Solicitation Summary: 36C26026R0082

This is a Request for Proposals (RFP) for construction services to upgrade Air Handling Units (AHU) 9 and 15 mechanical systems at the Mann-Grandstaff VA Medical Center in Spokane, Washington. The Department of Veterans Affairs Veterans Health Administration (VISN 20) is seeking a single contractor to provide all necessary labor, materials, supplies, services, and equipment to complete the work in accordance with the Statement of Work, specifications, and drawings. The project is 100% open market unrestricted, with contract value estimated between $1,000,000 and $2,000,000 (NAICS Code 238220—Plumbing, Heating, and Air-Conditioning Contractors). Proposals must be submitted electronically by email to Quyen.Mai@va.gov and Dennis.Einarson@va.gov by June 1, 2026 at 10:00 AM PDT. Questions must be submitted by May 20, 2026 at 10:00 AM PST. A pre-bid site visit is scheduled for May 13, 2026 at 8:00 AM PST at Building 5 Conference Room. The contract will be awarded on a firm fixed-price basis using best value tradeoff source selection procedures in accordance with FAR Part 15, with evaluation based on Technical Approach (Factor 1), Past Performance (Factor 2), and Price (Factor 3), where non-price factors are significantly more important than price.

The solicitation requires offerors to submit two volumes: Volume 1 (Technical and Past Performance Proposal) and Volume 2 (Price Proposal). Technical proposals must demonstrate understanding of project requirements, provide a detailed approach to resourcing and scheduling, identify key personnel (Project Manager, Quality Control Manager, Site Superintendent, Site Safety & Health Officer) with relevant experience, and minimize disruption to clinical operations. Past performance proposals must include three to five recent projects (within the past five years) of similar size, scope, and complexity, with at least two demonstrating large air handling equipment installation experience, supported by completed Past Performance Questionnaires or Contractor Performance Assessment Reports. Offerors must also submit a completed and signed SF 1442, a bid guarantee (SF 24), acknowledgment of all amendments, completed representations and certifications, responses to FAR 52.209-7 and 52.209-13, a Limitations on Subcontracting Certificate of Compliance, Contractor Rules of Behavior, and a divisional price breakout. The performance period is 365 calendar days from Notice to Proceed. The Government reserves the right to conduct negotiations and intends to award without negotiations unless the Contracting Officer determines negotiations necessary.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26026R0082

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C26026R0082 X 04-29-2026 668-22-105 36C260 NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver

WA

98661 NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver

WA

98661 Quyen Mai 360-816-2791 Construction NRM Project 668-22-105 Upgrade AHU 9 and 15 Mechanical Systems Located at the Mann-Grandstaff VA Medical Center, 4815 N Assembly St, Spokane, WA 99205

Contractor to provide all necessary labor, materials, supplies, services, and equipment to complete all work in accordance with the statement of work and attached specifications and drawings and other documents.

This procurement is 100% open market unrestricted.

Proposals must be submitted by email to Quyen.Mai@va.gov and Dennis.Einarson@va.gov, no later than the time and date specified in Block 13. Proposals submitted by any other means will not be accepted. Questions must be submitted by 10:00 AM PST on 05/20/2026 to Quyen.Mai@va.gov and Dennis.Einarson@va.gov. Any question answered by other than an RFP amendment providing question and answer to all interested parties have no bearing on this RFP.

This acquisition will use best value tradeoff source selection procedures in accordance with FAR (Overhaul) Part 15, based on the best overall (i.e., best value) proposal that is determined to be the most beneficial to the Government with appropriate consideration given to the non-price and price factors.

IAW VAAR 836.204, the magnitude of this construction is between $1,000,000 and $2,000,000. The NAICS Code for this procurement is 238220, Plumbing, Heating, and Air-Conditioning Contractors.

Note: Any and all FAR or VAAR clauses listed in supporting documentation, e.g. specifications, are strictly for reference only and do not supersede, replace, or enhance those clause or provisions, in fuller reference, included in the solicitation or contract. FAR and VAAR clauses or provisions found in the solicitation or contract prevail.

Additionally, any references to "bid" and "bidder" shall be interpreted as "offer" or "offeror" in accordance with acquisition procedures and definitions of FAR Part 15. This project does not require any specific brands of any items, equipment, fixtures, etc. Any reference of a brand name shall be interpreted as “brand name or equal.”

“System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to Complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce Requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM."

X X X

10:00 AM

PDT

06-01-2026 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

36C260 NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver

WA

98661 Department of Veterans Affairs

FMS-VA-2(101)

Financial Services Center PO Box 149971 Austin

TX

78714-9971

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
A.3 PRICE/COST SCHEDULE5
ITEM INFORMATION5
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS5
1.1 OVERVIEW7
1.2 INSTRUCTIONS FOR PROPOSAL PREPARATION AND SUBMISSION7
1.3 FORMAL COMMUNICATIONS8
1.4 PRE-BID SITE VISIT9
1.5 BASIS FOR AWARD9
1.6 EVALUATION FACTORS9
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS16
2.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)16
2.2 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)16
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION)16
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) ALTERNATE I (MAY 2014)17
2.5 52.228-1 BID GUARANTEE (SEP 1996)18
2.6 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)18
2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)19
2.8 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)19
2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)23
2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)24
2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)24
REPRESENTATIONS AND CERTIFICATIONS25
3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)25
3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)26
GENERAL CONDITIONS29
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)29
4.2 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)29
4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2025) (DEVIATION)30
4.4 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (NOV 2025) (DEVIATION)32
4.5 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (NOV 2025) (DEVIATION)33
4.6 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (NOV 2025) (DEVIATION)34
4.7 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV 2025)35
4.8 SUPPLEMENTAL INSURANCE REQUIREMENTS39
4.9 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION)40
4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)49
4.11 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (NOV 2025) (DEVIATION)51
4.12 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)53
4.13 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)54
4.14 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)55
4.15 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) ALTERNATE I (APR 2019)55
4.16 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)56
4.17 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)57
4.18 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)58
4.19 IT CONTRACT SECURITY59

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

The Contractor will provide all labor, materials, supplies, services, and equipment to complete all work for project 668-22-105 in accordance with the Statement of Work and attached specifications, drawings, and other documents at the Mann-Grandstaff VA Medical Center.

PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: Y1DA - Construction of Hospitals and Infirmaries

GRAND TOTAL
__________________

Page 1 of Page 1 of

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

This acquisition will use best value tradeoff source selection procedures in accordance with FAR (Overhaul) Part 15, based on the best overall (i.e., best value) proposal that is determined to be the most beneficial to the Government with appropriate consideration given to the non-price and price factors. This acquisition is a 100% Open Market Unrestricted.

The following items are required to be submitted with the proposal for the proposal to be determined responsive/acceptable. It is the responsibility of each offeror to ensure that its proposal reaches the designated point of submission in a timely manner. Proposals received that do not provide all requirements of the solicitation may be deemed nonresponsive/unacceptable and removed from further consideration at the discretion of the Government.

1. Standard Form (SF) 1442, completed and signed. Note: Contractor’s signature shall be in accordance with FAR (Overhaul) Part 4.102 (e.g., proper signature and format of person who is able to bind an individual, partnership, corporation, etc.).

2. Amendment(s). All solicitation amendments must be acknowledged in accordance FAR (Overhaul) Clause 52.215-1(b). Acknowledgement of All Amendments: The Offeror shall acknowledge all amendments.

3. A Bid Guarantee, SF 24, is required. The Offeror must furnish a bid guarantee (see FAR (Overhaul) 52.228-1). The bid guarantee must be provided on Standard Form 24.

4. Complete Technical Proposal Volume 1. A complete Volume 1 Technical and Past Performance Proposal addressing each Factor needs to be submitted per the submission requirements.

5. Complete Price Proposal Volume 2. A complete Volume 2 price proposal shall be submitted per the submission requirements.

· Offerors shall submit a completed and signed SF 1442.

· Offerors are recommended to submit other pricing information that assists the Government in evaluation.

6. Completed Representations and Certifications. Provisions or clauses incorporated by full text and/or reference in this solicitation requiring completion by the offeror must be completed and submitted with the offer.

7. Information Regarding Responsibility Matters:

The Offeror must provide their response to FAR (Overhaul) 52.209-7(b).

8. Violation of Arms Control Treaties or Agreements:

The Offeror must provide their response to FAR (Overhaul) 52.209-13(b) Certification.

9. Post-Award Small Business Program Representation:

The Offeror must provide their response to FAR (Overhaul) 52.219-28(h), if applicable.

10. Notice to SDVOSB Joint Venture/Mentor Protegee:

Any Offeror submitting a bid as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture (1) have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402 and (2) will perform the contract in compliance with the joint venture agreement. Failure to properly certify is a material defect; if not certified, offeror is ineligible for award.

11. Limitations on Subcontracting Certificate of Compliance. The offeror must complete and sign the VA Notice of Limitation on Subcontracting Certificate of Compliance for Services and Construction required in VAAR 852.219-75 as provided in a separate document (Attachment 10 – 668-21-100 Limitations on Subcontracting) and return it with their proposal submission. The document must be completed correctly in its entirety with the company name inserted twice in the certification paragraph, each of the five lines below the certification paragraph completed correctly and signed by an authorized signatory. Failure to properly certify is a material defect and will not be considered for award.

12. Divisional Price Breakout.

Offer shall complete the price schedule division breakout found at Attachment 12 of the solicitation.

13. Contractor Rules of Behavior.

Offers must complete the Contractor Rules of Behavior as required by VA Handbook 6500.6. offers must initial and date each page and can be found at Attachment 11 of the solicitation.

1.1 OVERVIEW

1.1.1 Intent: The intent of this solicitation (please note that the words solicitation and request for proposal (RFP) may be used synonymously throughout the solicitation documents) is to select one contractor to provide professional construction services in accordance with the attached documents. The period of performance is 365 calendar days from the issuance of the Notice to Proceed.

1.1.2 Method of Award: The Government intends to use the “Best Value” tradeoff process source selection approach in accordance with FAR (Overhaul) 15.101-1. A firm fixed price award will be made to the responsive, responsible offeror whose offer/proposal is determined to be the best value to the Government based on all factors outlined in this Solicitation.

1.1.3 Negotiations: The Government intends to evaluate proposals and award a contract without negotiations with offerors (except clarifications as described in FAR (Overhaul) 15.202(b)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct negotiations if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly evaluated proposals.

1.1.4 Non-responsive/Unacceptable Proposal: Offerors must comply with all detailed instructions in this Solicitation for format and data content of the proposal. Proposals that do not comply with the detailed instructions for the format and data content of the proposal may be considered non-responsive and may render the Offeror ineligible for award.

1.2 INSTRUCTIONS FOR PROPOSAL PREPARATION AND SUBMISSION

1.2.1 These instructions prescribe the format and other essential information for preparation/development and presentation of proposal data to ensure the submission of necessary information for the understanding and comprehensive evaluation of proposals. Carefully review this section prior to commencing proposal preparation. In order for proposals to receive full consideration for award, offerors should ensure that the information furnished in support of the proposal is factual, accurate, and complete.

1.2.2 Proposal submission should be in PDF Format compatible with the latest version of Adobe Acrobat. Offeror’s proposals shall be submitted in two (2) separate Volumes: Volume 1 – Technical and Past Performance Proposal and Volume 2 – Price/Cost Proposal with strict adherence to the format, data, and other requirements of this Solicitation. Please title files in the following format:

· Solicitation Number Company Name Volume 1 Technical and Past Performance Proposal

· Solicitation Number Company Name Volume 2 Price Proposal

1.2.3 Written proposals shall be prepared on standard 8.5 x 11-inch paper (charts may be landscaped but must be on 8.5 x 11-inch paper), text lines shall be single-spaced and shall have a font size no smaller than Microsoft Word Times New Roman 11-point font. Type that is smaller will be considered illegible. All pages of each proposal shall be appropriately numbered and identified with the RFP number. For ease of reviews, consecutive page numbering is required.

1.2.4 Indexing: Each Volume shall contain a “Table of Contents” for that volume. The “Table of Contents” shall identify major areas, paragraphs and subparagraphs by number and title as well as by page number and volume locations.

1.2.5 Offerors responding to this Solicitation with a proposal/offer to provide the work set forth in the Solicitation documents should limit submissions to data essential for evaluation of proposals, so that a minimum of time and monies will have been expended in preparing information required herein. However, failure to include all information requested may adversely affect the evaluation. A proposal that merely reiterates or promises to accomplish the requirements of the RFP shall be deemed nonresponsive.

Offerors are reminded of their responsibility to submit a proposal that is orderly and sufficiently documented that will enable the Government to easily understand and perform a thorough and fair evaluation. All commitments made in the proposal may become a part of the resultant contract. The data submitted with each proposal should be complete and concise, but not overly elaborate. Excessive reliance on promotional brochures is discouraged. In order to be effectively and equitably evaluated, the proposals must include sufficiently detailed information to clearly address all of the evaluation criteria factors described in the Solicitation.

**ALL PROPOSALS MUST BE SUBMITTED ELECTRONICALLY; NO HARD COPY OR FACSIMILE PROPOSALS WILL BE ACCEPTED**

1.3 FORMAL COMMUNICATIONS

The following Points of Contact (POC) are provided for this acquisition. Address any questions or concerns you may have to both listed POCs via email with the subject line Project 668-22-105 – 36C26026R0082 – Upgrade AHU 9 and 15, no later than May 20, 2026, at 10:00 AM (PST). The government is not obligated to answer any questions submitted after this date. Furthermore, all questions shall be submitted by the prime contractor(s) on behalf of their subcontractor(s) and supplier(s). Questions submitted by subcontractors and/or suppliers directly to the POCs above, or if applicable, the AE of Record, will be rejected and not answered.

Clarifications and answers will be provided only in response to written requests for clarification and will be made available to all Offerors simultaneously by Amendment to this solicitation. Written requests for clarification should be emailed to the addresses indicated below. The government assumes no responsibility for non-delivery due to problems with email servers, and no extensions will be granted for these issues.

Quyen Mai Contract Specialist Quyen.Mai@va.gov

Dennis Einarson Contracting Officer Dennis.Einarson@va.gov

1.4 PRE-BID SITE VISIT

A formal site visit has been scheduled for this project. This will be the only opportunity for potential Offerors to visit the site. All potential Offerors, subcontractors, and suppliers are strongly encouraged to attend this site visit.

Site Visit Information Date: May 13, 2026 Time: 8:00 AM PST Location: Mann-Grandstaff VA Medical Center

4815 North Assembly St
Spokane, WA 99205
Building 5 Conference Room

1.5 BASIS FOR AWARD

This acquisition will use best value tradeoff source selection procedures in accordance with FAR Part 15, based on the best overall (i.e., best value) proposal that is determined to be the most beneficial to the Government with appropriate consideration given to the non-price and price factors.

1.6 EVALUATION FACTORS

This acquisition will use best value tradeoff source selection procedures in accordance with FAR Part 15, based on the best overall (i.e., best value) proposal that is determined to be the most beneficial to the Government with appropriate consideration given to the non-price and price factors.

During the evaluation of each proposal, the Government will assign a rating for Factors 1-3. The following factors will be used to evaluate each proposal:

Factor 1: Technical Approach Factor 2: Past Performance Factor 3: Price Factors 1 and 2 are of approximately equal importance. All evaluation factors, other than price, when combined, are significantly more important than price (Factor 3).

VOLUME 1 – TECHNICAL AND PAST PERFORMANCE PROPOSAL

The term “technical,” as used herein, refers to non-price factors other than past performance. The purpose of the technical factor is to assess whether the offeror’s proposal will satisfy the Government’s minimum requirements. Factor 1 will be evaluated using the ratings and descriptions outlined below.

The following definitions apply to the ratings described in Table 1:

“Strength” means an aspect of the proposal that benefits the Government or exceeds requirements; “Weakness” means a flaw that may increase the risk of unsuccessful performance; and “Deficiency” means a material failure to meet a requirement or a combination of significant weaknesses that increases risk to an unacceptable level.

Rating
Table 1. Combined Technical/Risk Ratings

Descriptions

Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.

Good Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.

Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Marginal
Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable.

Factor 1: Technical Rating Subfactor 1: Technical Approach Each Offeror will receive a rating based upon an evaluation of its proposal for this factor.

This factor will evaluate the offeror’s narrative describing its approach for accomplishing the work identified in the Statement of Work (SOW) and project documents. The offeror shall provide sufficient detail to demonstrate a clear understanding of the project requirements, constraints, and risks, and to describe the specific methods, procedures, resources, and sequencing it will use to complete the work successfully.

To be considered acceptable, the offeror must do more than restate the requirements; it must demonstrate in detail how it will meet those requirements through a well-defined and feasible approach. Generic statements indicating the ability to perform the work without supporting explanation will be evaluated as lacking sufficient detail or understanding.

The Government will evaluate the extent to which the narrative:

· Is logical and free of contradictory or conflicting information.

· Describes an approach to resourcing, organizing, and communicating on the proposed project that is consistent with requirements in the project description.

· Provides a level of detail and specificity to this project that demonstrates the Offeror understands the requirements in the attached SOW, specifications, and drawings.

· Reduces the risk of unsuccessful contract performance.

· Is realistic and achievable, e.g., does the offeror’s stated technical approach, to include their overall structure and management of their project team, correlate to a high probability of success during contract performance?

· The approach minimizes impact and disruption to clinical operations If an offeror’s proposal is deemed “unacceptable” for Factor 1, the evaluation process will stop, and the government will no longer consider the offeror within the competitive range for award consideration.

Subfactor 2: Key Personnel The Offeror shall propose one (1) team that consists of key personnel (Project Manager, Quality Control Manager, Site Superintendent, Site Safety & Health Officer) for the project and meet the minimum qualifications of the Specifications.

The Offeror shall submit one (1) resume for each position. Resumes shall address functions and responsibilities of the resume holder relevant to general construction, renovation, maintenance, minor repair, and ancillary construction services with an emphasis on experience working active health care. A strength may be assessed for experience in VA Healthcare settings.

Each resume must be no more than two (2) pages and provide the following minimum information:

· Name and title(s).

· Years’ experience in each role identified.

· Years’ experience with the Offeror and with other entities.

· Education including degree(s), year, and specialization (if applicable).

· Experience in projects relevant to the Technical Evaluation Factor 1.

· Other experience, certifications, and qualifications relevant to solicitation requirements.

· Two (2) professional references with telephone number and email address.

The Offeror shall also provide an Organizational Chart listing key company personnel and their role. The proposed Key Personnel will require prior written approval of the Contracting Officer on substitutions and modifications.

Factor 2: Past Performance Each Offeror will receive a rating from Tables 2 and 3, below, based upon an evaluation of its proposal for this factor.

When evaluating past performance, the role performed by the Offeror or its subcontractor(s) will be considered for consistency with the proposed role to be performed by the offeror or subcontractor(s) under this contract. The evaluation will consider recency, relevancy, and quality of performance, which are combined to establish an overall performance assessment for each Offeror. The evaluation will be based on projects submitted by the Offeror and any relevant past performance information available from Government sources.

· Provide a list of a minimum of three (3) and a maximum of five (5) recent (defined as within the last 5 years from the date of solicitation issuance) that are similar in size, scope, and complexity. At least two (2) projects should demonstrate experience with the installation and start-up of similar large air handling equipment.

· Offeror shall use the attached form titled “Past Performance/Experience Questionnaire” (PPQ) form to obtain information from at least three (3) of the five (5) projects listed above. Completed Contractor Performance Assessment Reports (CPARS) may be submitted in lieu of a PPQ where available. The PPQ identifies mandatory information; failure to provide that information may result in the PPQ not being considered for evaluation. If fewer than three (3) PPQs or CPARSs are received, the Government will evaluate all available PPQs, CPARS, and other relevant past performance information.

If an Offeror does not have any past performance record, a neutral rating will be assigned for this evaluation factor.

Sources of Past Performance Information for Evaluation are as follows:

· Offeror-Provided Information: The Offeror shall identify the required projects and submit completed PPQs using the VA-provided form to ensure consistency of information.

· Other Available Sources: The Government may obtain and consider past performance information from any available sources, such as the Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), interviews with Program Managers, CORs, and Contracting Officers. Technical evaluators and the Contracting Officer may also use personal knowledge of the contractor’s prior VA contracts to assist with the evaluation.

Recency:

Each past performance submission will be assessed either as recent or not recent. To be considered recent, projects provided must be completed or are at least 75% complete, within the past five (5) years, as of the issue date of the solicitation.

Relevancy:

Each past performance submission will be assessed either as relevant or not relevant.

To be considered relevant, submitted projects must be 75% complete, similar in scope, complexity, size and cost or price to the solicitation requirement.

The proposal must demonstrate a clear connection between the entity performing the work under this solicitation and the entity whose past performance is being submitted. If an offeror relies on an affiliate (such as a parent company, subsidiary, or joint venture partner) or a proposed subcontractor to demonstrate past performance, the proposal must clearly describe the relationship and the extent to which that affiliate or subcontractor will participate in contract performance in order to receive credit.

Table 2 – Past Performance Relevancy Ratings

Rating
Definition
Very Relevant
Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant
Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Quality of Performance:

The final aspect of the past performance evaluation is to determine how well the contractor performed on the contracts. The past performance evaluation performed in support of a current source selection does not establish, create, or change the existing record and history of the offeror’s past performance on past contracts; rather, the past performance evaluation process gathers information from customers on how well the offeror performed those past contracts.

The Evaluation Team will review this past performance information and determine the quality and usefulness as it applies to performance confidence assessment.

Past Performance Confidence Assessment:

Offerors will receive an integrated past performance rating at the factor level. An offeror must receive an integrated Past Performance Confidence Assessment of “Substantial Confidence”, “Satisfactory Confidence”, or “Unknown Confidence (Neutral)” rating for this evaluation factor to be included in the competitive range for award consideration. Any proposals receiving a past performance evaluation rating of "Limited Confidence" or "No Confidence" for this factor will not be included in the competitive range for contract award consideration.

Proposals may be rated higher for the performance confidence assessment if they include projects that demonstrate any of the following:

1. If the offeror is a JV, recent and relevant projects where the JV entities have previously worked together may be considered more favorably than a JV where the entities have not worked together.

1. Projects demonstrating the experience of the offeror or JV entities (i.e. self-performed work) may be more highly rated than projects demonstrating the experience of subcontractors. Relevant experience of parent companies or affiliates will be considered equivalent to experience of the offeror only if the proposal clearly demonstrates the connection between the affiliate's proposed role on the solicitation project and the role of the affiliate on the past performance submitted.

1. Projects where the offeror demonstrates recent and relevant construction experience with The Department of Veterans Affairs, Veteran Health Administration may be rated more favorably.

1. Projects where the offeror demonstrates experience in the same geographical region as the solicitation project may be rated more favorably.

Table 3 – Past Performance Confidence Assessments

Rating
Description

Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

Unknown Confidence (Neutral) *
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

* Note: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)).

VOLUME 2 – PRICE PROPOSAL

Factor 3: Price Price reasonableness analysis will be performed by the Government to determine that the proposal prices offered are complete, fair, and reasonable. Price reasonableness will be determined in accordance with FAR 15.305(a)(1). Normally, competition establishes price reasonableness. Comparison of the proposed prices is expected to satisfy the requirement to perform a price analysis, however, the Government may, if necessary, request and analyze the offeror’s price breakdown to establish reasonableness of an otherwise successful offeror’s price.

The Government reserves the right to conduct price realism analysis. The Government will review the proposed price in the context of the technical proposal. Any inconsistencies between proposed performance and price must be clearly justified. For example, if unique and innovative approaches are the basis for an abnormally low or high price, the nature of the approaches and their impact to the proposed price must be clear in the proposal.

For purposes of award, the total evaluated price will include the total price noted in the price schedule.

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)

(a) All actual and potential offerors are encouraged to provide feedback on the preaward and debriefing processes, as applicable. Feedback may be provided to agencies up to 45 days after award. The feedback is anonymous, unless the participant self-identifies in the survey. Actual and potential offerors can participate in the survey by selecting the following link: https:// www.acquisition.gov/360.

(b) The Contracting Officer will not review the information provided until after contract award and will not consider it in the award decision. The survey is voluntary and does not convey any protections, rights, or grounds for protest. It creates a way for actual and potential offerors to provide the Government constructive feedback about the preaward and debriefing processes, as applicable, used for a specific acquisition.

(End of Clause)

2.2 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION) (a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) ALTERNATE I (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be percent of the bid price or , whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.6 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)

(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—

(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and

(2) Standard Form 28, Affidavit of Individual Surety.

(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.

(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.

(End of Provision)

2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Hand-Carried Address:

NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661 Mailing Address:

NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

2.8 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)

(a) Definitions. As used in this provision— Backhaul, covered article, covered telecommunications equipment or services, critical technology, FASCSA order, Intelligence community, interconnection arrangements, national security system, roaming, sensitive compartmented information, sensitive compartmented information system, source, and substantial or essential component have the meanings provided in the clause 52.240-91, Security Prohibitions and Exclusions.

Business operations means engaging in commerce in any form, including by acquiring, developing, maintaining, owning, selling, possessing, leasing, or operating equipment, facilities, personnel, products, services, personal property, real property, or any other apparatus of business or commerce.

Marginalized populations of Sudan means—

(1) Adversely affected groups in regions authorized to receive assistance under section 8(c) of the Darfur Peace and Accountability Act (Pub. L. 109-344) (50 U.S.C. 1701 note); and

(2) Marginalized areas in Northern Sudan described in section 4(9) of such Act.

Restricted business operations means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate—

(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;

(2) Are conducted under specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;

(3) Consist of providing goods or services to marginalized populations of Sudan;

(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;

(5) Consist of providing goods or services that are used only to promote health or education; or

(6) Have been voluntarily suspended.

Sensitive technology—

(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically—

(i) To restrict the free flow of unbiased information in Iran; or

(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and

(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).

(b) Procedures.

(1) Covered telecommunications and video surveillance. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.”

(2) FASCSA Orders.

(i) The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (e) of FAR 52.240-91, Security Prohibitions and Exclusions.

(ii) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM but are effective and apply to the solicitation and resultant contract (see FAR 40.204-1(c)(2)).

(iii) FASCSA orders issued after the date of solicitation do not apply unless added by an amendment to the solicitation.

(c) Covered telecommunications equipment or services representations. By submission of its offer, the Offeror represents that, after conducting a reasonable inquiry (that looks at any information in the Offeror’s possession but does not need to include an internal or third-party audit)—

(1) It will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation, except as waived by the solicitation, or as disclosed in paragraph (g); and

(2) It does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services, except as waived by the solicitation, or as disclosed in paragraph (g).

(d) FASCSA Representation. By submission of this offer, the offeror represents that it has conducted a reasonable…