This is a Price Schedule Breakdown template for a federal construction contract solicitation. The document provides instructions and a standardized format for contractors to submit pricing for the replacement of windows in Building 1 at Mann-Grandstaff VA Medical Center in Spokane, Washington, under Solicitation 36C26026R0011 (Project 668-24-1-2). The pricing structure is organized by Construction Specification Institute (CSI) Divisions, including General Requirements, Existing Conditions, Thermal and Moisture Protection, Openings, Finishes, and Furnishings, with line items for furnish and install labor. All pricing is fixed-price.
The template requires contractors to calculate subtotals and contract totals for various cost categories, including division costs, insurance and bonds, taxes and fees, operations and maintenance manuals and red line drawings, overhead, subcontract markup, and profit. The instructions clarify that field office overhead and general conditions are considered equivalent cost categories and should be applied only once to the base contract and any changes. Contractors are responsible for verifying formula accuracy and transposing totals to the Price Summary. The contract line item price breakdown is provided for information purposes only and does not constitute separate billable deliverables.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| Solicitation 36C26026R0011 - Project 668-24-1-2 |
Replace Windows Bldg 1 Mann-Grandstaff VA Medical Center - Spokane, WA
| Site & Infrastructure Subgroup | ||
| Rates | Base Item | |
| General Requirements & Facility Construction | Price | |
| Division Item 1 General Requirements (furnish and install) | $0.00 | |
| Division Item 2 Existing Conditions (furnish and install) | $0.00 | |
| Division Item 7 Thermal and Moisture Protection (furnish and install) | $0.00 | |
| Division Item 8 Openings (furnish and install) | $0.00 | |
| Division Item 9 Finishes (furnish and install) | $0.00 | |
| Division Item 12 Furnishings (furnish and install) | $0.00 |
TOTAL DIVISIONS $0.00
| Insurance / Bonds | $0.00 |
| Taxes / Other Fees (provide itemized list) | $0.00 |
| O&M Manuals and Red Line Drawings | $0.00 |
| Overhead | $0.00 |
| SubContract Mark-Up | $0.00 |
| Profit | $0.00 |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
| CONTRACT TOTALS | $0.00 | |
| TOAL | $0.00 |