Attachment 04 IDIQ attachment Section 02087 Removal of Bird and Bat Droppings 2024 12 26.pdf

PDF 70 KB Posted

Attached to
CANCELLATION: National Elevator Modernization & Construction IDIQ SB Set Aside RFP
Solicitation number
47PM0925R0004
Issued by

About this file

This is a technical specification document (Section 02087) detailing requirements for the removal of bird and bat droppings in federal facilities. The document outlines specific procedures, safety requirements, and execution methods for contractors performing this work.

The specification requires contractors to submit a work plan addressing dust control and safety measures before beginning work. Workers must use proper protective equipment including disposable coveralls, NIOSH-approved full-face respirators with HEPA filters, and chemical cartridges if using chlorine-based disinfectants. The execution process involves isolating work areas, saturating contaminated areas with approved cleaning solutions, removing debris using manual scrapers or HEPA vacuums, and proper disposal in doubled 6-mil plastic bags. Final cleanup requires either water stream cleaning or chlorinated disinfectant application, with visual inspection required for completion approval by the Contracting Officer.

View the file

Other files

File Type Posted
Proposal CheckIn SB Elevator Mod IDIQ Google Forms 2025 01 31.pdf PDF
Questions and Answers as of 2025 02 06.pdf PDF
Amendment 01 47PM0925R0004 SB Set Aside Nat Elevator IDIQ RFP 2025 02 06.pdf PDF
SB Elev Mod Pre-Proposal Conference 2025 02 05.pdf PDF
Attachment 12 Supplemental SF 1442_SB Elevator NTE Pricing Sheet.xlsx XLSX spreadsheet
Attachment 08 IDIQ attachment CIO 2180.2 GSA Rules of Behavior for Handling Personally Identifiable Information PII 2024 12 26.pdf PDF
Solicitation Cover Letter 2025 01 07.pdf PDF
Attachment 02 IDIQ attachment Section 02085 Asbestos Abatement Procedures 2024 12 26.pdf PDF
Attachment 10 Reps and Certs 2024 12 26.pdf PDF
Attachment 03 IDIQ attachment Section 02085 Roofing 2024 12 26.pdf PDF
Draft Solicitation Questions and Answers 2024 12 02.pdf PDF
Attachment 07 IDIQ attachment ADM 7002.1 GSA Smart Buildings 2024 12 26.pdf PDF
Attachment 11 IDIQ attachment GSA 527 Contractors Qualifications and Financial Information 2024 12 26.pdf PDF
47PM0925R0004 SB Set Aside Nat Elevator IDIQ RFP 2025 01 07.pdf PDF
Attachment 06 IDIQ attachment PIB 18 02 Attachment 6 File Naming 2024 12 26.pdf PDF
Attachment 09 ADM 2181 1 Homeland Security Presidential Directive 12 Personal Identity Verification for Contractor Employees 2024 12 26.pdf PDF
Attachment 01 IDIQ attachment Section 01546 Safety and Health Specification 2024 12 26.pdf PDF
Attachment 05 Section 02090 Control of Lead Based Paint Specification 2024 12 26.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

March 2012 Revision 02087-1

SECTION 02087- REMOVAL OF BIRD AND BAT DROPPINGS

Part 1 - GENERAL

1.1 CONTROL AREA

A. The control area includes the following:

Describe work area and indicate on project drawings

B. Related work specified in other sections:

Section 01546, "Safety and Health," applies to all work covered by this section.

1.2 SUBMITTALS

Contractor’s plan of action: to be approved prior to the commencement of work.

A. Work practices and dust control measures to eliminate or reduce dust generation during the removal.

B. Material Safety Data Sheets (MSDS) for any products used on site.

1.3 CONTRACTOR RESPONSIBILITY

The contractor shall assume full responsibility for the protection of workers, visitors to the site, and persons occupying areas adjacent to the site.

1.4 SEQUENCING

Removal of droppings must be done in conjunction with other environmental abatement work as appropriate and prior to work of other trades.

Part 2 - PRODUCTS

2.1 EQUIPMENT

A. Equipment, protective clothing and respirators required for the execution of this contract shall comply with all applicable Federal, State, and local regulations, including but not limited to: 29 CFR 1910.132 and 29 CFR 1910.132.

March 2012 Revision 02087-2

B. At a minimum, workers shall wear disposable coveralls including disposable shoe coverings and gloves. Workers shall wear NIOSH-approved full face respirators with combination high-efficiency particulate air (HEPA) filters capable of excluding particles of 0.3 micron size. Chemical cartridges for chlorine are required if a chlorine-based disinfectant is used.

Part 3 - EXECUTION

3.1 WORK PROCEDURES

A. Isolate the work area by sealing off all openings and fixtures, including but not limited to heating and cooling system air intakes and doorways. Cover all non-removable items and equipment in the work area with plastic sheeting taped securely in place.

B. Prior to removal, saturate the contaminated area. Small areas can be wetted with a soapy water mixture/water with a surfactant. Alternatively, the contractor may use a chlorine-based disinfecting solution, used at the manufacturers’ suggested maximum concentration (requires pre-approval of the product’s MSDS). Apply solution using a low velocity sprayer to prevent debris from becoming airborne.

Use an application rate to completely saturate the material. If necessary, spray the area several times to fully saturate. The disinfectant solution should be sprayed intermittently during removal to keep debris saturated. Prevent drainage of gross debris into the building drainage system.

C. Use manual scrapers, shovels, and the like for gross debris removal. Bag the droppings in doubled, 6-mil plastic bags. Close bags securely and transport to a landfill for burial.

D. An acceptable alternative method is the use of an industrial HEPA vacuum to remove the debris. Truck-mounted or trailer-mounted HEPA vacuum systems are recommended for buildings with deep accumulations of bat or bird droppings, feathers, carcasses, etc.

3.2 CLEAN-UP AND DISPOSAL

A. Disposable coveralls shall be placed in plastic bags prior to exiting work area.

Provisions for showers shall be available in the event coveralls are torn or breached. It is recommended that workers shower, thoroughly washing their hair, at the end of each work shift.

B. After gross debris has been abated, if conditions allow, the surfaces shall be final cleaned using a water stream. If this is not feasible a final application of chlorinated disinfectant shall be applied.

March 2012 Revision 02087-3

C. Air sampling, surface sampling, or the use of any other sampling method intended to confirm cleanliness is unnecessary in most cases. However, before a removal activity is considered finished, the cleaned area should be inspected visually to ensure that no residual dust or debris remains. The Contracting Officer or his/her designated representative will inspect the work area prior to approval of decontamination work.

END OF SECTION 02087