Attachment 1- Statement of Work.pdf
PDF 205 KB Posted
- Attached to
- 48 LRS - Modular Approach Shoring Kit
- Solicitation number
- FA558726Q0032
About this file
This Statement of Work (SOW) describes the requirement for manufacturing and delivering a prefabricated shoring kit to support cargo loading operations at the 48th Logistics Readiness Squadron located at Royal Air Force (RAF) Lakenheath in the United Kingdom.
The contractor must manufacture and deliver two approach shoring kits consisting of ramp sections and associated support equipment capable of accommodating self-propelled vehicles, towed trailers, and winched cargo into C-5, C-17, and C-130 aircraft, as well as LCACs and JHSVs, with minimum tire diameter of 24 inches. Specific technical specifications include: four 15K ATTLA-compliant ramp sections (24" X 94"), four wedge sections (24" X 28"), four ramp pads (8" x 24" x 4"H), two adjustable height stands (13"-15"), and one 96x42x53 side access top-loading container. All components must be certified to ATTLA #2012.02.06.02 Rev 1, capable of supporting 26,000 lbs. maximum single axle loads, maintain pressure not exceeding 50 pounds per square inch on cargo floors, feature smooth belting on contact surfaces, have high-traction rungs on ramp assemblies, and include tethered hitch pins and clips to prevent Foreign Object Damage. The equipment must meet or exceed DOD safety standards per DoDI 6055.01 and be modular with assembly capability in lengths of 130" to 788" and heights of 0" to 55". The contractor is responsible for all crating and shipment in compliance with ATTLA and DoDM 4140.65 (Wood Packaging Materials standards), with requested delivery within 90 days of contract award to Building 1035, RAF Lakenheath, Brandon Suffolk IP27 9PN. Shipping instructions vary based on vendor location: vendors within the United Kingdom use FOB Destination; vendors outside the UK may choose United States Postal Service, commercial small parcel carrier, or consolidated shipping point options, all with shipping costs included in the total purchase price. The contractor must establish clear organizational authority, maintain single point of contact with the Government, respond to contractual requests timely, manage any subcontractors, ensure contractor personnel obtain required installation access passes at RAF Lakenheath, promptly report safety incidents within 24 hours, and comply with all applicable UK Standards. Work hours are Monday through Friday, 0800-1700 UK time, excluding US federal holidays and UK bank holidays.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Statement of Work
(SOW)
48 LRS Prefabricated Shoring Kit at
Royal Air Force (RAF) Lakenheath
1.0 Introduction
1.1 Mission:
1.2 Background: Requirements mandated by AFI 24-605 V2, Section 3B, Cargo and Mail Documentation, Packaging, marking, and Labeling, requires that the shipper provides specialized shoring for the shipment of their cargo. In order to maintain the integrity of the shippers shoring kit, a prefabricated shoring kit will be maintained at the Air Transportation Function to alleviate any damage to the shippers shoring kit. This does not relieve the shipper of providing shoring.
1.3 Scope: Contractor to manufacture and ship the prefabricated shoring kit to be used in lieu of the shoring kit provided by the shipper on a case-by-case basis.
2.0 General Requirements
2.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.
2.2 Contract Management & Administration
2.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.
2.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.
2.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract.
2.4 Hours of Work: Work days are from Monday through Friday excluding US federal holidays and UK bank holidays.
Work hours are from 0800 to 1700 local UK time.
3.0 Product Specifications & Installation Requirements
3.1 The contractor must provide all personnel, equipment, tools, materials, supervision, transportation, safety equipment, any other items, and services necessary to supply the prefabricated shoring kit for the 48th Logistics Readiness Squadron, located at RAF Lakenheath UK.
3.2 Quantity Two: Approach Shoring Kits
-The Ramp Section and associated support kit (stands etc.) that can be placed over the ramp of a C5/C17/C130
- The Pre-Fabricated shoring kit system shall be capable of loading self-propelled vehicles, towed trailers, and other items winched into the aircraft or ship, with a minimum tire diameter of 24”.
- The system shall be compatible with C-130, C17 & C5 aircraft; all LCACs; and JHSVs.
- When under a full load, no pressures on aircraft/ship cargo floor or cargo ramp shall exceed 50 pounds per square inch.
- Each left/right ramp component assemblies shall be rated at 26,000 lbs. maximum single axle, (36" wide, no thicker than 4”, two Stainless Steel carry handles on each side.
- All stands shall be equipped with two Steel Rods (used to pin components together)
- The ramp assembly must have a top surface composed of high-traction rungs.
The 48 Logistics Readiness Squadron (LRS) is a subordinate unit of the 48 Mission Support Group (48 MSG) and is the deployment function for the 48 Fighter Wing (48 FW) under the Major Command of the United States Air Forces in Europe (USAFE). Mobilizing the 48th Fighter Wing (FW) in times of contingency and peacetime.
- System should be modular, with the capability to be assembled in numerous lengths (130” to 788”) and heights (0” to 55”).
- All components that come in contact with the aircraft/ship cargo floor or cargo door shall have smooth belting bonded securely to the base (e.g., Ramp Pads, and Stands).
- All components shall be certified by ATTLA # 2012.02.06.02 Rev 1.
- All Hitch Pins, Lynch Pins, Hitch Pin Clips, and Retaining Clips will be tethered to prevent FOD on military flightline or tarmac.
Specifications:
15K ATTLA Compliant Ramp section 24” X 94” Quantity 4 15K ATTLA Compliant Wedge section 24”X 28” Quantity 4 Ramp Pad 8”x24”x4”H Ramp Pad Quantity 4 Stand adjustment height 13”- 15” Quantity 2 96x42x53, Side Access Top-Loading Container Quantity 1
3.3 Shoring kit should be provided in a minimum of two skids 2652 lbs. each (estimated), measuring approximately 98 inches long x 48 inches wide x70 inches heigh.
3.4 The equipment used in this requirement must meet or exceed the Department of Defense (DOD) safety standards and display the required safety marks per DoDI 6055.01.
The contractor has full responsibility for the crating and shipment of equipment and delivery of goods required to provide this Prefabricated Shoring kit. Shipping crates should be in compliance with ATTLA and DoDM
4140.65 (Issue, Use and Disposal of Wood packaging Materials) (WPM).
3.5 The contractor has full responsibility for the crating and shipment of equipment and delivery of goods required to provide this Prefabricated Shoring kit. Shipping crates should be in compliance with ATTLA and DoDM 4140.65 (Issue, Use and Disposal of Wood packaging Materials) (WPM).
3.6 Delivery Requirements: Requested delivery is within 90 days of contract award to:
48 Logistics Readiness Squadron Bldg 1035, RAF Lakenheath Brandon Suffolk IP27 9PN
4.0 Special Requirements
4.1 Security & Safety
4.1.1 Operational Security (OPSEC): If any installation is required to take place in a Government facility, the Contractor shall be familiar with the organizational critical information and indicators list (CIIL) and OPSEC policy of any installation they require access to. The required CIIL can be provided by the Contracting Officer.
4.1.2 Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office. The Contractor shall cooperate in any resulting safety investigation.
4.2 Contractor Access to Installations: Access to DoD installations is limited to personnel with a valid installation access pass. Failure to submit required information to obtain required documentation will result in the exclusion of such employees from the installation until such documentation is obtained. Contractor employees may be subject to personal and vehicle searched when entering or leaving a DoD installation. If installation access is required, the Government will provide the Contractor with the required information and documents for installation access passes upon award. Subsequently, the Contractor shall provide a list of all employees along working under this contract, along with the required documentation upon receipt of contract award, and no later than 30 days prior to the projected need for any new installation access pass requirements. The Contractor is responsible for maintaining an adequate number of personnel with active installation access passes, and adhering to the timeframes stated in this section. The cognizant mission partner is responsible for the coordination of installation access passes. Upon termination of employment, termination or cancellation of the contract, or expiration of the contract the Contractor is responsible for collecting employee installation access passes and turning them in to the CO, or the cognizant mission partner in a timely fashion.
4.3 Shipping Instructions
4.3.1 For vendors located inside the United Kingdom.
4.3.1.1 Shipment shall be FOB Destination.
4.3.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either include the shipping in the costs of the items, or outline it in a separate line item).
4.3.1.3 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.
4.3.2 For vendors located outside of the United Kingdom.
4.3.2.1 Option One: United States Postal Service.
4.3.2.1.1 Shipping shall be FOB Destination.
4.3.2.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.1.3 Weight of individual shipments must not exceed 70lbs.
4.3.2.1.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.
4.3.2.1.5 Hazardous material is not submitted.
4.3.2.1.6 The Government will provide the APO shipping address as part of the solicitation.
4.3.2.2 Option Two: Commercial small parcel carrier.
4.3.2.2.1 Shipping shall be FOB Destination.
4.3.2.2.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.2.3 Weight of individual shipments must not exceed 300lbs.
4.3.2.2.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.
4.3.2.2.5 The Contractor is responsible for arranging and performing all shipping actions from origin to final destination.
4.3.2.2.6 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.
4.3.2.3 Option Three: Consolidated Shipping Point.
4.3.2.3.1 Shipping shall be FOB Destination.
4.3.2.3.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.3.3 Weight of individual shipments must exceed 300lbs.
4.3.2.3.4 Dimensions of individual shipments must exceed 72 inches of any one dimensions (length, width, height).
4.3.2.3.5 Hazardous material may be shipped via this method.
4.3.2.3.6 The Contractor must complete a DD Form 1139 “XXX” to determine if the cargo can be shipped via MILAIR.
4.3.2.3.7 The Contractor shall ensure all cargo is marked “UNITED
STATES AIR FORCE” in order to ensure shipments clear customs.
4.3.2.3.8 48 FW logistics points of contact are provided for in 4.3.3.
4.3.3 Contact Information; 48th Logistical Readiness Squadron (48 LRS)
4.3.3.1 48 LRS/Inbound Customs; 48lrs.lgrddc.inboundcustoms@us.af.mil.
4.3.3.2 48 LRS/Inbound Cargo; 48lrs.inboundcargo@us.af.mil.
4.3.3.3 Commercial phone number; +44 01638 52620.
4.4 Government Furnished Material: The US Government will not provide any Government Furnished Property
(GFP) or Government Furnished Equipment (GFE) as part of this contract.
4.5 Applicable Directives: Contractor shall ensure that all products supplied, and the installation comply with all applicable UK Standards.
5.0 Appendix: Related Documents
mailto:48lrs.lgrddc.inboundcustoms@us.af.mil mailto:48lrs.inboundcargo@us.af.mil
File details come from the government source that posted it. Updated .