Attachment 1- Specifications MUNRO (WMSL 755) DS FQ4 FY20.pdf
PDF 4 MB Posted
- Solicitation number
- 70Z08520RP45A5400
About this file
This combined synopsis/solicitation requests proposals for dockside repairs to USCGC MUNRO (WMSL 755). The Coast Guard seeks repairs in accordance with an attached specification including various work items and optional line items. Offerors must submit proposals by July 29, 2020. The contract will have a period of performance from September 14, 2020 through November 13, 2020. The solicitation is set aside for total small businesses. Offerors must be registered in SAM.gov and include information such as pricing, technical capability details, and representations/certifications with their proposals. The Coast Guard plans to award a firm fixed price contract by August 14, 2020. Questions are due by July 21, 2020. The solicitation incorporates FAR provisions and clauses including those related to commercial items and statutes/executive orders. Attachments include the specification, schedule, evaluation criteria, and forms.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC MUNRO (WMSL 755)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2020
Developed By: Erick B Keerins
(Rev-0, 05 April 2020)
USCGC MUNRO (WMSL-418) DOCKSIDE AVAILABILITY FY2020
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. xi Consolidated List of Critical Inspection Items .......................................................................................... xiii Principal Characteristics ............................................................................................................................. xiv General Requirements WORK ITEM 1: Tanks (Fuel Oil), Clean and Inspect WORK ITEM 2: High Purity Water Tank, Clean and Inspect WORK ITEM 3: Tanks (Ballast), Clean and Inspect WORK ITEM 4: Flex Hose Assemblies (Main Gas Turbine), Renew WORK ITEM 5: Flex Hose Assemblies (Main Reduction Gear), Renew WORK ITEM 6: Refrigeration Plant, System Groom WORK ITEM 7: Flex Hose Assemblies (Refrigeration Plant), Renew WORK ITEM 8: Flexible Hoses (Bow Thruster), Renew WORK ITEM 9: Cargo Handling Elevator, Level 2 Inspect and Repair WORK ITEM 10: Dual Point Davit, Biennial Maintenance, Perform WORK ITEM 11: Folding Boom Cranes, Biennial Maintenance, Perform WORK ITEM 12: Incinerator Clean, Inspect and Test WORK ITEM 13: Tanks (Ballast), Preserve (Partial) WORK ITEM 14: Chilled Water System Insulation, Renew WORK ITEM 15: Ventilation Ducting, Clean and Inspect WORK ITEM 16: Deck Covering (Polymeric), Repair (Patch) and Seal WORK ITEM 17: Tenting, Provide WORK ITEM 18: Deck Covering (Slip-Resistant), Renew WORK ITEM 19: Deck Covering (Polymeric), Seal WORK ITEM 20: Decks, Preserve (Full) WORK ITEM 21: Tank Sounding Tube, Replace WORK ITEM 22: VCHT Room Escape Scuttle and Ladder, Install WORK ITEM 23: Stern Launch and Recovery Lights, Install WORK ITEM 24: Intake Ventilation System, Modify WORK ITEM 25: Dewatering / Fire Pump (P-6) Stowage Racks Fabricate and Install WORK ITEM 26: Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect WORK ITEM 27: Tanks (Aviation Fuel, Storage), Preserve (Partial) WORK ITEM 28: Prototype AFFF Piping, Modify iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 418A-WMSL 100-001, Rev -, General Arrangements
Coast Guard Drawing 418A-WMSL 320-004, Rev -, Electrical Mods to Suit Installation of VCHT Escape
Scuttle
Coast Guard Drawing 418A-WMSL 505-001, Rev -, Piping Modifications to Suit VCHT Room Escape
Scuttle
Coast Guard Drawing 418A-WMSL-101-001, Rev -, Compartment & Access Drawing
Coast Guard Drawing 418A-WMSL-264-001, Rev -, RDCN GR/CPP GTRB LO Diagram
Coast Guard Drawing 418A-WMSL-512-001, Rev E, HVAC System Diagram (ASC512001)
Coast Guard Drawing 418A-WMSL-540-001, Rev -, Fuel Oil Diagram
Coast Guard Drawing 418A-WMSL-551-001, Rev -, Compressed Air Diagram
Coast Guard Drawing 418A-WMSL-801-011 Rev -, Booklet of General Plan
Coast Guard Drawing 750 WMSL 508-1, Rev C, Piping and Machinery Insulation Schedule and L/M
(ASC508001)
Coast Guard Drawing 750 WMSL 516-1, Rev E, A/C & Refrigeration Piping Diagram (ASC516001)
Coast Guard Drawing 750 WMSL 520-001, Rev H, Seawater Cooling System Diagram (ASC520001)
Coast Guard Drawing 750 WMSL 520-004, Rev E, Salt Water Cooling Unit 1320 (ASC520132-SW)
Coast Guard Drawing 750 WMSL 520-005, Rev E, Salt Water Cooling System Unit 2110 (ASC520211-
SW)
Coast Guard Drawing 750 WMSL 520-008, Rev F, Salt Water Cooling Unit 2210 (ASC520221-SW)
Coast Guard Drawing 750-WMSL 085-025, Rev -, Compartment Areas & Volumes NSC 3 & Follow
(AS3085012)
Coast Guard Drawing 750-WMSL 100-023, Rev H, Unit 2120 Structure - 1st Platf to 2nd Deck Fr 35 to
Fr 44 (ASC100212)
Coast Guard Drawing 750-WMSL 100-024, Rev H, Unit 2130 Structure 2nd Deck to Main Deck - Fr 35 to Fr 44 (ASC100213)
Coast Guard Drawing 750-WMSL 100-072, Rev -, Topside Configuration for NSC 5 & Follow
(AS5100004)
Coast Guard Drawing 750-WMSL 100-083, Rev -, General Arrangements NSC 5 & Follow (AS5100001)
(Unsigned)
Coast Guard Drawing 750-WMSL 100-084, Rev -, Topside Configuration for NSC 6 & Follow
(AS6100004)
v (Rev-0)
Coast Guard Drawing 750-WMSL 167-504, Rev E, Hatch & Scuttle List Ship Wide, NSC 3 and Follow
(AS3167003)
Coast Guard Drawing 750-WMSL 180-013, Rev E, Fdn Arr Dwg Design Unit 2120 Bklt No. 1
(ASC180212)
Coast Guard Drawing 750-WMSL 180-014, Rev D, Fdn Arr Dwg Design Unit 2130 Bklt No. 1
(ASC180213)
Coast Guard Drawing 750-WMSL 300-017, Rev C, Unit 2120 1st Platf Fr 35 to Fr 44 Arr of Elect Eqpt
(ASC300212)
Coast Guard Drawing 750-WMSL 300-018, Rev C, Unit 2130 2nd Deck Fr 35 to Fr 44 Arr of Elect Eqpt
(ASC300213)
Coast Guard Drawing 750-WMSL 304-014, Rev C, Unit 2120-1st Platf-Fr 35 to Fr 44 Wireway
Arrangement and Details (ASC304212)
Coast Guard Drawing 750-WMSL 320-514, Rev C, PWR Sys S/S Gen & Swbd Intcon Dk Plan & Elem
Wrg Diag (ASC3200018)
Coast Guard Drawing 750-WMSL 330-005, Rev C, Lighting System Deck Plan AMR (UL & LL), MMR
(Fwd & Aft) (UL & LL) (ASC330004)
Coast Guard Drawing 750-WMSL 330-011, Rev F, Lighting System Deck Plan Second Deck - Fwd of Fr
52 (ASC330007)
Coast Guard Drawing 750-WMSL 436-011, Rev E, Fire Detection Sys Deck Plan (ASC436009)
Coast Guard Drawing 750-WMSL 493-001, Rev E, Unclassified LAN Cable Block Diagram
(ASC493001)
Coast Guard Drawing 750-WMSL 508-001, Rev C, Piping and Machinery Insulation Schedule and L/M
(ASC508001)
Coast Guard Drawing 750-WMSL 512-024, Rev C, Vent & Air Conditioning Arr 1st Platf Unit 2120
(ASC512212)
Coast Guard Drawing 750-WMSL 528-016, Rev E, Plumbing & Interior Deck Drains and Vent System -
Unit 2120 (ASC528212-PD)
Coast Guard Drawing 750-WMSL 528-041, Rev D, Plumbing Fixture Hook-Up Detail Booklet
(ASC528004)
Coast Guard Drawing 750-WMSL 530-010, Rev B, Potable Water Unit 2120 (ASC530212-PW)
Coast Guard Drawing 750-WMSL 593-027, Rev D, Sewage System Unit 2120 (ASC593212-SS)
Coast Guard Drawing 750-WMSL 593-078, Rev C, Bilge & Oil Pollution Control System Unit 2120
(ASC593212-PC)
Coast Guard Drawing 750-WMSL 600-014, Rev E, Fab & Instl of Hull Design, Unit 2120 (ASC600212)
Coast Guard Drawing 750-WMSL 602-004, Rev E, Photoluminescent Markings (ASC602006)
Coast Guard Drawing 750-WMSL 602-010, Rev E, Label Plates List - Access, Frames and Bulkheads
(ASC602012)
Coast Guard Drawing 750-WMSL 623-500, Rev G, Vertical Ladder and Ladder Rung List and Details
Ship Wide (ASC623004)
Coast Guard Drawing 750-WMSL 635-001, Rev -, Thermal & Acoustic Insulation (ASC635001)
Coast Guard Drawing 750-WMSL 635-002, Rev K, Insulation Arr & Details Thermal, Acoustic, & Fire
(ASC635002)
Coast Guard Drawing 750-WMSL 801-011, Rev -, Booklet of General Plans (NSC 6 Only)
(ASC801001E) (Unsigned) vi (Rev-0)
Coast Guard Drawing 750-WMSL 801-011, Rev -, Booklet of General Plans (NSC 6 Only)
(ASC801001F) (Unsigned)
Coast Guard Drawing 750-WMSL-085-041, Rev -, Tank Capacity Curves (WMSL 755 Only)
(ASC085013F)
Coast Guard Drawing 750-WMSL-100-011, Rev H, Unit 1110 Structure - Innerbottom To 1st Platform &
2nd Deck – Bow to Fr 10 (ASC100111)
Coast Guard Drawing 750-WMSL-100-013, Rev K, Unit 1210 Structure - Innerbottom To 1st Platform -
Fr 10 to Fr 22 (ASC100121)
Coast Guard Drawing 750-WMSL-100-017, Rev K, Unit 1310 Structure - Innerbottom To 1st Platform -
Fr 22 to Fr 35 (ASC100131)
Coast Guard Drawing 750-WMSL-100-036, Rev M, Unit 3110 Structure - 1st Platform and Below - FR
65 TO FR 77 (ASC100131)
Coast Guard Drawing 750-WMSL-100-036, Rev M, Unit 3110 Structure - Innerbottom To 1st Platform -
Fr 65 to Fr 77 (ASC100311)
Coast Guard Drawing 750-WMSL-100-036, Rev M, Unit 3110 Structure 1st Platform and Below Frs 65-
77 (ASC100311)
Coast Guard Drawing 750-WMSL-100-040, Rev L, Unit 3210 Structure – Inner Bot To 1st Platform – Fr
76 to Fr 88 (ASC 100321)
Coast Guard Drawing 750-WMSL-100-040, Rev L, Unit 3210 Structure – Inner Bottom to 1st Platform –
FR 76 TO FR 88 (ASC100321)
Coast Guard Drawing 750-WMSL-100-040, Rev L, Unit 3210 Structure - Innerbottom To 1st Platform -
Fr 76 to Fr 88 (ASC100321)
Coast Guard Drawing 750-WMSL-100-083, Rev , General Arrangement NSC 5 & Follow (AS5100001)
Coast Guard Drawing 750-WMSL-100-083, Rev , General Arrangements NSC 5 & FOLLOW
(AS5100001)
Coast Guard Drawing 750-WMSL-100-083, Rev -, General Arrangements NSC 5 & FOLLOW
(AS5100001)
Coast Guard Drawing 750-WMSL-100-35, Rev K, Unit 2340 Structure - Main Deck to 01 Level - FR 52 to FR 64 (ASC100234)
Coast Guard Drawing 750-WMSL-100-531, Rev D, Structural Mods IWO New Aft Folding Cranes (753, 754 & 755)
Coast Guard Drawing 750-WMSL-167-001, Rev J, Manhole List Installation and Fabrication Details Ship
Wide (ASC167001)
Coast Guard Drawing 750-WMSL-186-500, Rev -, P-6 PUMP CANISTER RACK
Coast Guard Drawing 750-WMSL-300-023, Rev C, Unit 2240 - Main Dk Fr 44 to Fr 52 Arr of Elect Eqpt
(ASC300224) \
Coast Guard Drawing 750-WMSL-320-43, Rev B, Electrical One Line Diagram (NSC 5 SRD)
(ASC320001E)
Coast Guard Drawing 750-WMSL-320-579, Rev -, Electrical Installations IWO New Aft Folding Cranes
(754 & 755)
Coast Guard Drawing 750-WMSL-330-025, Rev C, Lighting System List of Feeds and Mains
(ASC330014)
Coast Guard Drawing 750-WMSL-331-501, Rev A, Stern Launch/Recovery System Lighting
Modifications
Coast Guard Drawing 750-WMSL-501-004, Rev D, Misc Independent Tanks Design and Details and
L/M (ASC501004)
vii (Rev-0)
Coast Guard Drawing 750-WMSL-505-006, Rev D, List of Hoses (ASC505006)
Coast Guard Drawing 750-WMSL-505-006, Rev D, List of Hoses
Coast Guard Drawing 750-WMSL-506-512, Rev -, Ferrous Sounding Tube Replacement A&D
Coast Guard Drawing 750-WMSL-508-001, Rev C, Piping and Machinery Insulation Schedule and L/M
(ASC508001)
Coast Guard Drawing 750-WMSL-509-001 Rev A, HVAC Insulation Schedule
Coast Guard Drawing 750-WMSL-512-001, Rev J, HVAC System Diagram (ASC512001)
Coast Guard Drawing 750-WMSL-512-034, Rev B, Vent & Air Cond Arr Mn Dk Unit 2340
(ASC512234)
Coast Guard Drawing 750-WMSL-512-040, Rev G, Vent & Air Cond Arr 2nd Deck Unit 3230
(ASC512323)
Coast Guard Drawing 750-WMSL-512-041, Rev F, Vent & Air Cond Arr Mn Dk Unit 3240
(ASC512324)
Coast Guard Drawing 750-WMSL-512-042, Rev C, Vent & Air Cond Arr 2nd Dk Unit 3330
(ASC512333)
Coast Guard Drawing 750-WMSL-512-059, Rev C, HVAC Equipment List (ASC512004)
Coast Guard Drawing 750-WMSL-512-070, Rev B, Vent & Air Conditioning Arr Mn Dk Unit 2340
(AS3512234)
Coast Guard Drawing 750-WMSL-512-527 Rev B, Airlift Mods to Ventilation System SS 2-56-2
Coast Guard Drawing 750-WMSL-516-001, Rev E, A/C & Refrigeration Piping Diagram (ASC516001)
Coast Guard Drawing 750-WMSL-516-002, Rev J, Chilled Water System Diagram (ASC516002)
Coast Guard Drawing 750-WMSL-516-010, Rev B, Chilled Water Unit 2140 (ASC516241-CW)
Coast Guard Drawing 750-WMSL-516-014, Rev B, Chilled Water Unit 2340 (ASC516234-CW)
Coast Guard Drawing 750-WMSL-520-001, Rev H, Seawater Cooling System Diagram (ASC520001)
Coast Guard Drawing 750-WMSL-530-001, Rev F, Potable Water Systems Diagram (ASC530001)
Coast Guard Drawing 750-WMSL-530-019, Rev D, Potable Water Unit 3120 (ASC530312-PW)
Coast Guard Drawing 750-WMSL-556-015, Rev E, Bow Thruster Hpu Diagram (ASC556009)
Coast Guard Drawing 750-WMSL-583-004, Rev G, Stern Launch/Recovery Arrangement & Details
(ASC583004)
Coast Guard Drawing 750-WMSL-593-011, Rev B, Solid Waste System Schematic (ASC593026)
Coast Guard Drawing 750-WMSL-593-039, Rev B, Bilige & Oil Pollution Cont Unit 2240 (ASC593224-
PC)
Coast Guard Drawing 750-WMSL-600-034, Rev F, FAB & INSTL OF HULL OUTFIT DESIGN, UNIT
Coast Guard Drawing 750-WMSL-600-042, Rev D, FAB & INSTL OF HULL OUTFI DESIGN, UNIT
Coast Guard Drawing 750-WMSL-635-02, Rev H, Insulation Arr & Details Thermal, Acoustic, & Fire
(ASC635002)
Coast Guard Drawing 750-WMSL-801-010, Rev A, Booklet of General Plans (NSC 5 ONLY)
(ASC801001E)
Coast Guard Drawing 750-WMSL-801-011, Rev -, Booklet of General Plans (NSC 6 ONLY)
(ASC801001E)
Coast Guard Drawing 750-WMSL-801-011, Rev , Booklet of General Plans (NSC 6 ONLY)
(ASC801001F)
viii (Rev-0)
Coast Guard Drawing 750-WMSL-801-011, Rev -, Booklet of General Plans (NSC 6 ONLY)
Coast Guard Drawing 750-WMSL-801-011, Rev A, Booklet of General Plans (NSC 6 ONLY)
(ASC810001E)
NAVSEA Drawing 803-1623057, Rev G, Scuttle, WT, Flush, Quick Acting, 25 Dia 25 psi-Arrangement
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation for Compartments Installation
Details
COAST GUARD PUBLICATIONS
American Society for Nondestructive Testing (ASNT), Recommended Practice No. SNT-TC-1A, 2016, Personnel Qualification and Certification in Nondestructive Testing
American Society for Nondestructive Testing (ASNT), Standard No. ANSI/ASNT CP-189-2016, 2016, ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Commandant Instruction (COMDTINST) M9000.6 (series), Naval Engineering Manual
Coast Guard Technical Publication (TP) 7108, SWBS 573, Jun 2007, Stores Elevator - Model 20833
Coast Guard Technical Publication (TP) 7168, 19 Oct 07, 3.2 Refrigeration Ships Store Plant
Coast Guard Technical Publication (TP) 7170, SWBS 593, May 2013, Incinerator - Type Atlas 600 S WS
& Diesel oil Tank - Type 600 - Installation, Operation & Maintenance Manual
Coast Guard Technical Publication (TP) 7903, SWBS 583, Apr 2019, Aft Boat handling system –Model
FB90-28
Coast Guard Technical Publication (TP) 7946, SWBS 593, Sep 2016, Incineration Plant - Installation, Operation, Maintenance & Spare Parts
Coast Guard Technical Publication (TP) 9618, SWBS 583, Nov 2018, Boat Davit - Models
DDP11000CTS & SP2200 (S/N: 2328, 2329, 2332 & 2330, 2331, 2333) (HULLS: 750, 751 & 753)
Coast Guard Yard Project YD-75H07 WI01, Rev -, Work Instruction to Support the Installation of an
Emergency Escape Scuttle from VCHT Room 3-36-2-E on USCGC Stratton
Coast Guard Yard Project YD-75H07 WI01, Rev -, Work Item 2 : VCHT Room Emergency Egress
Scuttle Installation
General Requirements for Drawing Preparation
MIL-PRF-900, Mar 1991, Rubber Gasket Material, 45 Durometer Hardness
NOTE
OTHER REFERENCES
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General
Requirements
Surface Forces Logistics Center Standard Specification 0085 (SFLC Std Spec 0085), 2018, Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018 Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2018, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2018, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 3100 (SFLC Std Spec 3100), 2018, Inspect, Test and Recondition AC Synchronous Generator in-Place ix (Rev-0)
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2018, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2018, Clean
Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2018, Install Interior
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2018, Temporary
Hull Accesses
TCTO WMSL-418-TB6030, 2019, Installation of Flush Mount Scuttle and Vertical Ladder as Secondary
Egress Route from VCHT Room 3-36-2-E to Crew Stateroom 2-36-8-l
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 11 (SSPC-SP 11), 2013, Power Tool Cleaning to Bare Metal
OTHER REFERENCES
American Society of Mechanical Engineers (ASME) A17.2, Guide for the Inspection of Elevators, Escalators and Moving Walks
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) F1836M, Reapproved 2007, Standard Specification for Stuffing Tubes, Nylon and Packing Assemblies (Metric)
ASTM International (ASTM) F683, 2008, Standard Practice for Selection and Application of Thermal
Insulation for Piping and Machinery
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2017, Occupational Safety and Health
Standards
Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2013, Occupational Safety and Health
Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 29, Part 1915, Subpart E, Sep 2015, Scaffolds, Ladders and
Other Working Surfaces
Code of Federal Regulations (CFR) Title 40, Jul 2013, Protection of the Environment
International Maritime Organization (IMO) International Convention for the Safety Of Life At Sea
(SOLAS), 2009 as amended in 2010 and 2011.
International Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition.
International Standards Organization (ISO) 4406, 2017, Hydraulic Fluid Power - Fluids - Method for
Coding Level of Contamination by Solid Particles
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-58, 2018, Pipe
Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation
MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic)
MIL-DTL-15024G, Mar 2018, General Specification for Plates, Tags, and Bands for Identification of
Equipment
MIL-DTL-15024G, Mar 2018, General Specification for Plates, Tags, and Bands for Identification of
Equipment
MIL-DTL-24643, Aug 2007, Cables and Cords, Electric, Low Smoke, For Shipboard Use, General
Specification for
MIL-HDBK-291, Sep 1986, Cargo Tank Cleaning x (Rev-0)
MIL-PRF-24176C, Oct 2004, Cement, Epoxy, Metal Repair and Hull Smoothing
MIL-PRF-24613, Nov 2007, Deck Covering Materials, Interior, Cosmetic Polymeric
MIL-PRF-24613, Nov2007, Deck Covering Materials, Interior, Cosmetic Polymeric
MIL-PRF-24667C, May 2008, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application
MIL-STD-2003-2, Sep 2009, Electric Plant Installation, Standard Methods for Surface Ships &
Submarines (Equipment)
MIL-STD-2003-3, Sep 2009, Electric Plant Installation, Standard Methods for Surface Ships &
Submarines (Penetrations)
Naval Sea Systems Command (NAVSEA) 0640-LP-111-4501, Apr 2012, NAVSEA OP 4 Rev 10, Ammunition And Explosives Safety Afloat
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C 6183, 2005, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2013, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.2 (SSPC-SP 2), 2004, Hand Tool Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
The Society for Protective Coatings (SSPC) VIS 3, 2004, Guide and Reference Photographs for Steel
Surfaces Prepared by Hand and Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet Abrasive Blast
Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 6 (WAB)/NACE WAB-3, 2015, Commercial Abrasive Blast Cleaning
USFGS 33 01 50.6, November 2018, Cleaning of Petroleum Storage Tanks xi (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
6 N Tetrafluoroethane, Technical (R-134A)
NSN: 6830-01-370-6207 125 lbs $992.00
6 N Henry “Y” Strainer
Assembly (Main
Assembly P/N: 896A-
5/8S)
PN: 5-010-003 (Screen) PN:
5-023-100 (Gasket) PN: 2-
023-080 (O-Ring)
6 $101.80
6 N Sea Water Regulating
Valve (Condenser).
Metrex Valve Corp lead time is usually 6-8 weeks.
PN: M900P-125-LRFL2-3W 2 $2,552.00
6 N Sea Water Regulating
Valve (Oil Cooler).
Metrex Valve Corp lead time is usually 3-4 weeks
PN: DA-868T-75-SE-M 2 $1,740.00
6 N Disk, Rupturable NSN: 4820-01-366-7330 PN:
026-31284-000
6 $2,274.06
6 N Connector, Flexible, Liquid
NSN: 4730-01-561-7408 PN:
026-41967-000
2 $3,196.17
6 N Connector, Flexible, Vapor
NSN: 5935-01-561-7463 PN:
026-41968-000
2 $5,303.11
6 N Valve, Pressure Relief NSN:4820-01-561-6471
PN:022-11355-000
6 $352.12
9 N Guide Roller PN: 184796 4 ea. 2,885.11
9 N Wire Rope PN: 188209 1 ea. 896.65
9 N Wire Rope NSN: 4010-01-561-8614 4 ea. 837.90
10 Y CB-OTH Mark IV
(Coast Guard Drawing
26B-CB-IV-801-001)
N/A 1 ea N/A
11 Y CB-OTH Mark IV
(Coast Guard Drawing
26B-CB-IV-801-001)
N/A 1ea. N/A
11 Y Long Range Interceptor
II (LRI-II) Cutter Boat
N/A 1ea. N/A
22 N 25― D Flush Deck
Quick-Acting
Watertight Scuttle, Steel, Hinge, 15 psi
NAVSEA Dwg 803-1623057
Juniper P/N : JE7455-SF
1 ea $2,730.00
22 N EEBD Holder NIN : AL-EEBD Malpass, Inc., P/N : 48EEBDAL
2 ea $85.00
22 N Strobe Light, Warning NIIN : - Federal Signal P/N : 1 ea $346.75 xii (Rev-0)
Alarm (Red) FB2PST120R
22 N Strobe Light, Warning
Alarm (Amber)
NIIN : - Federal Signal P/N :
FB2PST120A
1 ea $346.75
25 Y Dewatering Pump
Group
4320-01-470-5515/2BE6.5H 1 5780.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xiii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
1 Tanks (Fuel Oil), Clean and Inspect
3 Tanks (Ballast), Clean and Inspect
4 Flex Hose Assemblies (Main Gas Turbine), Renew
5 Flex Hose Assemblies (Main Reduction Gear), Renew
6 Refrigeration Plant, System Groom
7 Flex Hose Assemblies (Refrigeration Plant), Renew
8 Flexible Hoses (Bow Thruster), Renew
10 Dual Point Davit, Biennial Maintenance, Perform
11 Folding Boom Cranes, Biennial Maintenance, Perform
17 Tenting, Provide
18 Deck Covering (Slip-Resistant), Renew
22 VCHT Room Escape Scuttle and Ladder, Install
26 Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect xiv (Rev-0)
PRINCIPAL CHARACTERISTICS
418' WMSL
PHYSICAL
Length overall 418' 0"
Length between perpendiculars 390' 0"
Maximum beam 54' 0"
Beam @ 01 level 47' 9-1/8"
Depth (01 level @ side to baseline) 39' 2-3/4"
01 deck camber foredeck 1/4" in 1'-0"
Minimum berth depth 20' 0"
Height of highest projection Approximately 119'
Draft, design 14.40'
Design displacement 3925 long tons
MACHINERY
Two diesel engines MTU 20V, 20-cylinder 9,730 SHP each
One gas turbine General Electric LM2500; 29,500 SHP
Type of propulsion CODAG
Electrical system 24 Volt DC
Two controllable pitch propellers Rolls-Royce 5 blade, 14' 0" diameter; 229 RPM max
Two reduction gears RENK
One cross connect gear RENK
HULL
Hull material 5086 Aluminum
HSLA-80 Steel
ABS EH 36 Steel
ABS AH 36
Frame spacing
FWD of FR 9 2' 3"
FR 9 to FR 10 6' 9"
FR 10 to FR 98 4' 1"
FR 98 to FR 99 3'-8"
ELECTRICAL
Power Three 1360 kW, 450 V, 60 Hz, 3 Phase, 1800 RPM Caterpillar 3512B diesel engines with Baylor ship service generators
Shore tie cable Seven MIL-C-24368/2 (NATO) shore power receptacles, 400 A each
TANK CAPACITIES
Diesel oil 220,359 gal
Fresh water 12,454 gal
JP-5 Fuel 35,182 gal
1 (Rev-0)
00000_0220_FLT
REC_00000_FLT_MATOC Dockside (1014)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINS) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is 7690390037.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, 3 (Rev-0) and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2018 Edition Standard Specifications and supersede published content:
None.
4 (Rev-0)
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
7 (Rev-0)
QA-3A - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
8 (Rev-0)
QA-3B - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
9 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
11 (Rev-0)
12311_BJA_0220_755
12311_ANS_0719_418
WORK ITEM 1: Tanks (Fuel Oil), Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect Fuel Oil
Tanks as listed in Table 1.
TABLE 1. FUEL OIL TANKS
TANKS LOCATIONS
FLUID RESIDUES
(GALLONS)
CLEAN AND INSPECT
AREAS (SQFT)
FO Service Tank, Stbd 5-36-3-F 53 4,676
FO Service Tank, Port 5-36-2-F 53 4,676
FO Storage Tank, Stbd 5-76-1-F 75 1,636
FO Storage Tank, Port 5-76-2-F 75 1,636 Note : All information and quantities are approximate for bidding purposes only.
Fluid residues in table are calculated at 200% of the remaining volumes below stripping tubes.
Clean and inspect areas account for scantling areas and margins of 10-20% already.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 418A-WMSL-100-001, Rev -, Inboard and Outboard Profiles
Coast Guard Drawing 418A-WMSL-101-001, Rev -, Compartment and Access Drawing
Coast Guard Drawings 750-WMSL-085-041, Rev -, Tank Capacity Curves (WMSL 755 Only)
(ASC085013F)
Coast Guard Drawing 750-WMSL-100-036, Rev M, Unit 3110 Structure - 1st Platform and
Below - FR 65 TO FR 77 (ASC100131)
Coast Guard Drawing 750-WMSL-100-040, Rev L, Unit 3210 Structure – Inner Bottom to 1st
Platform – FR 76 TO FR 88 (ASC100321)
Coast Guard Drawing 750-WMSL-100-083, Rev -, General Arrangements NSC 5 & FOLLOW
(AS5100001)
Coast Guard Drawing 750-WMSL-167-001, Rev J, Manhole List Installation and Fabrication
Details Ship Wide (ASC167001)
Coast Guard Drawing 750-WMSL-801-011, Rev -, Booklet of General Plans (NSC 6 ONLY)
12 (Rev-0)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C 6183, 2005, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
USFGS 33 01 50.6, November 2018, Cleaning of Petroleum Storage Tanks
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.6 Inspection
3.1.2 Tech Rep. The Contractor shall provide the services of a qualified and certified NDE Operator and
Inspector as follows:
NDE Operator and Inspector certified and qualified in accordance with ASNT No. SNT-TC-
1A.
3.1.2.1 Qualifications/certifications. Submit the Tech Rep’s qualifications/certifications to the COR at the arrival conference.
3.1.3 Protective measures. The Contractor shall protect non-affected vessel’s equipment, components, and spaces during surface preparation and coating application procedures, as specified in SFLC Std Spec
0000, paragraph 3.3.3 (Vessel component, space, and equipment protection), and abide by all applicable environmental protection tasks, as specified in SFLC Std Spec 0000, Appendix B (Requirements for
Environmental Protection). Upon completion of work, remove and dispose of all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Residual fluids/residues
Piping and supports
Tank access cover
3.1.4.1 The Contractor shall remove and dispose of all tank residual fluids in accordance with all applicable federal, state, and local laws and regulations.
13 (Rev-0)
3.1.5 Work locations. The concerned work areas are listed in Table 1. See the drawings in section 2 for guidance, locations, and details.
3.1.6 Materials. The Contractor shall provide any new components, parts, materials, and paints with the same color, comparable and matching material properties as the existing components/parts. Use references in section 1, 2 and SFLC Std Spec 6310 for guidance, required materials, and details.
3.1.7 Safety. The Contractor shall provide safety measures as follows:
Notify the Coast Guard Inspector prior to opening any accesses to the designated tanks.
Open all accesses to the designated tanks using non-sparking tools.
Provide barriers over any open holes in the deck to prevent personnel from falling into open manholes, and post warning signs at the forward, aft, inboard, and outboard sides of all open accesses, while manhole covers are removed. Warning signs shall read: “DANGER, COVER
IS REMOVED.”
Provide adequate explosion proof lighting to illuminate the work area during cleaning and inspection.
Provide adequate lighting during night hours to illuminate hazards.
3.1.8 Work coordination. The Contractor shall coordinate the accomplishment of this work item with the following work items:
Tank Sounding Tube, Replace
Tanks (Aviation Fuel, Storage), Preserve “Partial” - Optional
WARNING!
Petroleum products are flammable, combustible, explosive, or toxic. Handle them with proper ventilation, safety, and caution especially for Hotwork.
Empty any fuel tanks underneath and lower fluids in any tanks nearby.
3.2 Operational test – initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of the equipment listed below to demonstrate existing operational condition. Submit a CFR.
TLIs
NOTE
Coast Guard personnel will operate all shipboard equipment and machinery.
3.3 Tank opening. The Contractor shall open the oil tight manhole and ventilate the confined spaces in accordance with SFLC Std Spec 0000, Paragraph 3.3.1.1 Temporary ventilation and 3.3.1.2 Confined or enclosed space entry and hot work.
CAUTION!
Toxic vapors may exist in tanks. Do not leave the tanks open unless certified
“Safe for Personnel”
3.4 Tank content removal. The Contractor shall dispose of residual tank contents and any cleaning fluids in compliance with SFLC Standard Spec 0000 and all applicable Federal, state, and local laws, ordinances and regulations. Notify the COR (in writing) at least 48 hours prior to removal of wastes and fluids.
14 (Rev-0)
Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
NOTE
Coast Guard personnel will operate all shipboard equipment and machinery.
3.5 Cleaning. The Contractor shall clean all designated tanks in accordance with UFGS 33 01 50.6 paragraph 3.7. Accomplish tasks as follows:
3.5.1 Plug. The Contractor shall plug all inlet and outlet piping in the tank to prevent contaminants from entering the tank. Use plugs with an attached lanyard, ring or other system that will ensure plugs are not lost in the pipe openings. Maintain a plug accountability log outside the tank(s) to prevent any of the installed temporary plugs from being lost inside the tank or for gotten inside at tank closure.
3.5.2 Clean. The Contractor shall clean all designated tank interior surfaces free of all foreign materials, such as sediment or sludge. Remove all persistent residues. Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Use non-sparking tools exclusively. Wipe the interior tank structure dry and free of all cleaning agents.
3.5.3 Disposal. Refer to paragraph 3.4 of this specification for disposal of tank cleaning products and residuals.
CAUTION
Flammable and toxic vapors may be present in fuel, dirty oil sludge, or other tank contaminants. These vapors may be released from the tank into the compartment’s atmosphere during the cleaning process.
Maintain gas free certification for the duration of all work performed in the tanks.
Use non-sparking tools exclusively.
NOTE
Ship’s force will pump down…