Attachment 12 - Price Breakout - 668-22-105 Upgrade AHU 9 and 15.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Y1DA--CON-NRM-668-22-105 Upgrade AHU-09/15 Mechanical Systems
Solicitation number
36C26026R0082
Issued by

About this file

This is a Price Schedule Breakdown template for a fixed-price construction contract to upgrade Air Handling Units (AHUs) 9 and 15 at Mann-Granstaff VA Medical Center in Spokane, Washington, under solicitation 36C26026R0082. The template provides a standardized format for contractors to submit pricing across multiple construction divisions organized into four subgroups: General Requirements & Facility Construction (Divisions 1-14), Facility Services (Divisions 21-28), Site & Infrastructure (Divisions 31-35), and Process Equipment (Divisions 40-48). Each division includes a line for furnish and install costs, with all entries showing $0.00 as placeholder values awaiting contractor input.

The template includes instructions clarifying that awardees are responsible for formula accuracy and total calculations, that the line-item breakdown is for informational purposes only and does not constitute separate billable items, and that field office overhead and general conditions are applied only once to the base contract and any changes. The price schedule requires contractors to also provide costs for insurance/bonds, taxes/fees, O&M manuals and red-line drawings, overhead, subcontract mark-up, profit, and any other non-requested items, culminating in a final contract total. All pricing under this solicitation is fixed price.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
668-21-100

Upgrade AHUs 18, 20, 22 Mann-Granstaff VA Medical Center, Spokane, WA

Site & Infrastructure Subgroup
RatesBase Item
General Requirements & Facility ConstructionPrice
Division Item 1 General Requirements (furnish and install)N/A$0.00
Division Item 2 Existing Conditions (furnish and install)N/A$0.00
Division Item 3 Concrete (furnish and install)N/A$0.00
Division Item 4 Masonry (furnish and install)N/A$0.00
Division Item 5 Metals (furnish and install)N/A$0.00
Division Item 6 Woods, Plastic and Composites (furnish and install)N/A$0.00
Division Item 7 Thermal and Moisture Protection (furnish and install)N/A$0.00
Division Item 8 Openings (furnish and install)N/A$0.00
Division Item 9 Finishes (furnish and install or state included in Division 5)N/A$0.00
Division Item 10 Specialties (furnish and install)N/A$0.00
Division Item 11 Equipment (furnish and install)N/A$0.00
Division Item 12 Furnishes (furnish and install)N/A$0.00
Division Item 13 Special Construction (furnish and install)N/A$0.00
Division Item 14 Conveying Equipment (furnish and install)N/A$0.00
Facility Services Subgroup
Division Item 21 Fire Suppression (furnish and install)N/A$0.00
Division Item 22 Plumbing (furnish and install)N/A$0.00
Division Item 23 Heating, Ventilating and A/C (furnish and install)N/A$0.00
Division Item 25 Integrated AutomationN/A$0.00
Division Item 26 ElectricN/A$0.00
Division Item 27 CommunicationsN/A$0.00
Division Item 28 Electronic Safety & SecurityN/A$0.00
Site & Infrastructure Subgroup
Division Item 31 EarthworkN/A$0.00
Division Item 32 Exterior ImprovmentsN/A$0.00
Division Item 33 UtilitiesN/A$0.00
Division Item 34 TransportationN/A$0.00
Division Item 35 Waterway & Marine ConstructionN/A$0.00
Process Equipment Subgroup$0.00
Division Item 40 Process InterconnectionsN/A$0.00
Division Item 41 Material Processing & Handling EquipmentN/A$0.00
Division Item 42 Process Heating, Cooling, & Drying EquipmentN/A$0.00
Division Item 43 Process Gas & Liquid HandlingN/A$0.00
Division Item 44 Pollution & Waste Control EquipmentN/A$0.00
Division Item 45 Industry Specific Mfg. EquipmentN/A$0.00
Division Item 46 Water & Wastewater EquipmentN/A$0.00
Division Item 48 Electrical Power GenerationN/A$0.00

TOTAL DIVISIONS $0.00

Insurance / Bonds$0.00
Taxes / Other Fees (provide itemized list)$0.00
O&M Manuals and Red Line Drawings$0.00
Overhead$0.00
SubContract Mark-Up$0.00
Profit$0.00
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS$0.00
TOAL$0.00

File details come from the government source that posted it. Updated .