Attachment 1_Statement of Work.docx
DOCX document 42 KB Posted
- Attached to
- Fire suppression system installation
- Solicitation number
- 12639526Q0210
About this file
This is a Statement of Work for the installation of a wet fire suppression system at Building 6418 of the Mexican Fruit Fly Rearing Facility (MFFRF) located at Moore Air Base in Edinburg, Texas. The facility, which produces 160 million sterile flies weekly to support the Rio Grande Valley's Mexican fruit fly eradication program, requires a retrofitted fire suppression system due to a recent fire in the larval rooms. The MFFRF was originally constructed in the early 1980s without fire suppression capability, and this system is needed to address the expanded operations.
The contractor must deliver a complete turnkey project including design and as-built drawings, underground fire line installation with tap, pressure independent valve (PIV), and above-ground backflow preventer with testing certification, and an automatic sprinkler system with canopy protection and flex drop installations. All work must comply with NFPA Standards for design densities, EPA requirements, and applicable federal, state, and local codes and regulations in Texas. The contractor is responsible for obtaining all necessary permits, removing and disposing of construction debris, and providing a one-year warranty on all labor and equipment commencing from substantial completion. Work is restricted to Monday through Friday from 7:00 AM to 3:30 PM at this restricted military facility, with any work outside these hours requiring prior written approval from the Facilities Maintenance Manager. All contractor personnel must possess valid picture identification, and the contractor must provide temporary restroom facilities for employees if the project duration exceeds three working days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12639526Q0210-0005.pdf | ||
| 12639526Q0210-0004.pdf | ||
| Building 6418 - Birds Eye View.pdf | ||
| Additional RFIs and Responses.docx | DOCX document | |
| 12639526Q0210-0003.pdf | ||
| 12639526Q0210-0002.pdf | ||
| RFIs and Responses.docx | DOCX document | |
| MFFRF_Bldg 6418 drawings_06201984.pdf | ||
| 6418 Fire Suppression System Sign-In Sheet.pdf | ||
| 12639526Q0210-0001.pdf | ||
| Attachment 2_Federal Construction Wage Rates_Hidalgo County.txt | TXT text file | |
| 12639526Q0210.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12639526Q0210, Attachment 1 Statement of Work For Installation of a Wet Fire Suppression System June 2026
1.0 Contract Project: Installation of a Wet Fire Suppression System
| 2.0 Location: | USDA Moore Air Base | |
| APHIS PPQ FO MFFRF | ||
| (Mexican Fruit Fly Rearing Facility) | ||
| Building 6418 | ||
| 22675 N. Moorefield Rd. | ||
| Moore Air Base | ||
| Edinburg, TX 78541 |
3.0 Project Background: Building 6418 is the Mexican Fruit Fly Rearing Facility (MFFRF). The Mexican Fruit Fly Program’s goal is the eradication of Mexican Fruit Flys, (Anastrepha ludens) from the Lower Rio Grande Valley in Texas and the northern municipalities of Tamaulipas, Mexico. Eradication will be followed by the establishment and long-term maintenance of a functional barrier to keep these areas free of Mexican fruit fly. The MFFRF can produce 160 million sterile flies a week to service the entire Rio Grande Valley’s citrus Mexican Fruit Fly eradication program.
Due to a recent fire in building 6418 larval rooms, wet fire suppression system is needed. Building 6418 was constructed in the early 80s with no fire suppression initially. Since then the program has expanded.
4.0 Project Scope: Contractor shall provide Design/As-Built drawings submittals and installation for a new retrofitted system starting at a flange one foot above the floor in building 6418. The system shall be a turnkey project encompassing everything needed to have a fully functioning fire suppression system. The contractor shall remove and dispose of all construction materials and debris off base.
4.1 Specifications:
1. Design and installation of the underground fire line including tap, piv, and above ground backflow preventer including testing certification, and riser room.
2. Design and installation of the turnkey automatic sprinkler system including canopy protection, sprinkler heads centered in ceiling tiles utilizing flex drops.
3. Submittal and approval to and from the authority having jurisdiction.
4. Fabrication and installation of the underground and overhead automatic sprinkler system including all permits, labor, materials and equipment needed for installation.
5. All labor and equipment shall have a one-year warranty commencing on substantial completion date.
6. Design densities shall be in accordance with NFPA Standards.
The Contractor shall ensure that all solutions/products shall be used in strict conformance with the product's Environmental Protection Agency (EPA) and state requirements. All manufacturers' instructions and recommendations for the use of the solutions shall be strictly followed. In addition, the contractor shall comply with all federal, state, or local laws and regulations concerning the use, storage, and disposal of hazardous materials.
Contractor will provide Material Safety Data Sheets as specified in this contract and keep the sheets current for any product that is used in this contract.
Contractors must comply with applicable codes, environmental regulations in the State of Texas and local ordinances.
· All work shall be performed in accordance with all applicable State and Local codes and standards.
· All work to be executed in a professional, workman like manner.
· All equipment and material installed on this project shall be new and unused unless otherwise noted.
· All work to be performed during normal business hours, Monday through Friday, unless otherwise noted.
5.0 Facility Security and Safety Requirements:
Moore Air Base is a restricted facility.
· Work Hours are Monday through Friday from 07:00 AM to 3:30 PM. All work outside of the mentioned days and hours must be approved by the Facilities Maintenance Manager in writing, prior to entering the facility. This includes work during Federal holidays.
· Some of this work will be required after 3:30, the Contractor is to provide a schedule for those days to coordinate with the Maintenance Mechanic Supervisor.
· All Contractor employees shall have a valid picture identification such as a driver’s license or a State identification card.
· All vehicles shall have proper insurance and registration for entering the facility.
· All Contractors working at the facility shall be under the supervision of a qualified job site superintendent. Anyone found outside of the determined construction area will be removed from the facility and not allowed to return.
· All Contractors shall provide temporary and portable restroom facilities for their employees if the project has a duration of over three working days.