This Statement of Work (SOW) details the renovation of B600 bathroom facilities at Dover Air Force Base (DAFB) in Delaware. The project involves comprehensive renovations of first and second-floor men's and women's restrooms, including replacing fixtures, finishes, toilets, sinks, mirrors, and urinals. The total project duration is 274 calendar days, with specific requirements including installing new phenolic bathroom partitions, 12"x24" floor and wall tiles, solid surface countertops, LED lighting, automatic faucets, touchless hand dryers, and paper towel dispensers. The renovations must comply with ADA requirements and Dover AFB Installation Facilities Standards, with all color and tile selections to be approved by Dover AFB Civil Engineering. The contractor will be responsible for demolition, installation, utility modifications, and ensuring minimal disruption to building occupants by renovating only one floor's restrooms at a time.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Renovate B600 Bathrooms
PROJECT NUMBER 1122143
1 April 2024
Table of Contents
PART I – PROJECT SPECIFIC GUIDANCE
1.SCOPE
1.1.Objective 1.2.Period of Performance 1.3.Limitations 1.4.Location 1.5.Job Description
2.POINTS OF CONTACT
3.GOVERNMENT-FURNISHED INFORMATION, EQUIPMENT, AND MATERIAL
PART II – GENERIC REQUIREMENTS
1.GOVERNING DESIGN AND CONSTRUCTION DOCUMENTS
2.TABLE OF DELIVERABLES
3.DESIGN REQUIREMENTS
4.CONSTRUCTION REQUIREMENTS
5.CONTRACT ADMINISTRATION REQUIREMENTS
6.INSPECTIONS
7SECURITY AND ANTITERRORISM
8ATTACHMENTS- 1
Attachment 1 B600 Bathroom Layout
1st Floor Restrooms
PART I – PROJECT SPECIFIC GUIDANCE
1. SCOPE
1.1. Objective
The general statement of work is to renovate building 600(B600) 1st and 2nd floor men’s and women’s restrooms by replacing fixtures, finishes, toilets, sinks, mirrors, and urinals. Specific details outlining the full scope of work is provided below in section 1.5. The primary location of this project is B600 on Dover Air Force Base, Delaware. The contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and other items and services necessary to renovate B600 restrooms.
1.2. Period of Performance
The period of performance for this project will be 274 calendar days. (Negotiable prior to contract award).
1.3. Limitations
The contractor will need to coordinate any electrical outages and construction to minimize interruptions to the building occupants. The contractor shall only demo/renovate a single floor restroom at a time to allow a single men’s and women’s room to be accessible during renovations.
All color/tile selections are to be made and approved by Dover AFB Civil Engineering.
1.4. Location
Location of work is to be at B600, Dover Air Force Base (DAFB) located in Kent County the city of Dover Delaware.
1.5. Job Description
1.5.1. GENERAL
Second Floor Male and Female restrooms shall be in compliance with the American
Disability Act (ADA).
1.5.1.1. Contractor shall demo and remove existing fixtures and finishes to include, toilets, urinals, sinks, toilet accessories, partitions, tile, thresholds, drywall, ceiling grid/tiles, mirrors and countertops.
1.5.1.2. Contractor shall provide and install new Phenolic bathroom partitions. Color scheme shall be coordinated with other finishes.
1.5.1.3. Individual bathroom stall partition doors to include coat hooks.
1.5.1.4. Contractor shall provide and install new 12’’x 24’’ tile on all floors.
1.5.1.5. Contractor shall provide and install sanitary cove base to match.
1.5.1.6. Contractor shall provide and install new 12’’x 24’’ tile on all the walls; to include behind and beside toilets and sinks as well as the back wall in the handicapped stall.
1.5.1.7. Tile edges shall be finished with approved metal trim.
1.5.1.8. All exposed dry wall shall be painted matching color scheme and in accordance with Dover Air Force Base Installation Facilities Standard (IFS).
1.5.1.9. Contractor shall provide and install new solid surface countertops with under-mount sinks and hard-wired automatic faucets on a GFCI circuit IAW NEC Article 210.8.
1.5.1.10. Contractor shall reinsulate all exposed domestic water plumbing lines.
1.5.1.11. Contractor shall snake and flush all sanitary lines associated with the restroom to the cleanout on the exterior of the building to clear any blockages and restore proper operation of the system.
1.5.1.12. Contractor shall provide and install wall cleanouts flushed with a stainless-steel cap.
1.5.1.13. Provide and replace floor drain covers.
1.5.1.14. Contractor shall anticipate replacing approximately 80 linear feet of wall framing metal track.
1.5.1.15. Contractor shall replace all bathroom exhaust registers.
1.5.1.16. Contractor shall provide a unit controller connected to exhaust fans and EMCS.
1.5.1.17. Contractor shall provide and install new mirrors with stainless steel frame and meet ADA requirements.
1.5.1.18. Replace all handicap handrails.
1.5.1.19. Contractor shall provide and install new LED lighting to match existing dimensions and locations in each bathroom. Lighting levels shall be in accordance with applicable UFC lighting levels.
1.5.1.20. Replace all electrical switches, outlets, and covers.
1.5.1.21. Contractor shall adjust and paint all entrance doors.
1.5.1.22. Replace all entrance door closers, handles and hinges.
1.5.1.23. Install floor mounted door stops.
1.5.1.24. Provide and install new thresholds.
1.5.1.25. Remove existing ceiling grid and tile; install new ceiling grid and tile.
1.5.2. B600 Men’s Bathrooms
1.5.2.1. Contractor shall provide and install 2 new water closets and 2 new urinals in existing locations of the 2nd floor restroom, and 2 water closets and 1 urinal in the first floor. All new fixtures shall be provided with new accessories and flushometers IAW
UFGS specifications.
1.5.2.2. Contractor shall provide and install 1new hard wired touchless hand dryer, 2 automated touchless paper towel dispensers, 1 touch-free soap dispenser and 1 wall mounted toiletry cabinet (see existing) in each restroom (1st and 2nd floor). Each bathroom stall shall receive a double roll toilet paper dispenser and toilet seat cover dispenser.
1.5.3. B600 Female’s Bathrooms
1.5.3.1. Contractor shall provide and install 3 new water closets in existing locations of the
2nd floor restroom, and 2 new water closets in the first floor. All new fixtures shall be provided with new accessories and flushometers IAW UFGS specifications.
1.5.3.2. Contractor shall provide and install 1 new hard wired touchless hand dryer, 2 automated touchless paper towel dispensers, 1 touch-free soap dispenser, and 1 wall mounted toiletry cabinet (see existing) in each restroom (1st and 2nd floor). Each bathroom stall shall receive a double roll toilet paper dispenser, toilet seat cover dispenser, and surface mounted feminine napkin disposal.
2. POINTS OF CONTACT
Points of Contact will be provided at the time of contract award.
3. GOVERNMENT-FURNISHED INFORMATION, EQUIPMENT, AND MATERIAL
3.1. Information
If available, the Government may provide information in the form of available plans, reports, maps, and drawings as necessary to facilitate accomplishment of the work required in this Statement of Work. The Government may furnish electronic copies of available As-
Built drawings that are pertinent to the facility involved after contract award, however, the
Government does not guarantee the availability or accuracy of As-built drawings. These drawings are not warranted to show conditions as they actually exist. The designer shall field verify the information shown on the As-Built drawings as necessary to produce a quality-designed project. As-Builts can be acquired at Building 600 (B600) Chevron Ave, Dover AFB or electronically via Department of Defense (DoD) Secure Access File
Exchange(SAFE).
3.2. Equipment – None provided.
3.3. Material – None provided.
3.4. Property – None provided.
PART II – GENERIC REQUIREMENTS
1. GOVERNING DESIGN AND CONSTRUCTION DOCUMENTS
1.1 Department of Defense specifications and criteria located at http://wbdg.org/ffc/dod.
1.2 Air Force specifications and criteria located at http://wbdg.org/ffc/af-afcec.
1.3 Dover Air Force Base specifications listed below are provided as solicitation/contract attachments or can be found using the web address provided.
1.3.1 Dover Air Force Base Design Guide (Attachment)
1.3.2 Dover Air Force Base Installation Facilities Standards (IFS) is located at:
http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/dover-afb-ifs
1.3.3 Dover Air Force Base Standard Specifications (Attachment)
2. TABLE OF DELIVERABLES
INSTRUCTIONS: IDENTIFIED DOCUMENTS ARE MANDATORY, THE NUMBER OF COPIES
AND DELIVERY DATE ARE SHOWN IN THE TABLE BELOW.
DESIGN
Deliverable Calendar Days Due
Bonds (Payment & Performance) 10 Calendar Days After Award
Pre Performance Conference - Determined by Government
AF Form 3064, Project Schedule 15 Calendar Days After Notice to Proceed (NTP)
Project Management Plan 15 Calendar Days After NTP
35% Design Submittal 45 Calendar Days After NTP
Government Review 35% 14 Calendar Days After receipt of 35% Design
Submittal
35% Design Review Meeting 7 Calendar Days After Government Review
CONSTRUCTION
Deliverable Days Due
Pre-Construction Meeting Prior to the start of work
Construction 180 Calendar
Days
After Pre-Construction Meeting
Construction Progress Meetings Bi-Weekly after start of work
Final Inspection CES Coordinated
As-Builts 28 Calendar Days After Final Inspection Acceptance
Warranties 28 Calendar Days After Final Inspection Acceptance
Item Copies Format Size
Bonds 1 Hard Copy
AF66, Submittal Register 1 PDF
AF Form 3064, Project Schedule 1 Electronic
AF Form 3065, Progress Reports 1 Electronic
35% Design – Drawings 2 Hard Copy and PDF 1 Half-Sized Set, 1 Full-Sized
35% Design – Specifications 1 Electronic Red Lined Specs
35% Design – Basis of Design 1 Electronic
Final Design – Specifications 1 Electronic
Final Design – Basis of Design 1 Electronic http://wbdg.org/ffc/dod http://wbdg.org/ffc/af-afcec http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/dover-afb-ifs
As-Built Drawings 1 PDF and
CAD files
To be provided 30 days after
BOD
Warranties 1 Electronic 18 MB Maximum File Size
O&M Manuals 1 Electronic 18 MB Maximum File Size
3. DESIGN REQUIREMENTS
3.1 Pre-Performance Conference – The Contracting Officer or designated representative shall conduct a Pre-Performance Conference at Dover Air Force Base, Delaware after receipt of
Payment and Performance Bonds. This meeting will involve all stakeholders, allowing the
Government and Contractor to discuss a complete overview of the project and any specific concerns. Importantly, a Notice to Proceed (NTP) may be issued at this meeting.
3.2 Project Management Plan (PMP) – Due 15 calendar days after NTP to include narrative document describing the contractor’s organizational structure and ability to meet regulatory requirements. PMP shall include:
A. Table of Contents
B. Team Structure
C. Quality Control Plan
D. Safety & Health Plan
E. Organizational Chart
F. QCM Appointment Letter
3.3 35% Design Submittal – Due 45 calendar days after NTP to include redlined specifications, drawings, and Basis of Design which convey the complete extent of the work in a preliminary manner. Design document submissions shall include the following:
A. Table of Contents
B. Executive summary of the scope of all work
C. Previous contractor Requests for Information and Government responses, if applicable.
D. Design Analysis (Basis of Design) and appropriate engineering calculations
E. Design drawings and specifications
F. Schedule of submittals for material approval.
3.4 35% Design Review Meeting – Due 7 calendar days after Government review of the 35%
Design Submittal. These meetings will include all relevant Base POC and Contracting
Personnel on an as needed basis. These meetings will cover the design review comments made on the current design submittal and will include any pertinent issues which could affect future progress. The following items shall be covered:
A. Meeting attendees and contact information
B. Review and resolution of design review comments
C. New business
D. Schedule
3.5 Pre-Construction Meeting: Contractor shall request a pre-construction meeting 14 calendar days prior to mobilizing and starting any site work. Mobilization date shall be requested by the
Contractor prior to the pre-construction meeting and approved by the Government. Any work performed on site without approved Issued for Construction Drawings/Specification and consent from the Government is considered to be performed at the Contractor’s risk.
4. CONSTRUCTION REQUIREMENTS
4.1 GENERAL
4.1.1 Work Schedule
Work shall be performed between 7:30 A.M. and 4:30 P.M. daily, Monday through
Friday, excluding federal legal holidays as outlined by Public Law Number 98-144 (or days not worked on Dover AFB due to the observance of such holidays). Unless otherwise specifically authorized herein or in writing by the Contracting Officer, the scheduling of work for times other than as set forth above, is not permitted. A request to work extended hours, weekends, and holidays may be submitted to the Contracting
Officer.
4.1.2 Permits – The Contractor is responsible for all applicable permits, licenses, and certificates required to perform and execute this contract.
4.2 SUBMITTALS
UFGS 01 33 00 Submittal Procedures shall govern construction submittals.
4.2.1 Submittal Format
Provide submittals with an AF Form 3000 in electronic format, with the exception of material samples required for SD- 04 Samples items. In addition to the electronic submittal, provide three hard copies of design submittals. Compile the submittal file as a single, complete document, to include the Transmittal.
Form described within. Name the electronic submittal file specifically according to its contents, coordinate the file naming convention with the Contracting Officer. Electronic files must be of sufficient quality that all information is legible. Use PDF as the electronic format, unless otherwise specified or directed by the Contracting Officer.
Generate PDF files from original documents with bookmarks so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical
Character Resolution (OCR) routines are required. Index and bookmark files exceeding
30 pages to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.
Email electronic submittal documents to an email address as directed by the Contracting
Officer. Provide electronic documents over 10MB on a disc. Provide hard copies of submittals when requested by the Contracting Officer. Up to three additional hard copies of any submittal may be requested at the discretion of the Contracting Officer, at no additional cost to the Government.
4.2.2 IAW Section 3.2the Contractor shall create and maintain a Master
Document List (MDL) and/or Submittal Register, i.e. AF Form 66 that includes all documents, whether the documents are a deliverable or not, which are prepared during the course of the contract. The MDL and its documents shall be maintained in libraries readily available for submittal to the Government. All Material Submittals shall be accomplished in accordance with the instructions pertaining to AF Form 3000, Material
Approval Submittal.
4.3 CONSTRUCTION PROGRESS MEETINGS
The Contractor shall perform bi-weekly Construction Progress Meetings with meeting minutes provided to the Contracting office within 3 days of meeting. These meetings will include all relevant Base POCs and Contracting Personnel on an as needed basis. These meetings will cover the progress made in the past period and will include any pertinent issues which could affect future work progress. The following items shall be covered:
4.3.1 Meeting attendees and contact information
4.3.2 Change orders
4.3.3 Requests for information
4.3.4 Material submittals and updated submittal register
4.3.5 Updated schedule
4.4 WORKSITE ACTIVITIES AND COORDINATION
The Contractor shall coordinate worksite activities with all applicable personnel to ensure the protection of human health and the environment; the prevention of damage to property, utilities, materials, supplies, and equipment; and the avoidance of work interruptions. The Contractor shall provide physical security to work areas with security equipment and personnel.
4.4.1 The Contractor shall be responsible for protecting the lives and health of employees and other persons on the work site; preventing damage to property, materials, supplies, and equipment, avoiding work interruptions and complying with Occupational Safety and
Health Administration (OSHA) safety and local safety office requirements. The
Contractor shall perform all operations in a prudent, conscientious, safe and professional manner and conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work. The Contractor shall maintain documentation supporting training records on site and have written Health and Safety Plans on site and available for workers and/or regulatory review. The Contractor shall provide the
Contracting Officer (CO) copies of any OSHA report(s), regarding a project site, submitted during the duration of the contract.
4.4.2 The Contractor shall record and report promptly (within 1 hour) by telephone, facsimile or other direct means to the CO, Contracting Officer Representative (COR), the Base POC, and to the military installation’s Safety Office, all available facts relating to each instance of damage to Government property or injury to either contractor or Government personnel. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, preserve evidence until released by the accident/mishap investigative authority through the CO, and immediately report the incident to the Fire Department at 911. If the
Government elects to conduct an investigation of the accident/mishap, the Contractor shall cooperate fully and assist Government personnel in conducting of the investigation until it is completed.
4.4.3 The Contractor agrees that his personnel and equipment are subject to safety inspections by Government personnel while on federal property.
4.5 QUALITY CONTROL
4.5.1 In addition to the requirements specified in the FAR clause 52.246-12--Inspection of Construction, the Contractor shall designate in writing, an individual responsible for managing the Contractor's inspection program. Such designation shall be made to the Contracting Officer prior to commencement of work on the job site.
4.5.2 The Government will require that work progress in stages when verification of the quantity, adequacy and/or accuracy of underlying work is necessary before follow-on work is allowed to start. When required by these specifications, such verifications shall be mandatory, and an allowance for these verifications shall be made in the
Contractor's Contract Progress Schedule. The Contractor shall provide notification that work is ready for verification in accordance with the requirements outlined in
Mandatory Verification Schedule.
4.6 SITE MANAGEMENT
4.6.1 Site Layout Plan:
Submit for approval a detailed scaled plan drawing showing the layout of the construction site prior to starting work. As a minimum the drawing shall include the locations of storage trailers, equipment storage and material staging areas, contractor employee parking areas, temporary construction fence including placement of safety signs (i.e. hard hat area, etc.), and trash dumpsters and containers. The submittal shall also include photographs of the site prior to disturbance by the start of work.
4.6.2 Site Preparation:
The Contractor shall perform site work as necessary to prepare sites for construction activities. Security and access controls shall be implemented to prevent unauthorized entry to sites and to protect wildlife from site exposure. The Contractor shall survey existing utilities to determine adequacy and need for modifications to support site activities before the start of demolition. The Contractor shall obtain appropriate approvals and shall construct connections or new systems for electrical power, water, sewer, gas distribution, telephone, and other utilities, as required, to accomplish the activities.
4.6.3 Demobilization:
The Contractor shall demobilize facilities as necessary, and restore the site. The
Contractor shall remove any temporary facilities and implement erosion control measures such as seeding, mulching, sodding, and erosion control fabrics; restore roads, structures, and utilities; and plant trees, shrubbery, grasses, and other vegetation. The
Contractor shall document and report on activities and train Government personnel to perform required facility equipment operation and maintenance, as requested.
4.6.4 Base appearance:
The appearance of construction sites at Dover AFB is of paramount importance to the
Commander of Dover AFB. A clean and well-kept construction site will help ensure proper compliance with the safety and environmental requirements of the contract. The management element of the Contractor’s performance rating will be affected by the compliance with this specification. The Contractor shall comply with all of the requirements specified herein and associated specification sections. The Contractor is responsible for the collection and disposal of all debris, rubble, residue and waste material generated in the performance of work under this contract. All such materials shall be removed from Dover AFB by the Contractor and disposed of in a State approved permitted landfill. The Contractor shall recycle concrete, untreated wood and other demolition debris. The Contractor is not permitted to deposit any such materials in Base trash collection containers or at any on-Base location without prior approval of the
Contracting Officer. The Contractor is responsible for remediating and/or reimbursing the
Base for any spills caused by them, their personnel, their subcontractors and/or their equipment.
4.6.5 Dust Control Plan:
Submit a plan for controlling the accumulation of dirt, debris, and dust on roadways and other surfaces adjacent to the construction site prior to the start of demolition. As a minimum the plan shall include the name of the Contractor including a designated point of contact, and the equipment to be used for cleaning the worksite.
4.6.6 Sanitation Facilities:
The Contractor shall provide portable sanitation facilities. Portable sanitation facilities shall be self- contained units with both urinals and stool capabilities. Units shall be adequately ventilated, cleaned and emptied at least once a week or more if determined necessary and directed by the Contracting Officer. The doors shall be self-closing and securable. The exterior of the unit shall match “Eagle Feather Tan”. Locate these facilities out of the view of the public, within the construction fence area. The Contractor shall request location approval by the Contracting Officer.
4.6.7 Construction Access Route Signs:
Any construction access route signs which the Contractor may wish to erect in order to facilitate location of the site by suppliers or subcontractors must receive prior approval by the Contracting Officer. Approved signs shall not exceed 12” x 18” in size, shall consist of white letters on a dark brown background (back of sign and post shall be dark brown also), and be mounted at locations approved by the Contracting Officer.
4.6.8 Construction Site Layout:
The Contractor shall arrange the storage trailers and dumpsters to effectively use the area designated on the plans. The Contractor shall request location approval by the Contracting
Officer.
4.6.9 Cleaning Roadways:
All roadways adjacent to the construction site which accumulate construction dirt, debris, dust, or other foreign materials as a result of activities related to this contract shall be cleaned at least daily or more often if determined necessary and directed by the Contracting
Officer in order to maintain a neat appearance. The method of cleaning shall remove and not just displace the material.
4.6.10 Trash Removal:
The Contractor shall provide 55 gallon trash containers. The Contractor shall empty the containers a minimum of once a week or more often if directed by the Contracting Officer.
The Contractor shall empty site dumpsters a minimum of once a week or more often if directed by the Contracting Officer in order to keep the site clean of trash. Dumpsters and containers shall not be allowed to overflow and permit trash to enter the site or adjacent areas. Larger construction use dumpster must be Eagle Feather Tan in color.
4.6.11 Safety Signs:
Safety signs shall be posted at all entrances to the construction site. The signs shall be ICI
Dover/Glidden color Pastel tint base: Formula # BLK 1P32 YOX 1P39 OXR 19 “DAFB
Eagle Feather Tan” unless safety mandates otherwise.
4.6.12 Restoration:
Except as otherwise required by the contract, all disturbed or damaged landscaping, paved areas, curbs or sidewalks shall be restored to the original condition. This condition will be as documented in the photographs of the undisturbed site submitted with the site layout plan.
4.7 ENVIRONMENTAL
4.7.1 Hazardous Material Usage:
Contractors must submit to the associated Contracting Office the information and supporting documentation (including Material Safety Data Sheets (MSDSs)) necessary to obtain hazardous material (HAZMAT) usage authorization. Report data on
HAZMAT used during the performance of the contract at intervals and in the format specified by Dover AFB.
4.7.2 Affirmative Procurement:
Affirmative Procurement (AP) is the name given to the federal program to strengthen efforts to protect the environment and promote economic growth through the purchase of recycled and other environmentally preferred products. Federal government procurement and use of recycled products, especially re-refined oil, can reduce our nation's dependency on foreign governments for raw materials.
4.7.3 Recycling of Construction Debris:
The Contractor and Dover AFB representatives shall make every attempt to recycle as much construction debris as possible and within financial reason. The Contractor shall utilize the provided Dover AFB recycling avenues for scrap metal and recycle other recyclable materials through own means.
4.7.4 Excess Soil Requiring Disposal Guidelines:
No excess soil shall be removed from Dover AFB by the contractor unless it has been sampled for contamination and approved by Dover AFB. The Contractor shall be required to arrange for sampling and disposal off base (at contractors expense).
4.7.5 Disposal of Encountered Groundwater:
No groundwater shall be removed from Dover AFB by the Contractor unless it has been sampled for contamination and approved by Dover AFB. Any encountered ground water during excavation is to be pumped to the nearest storm drain.
4.7.6 Conformance With Environmental Management System:
The Contractor shall perform work under this contract consistent with relevant policy and objectives identified in the Dover AFB environmental management system (EMS) applicable for this contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by the Dover AFB EMS and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. Found at: https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7001/afi32-7001.pdf
4.7.7 Air Permitting:
State of Delaware regulations pertaining to air pollution require the permitting of permanent placed equipment prior to installation. The following items require a construction permit prior to equipment being placed on the construction site.
4.7.7.1 Emergency generators with capacity greater than 450 kilowatts.
4.7.7.2 Boilers supplied by Natural Gas, LP gas, or other desulfurized fuel gas and have a rated heat input of less than 15 million British-
Thermal Units (BTUs) per hour.
4.7.7.3 Boilers utilizing any petroleum based fuel with a rated heat input of less than 10 million British-Thermal Units (BTUs) per hour.
4.7.7.4 Project specific equipment identified in the construction documents.
4.7.8 Hazardous Materials and Hazardous Waste Activities
Requirements:
4.7.8.1 To the extent required by other sections of this Statement of Work, the Contractor shall sample, test, remove, and dispose, all hazardous material and hazardous waste debris generated in the course of the work in accordance with applicable Federal, State, Local and these contract requirements. The Contractor shall provide all hazardous materials use and hazardous waste disposal documentation to the Base
Civil Engineering Squadron, and shall register with the Hazardous Materials
Pharmacy program (if available) at the installation to ensure appropriate and efficient tracking of the Contractor’s hazardous material purchases, inventories, use, and releases such as required by the Emergency Planning and Community Right-to-Know
Act (EPCRA), Executive Orders, or any installation reporting requirements. The
Contractor shall also comply with Federal, State, and Local requirements for any task https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7001/afi32-7001.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7001/afi32-7001.pdf involving the transportation of hazardous wastes and/or contaminated materials to off-site treatment, storage, and/or disposal facilities. This includes 40 CFR 260, 49
CFR 172, 173, 178, and 179, and all other applicable Federal, State, and Local transportation regulations.
For any areas where hazardous materials will be disturbed, the material must be handled in accordance with the requirements of the Environmental Protection Agency
(EPA), the Occupational Safety and Health Administration (OSHA), and the State of
Delaware regulations. There is no requirement to remove hazardous materials prior to demolition activities for this type of building in the State of Delaware, but contractors need to be made aware of the possible existence of hazardous materials so their workers and the environment can be adequately protected. Regulations established by
OSHA must be adhered to during work which involves building components containing hazardous materials in detectable amounts. Employers are required to use engineering controls and special work practices to reduce worker exposure at or below the permissible exposure level (PEL). It also requires exposure monitoring, biological monitoring, and employee training when a worker is exposed to airborne levels at or above the PEL. All hazardous materials are to be handled and disposed of as hazardous waste unless toxic characteristic leaching procedure (TCLP) testing is performed and indicates otherwise. Whenever renovation or demolition is performed on painted components, an attempt should be made to control dust. Any component containing hazardous materials in detectable amounts also has the ability to produce hazardous dust when it is disturbed.
5. CONTRACT ADMINISTRATION REQUIREMENTS
5.1 CONTRACT PROGRESS SCHEDULE, AF FORM 3064:
The Contractor shall prepare and submit, for approval, by the Contracting Office (CO), a work breakdown structure. The work breakdown structure shall be used to report the cost and schedule status for this project. All tasks required under this type of contract shall be included in the work breakdown structure.
5.2 PROGRESS REPORTS, AF FORM 3065:
Contractor shall complete biweekly Contract Progress Reports throughout the contract period. The work elements and percentages of the total job identified on the AF Form 3065 shall be identical to the work elements and percentages indicated on the AF Form 3064. Each invoice should be based on the most recent approved 3065 and will be entered through Wide Area Work Flow (WAWF). The
AF Form 3064, AF Form 3065, and invoice shall all cover the same period of time.
5.3 NOTIFICATION REQUIREMENT:
The Contractor is required to notify the Contracting Officer and the Project Manager of critical issues that may affect life, health, safety, contract performance, or the environment. Verbal notification should be made immediately followed by written notification as soon as practical.
5.4 TRANSMITTAL FORM:
Use AF Form 3000 Material Approval Submittal as the transmittal form for both design and construction submittals.
6. INSPECTIONS
6.1 PRE-FINAL INSPECTION
Pre-final inspection shall be coordinated by the Contractor to conduct a detailed inspection with the Government to identify construction deficiencies and remaining contractual items
(such as systems operating manuals, spare parts lists, as-built drawings and training requirements). The Contractor shall compile the list of deficiencies (punch list) which may have been identified during the Pre-final Inspection. A copy of the punch list shall be provided to the Base Civil Engineer, as well as the Contracting Officer.
6.2 FINAL INSPECTION
The Contractor shall conduct a final inspection with applicable Government officials after punch list items identified at the pre-final inspection are resolved.
6.3 FINAL ACCEPTANCE
This occurs when all punch-list items have been corrected by the Contractor and the Government accepts the work as complete. If there is no follow-on work under another contract, then Final
Acceptance would also be the physical completion date.
6.4 WARRANTY
A warranty shall be issued in accordance with FAR 52.246.21 (Warrantee of Construction).
A one year warranty shall be issued from the date of Final Acceptance for all work.
7 SECURITY AND ANTITERRORISM
7.1 SECURITY:
7.1.1 All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the Governmental Installation shall abide by all security instructions and directives of Dover AFB. Employees are responsible for safeguarding all government property provided for contractor use.
7.1.2 At the close for each work period, government facilities, equipment and materials shall be secured, lights, heat and water turned off and all doors and window secured.
7.1.3 The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general wellbeing or operational mission of the Installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during the Criminal Background Investigation
(CBI).
7.1.4 Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Employees and subcontractors later found to be undocumented or illegal aliens will be remanded to the proper authorities.
7.1.5 The contractor shall submit any request for compensation on delays to the
Contracting Officer for approval. The contractor shall notify the Contracting Officer or authorized representative as soon as the contractor realizes/determines of any potential delays in accordance with the terms and conditions of this requirement.
7.1.6 All contractors and subcontractors when working in a Controlled, Restricted or other sensitive areas must be escorted at all times. The military agency or unit responsible for the project or work is responsible for providing the escorts. The
Contractor shall follow existing procedures and instructions for obtaining entrance to restricted or controlled areas.
7.2 CONTRACTOR BADGE POLICIES:
7.2.1 All requests for contractor badges will be submitted through the 436th Contracting
Squadron Office and/or the requesting agencies base point of contact. The 436th
Contracting Squadron Office or base point of contact will then fill out an
Operational Risk Management Assessment Form (ORM) for the requesting agency and submit it to the Pass and Registrations section for approval IAW OPlan 31-101.
As a minimum the ORM will be submitted 10-days prior to the requested date of employment.
7.2.2 All contactor employees requesting to be granted unescorted access to the Installation are required to consent to a Criminal Background Investigation (CBI) prior to being granted entry to the Installation. Continued employment is contingent upon successful completion and favorable reporting of the CBI.
7.2.3 DAFB Contractor badges will be issued for a maximum period of one year. Prior to reissuing new badges, all old badges must be returned to 436th Security Forces Squadron
(436 SFS), Pass and Registration for destruction. Also, before a new badge will be issued, an ORM must be resubmitted to the Pass and Registration section for approval.
7.2.4 In the event a badge is lost or stolen, immediately contact the 436th Security Forces
Squadron, Pass and Registration office. The badge holder must accomplish the
Loss/Theft of Identification Worksheet and provide it to his/her supervisor. The supervisor of the contractor will investigate the loss and report in writing the circumstances in which the badge was lost to the 436th Contracting Squadron and 436th
Security Forces Squadron, Pass and Registration office and submit a new request for badge before a new badge can be reissued.
7.2.5 Base Contracting Office or base point of contact will immediately notify
436th Security Forces Squadron, Pass and Registration when a contractor’s employment has been terminated. The Site Supervisors are responsible for notifying and returning the contractor’s badge to Pass and Registration when this occurs. At no time will a contractor contact Security Forces directly regarding badge denial; they need to contact the Contracting Officer.
7.3 INSTALLATION ACCESS:
7.3.1 The contractor shall obtain personal contractor identification badges for all employees and vehicle passes for all contractor and personal vehicles requiring entry onto Dover
AFB from 436 SFS, Pass and Registration, for the duration of the contract. Employees are only permitted to enter the Installation during the date and time periods indicated on their contractor badge.
7.3.2 Vehicle registration, proof of insurance and a valid driver’s license must be presented for all vehicles while operating on the Installation. All vehicles entering the DAFB Main
Base, Military Family Housing or sensitive areas are subject to search. Any refusal or non- consent by an employee will result in termination of their base access and immediate confiscation of this access badge.
7.3.3 During Force Protection Condition (FPCON) Normal and Alpha, personnel without base issued badges must be sponsored onto the installation.
7.3.4 During FPCON Bravo, Charlie and Delta, personnel without base issued identification shall be physically escorted onto the installation.
7.3.5 During Higher FPCONs (Charlie and Delta) the base will normally curtail non-essential operations/functions; access by non-essential Contract operations will be suspended as the direction of the Installation Commander.
7.3.6 DoD Contractors supporting a Base Service Contract (e.g., Custodial Services, Ground Maintenance, etc.) are highly encouraged to complete AT Awareness
Level I training IAW AFI 10-245, Antiterrorism, Standard 25, by completing the―Force Protection computer based training (CBT) course through the Joint
Knowledge Online (JKO) Learning Management System (LMS) at http://jko.jten.mil/courses/atl1/launch.html for individuals without access to government Non-classified Internet Protocol Router Network (NIPRNET) computer and who do not possess a CAC card.
7.3.7 DoD Contractors or subcontractors without a CAC or who do not have access to a government Non-classified Internet Protocol Router Network (NIPRNET) computer performing construction on the installation should consider completing AT Awareness
Level I training IAW AFI 10-245, Antiterrorism, Standard 25, by completing the―
Force Protection computer based training (CBT) course through the Joint Knowledge
Online (JKO) Learning Management System (LMS) at http://jko.jten.mil/courses/atl1/launch.html
7.3.8 The standalone course MUST be completed on the computer in which it is started.
Course progress is not transferable between computers. The standalone course does provide a completion certificate but will not be tracked on JKO and no record will be maintained. AT Awareness Level I Training should be provided by the requiring unit after contract award or the sponsoring organization.
7.4 Flight-line Driving:
Not applicable to this project.
http://jko.jten.mil/courses/atl1/launch.html
8 ATTACHMENTS-
Attachment 1-
Attachment 1 B600 Bathroom Layout
1st Floor Restrooms
2nd Floor Restrooms
File details come from the government source that posted it. Updated .