This is a Google Forms proposal submission checklist and self-qualification assessment form for contractors bidding on a Small Business Elevator Modernization IDIQ contract. The form requests detailed information about the bidding company including SAM.gov registration details, UEI number, small business designations under NAICS 238290 (size standard $22M), and bonding capacity across different states.

The form requires contractors to provide past performance information for up to 10 elevator modernization projects, including contract numbers, award dates, completion dates, total contract values, subcontracting percentages, and work self-performed percentages. Additional requirements include submission of a 5-year safety report with OSHA 300 records, mechanics licenses, and confirmation of ability to obtain HSPD-12 clearances. The form concludes with a certification statement regarding the accuracy of information provided. Key proposal components referenced include Volume 1 (representations/certifications, GSA Form 527, SF1442) and Volume 2 (mechanics list and licenses).

View the file

Other files

File Type Posted
Questions and Answers as of 2025 02 06.pdf PDF
Amendment 01 47PM0925R0004 SB Set Aside Nat Elevator IDIQ RFP 2025 02 06.pdf PDF
SB Elev Mod Pre-Proposal Conference 2025 02 05.pdf PDF
Draft Solicitation Questions and Answers 2024 12 02.pdf PDF
Attachment 09 ADM 2181 1 Homeland Security Presidential Directive 12 Personal Identity Verification for Contractor Employees 2024 12 26.pdf PDF
Attachment 03 IDIQ attachment Section 02085 Roofing 2024 12 26.pdf PDF
Attachment 02 IDIQ attachment Section 02085 Asbestos Abatement Procedures 2024 12 26.pdf PDF
Attachment 08 IDIQ attachment CIO 2180.2 GSA Rules of Behavior for Handling Personally Identifiable Information PII 2024 12 26.pdf PDF
47PM0925R0004 SB Set Aside Nat Elevator IDIQ RFP 2025 01 07.pdf PDF
Attachment 11 IDIQ attachment GSA 527 Contractors Qualifications and Financial Information 2024 12 26.pdf PDF
Attachment 10 Reps and Certs 2024 12 26.pdf PDF
Attachment 07 IDIQ attachment ADM 7002.1 GSA Smart Buildings 2024 12 26.pdf PDF
Attachment 12 Supplemental SF 1442_SB Elevator NTE Pricing Sheet.xlsx XLSX spreadsheet
Attachment 05 Section 02090 Control of Lead Based Paint Specification 2024 12 26.pdf PDF
Solicitation Cover Letter 2025 01 07.pdf PDF
Attachment 01 IDIQ attachment Section 01546 Safety and Health Specification 2024 12 26.pdf PDF
Attachment 04 IDIQ attachment Section 02087 Removal of Bird and Bat Droppings 2024 12 26.pdf PDF
Attachment 06 IDIQ attachment PIB 18 02 Attachment 6 File Naming 2024 12 26.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Email *

2.

3.

4.

5.

6.

Small Business Elevator Modernization

IDIQ

Proposal Checklist, Self Quali�cation Assessment, and Technical Acceptability

* Indicates required question

What is your Company Name as listed in SAM.gov? *

Who is the signature authority authorized to sign for your company? (First and last name)

What is the email address of the signature authority authorized to sign for your company?

What is the phone number of the signature authority authorized to sign for your company?

What is your Company's Unique Entity Identifer (UEI) issued by SAM.gov? *

1/31/25, 7:02 AM Small Business Elevator Modernization IDIQ https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 1/24

7.

Example: January 7, 2019

8.

Mark only one oval.

Yes

No

9.

Check all that apply.

Other than small business Alaskan Native Corporation SBA Certi�ed 8(a) SBA Certi�ed HUBZone Veteran Owned Small Business Service Disabled Veteran Owned Small Business (SDVOSB) Small Disadvantaged Business (SDB) Woman Owned Small Business (WOSB) Small Business (SB)

SAM.gov Expiration Date? *

Is your company publicly searchable on SAM?

Please ensure your SAM registration allows public display of information Example message from our Contractor Responsibility Assessment service of a vendor current in SAM but not publicly searchable “FedDataCheck was able to locate the vendor; however, the vendor has chosen to not have their entity information displayed publicly in SAM. ... For a vendor who is currently designated as nonpublic to become publicly searchable … These instructions can also be found online here (Link to change public searchability or https://www.fsd.gov/gsafsd_sp?

id=kb_article&sys_id=c5cd667b1bc8e5906397ec21f54bcbfb).”

Under the UEI listed above, what small business designation is your firm under NAICS 238290 (Size Standard $22M)?

1/31/25, 7:02 AM Small Business Elevator Modernization IDIQ https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 2/24 https://www.fsd.gov/gsafsd_sp?id=kb_article&sys_id=c5cd667b1bc8e5906397ec21f54bcbfb

10.

Mark only one oval.

Yes

No

Not applicable

11.

12.

13.

Mark only one oval.

Yes

No

QUALIFICATION ASSESSMENT

Certified by SBA? *

Are there any other names your Company has used? *

What is your Company's Cage Code? *

Did your proposal include a Volume 1 which included the requirements as listed in the solicitation including representations and certifications as contained in Section K of the solicitaiton, GSA Form 527, and SF1442 with signed copies of amendments.

https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 3/24

14.

Yes

No

In addition to being a small business under the NAICS 238290, is your firm capable of self-performing 80% of the work as described in the solicitaiton (to include but not limited to modernizing controllers, fixtures, and door operators)?

https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 4/24

15.

Check all that apply.

Alabama Alaska Arizona Arkansas California Colorado Connecticut Delaware Florida Georgia Hawaii Idaho Illinois Indiana Iowa Kansas Kentucky Louisiana Maine Maryland Massachusetts Michigan Minnesota Mississippi Missouri Montana Nebraska Nevada New Hampshire New Jersey New Mexico New York - including New York City North Carolina North Dakota Ohio Oklahoma

Please mark the states that your firm has at least $500,000 single bonding capacity and $3 million aggregate bonding capacity.

https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 5/24

Oregon Pennsylvania Rhode Island South Carolina South Dakota Tennessee Texas Utah Vermont Virginia Washington West Virginia Wisconsin Wyoming District of Columbia American Samoa Guam Northern Mariana Islands Puerto Rico US Virgin Islands

Technical Acceptibility - safety and past performance

16.

Mark only one oval.

Yes

No

Did your proposal attach the required 5-year safety report as described in the solicitation with the attached OSHA 300 records to support the report?

https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 6/24

17.

Yes

No

Past Performance

For questions related to previous work, please start with the most current to least current.

18.

Mark only one oval.

PRIME

SUBCONTRACTOR

19.

20.

21.

Example: January 7, 2019

Does your company have a 5 year record of performing 2 or more elevator modernizations per year?

Project 1 *

Project 1 CUSTOMER *

Project 1 Contract Number *

Project 1 Award Date * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 7/24

22.

23.

24.

25.

26.

27.

Project 1 Essential Completion Date *

Project 1 Total Contract Award *

Project 1 Description *

Project 1 Total Subcontracting Dollars *

Project 1 Total Subcontracting Percentage *

Project 1 Percentage of work self-performed (in contract dollars not schedule) * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 8/24

28.

PRIME

SUBCONTRACTOR

29.

30.

31.

Example: January 7, 2019

32.

Example: January 7, 2019

33.

Project 2 *

Project 2 CUSTOMER *

Project 2 Contract Number *

Project 2 Award Date *

Project 2 Essential Completion Date *

Project 2 Total Contract Award * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 9/24

34.

35.

36.

37.

38.

Mark only one oval.

PRIME

SUBCONTRACTOR

39.

40.

Project 2 Description *

Project 2 Total Subcontracting Dollars *

Project 2 Total Subcontracting Percentage *

Project 2 Percentage of work self-performed (in contract dollars not schedule) *

Project 3 *

Project 3 CUSTOMER *

Project 3 Contract Number * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 10/24

41.

42.

Example: January 7, 2019

43.

44.

45.

46.

47.

Project 3 Award Date *

Project 3 Essential Completion Date *

Project 3 Total Contract Award *

Project 3 Description *

Project 3 Total Subcontracting Dollars *

Project 3 Total Subcontracting Percentage *

Project 3 Percentage of work self-performed (in contract dollars not schedule) * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 11/24

48.

PRIME

SUBCONTRACTOR

49.

50.

51.

Example: January 7, 2019

52.

Example: January 7, 2019

53.

Project 4 *

Project 4 CUSTOMER *

Project 4 Contract Number *

Project 4 Award Date *

Project 4 Essential Completion Date *

Project 4 Total Contract Award * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 12/24

54.

55.

56.

57.

58.

Mark only one oval.

PRIME

SUBCONTRACTOR

59.

60.

Project 4 Description *

Project 4 Total Subcontracting Dollars *

Project 4 Total Subcontracting Percentage *

Project 4 Percentage of work self-performed (in contract dollars not schedule) *

Project 5 *

Project 5 CUSTOMER *

Project 5 Contract Number * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 13/24

61.

62.

Example: January 7, 2019

63.

64.

65.

66.

67.

Project 5 Award Date *

Project 5 Essential Completion Date *

Project 5 Total Contract Award *

Project 5 Description *

Project 5 Total Subcontracting Dollars *

Project 5 Total Subcontracting Percentage *

Project 5 Percentage of work self-performed (in contract dollars not schedule) * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 14/24

68.

PRIME

SUBCONTRACTOR

69.

70.

71.

Example: January 7, 2019

72.

Example: January 7, 2019

73.

Project 6 *

Project 6 CUSTOMER *

Project 6 Contract Number *

Project 6 Award Date *

Project 6 Essential Completion Date *

Project 6 Total Contract Award * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 15/24

74.

75.

76.

77.

78.

Mark only one oval.

PRIME

SUBCONTRACTOR

79.

80.

Project 6 Description *

Project 6 Total Subcontracting Dollars *

Project 6 Total Subcontracting Percentage *

Project 6 Percentage of work self-performed (in contract dollars not schedule) *

Project 7 *

Project 7 CUSTOMER *

Project 7 Contract Number * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 16/24

81.

82.

Example: January 7, 2019

83.

84.

85.

86.

87.

Project 7 Award Date *

Project 7 Essential Completion Date *

Project 7 Total Contract Award *

Project 7 Description *

Project 7 Total Subcontracting Dollars *

Project 7 Total Subcontracting Percentage *

Project 7 Percentage of work self-performed (in contract dollars not schedule) * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 17/24

88.

PRIME

SUBCONTRACTOR

89.

90.

91.

Example: January 7, 2019

92.

Example: January 7, 2019

93.

Project 8 *

Project 8 CUSTOMER *

Project 8 Contract Number *

Project 8 Award Date *

Project 8 Essential Completion Date *

Project 8 Total Contract Award * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 18/24

94.

95.

96.

97.

98.

Mark only one oval.

PRIME

SUBCONTRACTOR

99.

100.

Project 8 Description *

Project 8 Total Subcontracting Dollars *

Project 8 Total Subcontracting Percentage *

Project 8 Percentage of work self-performed (in contract dollars not schedule) *

Project 9 *

Project 9 CUSTOMER *

Project 9 Contract Number * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 19/24

101.

102.

Example: January 7, 2019

103.

104.

105.

106.

107.

Project 9 Award Date *

Project 9 Essential Completion Date *

Project 9 Total Contract Award *

Project 9 Description *

Project 9 Total Subcontracting Dollars *

Project 9 Total Subcontracting Percentage *

Project 9 Percentage of work self-performed (in contract dollars not schedule) * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 20/24

108.

PRIME

SUBCONTRACTOR

109.

110.

111.

Example: January 7, 2019

112.

Example: January 7, 2019

113.

Project 10 *

Project 10 CUSTOMER *

Project 10 Contract Number *

Project 10 Award Date *

Project 10 Essential Completion Date *

Project 10 Total Contract Award * https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 21/24

114.

115.

116.

117.

Technical Acceptability - contractor employees

Please provide the mechanics list and the licenses in the proposal documents as instructed in the solicitation.

118.

Mark only one oval.

Yes

No

Project 10 Description *

Project 10 Total Subcontracting Dollars *

Project 10 Total Subcontracting Percentage *

Project 10 Percentage of work self-performed (in contract dollars not schedule) *

Did your proposal include a Volume 2 which includes a list of mechanics and a copy of each mechanic's license in accordance with the solicitation requirements?

https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 22/24

119.

Yes

No

Certification: The proposal information submitted as part of the email package and contained within this Google Form is accurate and complete to the best of my knowledge and belief. Submission of this form and the emailed proposal is with the understanding that knowingly misreprenting information is a cause for suspension and/or debarment to receive federal contracts; termination for default; and prosecution under Federal criminal and/or civil law.

120.

This content is neither created nor endorsed by Google.

Do current and will future employees proposed to support the solicited requirements (any task orders under the IDIQ) have the ability to meet the minimum requirements to obtain an HSPD-12 clearances in accordance with the solicitation requirements?

I certify the proposal information submitted in both this form and over email in response to the solicitation is accurate and complete to the best of my knowledge and belief. Please type your full name and position in the company.

Forms

1/31/25, 7:02 AM Small Business Elevator Modernization IDIQ https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 23/24 https://www.google.com/forms/about/?utm_source=product&utm_medium=forms_logo&utm_campaign=forms https://www.google.com/forms/about/?utm_source=product&utm_medium=forms_logo&utm_campaign=forms https://www.google.com/forms/about/?utm_source=product&utm_medium=forms_logo&utm_campaign=forms https://docs.google.com/forms/d/1c7FYCeLt3Soo5uXxVktfGT_zAsHy8nwmMHtGHTykNu4/edit 24/24