This document contains a statement of clarification and a related federal contract opportunity solicitation. The Bureau of Land Management issued a statement of clarification for the PPNM Rock Stabilization project to accept exceedances of noise limitations in the specification as long as publicly accessible areas do not exceed 70 dB(A). Seasonal construction restrictions from February to June and April to July apply for nesting owls and migratory birds respectively at the Turtle Rock construction area, although migratory bird nesting will be prevented by mowing.

The related solicitation is for the PPNM Rock Stabilization project near Billings, Montana, with an estimated price range of $1-5 million. Services include installation of geotechnical instrumentation, rockbolts, micropiles, cement grouted anchors, selective vegetation removal, mortar stabilization of rock joints, shotcrete, drainage controls and environmental/cultural resource protections. Proposals are due on March 7, 2023 to the Bureau of Land Management Montana State Office. Award is anticipated on May 19, 2023 with work to commence within 10 days and be complete by October 19, 2023. The solicitation was issued as a total small business set-aside with a NAICS code of 237990 and size standard of $45 million.

View the file

Other files for this federal contract opportunity

Other files attached to PPNM ROCK STABILIZATION, newest first.
File Type Posted
Amendment_1_-_PPNM_Rock_Stabilization_0001.pdf PDF
Sol_140L3623R0001_Amd_0001.pdf PDF
Attachment_5_-_PPNM_Stabilization_-_Appendix_D.pdf PDF
Solicitation_-_PPNM_Rock_Stabilization_-_Issued.pdf PDF
Attachment_18_-_DI-137_Release_of_Claims.pdf PDF
Attachment_17_-_Standard_Form_25A_-_Payment_Bond.pdf PDF
Attachment_16_-_Standard_Form_25_-_Performance_Bond.pdf PDF
Attachment_6_-_PPNM_Stabilization_-_Appendix_E.pdf PDF
Attachment_9_-_PPNM_Stabilization_-_Drawings.pdf PDF
Attachment_7_-_PPNM_Stabilization_-_Appendix_F.pdf PDF
Attachment_3_-_PPNM_Stabilization_-_Appendix_B.pdf PDF
Attachment_15_-_Standard_Form_24_-_Bid_Bond.pdf PDF
Attachment_12_-_Reference_List.pdf PDF
Attachment_4_-_PPNM_Stabilization_-_Appendix_C_Part4.pdf PDF
Attachment_2_-_PPNM_Stabilization_-_Appendix_A.pdf PDF
Attachment_14_-_Financial_Responsibility_Required_Documentation.pdf PDF
Attachment_13_-_Past_Performance_Questionnaire.pdf PDF
Attachment_11_-_General_Decision_Number.pdf PDF
Attachment_8_-_PPNM_Stabilization_-_Appendix_G.pdf PDF
Attachment_4_-_PPNM_Stabilization_-_Appendix_C_Part3.pdf PDF
Attachment_4_-_PPNM_Stabilization_-_Appendix_C_Part2.pdf PDF
Attachment_4_-_PPNM_Stabilization_-_Appendix_C_Part1.pdf PDF
Attachment_1_-_PPNM_Stabilization_-_Specifications.pdf PDF
Sol_140L3623R0001.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF CLARIFICATION

PPNM ROCK STABILIZATION

STATEMENT OF CLARIFICATION

BY THE BUREAU OF LAND MANAGEMENT

In order to ensure constructability of the project (e.g. drilling operations), the Government will accept limitation exceedances of the values listed in the Noise & Acoustics Management – 01 57 19.12 specification.

The intent of Noise & Acoustics Management – 01 57 19.12 specification is to protect the public from damaging and distracting noise and acoustics during construction. The Government will accept exceedance of limits listed in 01 57 19.12 Part 3.1.B.1 if no publicly accessible areas receive levels of dB(A) over 70 dB(A). The Government will not require a time duration of impact noise restriction as listed in 01 57 19.19 Part 3.1.B.1. If publicly accessible areas are to receive over 70 dB(A), then the areas

(e.g. boardwalk, viewing platforms, walking trails) will need to be closed from the public by the

Government for the duration of the construction activity causing the limitation exceedance. The

Contractor shall operate in a manner to adhere to 01 57 19.12 Part 3.1.A. The Government will accept sound level exceedance in 01 57 19.12 Part 3.1.C as long as the publicly accessible areas are below 70 dB(A) and Contractor personnel safety controls are per OSHA standards.

Seasonal construction restrictions from February 1 to June 30 apply for this project for nesting owls at the Turtle Rock construction areas only. Seasonal restrictions from April 15 to July 15 apply for this project for migratory birds. Migratory bird restrictions will be mitigated by the Government by mowing all construction areas to prevent migratory bird nesting from establishing. If migratory bird nests are established and identified, however not anticipated for this project, the seasonal restriction shall apply to this project.