Attachment_13_-_Lim_on_SubK_Breakout.xlsx

XLSX spreadsheet 91 KB Posted

Attached to
HVAC CONTROL SYSTEM, OR
Solicitation number
140L0625B0004
Issued by

About this file

This file is an attachment detailing subcontracting limitations for a small business set-aside contract for an HVAC Control System project. The solicitation (Number 140L0625B0004) is issued by the Department of the Interior Bureau of Land Management National Office, with a 90-day performance period after notice to proceed. The contract requires 25% self-performance by the contractor, and includes a detailed breakdown template for tracking labor costs, materials, and subcontractor payments across small business (SSS) and large business (LBS) subcontractors. The spreadsheet provides a mechanism to calculate and verify compliance with federal subcontracting limitations, ensuring proper allocation of contract work between the prime contractor and its subcontractors while maintaining the small business set-aside requirements.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)

Solicitation Number140L0625B0004 - HVAC Control System, OR
Type of Set-AsideSmall Business
Performance Period90 Days after NTP
Required Self-Performance25%

(A) Total Amount Proposed¹

(B) Total Material Cost2

(C) Self Performed Labor

(D) Small Business Subcontractor (SSS) Labor3
Total Amount Paid to [Insert First SSS Name]
Total Amount Paid to [Insert Second SSS Name]
Total Amount Paid to [Insert Third SSS Name]
Total Amount Paid to [Insert Fourth SSS Name]
Total Amount Paid to [Insert Fifth SSS Name]
Total Amount Paid to [Insert Sixth SSS Name]
Total Amount Paid to SSS Companies$0.00
(E) Large Business Subcontractor (LBS) Labor
Total Amount Paid to [Insert First LBS Name]
Total Amount Paid to [Insert Second LBS Name]
Total Amount Paid to [Insert Third LBS Name]
Total Amount Paid to [Insert Fourth LBS Name]
Total Amount Paid to [Insert Fifth LBS Name]
Total Amount Paid to [Insert Sixth LBS Name]
Total Amount Paid to LBS Companies$0.00

(F) Total Labor Cost4 $0.00

(G) Limitation on Subcontracting Percentage5
(Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor CostERROR:#DIV/0!
*Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost
*Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1.
*Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor.
*Note 4: Total labor costs consist of all contractual costs other than material.
*Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage.

Sheet2

Services (except construction)
General construction
Construction by special trade contractors

File details come from the government source that posted it. Updated .