Attachment 1 - USCGC BLUEBELL DD FY 24 - Work Items.xls
XLS spreadsheet 79 KB Posted
- Attached to
- USCGC BLUEBELL DD FY 24
- Solicitation number
- 70Z08523RIBCT0012
About this file
This document contains a pricing schedule for work items for the drydock availability of the USCGC BLUEBELL in fiscal year 2024. The schedule lists over 60 items required for maintenance and repair of the vessel's hull, tanks, piping systems, ventilation ducts, electrical systems and other components. Pricing is provided on either a job basis or hourly rate, with many items designated as optional. The related federal contract opportunity posting indicates Solicitation Number 70Z08523RIBCT0012 for the USCGC BLUEBELL DD FY 24 work issued by the Department of Homeland Security Coast Guard. The opportunity type is listed as a solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BLUEBELL (WLI-100) DRYDOCK AVAILABILITY FY2024 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | NSP | JOB | NSP | |
| D-002 | Hull Plating, Side Scan, Ultrasonic Testing | JOB | $0.00 | ||
| D-003 | Hull Plating, U/W Body, Inspect | JOB | $0.00 | ||
| O-004 | U/W Body, Preserve, 100 percent | JOB | $0.00 | ||
| O-005 | U/W Body, Preserve, Partial, Condition A | JOB | $0.00 | ||
| O-006 | U/W Body, Preserve, Partial, Condition B | JOB | $0.00 | ||
| O-007 | Hull Plating Freeboard, Preserve, Partial | JOB | $0.00 | ||
| O-008 | Hull Plating Freeboard, Preserve, 100 Percent | JOB | $0.00 | ||
| O-009 | Hull and Structural Plating, General, 12.75 lbs. Steel Plate, Renew | JOB | $0.00 | ||
| O-010 | Hull And Structural Plating, General, Cracked Steel Welds, Repairs | JOB | $0.00 | ||
| O-011 | Hull and Structural Plating, General, Degraded Weld, Steel, Repair | JOB | $0.00 | ||
| D-012 | Appendages, U/W, Leak Test | JOB | $0.00 | ||
| D-013 | Propulsion Shaft Rope Guards, Inspect | JOB | $0.00 | ||
| D-014 | Appendages, U/W, Internal, Preserve | JOB | $0.00 | ||
| D-015 | Tanks, Potable Water, Clean and Inspect | JOB | $0.00 | ||
| D-016 | Tanks, Ballast, Clean and Inspect | JOB | $0.00 | ||
| D-017 | Voids, Accessible, Clean and Inspect | JOB | $0.00 | ||
| D-018 | Propulsion Shaft Bearings, External, Check Clearances | JOB | $0.00 | ||
| D-019 | Propeller , Clean And Inspect | JOB | $0.00 | ||
| D-020 | Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean | JOB | $0.00 | ||
| D-021 | Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean | JOB | $0.00 | ||
| D-022 | Boiler Exhaust Stack Uptakes, Commercial Clean | JOB | $0.00 | ||
| D-023 | Vent Ducts, Engine And Motor Room, All, Commercial Cleaning | JOB | $0.00 | ||
| D-024 | Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning | JOB | $0.00 | ||
| D-025 | Vent Ducts, Laundry Exhaust, Commercial Cleaning | JOB | $0.00 | ||
| O-026 | Vent Ducts, All Other, Commercial Cleaning | JOB | $0.00 | ||
| D-027 | Vent Fans and Motors, Non-Machinery Spaces, Overhaul | JOB | $0.00 | ||
| D-028 | Sea Strainers, Duplex, All Sizes, Overhaul | JOB | $0.00 | ||
| D-029 | Potable Water Pneumatic Tanks, Clean and Inspect | JOB | $0.00 | ||
| D-030 | Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift | JOB | $0.00 | ||
| O-031 | Rudders, Preserve, 100 Percent | JOB | $0.00 | ||
| D-032 | Rudder Stock Bearings Clearances, Check | JOB | $0.00 | ||
| D-033 | Boat Boom, Inspect & Service | JOB | $0.00 | ||
| D-034 | Buoy And Cargo Crane, Inspect And Service | JOB | $0.00 | ||
| D-035 | Grey Water Holding Tanks, Clean and Inspect | JOB | $0.00 | ||
| D-036 | Sewage Holding Tanks, Clean and Inspect | JOB | $0.00 | ||
| D-037 | Grey Water Piping, Clean and Flush | JOB | $0.00 | ||
| D-038 | Sewage Piping, Clean and Flush | JOB | $0.00 | ||
| O-039 | Tanks, Grey Water Holding, Preserve, Partial | JOB | $0.00 | ||
| O-040 | Tanks (Sewage Holding), Preserve, 100 percent | JOB | $0.00 | ||
| O-041 | Tanks (Sewage Holding), Preserve, Partial | JOB | $0.00 | ||
| O-042 | Tanks, Ballast, Preserve, 100 Percent | JOB | $0.00 | ||
| O-043 | Tanks, Ballast, Preserve, Partial | JOB | $0.00 | ||
| O-044 | Tanks, Potable Water, Preserve, Partial, | JOB | $0.00 | ||
| D-045 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | $0.00 | ||
| D-046 | Drydock | JOB | $0.00 | ||
| D-047 | Temporary Services, Provide - Tender | JOB | $0.00 | ||
| D-048 | Engine, Overhaul, Tender/Barge, Crane, Center Section | JOB | $0.00 | ||
| D-049 | Deck Covering, Interior, Wet and Dry, Renew | JOB | $0.00 | ||
| D-050 | Machinery Exhaust Stack Insulation, Renew | JOB | $0.00 | ||
| D-051 | Tanks, Clean and Inspect | JOB | $0.00 | ||
| D-052 | Ship Service Air Receiver, Overhaul | JOB | $0.00 | ||
| O-053 | Ship Service Air Receiver, Renew | JOB | $0.00 | ||
| D-054 | Crew’s Quarters Racks, Renew | JOB | $0.00 | ||
| D-055 | CPO Stateroom Racks, Renew | JOB | $0.00 | ||
| D-056 | Point of Use Potable Water Filters, Install | JOB | $0.00 | ||
| D-057 | Various Pipe Hangers, Renew | JOB | $0.00 | ||
| D-058 | Piping Insulation, Renew | JOB | $0.00 | ||
| D-059 | Heating and Chilled Piping, Renew | JOB | $0.00 | ||
| D-060 | Sea Trial Performance, Support, Provide | JOB | |||
| D-061 | Independent NACE Inspector (Level 3), Provide | JOB | |||
| D-062 | Tenting, Provide | JOB | |||
| O-00A | Composite Labor Rate | Hour | 0 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(5/15/2023) Draft-00 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate