Attachment 15 - SABER SEED Bid Schedule.xlsx

XLSX spreadsheet 542 KB Posted

Attached to
SABER IDIQ - Dover AFB Federal contract opportunity
Solicitation number
FA449725R0010
Issued by
Department of the Air Force Air Mobility Command

About this file

This file is a detailed Construction Cost Estimate spreadsheet for the SABER SEED Project located at Dover Air Force Base, Delaware. The spreadsheet is a comprehensive bid schedule template organized by 50 Construction Specifications Institute (CSI) divisions, designed to help contractors systematically break down and estimate project costs across different construction categories such as general requirements, existing conditions, concrete work, masonry, metals, electrical, HVAC, plumbing, and other technical divisions.

The spreadsheet provides instructions for contractors to complete cost estimates, allowing them to input labor, material, and total costs for each division. It includes sections for overhead, profit percentages for both prime and subcontractors, and a summary page that automatically calculates totals. The document is specifically tied to Contract Line Item Number (CLIN) 0010, which covers design and construction work to renovate B600 restrooms, including HVAC, electrical, and interior work. While the current spreadsheet shows placeholder values of zero, it is structured to enable detailed cost estimation across all major construction categories.

View the file

Other files for this federal contract opportunity

Other files attached to SABER IDIQ - Dover AFB, newest first.
File Type Posted
Solicitation - FA449725R0010 Amendment 03.pdf PDF
Solicitation - FA449725R0010 Updated 30 Oct 25.pdf PDF
Attachment 17 - Questions and Answers (Consolidated).xlsx XLSX spreadsheet
Solicitation - FA449725R0010 Updated 30 Oct 25.pdf PDF
Attachment 01 - SABER Master Specifications Updated 20250929.pdf PDF
Solicitation - FA449725R0010.pdf PDF
Attachment 02 - Coefficient Price Proposal Schedule.xlsx XLSX spreadsheet
Attachment 08 - Sample Proposal.pdf PDF
Attachment 05 - DAFB Environmental Specifications.pdf PDF
Attachment 10 - Wage Determination - Heavy.pdf PDF
Attachment 11 - Wage Determination - Highway.pdf PDF
Solicitation - FA449725R0010.pdf PDF
Attachment 01 - SABER Master Specifications Updated 20250908.pdf PDF
Attachment 03 - DAFB Site Management.pdf PDF
Attachment 04 - Dover AFB Installation Facilities Standards.pdf PDF
Attachment 08 - Sample Proposal_RS MEANS.pdf PDF
Attachment 16 - AF FORM 3064 Contract Progress Schedule.xlsx XLSX spreadsheet
Attachment 06 - DAFB General Requirements.pdf PDF
Attachment 07 - DAFB Sediment and Erosion Control.pdf PDF
Attachment 14 - SABER SEED Project SOW.pdf PDF
Attachment 17 - Questions and Answers Submission Form.xlsx XLSX spreadsheet
Attachment 02 - Coefficient Price Proposal Schedule.xlsx XLSX spreadsheet
Attachment 09 - Wage Determination - Building.pdf PDF
Attachment 12 - Present Past Performance Questionnaire.pdf PDF
Attachment 13 - Present Past Performance Information.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.

Exceptions:

(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.

(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.

The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.

Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.

* CSI = Construction Specifications Institute

&"Verdana,Bold"Construction Cost Estimate

&P of &N

Summary BID SCHEDULE Date:

COMPANY

PROJECT
SABER SEED ProjectCLIN: 0010 - Includes all Design and Construction work required to renovate the B600 restrooms to include HVAC, Electrical, and Interiors as specified in the Statement of work.
LOCATIONPROJECT NO.1122143
DOVER AIR FORCE BASE, DE
DIVISIONDESCRIPTION% by
DivisionDivision Total
DIVISION 01GENERAL REQUIREMENTSERROR:#DIV/0!- 0
DIVISION 02EXISTING CONDITIONSERROR:#DIV/0!- 0
DIVISION 03CONCRETE WORKERROR:#DIV/0!- 0FILL IN AS REQUIRED (this will link to the entire document)

davisjam: davisjam:

Percentages listed are place fillers. Please complete as required

DIVISION 04MASONRYERROR:#DIV/0!- 0
DIVISION 05METALSERROR:#DIV/0!- 0
DIVISION 06WOOD, PLASTICS AND COMPOSITESERROR:#DIV/0!- 0GC Overhead
DIVISION 07THERMAL AND MOISTURE PROTECTIONERROR:#DIV/0!- 0GC Profit
DIVISION 08OPENINGSERROR:#DIV/0!- 0
DIVISION 09FINISHESERROR:#DIV/0!- 0
DIVISION 10SPECIALTIESERROR:#DIV/0!- 0
DIVISION 11EQUIPMENTERROR:#DIV/0!- 0Risk/Bonding
DIVISION 12FURNISHINGSERROR:#DIV/0!- 0Design
DIVISION 13SPECIAL CONSTRUCTIONERROR:#DIV/0!- 0This spreadsheet contains many formulas... please save a copy prior to editing in case you make a mistake. All shaded areas are either linked or contain formulas
DIVISION 14CONVEYING EQUIPMENTERROR:#DIV/0!- 0
DIVISION 15RESERVEDERROR:#DIV/0!- 0
DIVISION 16RESERVEDERROR:#DIV/0!- 0
DIVISION 20RESERVEDERROR:#DIV/0!- 0
DIVISION 21FIRE SUPRESSIONERROR:#DIV/0!- 0
DIVISION 22PLUMBINGERROR:#DIV/0!- 02
DIVISION 23HEATING, VENTILATING AND A/CERROR:#DIV/0!- 02
DIVISION 24RESERVEDERROR:#DIV/0!- 0
DIVISION 25INTEGRATED AUTOMATIONERROR:#DIV/0!- 00
DIVISION 26ELECTRICALERROR:#DIV/0!- 0
DIVISION 27COMMUNICATIONSERROR:#DIV/0!- 0Select Area Cost Factor Type:
DIVISION 28ELECTRONIC SAFETY AND SECURITYERROR:#DIV/0!- 0
DIVISION 29RESERVEDERROR:#DIV/0!- 0
DIVISION 30RESERVEDERROR:#DIV/0!- 0
DIVISION 31EARTHWORKERROR:#DIV/0!- 0
DIVISION 32EXTERIOR IMPROVEMENTSERROR:#DIV/0!- 0
DIVISION 33UTILITIESERROR:#DIV/0!- 0
DIVISION 34TRANSPORTATIONERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
DIVISION 36RESERVEDERROR:#DIV/0!- 0
DIVISION 37RESERVEDERROR:#DIV/0!- 0
DIVISION 38RESERVEDERROR:#DIV/0!- 0
DIVISION 39RESERVEDERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
DIVISION 46RESERVEDERROR:#DIV/0!- 0
DIVISION 47RESERVEDERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
DIVISION 49RESERVEDERROR:#DIV/0!- 0

HARD COST TOTAL ERROR:#DIV/0! - 0

PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)0%- 0
SUBTOTAL- 0
PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)0%- 0
SUBTOTAL- 0
Design0.00%- 0
SUBTOTAL- 0
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)0.0%- 0
CONTRACT TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Sustainment Repair/Const ACF Already Factored

Div1

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABOREQUIPMENT
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
GENERAL REQUIREMENTS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div2

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXISTING CONDITIONS
- 0
- 0- 0
- 0- 0- 0
- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
0.00%
- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div3

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONCRETE WORK
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div4

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
MASONRY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div5

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
METALS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div6

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WOOD, PLASTICS AND COMPOSITES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div7

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
THERMAL AND MOISTURE PROTECTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div8

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
OPENINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div9

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FINISHES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div10

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIALTIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div11

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div12

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FURNISHINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div13

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIAL CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div14

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONVEYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
0.00%- 0
0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div15

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
0.00%- 0
0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div16

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
0.00%- 0
0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div20

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
0.00%- 0
0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div21

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FIRE SUPRESSION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div22

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PLUMBING
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div23

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
HEATING, VENTILATING AND A/C
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div24

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
0.00%- 0
0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div25

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
INTEGRATED AUTOMATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div26

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRICAL

- 0 - 0 - 0

- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div27

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
COMMUNICATIONS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div28

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRONIC SAFETY AND SECURITY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div29

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div30

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div31

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EARTHWORK
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div32

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0FJXT 240013
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXTERIOR IMPROVEMENTS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div33

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
UTILITIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div34

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
TRANSPORTATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div35

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div36

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div37

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div38

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div39

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div40

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div41

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div42

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div43

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div44

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div45

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div46

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div47

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div48

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div49

BID SCHEDULEDATE
31-Dec-99
PROJECTBASIS FOR ESTIMATE
SABER SEED ProjectCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
01,122,143.00
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0
TOTAL LABOR/MATERIALS- 0
SUBTOTAL- 0
0.00%- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

File details come from the government source that posted it. Updated .