Attachment 12 - CDRL A004 - Quality Control Plan.pdf
PDF 264 KB Posted
- Solicitation number
- SP3300-22-R-5005
- Issued by
-
Defense Logistics Agency Distribution
About this file
This document contains a Contract Data Requirements List (CDRL) for a Quality Control Plan (QCP) and related details for a professional support services contract opportunity with the Defense Logistics Agency Distribution Business Development Office. Key requirements include the contractor submitting an initial site-specific QCP within 45 days prior to transition that details quality processes meeting contract standards, with subsequent revisions submitted within 10 days of any changes. On a monthly basis, the contractor must provide a quality control report specifying completed and scheduled inspections, conforming and nonconforming results, corrective action plans and statuses, and any revisions to address government-identified deficiencies. Nonconforming inspection reports must be submitted within 24 hours.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages yre3533 Highlight yre3533 Highlight
DD Form 1423-1, FEB 2001 Page 2 of 2
CDRL A006, Quality Control Plan (QCP)
The Contractor’s quality control plan shall outline the tasks performed by the Contractor to sustain or improve quality or work and ensure work meets contract requirements.
The Contractor shall include in the plan:
A. Quality Control:
1) Details of surveillance methods to be used.
2) Identification of the frequency of QC inspections and the process used to determine the most appropriate frequency.
3) Lot and sample size determinations.
4) Criteria for determining conforming vs. non-conforming results.
5) Documentation requirements.
6) How corrective action will be developed, implemented and monitored to correct non-conformances and mitigate future non-conforming outcomes for all QC checklist questions.
7) QC Inspection Checklists that include the requirements identified in the Performance Work
Statement.
8) Revision and updates in response to both internal QC inspections as well as any deficiencies identified by the Government (e.g, Quality Assurance; Independent DLA Distribution Review; Independent Public Auditor (IPA) and Managers Internal Control Program/Annual Statement of Assurance processes to ensure identified problem areas receive attention and closer monitoring.
9) Roles and Responsibilities and Lines of Authority for the QC Program.
Attachments:
1 - Sample Corrective Action Plan (CAP)
Defense Distribution Center…………………….
Corrective and Preventive Action Request (CPAR) Form
Corrective Action Preventive Action
Surveillance Report No.
Quality Control Evaluator Surveillance Date Significance
Requested as a result of Scheduled QC Check Management Request External Audit Finding Prior Nonconformance Internal Audit Finding Customer Advisor
Problem Description:
Identified Root Cause:
Corrective/ Preventive Actions:
Supervisor Signature Implementation Date:
QC Follow up Date:
All Corrective/Preventive Actions IMPLEMETED: Yes No If NO, please explain below:
All Corrective/Preventive Actions EFFECTIVE: Yes No If NO, please explain below:
QC Signature: Date:
| A006 - Quality Control Plan page 1.pdf |
| CDRL A006 Attachment 3.pdf |
| Sheet1 |
| A006 Atch 1 List of Internal Controls revised.pdf |
| P2S |
| ADP84B7.tmp |
| P2S |
| A006 - Attachment 1.pdf |
| P2S |
| A006 - Attachment 4.pdf |
| CDRL A006 Attachment 3.pdf |
| Sheet1 |
| A006 Atch 1 List of Internal Controls revised.pdf |
| P2S |
Untitled
| A_CONTRACT_LINE_ITEM_NO: 0003 |
| B_EXHIBIT: Attachment 12 |
| TDP: |
| TM: |
| OTHER: |
| DSYSTEMITEM: |
| E_CONTRACTPR_NO: SP3300-22-R-5005 |
| FCONTRACTOR: |
| 1_DATA_ITEM_NO: A004 |
| 2_TITLE_OF_DATA_ITEM: Quality Control Plan (QCP) |
| 3_SUBTITLE: |
| 4_AUTHORITY_Data_Acquisit: |
| 5_CONTRACT_REFERENCE: [PWS C-1.7, Quality Control Plan] |
| 6_REQUIRING_OFFICE: DLA Distribution J-7 |
| 7_DID_250_REQ: See Block 16 |
| 8_APP_CODE: |
| DIST_STATEMENT: B |
| 10_FREQUENCY: See Block 16 |
| 11_AS_OF_DATE: N/A |
| 12_DATE_OF_FIRST_SUBMISSI: See Block 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: See Block 16 |
| addressee1: QCP & Revisions: |
| draft1: |
| reg1: |
| repro1: |
| addressee2: J-7 Contract Spec |
| draft2: |
| reg2: 1 |
| repro2: |
| addressee3: COR/TPOC |
| draft3: |
| reg3: |
| repro3: 1 |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: Monthly QC Report: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: COR/TPOC |
| draft6: |
| reg6: 1 |
| repro6: |
| addressee7: J7 Contract Spec |
| draft7: |
| reg7: |
| repro7: 1 |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: Nonconfoming QC |
| draft9: |
| reg9: |
| repro9: |
| addressee10: Inspection Results: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: COR/TPOC |
| draft11: |
| reg11: 1 |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_repro: 2 |
| 16_REMARKS: Submit electronically. Submit a final site specific QCP not later than 45 calendar days prior to the end of transition that details the Contractor's process for a quality system that is a prevention based outlook and an approach to customer satisfaction that is proactive to meeting the objectives through all areas of performance IAW C-1.7. The Contractor's QCP shall be maintained throughout the life of the contract and shall include the Contractor's procedures to routinely evaluate the effectiveness of the plan to ensure the Contractor is meeting the performance standards and requirements of the contract. Subsequent submission shall be submitted with the Contractor updates or revisions to the QCP within 10 calendar days of the change. |
See page two for QCP requirements.
Submit Monthly NLT 5 working dates after the end of the month a QC Report detailing:
1. Scheduled vs Completed QC Inspections and explanations for QC Inspections not completed that were scheduled
2. Conforming vs Non-conforming QC Inspection Results
3. A copy of all QC Corrective Action Plans and status of implementation and maintenance to mitigate future occurrences of same non-conformance
4. Forecasted revisions to the QCP to address any deficiencies identified by the Government
Items #1, 2, and 4 above shall be submitted on Contractor letterhead. Item #3 shall be submitted using the format at Attachment 1.
Copies of all completed non-conforming QC inspection reports shall be submitted within 24 hours to the addressees in Block 14.
Block 7 - Inspection and acceptance requirements: The KO will review and accept the QCP, and any updates, after coordination with the COR and/or TPOC and Contract Specialist. The accepted plan and subsequent revisions will be incorporated into the contact by modification. The COR and/or TPOC will review and accept the monthly QC Report.
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| G_PREPARED_BY: |
| H_DATE: |
| 1_APPROVED_BY: |
| J_DATE: |
| Page: 1 |
| of_pages: 2 |
| Reset: |
| reg38t: 3 |
| Site: |
| Check Box2: Off |
| Check Box3: Off |
| Text4: |
| QCE: |
| Surveillance Data: |
| Significance: |
| Check Box8: Off |
| Check Box10: Off |
| Check Box12: Off |
| Check Box9: Off |
| Check Box11: Off |
| Check Box13: Off |
| Problem Description: |
| Identified Root Cause: |
| Corrective/Preventive Actions: |
| Implementation Date: |
| QC Follow Up Date: |
| Check Box20: Off |
| Actions Implemented: |
| Check Box21: Off |
| Check Box23: Off |
| Check Box24: Off |
| Actions Effective?: |
| Data: |
File details come from the government source that posted it. Updated .