This Statement of Objectives (SOO) outlines requirements for a SATCOM Modernization project at Keesler AFB, Mississippi, focusing on a Deployable Dual-Hub SATCOM Terminal. The objective is to deliver a portable, interoperable terminal capable of operating across four SHF bands (C, X, Ku, Ka) on both commercial and military satellites, designed for ease of use, rapid deployment, and educational applications.
The required system features a dual-hub configuration with 1.8-to-2.4 meter antennas, modular multi-band operation, and compact deployability. Key components include outdoor equipment like antennas, modular feed boom assembly, integrated modem, and indoor equipment such as ruggedized laptops/tablets and a UPS. Operational requirements include rapid setup/teardown, power source integration, satellite acquisition, and comprehensive monitoring. Deliverables encompass system documentation, on-site integration, and a train-the-trainer program for 12 instructors and maintenance staff. The organization requires three sets of this terminal system to replace the existing Ground Multi-Band Terminal and Quad-band Large Aperture Antenna system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Objectives SATCOM Modernization
(Deployable Dual-Hub SATCOM Terminal)
Prepared by:
Keesler AFB, MS
The organization requires a replacement for the existing Ground Multi-Band Terminal (GMT) and Quad-band Large Aperture Antenna (QLAA) system with a Deployable Dual-Hub SATCOM Terminal. The replacement equipment must constitute three sets of the below required items and meet all desired capabilities:
Objectives:
Deliver a portable, interoperable, and deployable dual-hub SATCOM terminal system, capable of operating across four SHF bands (C, X, Ku, Ka) on both commercial and military satellites. This system will be designed for ease of use, rapid deployment, and educational applications.
Required System Features:
• Dual-Hub Configuration: Utilizing a 1.8-to-2.4 meter Small Aperture Antenna (SAA) "Hub 1" and a QLAA "Hub 2" for operational flexibility.
• Multi-Band Operation: Modular switching between C, X, Ku, and Ka-bands via an innovative modular feed boom design, interchangeable between Hub 1 and Hub 2.
• Compact & Deployable: Meeting a strict antenna size requirement of 1.8-to-2.4 meters for portability and featuring secure mounting capabilities for concrete pad locations.
• Transit Case Design: All system components will be housed in ruggedized, transportable transit cases optimized for storage, transit, and rapid deployment.
• Two-Person Deployment: The system will be engineered for assembly and operation by a team of two trained personnel.
• Remote Operation: Full system control and monitoring capabilities via a vendor provided/programmed laptop or tablet interface, enabling remote operation from a Cyber- Physical Power System (CPPS) classroom environment.
System Components:
• Outdoor Equipment:
o 1.8-to-2.4m SAA (Hub 1) and QLAA (Hub 2) antennas o Modular feed boom assembly for all four SHF bands o Integrated modem assembly with spectrum analyzer and pointing assistance o RF ODU and Network Access Assembly (NAA)
• Indoor Equipment:
o 2 Ruggedized laptops or tablets with control and monitoring software o Uninterruptible Power Supply (UPS)
Operational Requirements:
The SATCOM terminal system must facilitate the following:
• Rapid Setup/Teardown: Streamlined deployment and pack-up procedures in field environments.
• Power Source Connection: Integration 120/240 VAC, 50-60Hz power sources.
• Satellite Acquisition: Operational peak/poll/acquire functionality across all supported bands and satellites.
• Interface Connectivity: Secure and interface connections and wiring.
• Modem Configuration: Modem configuration operations.
• Feed Horn Swapping: Simple and quick replacement/swapping of feed horns as needed.
• Monitoring & Control: Effective and comprehensive system monitoring and control through the provided laptop interface.
Deliverables:
• Comprehensive system documentation, including any user manuals, training materials
(eLearning, Instructor-led training procedures, interactive guides, guided video-based, On-The-Job training), and maintenance action guides.
• On-site system set-up and integration.
• Operator training program (Train-the trainer) for 12 instructors and maintenance staff for effective system sustainment and operation