Attachment 17- HexFoam SOP (25 FEB 20).pdf

PDF 580 KB Posted

Attached to
Job Order Contract Fort Drum Federal contract opportunity
Solicitation number
W911S22R8000
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Drum

About this file

This document provides standard operating procedures for cleaning spills of hex foam at Fort Drum, New York. The SOP outlines spill response procedures including stopping the flow of foam if safe to do, keeping hanger doors closed to prevent environmental release, directing spilled foam to the sanitary sewer through the oil water separator building, and monitoring sewer lift stations and adding defoamer if needed. Reporting requirements are specified for spills over a certain pound threshold which must be reported within two hours to the NYS DEC Spill Hotline. An appendix lists hex foam inventory locations by product, tank size, and pounds at various buildings on base.

A related federal contract opportunity posted on SAM.gov solicits for a job order contract at Fort Drum to encompass repair and construction tasks such as carpentry, road repair, roofing, excavation, electrical, HVAC, plumbing, sheet metal work, painting, demolition, concrete, welding, and emergency repairs for water and gas lines. The NAICS code is 236220 for commercial and institutional building construction with a $39.5 million small business size standard. The guaranteed minimum is $10,000 for the base period and $5,000 for each option period, with a maximum ordering value of $110 million over the life of the contract. Interested parties must register in SAM under NAICS 236220 and have certifications on record. The point of contact is provided.

View the file

Other files for this federal contract opportunity

Other files attached to Job Order Contract Fort Drum, newest first.
File Type Posted
Exhibit A-CDRLs D005-D008 JOC.pdf PDF
Attachment 15- Performance Assessment Questionnaire-1.pdf PDF
Attachment 5- IMDR-ES Form 2 Application for Sponsorship (Jan 2016).pdf PDF
Exhibit A-CDRLs D013-D016 JOC.pdf PDF
Attachment 12- Fort Drum Exterior Utility Standards (28 MAR 18).pdf PDF
Attachment 2- Wage Determination NY20220022.pdf PDF
Attachment 4- ENG FORM 4025-R (Mar 2012).pdf PDF
Attachment 18- Fort Drum JOC Specs derived from Front Range SABER 2015.pdf PDF
Attachment 16- AFFF Release SOP (08 MAR 21).pdf PDF
Exhibit A-CDRLs D017-D020 JOC.pdf PDF
Attachment 11- Confined Space Entry Procedures.pdf PDF
Attachment 1- Statement of Work.pdf PDF
Attachment 9- NYDEC Sewer Submittal Procedures (4 OCT 19).pdf PDF
Attachment 7- Endangered Species Act Requirements.pdf PDF
Attachment 14- Fort Drum Hazardous Waste Management Plan (01 AUG 19).pdf PDF
W911S222R8000 JOC Solicitation.pdf PDF
Exhibit A-CDRLs D001-D004 JOC.pdf PDF
Attachment 10- GPM-21-11 Excavation Permits (27 OCT 21).pdf PDF
Attachment 13- Contractors Final Addidavit.pdf PDF
Attachment 8- Water Supply Improvement Submittal Procedures.pdf PDF
Attachment 6- Fort Drum Electrical Outrages SOP.pdf PDF
Attachment 3- Wage Determination NY20220009.pdf PDF
Exhibit A-CDRLs D009-D012 JOC.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORT DRUM PUBLIC WORKS ENVIRONMENTAL DIVISION STANDARD

OPERATING PROCEDURES (SOP) FOR CLEANING HEX FOAM SPILLS

Purpose: To provide procedures for cleaning up an accidental release of hex foam to include ANSUL JET-X 2% (HEX – soap formula).

Spill/Release Response Procedures:

a. Spills of any quantity of hex foam shall be reported immediately to the Fort Drum Fire Department (Call 911) then the Environmental Division.

b. Stop and then control the flow of foam if safe to do so.

c. Keep the hanger doors closed to prevent foam from reaching the environment.

i. If hanger doors must be opened to remove helicopters, block all drains in the area before opening the hanger doors.

ii. If foam does go down a drain and reaches the Range 7 outfall (Outfall 1), call the plumbing shop (772-2260) to defoam and pump the concrete vault. Contaminated water can be discharged to the sewer.

d. Spent foam inside hangers can be directed to the sanitary sewer through the oil water separator → building 2086 (contaminated sewer).

e. Spent foam will cause problems with sewer lift stations. PW Utilities will monitor lift stations at 2086 and 2175 and add defoamer at 50 ppm if required.

f. Environmental will call both DANC Warneck Lift Station (315-786-4000) and Watertown POTW (315-785-7840) to let them know the volume of hex foam that has entered the sewer system. A safety data sheet (SDS) may be requested.

Reporting Requirements

a. If over XXX pounds of Ansul Jet-X 2% is spilled, it must be reported within 2 hours to the NYS DEC Spill Hotline (1-800-457-7362). A spill report must then be completed (Appendix A).

b. A copy of the spill report must be entered into the spill response database or the DPW Environmental hard copy form must be filled out and placed in the spill response log book within 24 hours of the spill occurrence.

c. Photos taken during and after the spill are sent to the POL manager.

d. Use MapsRUs to mark the location of the spill. Identify the mark with either the spill number (given by NYSDEC) or for non-NYSDEC reportable spills, label the mark with the date (YYYYMMDD) or work with the Geospatial Data Manager to identify/denote the location of the spill.

Points of Contact

a. Fort Drum Fire Department, 911.

b. DPW, Environmental Division Chief, James M. Miller, 772-5269.

c. Environmental Compliance Branch Chief, Ian Crawford, 772-5063.

d. POL/P2/EMS Compliance Manager, Anthony Rambone, 772-4154.

e. Drinking Water and Wastewater Manager, Chris Whitman, 772-2678.

f. Utilities Branch Chief, Jon Parobeck, 772-2260.

g. DPW Roads and Grounds, 772-4448 or 772-2061.

h. Watertown POTW, 315-785-7840.

i. DANC Warneck Lift Station, 315-786-4000.

** ANSUL JET-X 2% (HEX – soap formula) does not contain PFAS and can therefore be discharged to sewer.

Appendix A

Appendix B- Hex Foam Inventory

Location Product Tank Size 55 Gallon Drums

Actual Gallons

Pounds Notes

2049 Jet-X-2% 400 0 400 3407 2050 Jet-X-2% 200 2 310 2640 2060 Jet-X-2% 500 2 610 5195 North Section 2060 Jet-X-2% 500 2 610 5195 South Section 2070 Jet-X-2% 700 2 810 6899 2072 Jet-X-2% 536 0 0 0 Not Operational 2074 Jet-X-2% 400 1 455 3875 Middle Section 2074 Jet-X-2% 800 0 800 6814 North Section 2074 Jet-X-2% 600 0 600 5110 South Section 19710 Jet-X-2% 700 3.5 893 7601 20472 Jet-X-2% 460 0 460 3918 20470 Jet-X-2.75% 200 0.5 228 1938 20471 Jet-X-2.75% 200 1.5 283 2406