Attachment 11 - 668-24-102 - Cost Division Breakout.xls

XLS spreadsheet 215 KB Posted

Attached to
Y1DA--CON-NRM-668-24-102 Replace Windows Building 1 Federal contract opportunity
Solicitation number
36C26026R0011
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

About this file

This is a Construction Cost Estimate template in CSI (Construction Specifications Institute) Format for solicitation 668-24-102, "Replace Exterior Windows Building 1" at Mann-Grandstaff VA Medical Center in Spokane, Washington. The spreadsheet is designed to assist contractors in preparing detailed cost proposals by division using a prefilled structure that links individual division estimates to a summary page with automatic calculations for overhead, profit, sales tax, bonding, and risk.

The template includes six active CSI divisions: Division 01 (General Requirements), Division 02 (Existing Conditions), Division 07 (Thermal and Moisture Protection), Division 08 (Openings), Division 09 (Finishes), and Division 12 (Furnishings). Contractors may add missing items or additional divisions beyond those prefilled. The spreadsheet automatically calculates the hard cost total, applies configurable overhead and profit percentages for both prime contractors (10% overhead and 10% profit as defaults) and subcontractors (5% overhead and 11% profit as defaults), includes 6% Florida State Sales Tax, 2% Builder's Risk/Performance Bonds, and generates a final contract total. Key instructions specify that if prime contractors self-perform work, overhead and profit must be zeroed for that division to avoid double-counting, and if subcontractors have different rates, adjustments must be made at the division level while maintaining spreadsheet integrity. The form requires contractors to complete designated "Fill Here" fields including company name, date, estimator information, and percentage rates, with all other calculations auto-populating from division entries.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--CON-NRM-668-24-102 Replace Windows Building 1, newest first.
File Type Posted
668-24-102 Technical Questions Consolidated Responses updated 4-3-2026.pdf PDF
36C26026R0011 0004.docx DOCX document
Attachment 11- Cost Division Breakout Version 1.xlsx XLSX spreadsheet
82-1000 VA Spokane Windows HazMat Survey Report _no dwgs.pdf PDF
36C26026R0011 - 668-24-102 - Questions with Consolidated Responses.pdf PDF
24-046.2 MGVAMC Summer 2024 AHERA 3-Year Reinspection Rpt_.pdf PDF
36C26026R0011_1 Solicitation Page 27.pdf PDF
36C26026R0011 0003.docx DOCX document
36C26026R0011 0002.docx DOCX document
668-24-102 Pre-Bid Walk-Through Sign In.pdf PDF
36C26026R0011 0001.docx DOCX document
Attachment 13 - 668-24-102 - Site Visit Area Map - Revised.pdf PDF
Attachment 13 - 668-24-102 - Site Visit Area Map.pdf PDF
Attachment 6 - 668-22-102 - LEVEL 3 Window project VHA ICRA.pdf PDF
Attachment 2 - 668-24-102 - BID SET DRAWINGS.pdf PDF
36C26026R0011_1.docx DOCX document
Attachment 12 - 668-24-102 - Spokane Wage Determination 1_23_26.pdf PDF
Attachment 9 - 668-24-102 - Contractor Rules of Behavior.pdf PDF
Attachment 4 - 668-24-102 - PCRA_VHA PCRA.pdf PDF
Attachment 10 - 668-24-102 - Past Performance Questionnaire.docx DOCX document
Attachment 8 - 668-24-102 - Limitations on Subcontracting-Construction.pdf PDF
Attachment 7 - 668-24-102 - Hazardous Survey Report.pdf PDF
Attachment 5 - 668-24-102 - LEVEL 2 Window project VHA ICRA.pdf PDF
Attachment 3 - 668-24-102 - BID SET SPECIFICATIONS 2_18_26.pdf PDF
Attachment 1 - 668-24-102 - CON SOW.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.

Exceptions:

(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.

(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.

The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.
Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.
* CSI = Construction Specifications Institute

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Summary

CONSTRUCTION COST ESTIMATEDate:
Fill Here
COMPANY
Fill Here
PROJECT
668-24-102 - Replace Exterior Windows Bldg 1
LOCATIONPROJECT NO.663-21-100
Mann-Grandstaff VA Medical Center, Spokane, WA
DIVISIONDESCRIPTION% by
DivisionDivision Total
DIVISION 01GENERAL REQUIREMENTS45.7%50.00
DIVISION 02EXISTING CONDITIONS54.3%59.48
DIVISION 07THERMAL AND MOISTURE PROTECTION0.0%- 0FILL IN AS REQUIRED (this will link to the entire document)
DIVISION 08OPENINGS0.0%- 0
DIVISION 09FINISHES0.0%- 0
DIVISION 12FURNISHINGS0.0%- 0GC Overhead10.00%
GC Profit10.00%
HARD COST TOTAL100%109.48Sub Overhead5.00%
Sub Profit11.00%
Sales Tax6.00%
PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)10%10.95Risk/Bonding2.00%
SUBTOTAL120.42
PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)10%12.04This spreadsheet contains many formulas... please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas
SUBTOTAL132.46
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)2%2.65
CONTRACT TOTAL$ 135.11

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N davisjam:

Percentages listed are place fillers. Please complete as required

Div1

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
668-24-102 - Replace Exterior Windows Bldg 1CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Mann-Grandstaff VA Medical Center, Spokane, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663-21-100
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
GENERAL REQUIREMENTS
- 0- 0- 0
- 0- 0- 0
Sample Input2- 010.0020.0020.00
Sample Input31.0010.0030.00- 030.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS30.0020.00
SUBTOTAL50.00
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ 50.00

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div2

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
668-24-102 - Replace Exterior Windows Bldg 1CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Mann-Grandstaff VA Medical Center, Spokane, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663-21-100
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXISTING CONDITIONS
- 0- 0- 0
- 0- 0- 0
Sample Input2- 010.0020.0020.00
Sample Input310.0030.00- 030.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS30.0020.00
SUBTOTAL50.00
Sub-Contractor's Overhead5.00%2.50
Sub-Contractor's Profit11.00%5.78
FL State Sales Tax6.00%1.20
TOTAL$ 59.48

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div7

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
668-24-102 - Replace Exterior Windows Bldg 1CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Mann-Grandstaff VA Medical Center, Spokane, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663-21-100
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
THERMAL AND MOISTURE PROTECTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div8

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
668-24-102 - Replace Exterior Windows Bldg 1CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Mann-Grandstaff VA Medical Center, Spokane, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663-21-100
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
OPENINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div9

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
668-24-102 - Replace Exterior Windows Bldg 1CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Mann-Grandstaff VA Medical Center, Spokane, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663-21-100
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FINISHES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div12

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
668-24-102 - Replace Exterior Windows Bldg 1CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Mann-Grandstaff VA Medical Center, Spokane, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663-21-100
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FURNISHINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0