Attachment 12 Supplemental SF 1442_SB Elevator NTE Pricing Sheet.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
CANCELLATION: National Elevator Modernization & Construction IDIQ SB Set Aside RFP
Solicitation number
47PM0925R0004
Issued by

About this file

This is a pricing template spreadsheet for elevator modernization services that includes a base period and four option periods. The template requires not-to-exceed (NTE) pricing for six line items in each period: elevator team labor hours (6,000 hours per period), geared machines (5 units), gearless machines (5 units), hydraulic power units (5 units), hydraulic controllers (5 units), and traction controllers (5 units).

The spreadsheet is structured to capture unit prices and total prices for each line item, with automatic calculation of period totals and an overall total for the base plus all options. All pricing fields are currently blank ($0.00) as this is a template for offeror completion. Line items reference qualifications defined in section B.8 of the agreement. This is Attachment 12 to solicitation 47PM0925R0004 for the GSA Public Buildings Service Small Business Set-Aside National Elevator Modernization IDIQ contract.

View the file

Other files

File Type Posted
Questions and Answers as of 2025 02 06.pdf PDF
Amendment 01 47PM0925R0004 SB Set Aside Nat Elevator IDIQ RFP 2025 02 06.pdf PDF
Proposal CheckIn SB Elevator Mod IDIQ Google Forms 2025 01 31.pdf PDF
SB Elev Mod Pre-Proposal Conference 2025 02 05.pdf PDF
Draft Solicitation Questions and Answers 2024 12 02.pdf PDF
Attachment 09 ADM 2181 1 Homeland Security Presidential Directive 12 Personal Identity Verification for Contractor Employees 2024 12 26.pdf PDF
Attachment 03 IDIQ attachment Section 02085 Roofing 2024 12 26.pdf PDF
Attachment 02 IDIQ attachment Section 02085 Asbestos Abatement Procedures 2024 12 26.pdf PDF
Attachment 08 IDIQ attachment CIO 2180.2 GSA Rules of Behavior for Handling Personally Identifiable Information PII 2024 12 26.pdf PDF
47PM0925R0004 SB Set Aside Nat Elevator IDIQ RFP 2025 01 07.pdf PDF
Attachment 11 IDIQ attachment GSA 527 Contractors Qualifications and Financial Information 2024 12 26.pdf PDF
Attachment 10 Reps and Certs 2024 12 26.pdf PDF
Attachment 07 IDIQ attachment ADM 7002.1 GSA Smart Buildings 2024 12 26.pdf PDF
Attachment 05 Section 02090 Control of Lead Based Paint Specification 2024 12 26.pdf PDF
Solicitation Cover Letter 2025 01 07.pdf PDF
Attachment 01 IDIQ attachment Section 01546 Safety and Health Specification 2024 12 26.pdf PDF
Attachment 04 IDIQ attachment Section 02087 Removal of Bird and Bat Droppings 2024 12 26.pdf PDF
Attachment 06 IDIQ attachment PIB 18 02 Attachment 6 File Naming 2024 12 26.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Not to Exceed Pricing Sheet
ItemBASE PERIODNTE QTYUnitNTE
Unit PriceNTE

Total

0101Elevator Team per qualifications defined by B.8 and the agreement6,000HR$0.00
0102Geared Machines as defined by B.8 and the agreement5EA$0.00
0103Gearless Machines as defined by B.8 and the agreement5EA$0.00
0104Hydraulic Power Unit as defined by B.8 and the agreement5EA$0.00
0105Hydraulic Controller as defined by B.8 and the agreement5EA$0.00
0106Traction Controller as defined by B.8 and the agreement5EA$0.00
Total Not to Exceed Base Period Price$0.00
50
ItemOPTION PERIOD 1NTE QTYUnitNTE
Unit PriceNTE

Total

1101Elevator Team per qualifications defined by B.8 and the agreement6,000HR$0.00
1102Geared Machines as defined by B.8 and the agreement5EA$0.00
1103Gearless Machines as defined by B.8 and the agreement5EA$0.00
1104Hydraulic Power Unit as defined by B.8 and the agreement5EA$0.00
1105Hydraulic Controller as defined by B.8 and the agreement5EA$0.00
1106Traction Controller as defined by B.8 and the agreement5EA$0.00
Total Not to Exceed Option Period 1 Price$0.00
ItemOPTION PERIOD 2NTE QTYUnitNTE
Unit PriceNTE

Total

2101Elevator Team per qualifications defined by B.8 and the agreement6,000HR$0.00
2102Geared Machines as defined by B.8 and the agreement5EA$0.00
2103Gearless Machines as defined by B.8 and the agreement5EA$0.00
2104Hydraulic Power Unit as defined by B.8 and the agreement5EA$0.00
2105Hydraulic Controller as defined by B.8 and the agreement5EA$0.00
2106Traction Controller as defined by B.8 and the agreement5EA$0.00
Total Not to Exceed Option Period 2 Price$0.00
ItemOPTION PERIOD 3NTE QTYUnitNTE
Unit PriceNTE

Total

3101Elevator Team per qualifications defined by B.8 and the agreement6,000HR$0.00
3102Geared Machines as defined by B.8 and the agreement5EA$0.00
3103Gearless Machines as defined by B.8 and the agreement5EA$0.00
3104Hydraulic Power Unit as defined by B.8 and the agreement5EA$0.00
3105Hydraulic Controller as defined by B.8 and the agreement5EA$0.00
3106Traction Controller as defined by B.8 and the agreement5EA$0.00
Total Not to Exceed Option Period 3 Price$0.00
ItemOPTION PERIOD 4NTE QTYUnitNTE
Unit PriceNTE

Total

4101Elevator Team per qualifications defined by B.8 and the agreement6,000HR$0.00
4102Geared Machines as defined by B.8 and the agreement5EA$0.00
4103Gearless Machines as defined by B.8 and the agreement5EA$0.00
4104Hydraulic Power Unit as defined by B.8 and the agreement5EA$0.00
4105Hydraulic Controller as defined by B.8 and the agreement5EA$0.00
4106Traction Controller as defined by B.8 and the agreement5EA$0.00
Total Not to Exceed Option Period 4 Price$0.00
Total Not to Exceed Price - Base plus Options$0.00

File details come from the government source that posted it. Updated .