines, power plants, utility distribution bldgs. etc.) | |||
| Paragraph 4.6.1.4. | Submit a Project for each threshold, up to 3 total projects for each | 0-3 Projects | Point Value Each | Total Across |
| Prime Contractor Under €750K: Note: each project submitted receives a max point value of 100pts. | 3 | 100 | 300 | |
| Prime Contractor Over €750K: Note: each project submitted receives a max point value of 200pts. | 3 | 200 | 600 | |
| Category 5 | Construction in Secured Areas (e.g. Munition area, Sensitive Compartment Information Facilities, Bunkers, etc.) | |||
| Paragraph 4.6.1.5. | Submit a Project for each threshold, up to 3 total projects for each | 0-3 Projects | Point Value Each | Total Across |
| Prime Contractor Under €750K: Note: each project submitted receives a max point value of 100pts. | 3 | 100 | 300 | |
| Prime Contractor Over €750K: Note: each project submitted receives a max point value of 200pts. | 3 | 200 | 600 | |
| Category 6 | Individual Trade (Individual trade shall be at least 60% of total project) | |||
| Paragraph 4.6.1.6. | Submit a Project for each threshold, up to 2 total individual trade projects for each | 0-2 Projects | Point Value Each | Total Across |
| Prime Contractor Under €500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 100pts | 2 | 100 | 200 | |
| Prime Contractor Over €500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 200pts. | 2 | 200 | 400 | |
| Prime Contractor Under €500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 100pts | 2 | 100 | 200 | |
| Prime Contractor Over €500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 200pts. | 2 | 200 | 400 | |
| Prime Contractor Under €500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts | 2 | 100 | 200 | |
| Prime Contractor Over €500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts. | 2 | 200 | 400 | |
| Prime Contractor Under €500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 100pts | 2 | 100 | 200 | |
| Prime Contractor Over €500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 200pts. | 2 | 200 | 400 | |
| Prime Contractor Under €500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 100pts | 2 | 100 | 200 | |
| Prime Contractor Over €500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 200pts. | 2 | 200 | 400 | |
| Prime Contractor Under €500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 100pts | 2 | 100 | 200 | |
| Prime Contractor Over €500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 200pts. | 2 | 200 | 400 | |
| Prime Contractor Under €750K ROOFING: Note: each project submitted receives a max point value of 100pts | 2 | 100 | 200 | |
| Prime Contractor Over €750K ROOFING: Note: each project submitted receives a max point value of 200pts. | 2 | 200 | 400 | |
| Prime Contractor Under €750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts | 2 | 100 | 200 | |
| Prime Contractor Over €750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts. | 2 | 200 | 400 | |
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 15100 | |||
| Instruction to Offeror Paragraph | Section 2 - DESIGN EXPERIENCE | |||
| Relevant Design Projects: (The submitted projects must meet the conditions listed, must have been performed in Germany, must have taken place within the last 10 years of the release date of the MACC solicitation, and at least 80% completed no later 31 Aug 2024) | ||||
| Category 7 | Experience as Prime on Design-Build Projects (KTR Designing then Building) | |||
| Paragraph 4.6.2.1.1. | Submit a Project with Design Build effort, up to 2 total projects | 0-2 Projects | Point Value Each | Total Across |
| Prime Contractor over €1M construction cost: Note: each project submitted receives a max point value of 400pts. | 2 | 400 | 800 | |
| Paragraph 4.6.2.1.2. | For one of the Projects above submit all design documents in compliance with HOAI Phase 3 and VDI 6026 Design Planning at a minimum | Yes or No | Point Value Each | Total Across |
| Statement of Work: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 200pts. | ||||
| KG 330/340: interior and exterior walls (vertical construction elements) | Yes | 20 | 20 | |
| KG 350: Ceilings (horizontal construction elements) | Yes | 20 | 20 | |
| KG 360: Roofs | Yes | 20 | 20 | |
| KG 410: Waste water, water, and gas systems | Yes | 20 | 20 | |
| KG 474: Fire-extinguishing systems | Yes | 20 | 20 | |
| KG 420: Heat-supply systems | Yes | 20 | 20 | |
| KG 430: HVAC systems | Yes | 20 | 20 | |
| KG 440: Electrical systems | Yes | 20 | 20 | |
| KG 450: Communications, security and information systems | Yes | 20 | 20 | |
| KG 480: Building automation and automation of engineering structures | Yes | 20 | 20 | |
| Drawings: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 400pts. | ||||
| KG 330/340: interior and exterior walls (vertical construction elements) | Yes | 40 | 40 | |
| KG 350: Ceilings (horizontal construction elements) | Yes | 40 | 40 | |
| KG 360: Roofs | Yes | 40 | 40 | |
| KG 410: Waste water, water, and gas systems | Yes | 40 | 40 | |
| KG 474: Fire-extinguishing systems | Yes | 40 | 40 | |
| KG 420: Heat-supply systems | Yes | 40 | 40 | |
| KG 430: HVAC systems | Yes | 40 | 40 | |
| KG 440: Electrical systems | Yes | 40 | 40 | |
| KG 450: Communications, security and information systems | Yes | 40 | 40 | |
| KG 480: Building automation and automation of engineering structures | Yes | 40 | 40 | |
| Calculations: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 400pts. | ||||
| KG 330/340: interior and exterior walls (vertical construction elements) | Yes | 40 | 40 | |
| KG 350: Ceilings (horizontal construction elements) | Yes | 40 | 40 | |
| KG 360: Roofs | Yes | 40 | 40 | |
| KG 410: Waste water, water, and gas systems | Yes | 40 | 40 | |
| KG 474: Fire-extinguishing systems | Yes | 40 | 40 | |
| KG 420: Heat-supply systems | Yes | 40 | 40 | |
| KG 430: HVAC systems | Yes | 40 | 40 | |
| KG 440: Electrical systems | Yes | 40 | 40 | |
| KG 450: Communications, security and information systems | Yes | 40 | 40 | |
| KG 480: Building automation and automation of engineering structures | Yes | 40 | 40 | |
| Category 8 | Experience with German Construction Permitting requiring approval by at least local county administration | |||
| Paragraph 4.6.2.2. | Submit 3 Projects as a Prime which required construction permitting | Yes or No | Point Value | Total Across |
| Only one: Yes = 200pts. / No = 0pts | Yes | 200 | 200 | |
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 2000 | |||
| Instruction to Offeror Paragraph | Section 3 - CERTIFICATIONS/INNOVATION | |||
| Category 9 | Does the Offeror have each or any of the following? Type the word Yes or No in Column C. | |||
| Paragraph 4.6.3.1. | Certification for Construction according Water Resources Law (WHG; Wasserhaushaltsgesetz) | Yes or No | Point Value Each | Total Across |
| Certificate: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |
| Paragraph 4.6.3.2. | Certification for Waterline Construction (DVGW; Deutscher Verein des Gas- und Wasserfaches) | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |
| Paragraph 4.6.3.3. | Certification for Wastewater and Sewer Construction and Maintenance (RAL-GZ 961) | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |
| Paragraph 4.6.3.4. | Employment Safety Certification (e.g. OSHA, AMS) | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |
| Paragraph 4.6.3.5. | Prequalification Certification according § 6 VOB/A | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |
| Paragraph 4.6.3.6. | Environmental Management Systems (ISO 14001 Certification) | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 1200 | |||
| Instruction to Offeror Paragraph | Section 4 - STAFFING | |||
| Category 10 | Does the Offeror have each or any of the following in their own company? Type the word Yes or No in Column C. | |||
| Paragraph 4.6.4.1. | Trade/Construction Workers | |||
| Submit number of personnel, pick only one | Yes or No | Point Value Each | Total Across | |
| 1 - 5 Workers: Note: Only one Yes which = 100pts max /No = 0pts. | No | 100 | 0 | |
| >5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts | Yes | 200 | 200 | |
| Paragraph 4.6.4.2. | Architects/Engineers | |||
| Submit number of personnel, pick only one | ||||
| 1 - 3 A/E: Note: Only one Yes which = 100pts max /No = 0pts. | No | 100 | 0 | |
| >3 A/E: Note: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |
| Paragraph 4.6.4.3. | Certified Safety Manager (SiGeKo or equivalent) | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |
| Paragraph 4.6.4.4. | Certified Building Energy Consultant | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |
| Paragraph 4.6.4.5. | Certified Fire Protection Specialist according DIN 14675 or equivalent | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |
| Paragraph 4.6.4.6. | Certified Training for Hazardous Material abatement TRGS (Technical Rules for Hazardous Substances) | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 1000 | |||
| Instruction to Offeror Paragraph | Section 5 - GEOGRAPHIC EXPERTISE | |||
| Category 11 | Does the Offeror have each or any of the following? Type the word Yes or No in Column C. | |||
| Paragraph 4.6.5.1. | Existing manned office within 25km of RAB | Yes or No | Point Value Each | Total Across |
| Certificate: Only one Yes which = 50pts max /No = 0pts. | Yes | 50 | 50 | |
| Paragraph 4.6.5.2. | Existing manned office within 25km of SAB | |||
| Certificate: Only one Yes which = 50pts max /No = 0pts. | Yes | 50 | 50 | |
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 100 | |||
| TOTAL POINTS SCORED | 19,400 | |||
| MAXIMUM POINTS | 19,400 | |||
| Remarks: for Section 1 & 2 Projects can be submitted multiple times | MINIMUM SCORE REQUIRED | 17,000 |