Attachment 1 SOI.pdf
PDF 124 KB Posted
- Attached to
- Comanche Park Campground Reconstruction Federal contract opportunity
- Solicitation number
- 1240LT26Q0046
About this file
This is a Schedule of Items for a federal construction project. The document outlines the work scope for the Comanche Park Campground Reconstruction project located within Black Hills National Forest (Workplan Acquisition Plan/Requisition No. 716505).
The project encompasses 17 base line items organized into demolition, infrastructure, and construction phases. Demolition work includes five toilet buildings, one pumphouse building, the existing water system, general campground furnishings and amenities, and existing roads. New construction components consist of a pumphouse building, water storage tank, complete water system, four new toilet buildings, three host/volunteer site structures, electrical infrastructure, two gates, a campground entrance sign, and general signage. Additionally, the scope includes site work for campsites, existing campground road improvements, and host site wastewater connections and tanks. The pay units vary between Lump Sum (LS) contracts for comprehensive work packages and Each (EACH) pricing for discrete structures. Estimated quantities range from one unit for most infrastructure items to five toilet buildings for demolition and three host/volunteer sites for construction. The document provides a framework for pricing but does not include unit costs or total contract values, as these columns remain blank, indicating this is a pricing template awaiting contractor bids.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q and A.pdf | ||
| Comanche Site Visit.pdf | ||
| Q and A.pdf | ||
| Attchment 3 Comanche_Specifications v2.pdf | ||
| 1240LT26Q0046 A0001.pdf | ||
| Attachment 2 SOW.pdf | ||
| Attachment 4 Maps and Drawaings.pdf | ||
| 1240LT26Q0046.pdf | ||
| Attachment 3_Comanche_Specifications.pdf | ||
| Attachment 5 Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE
ITEM
NUMBER
DESCRIPTION PAY
UNIT EST QTY UNIT COST TOTAL
0001 General Requirements/Mobilization LS ALL 0002 Toilet Buildings Demolition EACH 5 0003 Pumphouse Building Demolition EACH 1 0004 Water System Demolition LS 1 0005 General Demolition, Campground Furnishings and Amenities LS 1 0006 Existing Campground Road Improvements LS 1 0007 Site Work for Camp Sites LS 1 0008 New Pumphouse Building LS 1 0009 Water Storage Tank LS 1 0010 Water System LS 1 0011 Host /Volunteer Site Construction EACH 3 0012 Host Site Wastewater Connections and Tanks LS 1 0013 Electrical LS 1 0014 New Toilet Buildings EACH 4 0015 Gates EACH 2 0016 Campground Entrance Sign EACH 1 0017 Signage LS 1
Grand Total
SCHEDULE OF ITEMS
BLACK HILLS NATIONAL FOREST
PROJECT TITLE: COMANCHE PARK CAMPGROUND RECONSTRUCTION
WORKPLAN ACQUISITION PLAN/REQUISITION NO: 716505
SCHEDULE OF ITEMS
CONTRACT (WITH OPTIONS)
| WORKPLAN ACQUISITION PLANREQUISITION NO 716505: SAM UEI: |
| SCHEDULE OF ITEMS: |
| DESCRIPTION: |
| General RequirementsMobilization: |
| UNIT COSTALL: |
| TOTALALL: |
| Toilet Buildings Demolition: |
| UNIT COST5: |
| TOTAL5: |
| Pumphouse Building Demolition: |
| UNIT COST1: |
| TOTAL1: |
| Water System Demolition: |
| UNIT COST1_2: |
| TOTAL1_2: |
| UNIT COST1_3: |
| TOTAL1_3: |
| Existing Campground Road Improvements: |
| UNIT COST1_4: |
| TOTAL1_4: |
| Site Work for Camp Sites: |
| UNIT COST1_5: |
| TOTAL1_5: |
| New Pumphouse Building: |
| UNIT COST1_6: |
| TOTAL1_6: |
| Water Storage Tank: |
| UNIT COST1_7: |
| TOTAL1_7: |
| Water System: |
| UNIT COST1_8: |
| TOTAL1_8: |
| Host Volunteer Site Construction: |
| UNIT COST3: |
| TOTAL3: |
| UNIT COST1_9: |
| TOTAL1_9: |
| Electrical: |
| UNIT COST1_10: |
| TOTAL1_10: |
| New Toilet Buildings: |
| UNIT COST4: |
| TOTAL4: |
| Gates: |
| UNIT COST2: |
| TOTAL2: |
| Campground Entrance Sign: |
| UNIT COST1_11: |
| TOTAL1_11: |
| Signage: |
| UNIT COST1_12: |
| TOTAL1_12: |
File details come from the government source that posted it. Updated .