Attachment_1_-_PPNM_Stabilization_-_Specifications.pdf

PDF 2 MB Posted

Attached to
PPNM ROCK STABILIZATION Federal contract opportunity
Solicitation number
140L3623R0001
Issued by
Department of the Interior Bureau of Land Management

About this file

This document outlines a federal solicitation for construction services. The Bureau of Land Management is seeking proposals to perform stabilization work at multiple areas of the Pompeys Pillar National Monument site in Montana. Services include installing geotechnical instrumentation, rockbolts, micropiles, shotcrete, structural steel, concrete elements, and implementing erosion control. Offerors must submit proposals by March 7th, 2023. The contract is estimated between $1-5 million and is set aside for small businesses. The contractor must begin work by May 29th, 2023 and complete all work by October 19th, 2023. Interested parties should contact the point of contact for additional requirement details.

View the file

Other files for this federal contract opportunity

Other files attached to PPNM ROCK STABILIZATION, newest first.
File Type Posted
Amendment_1_-_PPNM_Rock_Stabilization_0001.pdf PDF
Sol_140L3623R0001_Amd_0001.pdf PDF
Attachment_9_-_PPNM_Stabilization_-_Drawings.pdf PDF
Attachment_7_-_PPNM_Stabilization_-_Appendix_F.pdf PDF
Attachment_3_-_PPNM_Stabilization_-_Appendix_B.pdf PDF
Attachment_14_-_Financial_Responsibility_Required_Documentation.pdf PDF
Attachment_13_-_Past_Performance_Questionnaire.pdf PDF
Attachment_11_-_General_Decision_Number.pdf PDF
Attachment_8_-_PPNM_Stabilization_-_Appendix_G.pdf PDF
Attachment_4_-_PPNM_Stabilization_-_Appendix_C_Part3.pdf PDF
Attachment_4_-_PPNM_Stabilization_-_Appendix_C_Part2.pdf PDF
Attachment_4_-_PPNM_Stabilization_-_Appendix_C_Part1.pdf PDF
Sol_140L3623R0001.pdf PDF
Attachment_5_-_PPNM_Stabilization_-_Appendix_D.pdf PDF
Solicitation_-_PPNM_Rock_Stabilization_-_Issued.pdf PDF
Attachment_18_-_DI-137_Release_of_Claims.pdf PDF
Attachment_17_-_Standard_Form_25A_-_Payment_Bond.pdf PDF
Attachment_16_-_Standard_Form_25_-_Performance_Bond.pdf PDF
Attachment_10_-_PPNM_Stabilization_-_Statement_of_Clarification.pdf PDF
Attachment_6_-_PPNM_Stabilization_-_Appendix_E.pdf PDF
Attachment_15_-_Standard_Form_24_-_Bid_Bond.pdf PDF
Attachment_12_-_Reference_List.pdf PDF
Attachment_4_-_PPNM_Stabilization_-_Appendix_C_Part4.pdf PDF
Attachment_2_-_PPNM_Stabilization_-_Appendix_A.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 27 00 - 1

DEFINITION OF CONTRACT LINE ITEMS

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

C. The Contract Line Items in this section will be measured for progress payment . Any changes to the work, including changes in quantities of these Contract Line Items, not authorized by the Government in writing will not be measured and paid for. This is a fixed firm price contract.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line Item No. 0001 - Mobilization, Site Work, Restoration and Demobilization

1. This item consists of all preparatory work, bonds, insurance, temporary facilities, and movement of personnel, equipment, supplies, to the Project site, site work, protection of staging and construction areas, signage, temporary fencing other facilities necessary for the Work, and all costs associated with completing the Work that are not included in other bid items.

2. Measurement for progress payment: Payment for Mobilization, Site Work, Restoration, and Demobilization will be made at the contract lump sum price. Progress payments will be as follows:

a. When 5 percent of the total original Contract amount is earned from other Contract items, 50 percent of the amount bid for Mobilization, Site Work, Restoration and Demobilization will be included in the progress payment estimate.

b. When 40 percent of the total original Contract amount is earned from other schedule items, 40 percent of the amount bid for Mobilization, Site Work, Restoration and Demobilization will be included in the progress payment estimate.

c. The final 10 percent of the amount bid for Mobilization, Site Work, Restoration and Demobilization will be included in the final contract payment.

B. Contract Line Item No. 0002 - Install 22-Foot Rockbolts (Rockbolt Type 4)

1. This item consists of all preparatory work, planning, equipment, materials and labor to drill, test and document rockbolt hole, installation of rockbolt, grouting, cleaning of rock surface, all related testing and placing of mortar over the head assembly.

01 27 00 - 2

2. Measurement for progress payment: The Government will measure Type 4 Rockbolts by the number of rockbolts successfully installed and accepted. Rockbolts not installed correctly or failing proof or performance load tests will not be measured for payment.

Additional Rockbolts not approved by the government or Rockbolts incorrectly placed will not be measured for payment.

C. Contract Line Item No. 0003 – Scale Sandstone

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to sound, scale in a controlled manner, remove and dispose of rock debris removed from sandstone blocks 1A-1E, 2A-2E, 3 and 4.

2. Measurement for progress payment: The Government will measure Scale Sandstone by the hour. Areas and rocks to be scaled will be field identified by the Government within the limits of sandstone blocks 1-4. Provide notice of planned scaling activities as required by the Government representative so arrangements can be made to verify quantities. Time spent for routine inspection, sounding and scaling of the areas previously scaled will not be measured for payment.

D. Contract Line Item No. 0004 – Block 2D Rock Removal

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to drill, split, scale in a controlled manner, remove and dispose of overhanging rock removed from sandstone block 2D.

2. Measurement for progress payment: The Government will measure Block 2D Rock by the percentage of the specified work completed and accepted of the contract amount bid for Block 2D Rock Removal.

E. Contract Line Item No. 0005 – Siltstone Stabilization Footing

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to excavate, form and pour a reinforced concrete footing to support the siltstone stabilization shotcrete.

2. Measurement for progress payment: The Government will measure Siltstone Stabilization Footing that have been constructed and accepted per lineal foot as measured at the front face of the footing.

F. Contract Line Item No. 0006 – Construct Drainage System FES-1 to SS-6

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to excavate, install piping, make connections, install structures, place backfill and compact soil to grade.

2. Measurement for progress payment: The Government will measure Drainage System that has been constructed and accepted per lineal foot as measured along the centerline of the drainage system.

G. Contract Line Item No. 0007 - Install 15-Foot Rockbolts (Rockbolt Type 2)

1. This item consists of all preparatory work, planning, equipment, materials and labor to drill, test and document rockbolt hole, installation of rockbolt, grouting, cleaning of rock surface, all related testing and anchor head assembly.

2. Measurement for progress payment: The Government will measure Type 2 Rockbolts by the number of rockbolts successfully installed and accepted. Rockbolts not installed correctly or failing proof or performance load tests will not be measured for payment.

Additional Rockbolts not approved by the government or Rockbolts incorrectly placed will not be measured for payment.

01 27 00 - 3

H. Contract Line Item No. 0008 - Install 10-Foot Rockbolts (Rockbolt Type 3)

1. This item consists of all preparatory work, planning, equipment, materials and labor to drill, test and document rockbolt hole, installation of rockbolt, grouting, cleaning of rock surface, all related testing and anchor head assembly.

2. Measurement for progress payment: The Government will measure Type 3 Rockbolts by the number of rockbolts successfully installed and accepted. Rockbolts not installed correctly or failing proof or performance load tests will not be measured for payment.

Additional Rockbolts not approved by the government or Rockbolts incorrectly placed will not be measured for payment.

I. Contract Line Item No. 0009 – Siltstone Stabilization Shotcrete

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to scale, shape, apply siltstone hardener, furnish and install strip drains, including connection to 3” PVC pipe, and place 4-inch minimum structural reinforced shotcrete.

2. Measurement for progress payment: The Government will measure Siltstone Stabilization Shotcrete that is properly installed without voids, shadows behind reinforcement or drummy by the square foot. Shotcrete not meeting the specified quality requirements will not be measured for payment.

J. Contract Line Item No. 0010 – Block 2 Underpinning

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to install the Block 2 Underpinning, including but not limited to excavation for footing, installation and testing of micropiles, construction of reinforced foundation, placement of support post, and placement of 6-inch thick reinforced architecturally textured and colored shotcrete enclosure.

2. Measurement for progress payment: The Government will measure Block 2 Underpinning by the percentage of the specified work completed and accepted of the contract amount bid for Block 2 Underpinning.

K. Contract Line Item No. 0011 – Siltstone Architectural Shotcrete

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to place 4-inch minimum architectural shotcrete, including shaping, texturing and multi-color staining.

2. Measurement for progress payment: The Government will measure Siltstone Architectural Shotcrete per square foot that is properly installed, textured and stained without voids or delaminating from the structural shotcrete. Shotcrete not meeting the specified quality requirements will not be measured for payment.

L. Contract Line Item No. 0012 – Instrumentation and Integration

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to install the following: four strain gauge instrumented rockbolts, six borehole pressure cells, one crack meter at Block 2, all required data loggers, communication devices, system integration and related appurtenances necessary for a functional instrumentation system to monitor the specified instrumentation locations.

2. Measurement for progress payment: The Government will measure Instrumentation and Integration by the percentage of the specified work completed and accepted of the contract amount bid for Instrumentation and Integration.

01 27 00 - 4

M. Contract Line Item No. 0013 – Signature Area Instrumentation Protection

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to install the Signature Area Instrumentation Protection, including but not limited to temporary and permanent protection of existing instrumentation with fabricated handholes and related appurtenances.

2. Measurement for progress payment: The Government will measure Signature Area Instrumentation Protection by the percentage of the specified work completed and accepted of the contract amount bid for Signature Area Instrumentation Protection

N. Contract Line Item No. 0014 – Signature Area – Area 1 Curb

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to excavate, form and pour an integrally colored, reinforced concrete curb.

2. Measurement for progress payment: The Government will measure Signature Area – Area

1 Curb that have been properly constructed and accepted. Measurement will be made per lineal foot along the back face of the curb.

O. Contract Line Item No. 0015 – Signature Area – Area 2 Curb

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to excavate, form and pour an integrally colored, reinforced concrete curb.

2. Measurement for progress payment: The Government will measure Signature Area – Area

2 Curb that have been properly constructed and accepted. Measurement will be made per lineal foot along the back face of the curb.

P. Contract Line Item No. 0016 – Signature Area – Area 3 Curb

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to excavate, form and pour an integrally colored, reinforced concrete curb.

2. Measurement for progress payment: The Government will measure Signature Area – Area

3 Curb that have been properly constructed and accepted. Measurement will be made per lineal foot along the back face of the curb.

Q. Contract Line Item No. 0017 – Signature Area Drainage System

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to place metal flashing, place and compact sand backfill, place PVC protection sheet and HDPE waterproofing membrane, install membrane terminations and washed aggregate ballast.

2. Measurement for progress payment: The Government will measure Signature Area Drainage System that is properly installed and accepted by the square foot.

R. Contract Line Item No. 0018 – Construct Drainage System SS-9 to SS-6

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to excavate, install piping, make connections, install structures, place colored mortar backfill to existing rock surface from structure SS-9 up SS-6, not including structure

SS-6.

2. Measurement for payment: The Government will measure Drainage System that has been constructed and accepted by the lineal foot as measured at the centerline of the drainage system.

01 27 00 - 5

S. Contract Line Item No. 0019 – Turtle Rock Stabilization

1. This item consists of all preparatory work, planning, coordination, equipment, materials and labor to install the Turtle Rock Stabilization, including but not limited to coring, drilling and installation of 3 Type 1 Rockbolts, fabrication and installation of support post including architectural coating system, and placement of colored mortar seam treatment.

2. Measurement for progress payment: The Government will measure Turtle Rock Stabilization by the percentage of the specified work completed and accepted of the contract amount bid for Turtle Rock Stabilization.

END OF SECTION 01 27 00

01 27 00 - 6

This Page Left Blank Intentionally

01 42 00 - 1

REFERENCE STANDARDS

SECTION 01 42 00 – REFERENCE STANDARDS

PART 1 - GENERAL

1.1 ENVIRONMENTAL DEFINITIONS

A. Definitions pertaining to sustainable development: As defined in ASTM E2114 and as specified herein.

B. Chain-of-Custody: Process whereby a product or material is maintained under the physical possession or control during its entire life cycle.

C. Deconstruction: Disassembly of buildings for the purpose of recovering materials.

D. DFE (Design for the Environment): A technique that includes elements of resource conservation and pollution prevention as applied in various product sectors. A technique that incorporates approaches which are part of product (or assembly) concept, need and design. Considerations involve material selection, material and energy efficiency, reuse, maintainability and design for disassembly and recyclability. Refer to ISO Guide 64 for additional clarification.

E. Environmentally preferable products: Products and services that have a lesser or reduced effect on the environment in comparison to conventional products and services. Refer to EPA’s Final Guidance on Environmentally Preferable Purchasing at www.epa.gov/oppt/epp.

F. Non-Renewable Resource: A resource that exists in a fixed amount that cannot be replenished on a human time scale. Non-renewable resources have the potential for renewal only by geological, physical, and chemical processes taking place over of millions of years. Examples include: iron ore, coal, and oil.

G. Perpetual Resource: A resource that is virtually inexhaustible on a human time scale. Examples include solar energy, tidal energy, and wind energy.

H. Recycled Content Materials: Products that contain pre-consumer or post-consumer materials as all or part of their feedstock. Recycled content claim shall be consistent with Federal Trade Commission (FTC) Guide for the Use of Environmental Marketing Claims.

I. Renewable Resource: A resource that is grown, naturally replenished, or cleansed, at a rate which exceeds depletion of the usable supply of that resource. A renewable resource can be exhausted if improperly managed. However, a renewable resource can last indefinitely with proper stewardship. Examples include: trees in forests, grasses in grasslands, and fertile soil.

1.2 QUALITY ASSURANCE

A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.

01 42 00 - 2

B. Publication Dates: Comply with standards in effect as of date of the Contract Documents, unless otherwise indicated.

C. Conflicting Requirements: Where compliance with two or more standards is specified, and the standards may establish different or conflicting requirements for minimum quantities or quality levels comply with the most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to Government for a decision before proceeding.

1.3 INDUSTRY STANDARDS

A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.

B. Publication Dates: Comply with standards in effect as of date of the Contract Documents unless otherwise indicated.

C. Copies of Standards: Each entity engaged in construction on Project should be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with the Contract Documents.

1. Where copies of standards are needed to perform a required construction activity, obtain copies directly from publication source.

1.4 ABBREVIATIONS AND ACRONYMS

A. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities found in Section 01 42 00 Sources for Reference Publications at www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs (accessible via https://specsintact.ksc.nasa.gov/Masters/Masters.shtml > Downloads section > click on UFGS Master (WBDG website). Names, telephone numbers, and websites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

XX EXAMPLE Association (The) www.EXAMPLE.org

B. Code Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and websites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

DIN Deutsches Institut fur Normung e.V. 49 30 2601-3003 www.din.de/en

IAPMO International Association of Plumbing and Mechanical Officials (909) 472-4100

01 42 00 - 3 www.iapmo.org

ICC International Code Council (888) 422-7233 www.iccsafe.org

ICC-ES ICC Evaluation Service, Inc. (800) 423-6587 www.icc-es.org (562) 699-0543

C. Federal Government Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, and websites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

ABA &

ABAAS United States Access Board

Architectural Barriers Act (ABA) Architectural Barriers Act Accessibility Standards (ABAAS) www.access-board.gov

CoE Army Corps of Engineers www.usace.army.mil

CPSC Consumer Product Safety Commission www.cpsc.gov

DOC Department of Commerce www.commerce.gov

DOD Department of Defense www.defense.gov

DOJ Department of Justice www.justice.gov

DOE Department of Energy www.energy.gov

EPA Environmental Protection Agency www.epa.gov

FAA Federal Aviation Administration www.faa.gov

FCC Federal Communications Commission www.fcc.gov

FDA Food and Drug Administration www.fda.gov

GSA General Services Administration www.gsa.gov

01 42 00 - 4

HUD Department of Housing and Urban Development www.hud.gov

LBL Lawrence Berkeley National Laboratory www.lbl.gov

NCHRP National Cooperative Highway Research Program (See TRB)

NIST National Institute of Standards and Technology www.nist.gov

OSHA Occupational Safety & Health Administration www.osha.gov

PHS U.S. Department of Health and Human Services www.usphs.gov/ophs/

RUS Rural Utilities Service (See USDA)

SD State Department www.state.gov

TRB Transportation Research Board www.trb.org

USDA Department of Agriculture www.usda.gov

USP U.S. Pharmacopeia www.usp.org

USPS Postal Service www.usps.com

D. Standards and Regulations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the standards and regulations in the following list. Names, telephone numbers, and websites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

ABAAS Architectural Barriers Act Accessibility Standards www.access-board.gov

CFR Code of Federal Regulations Available from Government Printing Office www.gpoaccess.gov/cfr/index.html

DOD Department of Defense Military Specifications and Standards Available from Department of Defense Single Stock Point

01 42 00 - 5 http://dodssp.daps.dla.mil

DSCC Defense Supply Center Columbus (See FS)

FED-STD Federal Standard (See FS)

FS Federal Specification Available from Department of Defense Single Stock Point http://quicksearch.dla.mil/

Available from General Services Administration www.gsa.gov

Available from National Institute of Building Sciences www.nibs.org

FTMS Federal Test Method Standard (See FS)

MIL (See MILSPEC)

MIL-STD (See MILSPEC)

MILSPEC Military Specification and Standards Available from Department of Defense Single Stock Point http://quicksearch.dla.mil

UFAS Uniform Federal Accessibility Standards Available from Access Board www.access-board.gov

(UFAS is only for housing projects per Fair Housing Act. See also the Fair Housing Act Design Manual, www.huduser.gov/portal/publications/destech/fairhousing.html)

1.5 ENVIRONMENTAL REFERENCE STANDARDS

A. American Forest and Paper Association:

1. Sustainable Forestry Initiative

B. American Society of Heating Refrigerating and Air Conditioning Engineers (ASHRAE):

ASHRAE 52.2, Method of Testing General Ventilation Air Cleaning Devices for

Removal Efficiency by Particle Size ASHRAE 55, Thermal Environmental Conditions for Human Occupancy ASHRAE 62.1, Ventilation for Acceptable Indoor Air Quality ASHRAE 62.2, Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential

Buildings ASHRAE/IESNA 90.1, Energy Standard for Buildings, Except Low-Rise Residential

Buildings

01 42 00 - 6

ASHRAE 90.2, Energy Efficient Design of Low-Rise Residential Buildings

C. American Association of State Highway and Transportation Officials (AASHTO):

M288 Geotextile Specification for Highway Applications MP009-06 Standard Specification for Compost for Erosion/Sediment Control (Filter

Berms and Filter Socks) MP010-03 Standard Specification for Compost for Erosion/Sediment Control (Compost

Blankets)

D. American Society for Testing and Materials International (ASTM):

A478 Standard Specification for Chromium-Nickel Stainless Steel Weaving and Knitting

Wire A580/A580M Standard Specification for Stainless Steel Wire A653/A653M Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-

Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process B813 Standard Specification for Liquid and Paste Fluxes for Soldering of Copper and

Copper Alloy Tube C1240 Standard Specification for Silica Fume Used in Cementitious Mixtures C128 Standard Test Method for Density, Relative Density (Specific Gravity), and

Absorption of Fine Aggregate C131 Standard Test Method for Resistance to Degradation of Small-Size Coarse

Aggregate by Abrasion and Impact in the Los Angeles Machine C1319 Standard Specification for Concrete Grid Paving Units C1338 Standard Test Method for Determining Fungi Resistance of Insulation Materials and Facings C136 Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates C1371 Standard Test Method for Determination of Emittance of Materials Near Room

Temperature Using Portable Emissometers C1386 Standard Specification for Precast Autoclaved AERATED Concrete (PAAC) Wall

Construction Units C1483 Standard Specification for Exterior Solar Radiation Control Coatings on Buildings C1549 Standard Test Method for Determination of Solar Reflectance Near Ambient

Temperature Using a Portable Solar Reflectometer C1601 Standard Test Method for Field Determination of Water Penetration of Masonry

Wall Surfaces C289 Standard Test Method for Potential Alkali-Silica Reactivity of Aggregates

(Chemical Method) C311 Test Methods for Sampling and Testing Fly Ash or Natural Possolans for Use as a

Mineral Admixture in Portland-Cement Concrete C33 Standard Specification for Concrete Aggregates C593 Standard Specification for Fly Ash and Other Pozzolans for Use With Lime C595 Standard Specification for Blended Hydraulic Cements C618 Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for

Use as a Mineral Admixture in Concrete C67 Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile C739 Standard Specification for Cellulosic Fiber (Wood-Base) Loose-Fill Thermal

Insulation C936 Standard Specification for Interlocking Concrete Paver Units

01 42 00 - 7

C989 Standard Specification for Ground Granulated Blast-Furnace Slag for Use in Concrete and Mortars

D1435 Standard Practice for Outdoor Weathering of Plastics D1557 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using

Modified Effort (56,000 ft-lbf/ft3(2,700 kN-m/m3)) D1972 Standard Practice for Generic Marking of Plastic Products D198 Standard Test Methods of Static Tests of Lumber in Structural Sizes D2103 Standard Specification for Polyethylene Film and Sheeting D217 Standard Test Methods for Cone Penetration of Lubricating Grease D2369 Standard Test Method for Volatile Content of Coatings D3273 Standard Test Method for Resistance to Growth of Mold on the Surface of Interior

Coatings in an Environmental Chamber D3786 Standard Test Method for Hydraulic Bursting Strength of Textile Fabrics-

Diaphragm Bursting Strength Tester Method D3792 Standard Test Method for Water Content of Coatings by Direct Injection Into a

Gas Chromatograph D3864 Standard Guide for Continual On-Line Monitoring Systems for Water Analysis D3960 Standard Practice for Determining Volatile Organic Compound (VOC) Content of

Paints and Related Coatings D4017 Standard Test Method for Water in Paints and Paint Materials by Karl Fischer

Method D4263 Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet

Method D4444 Standard Test Methods for Use and Calibration of Hand-Held Moisture Meters D4491 Standard Test Methods for Water Permeability of Geotextiles by Permittivity D4552 Standard Practice for Classifying Hot-Mix Recycling Agents D4632 Standard Test Method for Grab Breaking Load and Elongation of Geotextiles D4716 Test Method for Determining the (In-plane) Flow Rate per Unit Width and

Hydraulic Transmissivity of a Geosynthetic Using a Constant Head D4833 Standard Test Method for Index Puncture Resistance of Geotextiles, Geomembranes, and Related Product D4840 Standard Guide for Sampling Chain-of-Custody Procedures D4887 Standard Test Method for Preparation of Viscosity Blends for Hot Recycled

Bituminous Materials D5106 Standard Specification for Steel Slag Aggregates for Bituminous Paving Mixtures D5116 Standard Guide for Small-Scale Environmental Chamber Determinations of

Organic Emissions from Indoor Materials/Products D5199 Standard Test Method for Measuring the Nominal Thickness of Geosynthetics D5261 Standard Test Method for Measuring Mass per Unit Area of Geotextiles D5268 Standard Specification for Topsoil Used for Landscaping Purposes D5359 Standard Specification for Glass Cullet Recovered from Waste for Use in

Manufacture of Glass Fiber D5505 Standard Practice for Classifying Emulsified Recycling Agents D5509 Standard Practice for Exposing Plastics to a Simulated Compost Environment D5512 Standard Practice for Exposing Plastics to a Simulated Compost Environment

Using an Externally Heated Reactor D5539 Standard Specification for Seed Starter Mix D5957 Standard Guide for Flood Testing Horizontal Waterproofing Installations

01 42 00 - 8

D5603 Standard Classification for Rubber Compounding Materials—Recycled Vulcanizate Particulate Rubber

D5663 Standard Guide for Validating Recycled Content in Packaging Paper and Paperboard

D5759 Standard Guide for Characterization of Coal Fly Ash and Clean Coal Combustion Fly Ash for Potential Uses

D5792 Standard Practice for Generation of Environmental Data Related to Waste Management Activities: Development of Data Quality Objectives

D5834 Standard Guide for Source Reduction Reuse, Recycling, and Disposal of Solid and Corrugated Fiberboard (Cardboard)

D5851 Standard Guide for Planning and Implementing a Water Monitoring Program D5852 Standard Test Method for Erodibility Determination of Soil in the Field or in the

Laboratory by the Jet Index Method D6002 Standard Guide for Assessing the Compostability of Environmentally Degradable

Plastics D6006 Standard Guide for Assessing Biodegradability of Hydraulic Fluid D6007 Standard Test Method for Determining Formaldehyde Concentration in Air from

Wood Products Using a Small Scale Chamber D6046 Standard Classification of Hydraulic Fluids for Environmental Impact D6081 Standard Practice for Aquatic Toxicity Testing of Lubricants: Sample Preparation and Results Interpretation D6108 Standard Test Method for Compressive Properties of Plastic Lumber and Shapes D6109 Standard Test Methods for Flexural Properties of Unreinforced and Reinforced

Plastic Lumber D6112 Standard Test Methods for Compressive and Flexural creep and Creep-Rupture of

Plastic Lumber and Shapes D6117 Standard Test Methods for Mechanical Fasteners In Plastic Lumber and Shapes D6155 Standard Specification for Nontraditional Coarse Aggregates for Bituminous

Paving Mixtures D6245 Standard Guide for Using Indoor Carbon Dioxide Concentrations to Evaluate

Indoor Air Quality and Ventilation D6261 Standard Specification for Extruded and Compression Molded Basic Shapes

Made from Thermoplastic Polyester (TPES) D6262 Standard Specification for Extruded, Compression Molded, and Injection Molded

Basic Shapes of Poly(aryl ether ketone) (PAEK) D6270 Standard Practice for Use of Scrap Tires in Civil Engineering Applications D6329 Standard Guide for Developing Methodology for Evaluating the Ability of Indoor

Materials to Support Microbial Growth Using Static Environmental Chambers D6330 Standard Practice for Determination of Volatile Organic Compounds (Excluding

Formaldehyde) Emissions from Wood-Based Panels Using Small Environmental Chambers Under Defined Test Conditions

D6345 Standard Guide for Selection of Methods for Active, Integrative Sampling of Volatile Organic Compounds in Air

D6400 Standard Specification for Compostable Plastics D6435 Standard Test Method for Shear Properties of Plastic Lumber and Plastic Lumber

Shapes D6629 Standard Guide for Selection of Methods for Estimating Soil Loss by Erosion D6662 Standard Specification for Polyolefin-Based Plastic Lumber Decking Boards

01 42 00 - 9

D6712 Standard Specification for Ultra-High-Molecular-Weight Polyethylene (UHMW- PE) Solid Plastic Shapes

D6886 Standard Test Method for Speciation of the Volatile Organic Compounds (VOCs) in Low VOC Content Waterborne Air-Dry Coatings by Gas Chromatography

D692 Standard Specification for Coarse Aggregate for Bituminous Paving Mixtures D696 Standard Test Method for Coefficient of Linear Thermal Expansion of Plastics

Between -30°C and 30°C With a Vitreous Silica Dilatometer D698 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using

Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)) D7186 Standard Practice for Quality Assurance Observation of Roof Construction and

Repair E1021 Standard Test Methods for Measuring Spectral Response of Photovoltaic Cells E1038 Standard Test Method for Determining Resistance of Photovoltaic Modules to

Hail by Impact with Propelled Ice Balls E1039 Standard Test Method for Calibration of Silicon Non-Concentrator Photovoltaic

Primary Reference Cells Under Global Irradiation E1040 Standard Specification for Physical Characteristics of Nonconcentrator Terrestrial

Photovoltaic Reference Cells E1105 Standard Test Method for Field Determination of Water Penetration of Installed

Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform or Cyclic Static Air Pressure Difference

E1171 Standard Test Method for Photovoltaic Modules in Cyclic Temperature and Humidity Environments

E1333 Standard Test Method for Determining Formaldehyde Concentrations in Air and Emission Rates from Wood Products Under Defined Test Conditions Using a Large Chamber

E1362 Standard Test Method for Calibration of Non-Concentrator Photovoltaic Secondary Reference Cells

E1433 Standard Guide for Selection of Standards on Environmental Acoustics E1462 Standard Test Methods for Insulation Integrity and Ground Path Continuity of

Photovoltaic Modules E1596 Standard Test Methods for Solar Radiation Weathering of Photovoltaic Modules E1597 Standard Test Method for Saltwater Pressure Immersion and Temperature Testing of Photovoltaic Modules for Marine Environments E1609 Standard Guide for Development and Implementation of a Pollution Prevention

Program E1686 Standard Guide for Selection of Environmental Noise Measurements and Criteria E1690 Standard Test Method for Determination of Ethanol Extractives in Biomass E1721 Standard Test Method for Determination of Acid-Insoluble Residue in Biomass E1755 Standard Test Method for Ash in Biomass E1758 Standard Test Method for Determination of Carbohydrates in Biomass by High

Performance Liquid Chromatography E1780 Standard Guide for Measuring Outdoor Sound Received from a Nearby Fixed

Source E1799 Standard Practice for Visual Inspections of Photovoltaic Modules E1802 Standard Test Methods for Wet Insulation Integrity Testing of Photovoltaic

Modules E1821 Standard Test Method for Determination of Carbohydrates in Biomass by Gas

Chromatography

01 42 00 - 10

E1827 Standard Test Methods for Determining Airtightness of Buildings Using an Orifice Blower Door

E1830 Standard Test Methods for Determining Mechanical Integrity of Photovoltaic Modules

E1861 Standard Guide for Use of Coal Combustion By-Products in Structural Fills E1918 Standard Test Method for Measuring Solar Reflectance of Horizontal and Low-

Sloped Surfaces in the Field E1971 Standard Guide for Stewardship for the Cleaning of Commercial and Institutional

Buildings E1980 Standard Practice for Calculating Solar Reflectance Index of Horizontal and Low-

Sloped Opaque Surfaces E1991 Standard Guide for Environmental Life Cycle Assessment of Building

Materials/Products E2047 Standard Test Method for Wet Insulation Integrity Testing of Photovoltaic Arrays E2114 Standard Terminology for Sustainability Relative to the Performance of Buildings E2128 Standard Guide for Evaluating Water Leakage of Building Walls E2129 Standard Practice for Data Collection for Sustainability Assessment of Building

Products E2397 Standard Practice for Determination of Dead Loads and Live Loads associated with Green Roof Systems E2398 Standard Test Method for Water Capture and Media Retention of Geocomposite

Drain Layers for Green Roof Systems E2399 Standard Test Method for Maximum Media Density for Dead Load Analysis of

Green Roof Systems E2400 Standard Guide for Selection, Installation, and Maintenance of Plants for Green

Roof Systems E241 Standard Guide for Limiting Water-Induced Damage to Buildings E2432 Standard Guide for General Principles of Sustainability Relative to Buildings E408 Standard Test Methods for Total Normal Emittance of Surfaces Using Inspection-

Meter Techniques E413 Standard Classification for Rating Sound Insulation E477 Standard Test Method for Measuring Acoustical and Airflow Performance of Duct

Liner Materials and Prefabricated Silencers E648 Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a

Radiant Heat Energy Source E683 Standard Practice for Installation and Service of Solar Space Heating Systems for

One- and Two-Family Dwellings E779 Standard Test Method for Determining Air Leakage Rate by Fan Pressurization E781 Standard Practice for Evaluating Absorptive Solar Receiver Materials When

Exposed to Conditions Simulating Stagnation in Solar Collectors With Cover Plates E782 Standard Practice for Exposure of Cover Materials for Solar Collectors to Natural

Weathering Under Conditions Simulating Operational Mode E823 Standard Practice for Nonoperational Exposure and Inspection of a Solar Collector E881 Standard Practice for Exposure of Solar Collector Cover Materials to Natural

Weathering Under Conditions Simulating Stagnation Mode E90 Standard Test Method for Laboratory Measurement of Airborne Sound Transmission

Loss of Building Partitions and Elements E903 Standard Test Method for Solar Absorptance, Reflectance, and Transmittance of

Materials Using Integrating Spheres

01 42 00 - 11

E948 Standard Test Method for Electrical Performance of Photovoltaic Cells Using Reference Cells Under Simulated Sunlight

F1869 Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride

F2034 Standard Specification for Sheet Linoleum Floor Covering F2170 Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs

Using in situ Probes

E. Bat Conservation International:

Bat Approved Bat Houses

F. Carpet and Rug Institute Green Label & Green Label Plus Testing Programs, www.carpet-rug.org/green-label-plus.html

G. Center for Resource Solutions Green-e program

H. EPA:

Comprehensive Procurement Guidelines

ENERGY STAR

Environmentally Preferable Purchasing Program Final Guidance GreenScapes program Heat Island Initiative Indoor Air Quality Building Education and Assessment Model (I-BEAM) National Environmental Performance Track Pollution Prevention (P2) Product Stewardship Program Significant New Alternatives Policy (SNAP) Program

I. Federal Trade Commission:

Guide for the Use of Environmental Marketing Claims

J. Forest Stewardship Council:

Chain-Of-Custody Forest Management

K. Green Building Initiative (GBI):

Green Globes - US

L. Green Seal:

GC-03 Anti-Corrosive Paints GC-12 Occupancy Sensors GC-13 Split-Ductless Air-Source Heat Pumps GS-05 Compact Fluorescent Lamps GS-11 Paints GS-13 Windows GS-14 Window Films GS-31 Electric Chillers

01 42 00 - 12

GS-32 Photovoltaic Modules GS-36 Commercial Adhesives GS-37 Industrial & Institutional Cleaners

M. International Iron and Steel Institute:

CO2 Breakthrough Program

N. International Organization of Standardization:

Guide 64; Guide for Inclusion of Environmental Aspects in Product Standards 9660 Information processing -- Volume and file structure of CD-ROM for information interchange 14001 Environmental management systems – Specification with guidance for use 14004 Environmental Management Systems – General Guidelines on Principles, Systems and Supporting Techniques 14020 Environmental labels and declarations – General principles 14024 Environmental labels and declarations – Type I environmental labelling -

Principles and procedures 14040 Environmental management – Life cycle assessment – Principles and framework

O. National Association of Home Builders:

Advanced Framing Techniques: Optimum Value Engineering

P. National Institute of Building Sciences:

MOIST program for transfer of heat and moisture Whole Building Design Guide

Q. National Institute of Standards and Technology:

BEES (Building for Environmental and Economic Sustainability) Lifecycle Decision

Support Tool

R. Sheet Metal and Air Conditioning Contractors’ National Association:

IAQ Guidelines for Occupied Buildings Under Construction

S. Southcoast Air Quality Management District:

1168 Adhesive And Sealant Applications

T. US Composting Council:

Seal of Testing Assurance Program

U. US Department of Agriculture:

Biobased Products – Definitions and Descriptions

V. US Green Building Council:

LEED™ 2009 Green Building Rating System

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 42 00

07 13 53 - 1

ELASTOMERIC SHEET WATERPROOFING

SECTION 07 13 53 - ELASTOMERIC SHEET WATERPROOFING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Furnish and install EPDM Membrane Waterproofing System for horizontal applications on cast-in-place concrete and compacted sand bed in accordance with drawings and specifications.

B. RELATED SECTIONS

1. Section 03 30 00 - Cast-In-Place Concrete

1.2 REFERENCES

A. ASTM International

1. ASTM D 312 Specification for Asphalt Used in Roofing

2. ASTM D 412 Tests for Rubber Properties in Tension

3. ASTM D 471 Test Method for Rubber Property - Effect of Liquids

4. ASTM D 573 Test Method for Rubber Deterioration in an Air Oven

5. ASTM D 624 Test Method for Rubber Property - Tear Resistance

6. ASTM D 698 Test Methods for Laboratory Compaction Characteristics of Soil Using

Standard Effort

7. ASTM D 746 Test Method for Brittleness Temperature of Plastics and Elastomers by

Impact

8. ASTM D 816 Method of Testing Rubber Cements

9. ASTM D 1149 Test Method for Rubber Deterioration, Ozone Resistance

10. ASTM D 1204 Test Method for Linear Dimensional Changes of Nonrigid Thermoplastic

Sheeting or Film at Elevated Temperature

11. ASTM D 4263 Test Method for Indicating Moisture in Concrete by the Plastic Sheet

Method

12. ASTM D 6134 Standard Specification for Vulcanized Rubber Sheets Used in

Waterproofing Systems

13. ASTM E-96(B) Water Vapor Transmission of Materials

1.3 SYSTEM DESCRIPTION

A. Product provided by this Section is a 0.060" thick EPDM based elastomeric homogenous membrane with a protective mat. This system is installed in conjunction with a washed, crushed rock ballast and sand backfill.

1.4 SUBMITTALS

A. General: Submit in accordance with Section 01 33 23.

07 13 53 - 2

B. Product Data: Submit manufacturer's product literature and installation instructions.

C. Subcontractor's approval by Manufacturer: Submit document stating manufacturer's acceptance of subcontractor as an Approved Applicator for the specified materials.

D. Warranty: Submit a sample warranty identifying the terms and conditions stated in Section 1.7.

E. Shop drawings: Shall include an outline of waterproofing area and type of penetrations, terminations, perimeter and special details.

F. Rock Ballast sample: Provide sample to the Government Representative for final color selection.

1.5 QUALITY ASSURANCE

A. Applicator Qualifications: Applicator shall be experienced in applying the same or similar materials and shall be specifically approved in writing by the membrane manufacturer.

B. Regulatory Requirements: Comply with applicable codes, regulations, ordinances, and laws regarding use and application of products that contain volatile organic compounds (VOC).

C. Pre-Application Conference: Prior to beginning work, convene a conference to review conditions, installation procedures, schedules and coordination with other work.

D. Inspection: Upon completion conduct an inspection with owner and contractor to ascertain that the waterproofing system was installed according to specifications and details.

E. Flood Testing: Flood test with 1 to 2 inches of water for a 24-hour period prior to placement of protection membrane and ballast.

1.6 DELIVERY, STORAGE AND HANLDING

A. Deliver materials to Project site in original, factory-sealed, unopened containers bearing manufacturer's name and label intact and legible with following information.

1. Name of material.

2. Manufacturer's stock number and date of manufacture.

3. Material safety data sheet.

B. Recommended storage and application temperature is 75F. Store materials in protected and well-ventilated area.

C. Restore liquid adhesives and sealants to a minimum of 60F before use after exposure to lower temperature.

D. Protect waterproofing membrane and related materials in a manner to prevent damage and inclusion of foreign matter. All cartons of sealant and adhesive containers shall be protected from weather. Keep lids of adhesive cans securely fastened between use. In cold weather, materials must be stored in a heated area until the day of use.

07 13 53 - 3

1.7 PROJECT CONDITIONS

A. Do not allow waste products (e.g., petroleum, grease, oil, solvents, vegetable, mineral oil or animal fat) or direct steam venting to come into contact with the waterproofing membrane.

B. Do not expose membrane and accessories to a constant temperature in excess of 180°F.

C. Prior to the use of any product, consult the Material Safety Data Sheet and Technical Data Bulletin for cautions and warnings. Cements, splice cleaners and bonding adhesives and their fumes are EXTREMELY FLAMMABLE; they contain solvents that may cause dangerous fire and explosion hazards when exposed to heat, flame, or sparks. Store and use away from all sources of heat, flame, or sparks. Post "NO SMOKING" signs. Do not use in a confined or unventilated area. Vapors are heavier than air and may travel along ground to a distant ignition source and flash back.

D. Warn personnel against breathing of vapors and contact of material with skin or eyes. Wear applicable protective clothing and respiratory protection gear. Rubber gloves (available from membrane manufacturer) are required for hand protection when using Splice Cleaner. Glasses, goggles or face shield are recommended for eye protection when using adhesives and splice cleaner.

E. Cold temperatures will not restrict the installation of the Sure-Seal Waterproofing System. Follow specified precautions for storage of materials and expose only enough cements and adhesives to be used within a 4-hour period.

F. Splicing and bonding surfaces should be dry and clean.

G. Substrate shall be free of ponded water, ice or snow.

H. Coordinate waterproofing work with other trades. The applicator shall have sole right of access to the specified areas for the time needed to complete the application and allow the membrane to cure adequately.

I. Protect adjoining surfaces not to be coated against damage or soiling. Protect plants, vegetation and animals which might be affected by waterproofing operations.

J. Maintain work area in a neat and orderly condition, removing empty containers, rags, and rubbish daily from the site.

PART 2 - PRODUCTS

2.1 APPROVED MANUFACTURERS

A. Sure-Seal Membrane Waterproofing System by Carlisle Coatings and Waterproofing Incorporate.

B. Approved equal

07 13 53 - 4

2.2 PRODUCTS

A. EPDM Membrane Waterproofing: Shall be Sure-Seal EPDM Membrane, sheet, minimum 0.060" thick, and shall meet or exceed the following requirements:

1. Tensile Strength: 1630 psi minimum, ASTM D 412

2. Ultimate Elongation: 520% minimum, ASTM D 412

3. Thickness Tolerance: +10%, ASTM D 412

4. Tear Resistance: 230 lbf/in minimum, ASTM D 624

5. Brittleness Temperature: -45 F maximum, ASTM D 746

6. Water Absorption: 2% maximum, ASTM D 471, 7d at 158F

7. Permeance: 0.05 Perm maximum, ASTM E-96 B

8. Factory Seam Strength: membrane rupture, ASTM D 816

9. Resistance to Heat Aging: Properties after 168 hrs. at 240F, ASTM D 573:

a. Tensile Strength: 1600 psi minimum

b. Ultimate Elongation: 310% minimum

c. Linear Dimensional Change: -0.4 mass % maximum

10. Ozone Resistance: ASTM D 1149

a. No cracks after 100 ppm ozone, 168 hrs at 104F, 50% strain

11. Meets ASTM D 6134 specification

2.3 ACCESSORY PRODUCTS

A. Sure-Seal Elastoform Flashing: .060 inches thick, furnished by membrane manufacturer.

B. Bonding Adhesive: A high-strength synthetic rubber adhesive used to bond membrane to compatible substrate, furnished by membrane manufacturer. DO NOT USE FOR SPLICES.

C. Weathered Membrane Cleaner: Cleans membrane surfaces before applying splicing cement and lap sealant, furnished by membrane manufacturer.

D. Pourable Sealer: A two-component polyurethane-based material used to seal around difficult objects, furnished by membrane manufacturer.

E. Rubber Gloves: For application of Splice Cleaner and other adhesives, furnished by membrane manufacturer.

F. HP Protection Mat: A geotextile mat used for protecting the membrane splice on compacted sand surfaces, furnished by membrane manufacturer.

G. Protection Course: Sure-Seal HP Protective Mat.

H. Sure-Seal Lap Sealant: Sealant for sealing splice edges and mechanical terminations on vertical and horizontal surfaces or to seal membranes terminated in to reglets.

I. Sure-Seal H.P. 250 Primer: Used to prime the membrane splice to SecurTAPE application.

2.4 BALLAST

A. Ballast shall consist of a clean washed crushed limestone, light to dark gold in color.

07 13 53 - 5

1. Size: 3/4" clear.

2.5 COMPACTED SAND BACKFILL

A. Sand backfill shall conform with the requirements of MDT Filter Material, Table 701-20, Gradation No. 1 or approved equal.

PART 3 - EXECUTION

3.1 INSPECTION

A. Before any waterproofing work is started the waterproofing applicator shall thoroughly examine all surfaces for any deficiencies. Should any deficiencies exist, the Government Representative shall be notified in writing and corrections made.

B. Concrete shall be cured at least 7 days or pass ASTM D 4263.

3.2 COMPACTED SAND BACKFILL PREPARATION

A. Remove all vegetation and loose debris from the top of the rock surface. Install metal flashing and protection mat over metal flashing and rock surface.

B. Place sand backfill over the protection mat. Compact sand over protection mat as indicated on the Drawings. Sand shall be wetted and compacted with a minimum of (3) passes of a small vibratory plate compactor.

3.3 CONCRETE CURB SURFACE PREPARATION

A. The concrete surface must be free from laitance, loose aggregate, sharp projections, grease, oil, dirt, curing compounds or other contaminants.

B. Provide a smooth, even substrate. Voids, rock pockets and excessively rough surfaces shall be repaired with approved non-shrink grout or ground to match the unprepared areas.

C. Repair joints and cracks wider than 1/4" with Sure-Seal Pourable Sealer.

3.4 APPLICATION

A. Horizontal Attachment:

1. Loose lay the membrane over metal flashing, protection course and compacted sand.

B. Membrane Splicing - EP-95 Splicing Cement

1. Membrane splices must be a minimum of 6 inches wide.

2. Mark the edge of overlapping sheet with Weathered Membrane Cleaner and fold top sheet back for cleaning and EP-95 Splicing Cement application.

07 13 53 - 6

3. Remove dirt and excess dust from the mating surfaces of the overlapping membrane sheets by wiping with Sure-Seal HP Splice Wipes or a clean rag. To remove accumulated dirt, footprints, etc., scrub the membrane sheets with warm soapy water and rinse with clean water.

4. Clean the dry splice area of both membrane sheets by scrubbing with Sure-Seal HP Splice Wipes or clean natural fiber rags using Weathered Membrane Cleaner. Extra cleaning is required along a factory seam with intersects a splice area. Sponges, sponge mops, squeegees, brushes, paint rollers, etc. MUST NOT BE USED.

5. Check the membrane surfaces to verify adequate cleaning procedures are maintained by both mating surfaces solid black in color.

6. Stir Splicing Cement thoroughly scraping the…