This document contains questions and answers regarding solicitation number 70Z08523RIBCT0012 for repair and maintenance work on USCGC BLUEBELL DD for fiscal year 2024. The questions seek clarification on work item scopes such as the quantity of piping to be replaced, whether fuel tanks require cleaning, and flexibility in the period of performance. Answers provide additional details on specifications, updated drawings and lists, and confirmation that some tasks can be completed without welding to the deck or fully replacing piping systems.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers – CGC BLUEBELL DD FY 24
1. WI-027 - The spec references Table 1 Fans but no table is given. Additional vaneaxial fan data was not provided in the notes section. Please provide additional clarifications.
• Added table to WI, removed additional data verbiage from 4. NOTES, updated spec
2. W-032 - The intent section is missing verbiage, and the CIR section reference does not exist. Please provide additional information.
• Added verbiage to 1. SCOPE, updated spec
3. W-034 - Section 3.2 references Govt-issued property throughout tasks. Section 1.2 says
“None” for GFM. Please clarify.
• GFE was already purchased commercially. Parts still supplied by us.
4. W-049 - Does this work item require polymeric Epoxy or One step Terrazzo?
• Cosmetic Polymeric Epoxy Resin
• CIR requirement updated , updated spec
5. See the following screenshot. The CIR list contains several errors. Please provide clarification:
• Updated CIR list, updated spec
6. WI 59 – Piping lengths verification, The intent of the work item is for the contractor to renew miscellaneous heating and chilling water piping systems throughout the cutter. The referenced drawing in 3.3 lists nearly 700’ of piping. Are we to quote replacement of all the material listed in drawing number 180-TE-3802-4, Rev B? Or just miscellaneous parts of the system that have failed. Please provide an approximate amount of piping to be replaced if it is not the whole list.
We will not be replacing the whole piping system. I spoke with EPO and it would be approximately 100 liner feet.
7. WI 54, Fuel Tank Interference For Securing New Racks, The installation of new berthing racks will take place above the fuel tanks. In order to weld the racks to the floor the tanks will need to be cleaned and gas freed. Will the tanks be required to be cleaned and gas freed to complete this WI?
The KTR will not have to weld racks to the deck. There are existing mounting areas that the
KTR can use to mount the new racks.
8. Is there flexibility in the PoP?
Yes, POP is shifted to 1/23/2024 – 5/1/2024.