Summary
This is a Statement of Work and Inspection Criteria document issued by the Iowa Department of Public Defense for Fire Preventive Maintenance Services at the 185th Air Refueling Wing in Sioux City, Iowa. The contract requires comprehensive inspection and maintenance of fire detection and suppression systems across 25 buildings, including fire alarm panels, heat detectors, smoke detectors, pull stations, duct detectors, wet pipe sprinkler systems, dry pipe systems, pre-action systems, fire pumps, mass notification systems, and hood systems. Work must be performed in accordance with UFC 3-601-02 (Unified Facilities Criteria for Fire Protection Systems Inspection, Testing, and Maintenance) dated October 7, 2021, and applicable NFPA standards. The scope encompasses detailed testing of initiating devices, control valves, water flow alarm devices, alarm valve trim, main drains, fire department connections, fire pump components, and mass notification systems across specified facilities including the Civil Engineering building, Base Gym, Jet Engine Repair Shop, POL Complex, Paint Facility, Liquid Oxygen Building, Base Network Control Center, various maintenance buildings, Aircraft Maintenance Hangar, Dining Hall, Headquarters Building, Fuel Cell Repair Hangar, Base Supply, and Fire Department facilities. Site plans and floor plans for all buildings are provided as reference documents to support the inspection and maintenance activities.
The contract requires submission of detailed inspection reports documenting specific deficiencies by building location, device type, manufacturer, model number, and unmet requirements. The solicitation does not specify pricing terms, award amounts, set-asides, incumbent information, or specific response and award dates within this document. Bids must be submitted through the IMPACS procurement system (https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=DASIowa) with a submission deadline of June 21, 2024. The contractor must provide all necessary labor, materials, tools, and equipment to complete the work. No funding sources, budget amounts, or renewal options are specified in this attachment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment #1.pdf | ||
| Attachment #2.pdf | ||
| Attachment #3.xlsx | XLSX spreadsheet | |
| Attachment #3 Inspection listing and Frequencys.xlsx | XLSX spreadsheet | |
| Attachment #2 Site Plans - Floor Plans.pdf | ||
| Attacment #6-Sioux City Fire questions and answer responses.docx | DOCX document | |
| Attachment #5 RFQ- Sioux City Fire.pdf | ||
| 1234607-event.pdf | ||
| Attachment #4 - Section 889 Form(blank).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Inspection of Installed Fire Detection and Suppression Systems 185th Air Refueling Wing
Sioux City, Iowa
STATEMENT OF WORK
Inspection procedures for buildings at the 185th ARW with installed fire detection and suppression systems.
The buildings at the 185th ARW equipped with installed fire detection and suppression systems shall be inspected in accordance with the:
UFC 3-601-02
UNIFIED FACILITIES CRITERIA (UFC)
FIRE PROTECTION SYSTEMS INSPECTION,
TESTING, AND MAINTENANCE
07 October 2021
The following buildings will be inspected under this contract:
220-221 (Civil Engineering) 234 (Base Gym/AGE Storage) 235 (Jet Engine Repair Shop) 240, 242, 243, and 245 (POL Complex) 241 (Regional Paint Facility) 247 (Liquid Oxygen Building) 251 (Base Network Control Center) 252 (AGE Maintenance Shop) 253 (Flight Line Maintenance Building) 254 (Base Operations) 261 (Aircraft Maintenance Hangar) 265 (Dining Hall/Clinic) 269 (Headquarters Building) 278 (Fuel Cell Repair Hangar) 280-281 (Base Supply) 282 (Hazardous Materials Storage) 283 (Vehicle Maintenance) 284 (Security Forces) 286 (Fire Department)
The inspector shall provide a specific listing of items that fail to meet the inspection criteria. This list of installed system deficiencies will include specific location of items within the building, type of device (heat, smoke, or pull station), manufacturer, and model number, and the requirement that was not met.
List of Facilities and Systems:
The facility has a wet system that is fed off the domestic water supply with 1 sprinkler head located in the paint storage room. The facility has 62 heats, 15 pull stations, and 1 duct detector. Building 221 reports to the fire alarm panel in 220.
234 (Base Gym/Age Storage) The facility has 11 heats, 4 smokes, 2 pull stations, and 2 horn/strobe combinations.
235 (Jet Engine Repair Shop) The facility has 28 heats, 1 smoke, 5 pull stations, 1 duct detector, 1 door holder, and 1 fan shutdown.
240 (POL Administration) The facility has 9 heats, 1 smoke, and 3 pull stations.
241 (Regional Paint Facility) The facility has wet system, foam spray system, fire pump, 112 heats, 9 pull stations, and 9 solenoids.
242 (POL Electric Shed) The facility has 1 smoke, and 1 pull station. Reports to building 240
243 (POL Storage Shed) The facility has 1 smoke, and 1 pull station. Reports to building 240
245 (POL Pump House) The facility has a wet system, 15 heats, 2 smokes, and 6 pull stations.
The building has its own panel but reports to building 240.
247 (Liquid Oxygen Building) The facility has 1 heat, 1 smoke, and 1 pull station.
251 (Base Network Control Center (BNCC) The facility has pre-action system (wet), 6 smokes, 1 pull station, and 4 horn/strobe combinations.
252 (AGE Maintenance Building) The facility has a wet system, 27 heats (will need JLG to test), 1 smoke, 2 duct detectors, and 12 pull stations.
253 (Flightline Maintenance Building) The facility has 45 heats, 2 duct detectors, and 6 pull stations.
254 (Base Operations) The facility has a wet system, 2 hood systems, 127 heats, 3 duct detectors, 13 pull stations, and 5 VESDA (very early smoke detection system).
261 (Aircraft Maintenance Hangar) The facility has a wet system, 2 fire pumps, 226 heats (will need JLG to test hangar bay area), 3 smokes, 16 duct detectors, and 12 pull stations.
265 (Dining Hall/Clinic) The facility has a wet system, 2 hood systems in kitchen area (will need to be done semi-annual), 1 heat, 6 smokes, 11 pull stations, 5 duct detectors, and 3 remote annunciator panels.
269 (Headquarters) The facility has 89 heats, 11 smokes, and 8 pull stations.
278 (Fuel Cell Maintenance Hangar) The facility has a wet system, 2 fire pumps, 56 heats (will need JLG to test hangar bay area), 1 smoke, 6 duct detectors, and 13 pull stations.
280 (Base Supply) The facility has 2 wet systems, 1 dry system (covers building 281), 79 heats, 12 smokes, 1 duct detector, and 7 pull stations.
281 (Hazardous Materials Pharmacy) The facility has dry system (sprinkler riser in building 280), 6 heats, 2 smokes, 4 pull stations, 3 bells, and 2 horn/strobe combinations. The building fire alarm reports to building 280.
282 (Hazardous Materials Storage) The facility has 2 heats, 1 pull station, and 1 horn/strobe combination.
283 (Vehicle Maintenance) The facility has a wet system, dry system (for vehicle storage area), 31 Heats (will need JLG to test in maintenance area), 4 smokes, and 13 pull stations.
284 (Security Forces) The facility has a wet system, pre-action system in the gun vault, 10 smokes, 7 duct detectors, 6 pull stations, and horn/strobe combinations.
286 (Fire Department) The facility has a wet system, 13 heats (2nd floor dorm rooms), 22 smokes, 10 pull stations, and horn/strobe combinations.
Individual List of Buildings and Testing Criteria
Fire Alarm Panel and Annunciator Equipment
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Heat Detectors (those required by MIL-HNBK-1008)
Test with heat source to verify alarm initiation and receipt.
Pull Stations
Operate to verify alarm receipt.
Duct Detector
Operate to verify receipt. (IAW NFPA 72 10.4.3) Wet Pipe Sprinkler System Control Valves (locked or supervised)
Verify valve position Operate valve through entire travel to verify function Lubricate valve and stems to ensure operability
Water Flow Alarm Devices Operate to verify initiation and receipt of alarm Verify alarm test valve alignment and tamper switch (if supervised)
Alarm Valve and Trim Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Main Drain Conduct main drain test to verify supply (valve position)
Fire Department Connection Verify accessibility and condition If caps removed or missing check for obstructions
234 (Base Gym) Fire Alarm Panel and Annunciator Equipment
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Heat Detectors (those required by MIL-HNBK-1008)
Test with heat source to verify alarm initiation and receipt.
Pull Stations
Operate to verify alarm receipt
235 (Jet Engine Repair Shop)
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Heat Detectors (those required by MIL-HNBK-1008)
Test with heat source to verify alarm initiation and receipt Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt Duct Detector
Operate to verify receipt. (IAW NFPA 72 10.4.3) Pull Stations
Operate to verify alarm receipt
240 (POL Administration) Fire Alarm Panel and Annunciator Equipment
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Heat Detectors (those required by MIL-HNBK-1008)
Test with heat source to verify alarm initiation and receipt Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt Pull Stations
Operate to verify alarm receipt
242 (POL Electric Shed) Reports To Building 240 Initiating Devices Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt Pull Stations
Operate to verify alarm receipt
243 (POL Storage Shed) Reports To Building 240 Initiating Devices Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt Pull Stations
Operate to verify alarm receipt
245 (POL Pump House) Reports To Building 240 Fire Alarm Panel and Annunciator Equipment
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and LED’s are illuminated.
Test with heat source to verify alarm initiation and receipt
Smoke Detectors (those required by MIL-HNBK-1008) Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt
Pull Stations Operate to verify alarm receipt
Wet Pipe Sprinkler System Control Valves (locked or supervised)
Verify valve position Operate valve through entire travel to verify function Lubricate valve and stems to ensure operability
Water Flow Alarm Devices Operate to verify initiation and receipt of alarm Verify alarm test valve alignment and tamper switch (if supervised)
Alarm Valve and Trim
Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Main Drain Conduct main drain test to verify supply (valve position)
Fire Department Connection
If caps removed or missing check for obstruction
241 (Regional Paint Facility)
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and LED’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Heat Detectors (those required by MIL-HNBK-1008)
Test with heat source to verify alarm initiation and receipt Pull Stations
Operate to verify alarm receipt Sprinkler Systems Control Valves (supervised)
Verify valve is in open position Operate valve through entire travel to verify function Lubricate stem
Actuators Verify operability of manual and automatic actuators
Distribution System Verify nozzle (head) coverage during flow test Inspect piping hangers, heads, and nozzles for condition and location
Fire Pumps Control Valve
Operate and lubricate valves to ensure operability Controllers
Calibrate pressure switches Exercise circuit breakers and switches to verify operability Inspect fuses
Pumps Check coupling alignment to ensure shaft aligned Check pump shaft end play Lubricate bearings Lubricate couplings Lubricate right-angle drives
Pressure Gauges Check reading and verify gauge operability
Wet Pipe Sprinkler System Control Valves (locked or supervised)
Verify valve position Operate valve through entire travel to verify function Lubricate valve and stems to ensure operability
Water Flow Alarm Devices Operate to verify initiation and receipt of alarm Verify alarm test valve alignment and tamper switch (if supervised)
Alarm Valve and Trim Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Main Drain Conduct main drain test to verify supply (valve position)
Fire Department Connection
247 (Liquid Oxygen Building)
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and LED’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Heat Detectors (those required by MIL-HNBK-1008)
Test with heat source to verify alarm initiation and receipt Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt Pull Stations
Operate to verify alarm receipt
251 (Base Network Control Center) Fire Alarm Panel and Annunciator Equipment
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and LED’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt
Wet Pipe Sprinkler System Control Valves (locked or supervised)
Verify valve position Operate valve through entire travel to verify function Lubricate valve and stems to ensure operability
Water Flow Alarm Devices
Verify alarm test valve alignment and tamper switch (if supervised)
Alarm Valve and Trim Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Main Drain Conduct main drain test to verify supply (valve position)
Fire Department Connection
Pre-Action Automatic Sprinkler System
Verify valve position Operate valve through entire travel to verify function Lubricate valve and stems to ensure operability
Water Flow Alarm Devices Operate to verify initiation and receipt of alarm Verify alarm test valve alignment and tamper switch (if supervised)
Pre-Action Valve and Trim Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition Trip to verify proper operation Inspect internal condition and clean valve seat before resetting
252 (AGE Maintenance Building)
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Heat Detectors (those required by MIL-HNBK-1008)
Test with heat source to verify alarm initiation and receipt Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt Duct Detector
Operate to verify receipt. (IAW NFPA 72 10.4.3)
Verify valve position Operate valve through entire travel to verify function Lubricate valve and stems to ensure operability
Water Flow Alarm Devices Operate to verify initiation and receipt of alarm Verify alarm test valve alignment and tamper switch (if supervised)
Alarm Valve and Trim Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Main Drain Conduct main drain test to verify supply (valve position)
Fire Department Connection
253 (Flight Line Maintenance Building)
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Test with heat source to verify alarm initiation and receipt Duct Detectors
Operate to verify receipt. (IAW NFPA 72 10.4.3) Pull Stations
Operate to verify alarm receipt
254 (Base Operations) Fire Alarm Panel and Annunciator Equipment
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Heat Detectors (those required by MIL-HNBK-1008)
Test with heat source to verify alarm initiation and receipt Pull Stations
Operate to verify alarm receipt VESDA (Very early smoke detection system)
Test with aerosol smoke to verify smoke entry and alarm initiation and receipt
Verify valve position
Verify alarm test valve alignment and tamper switch (if supervised)
Alarm Valve and Trim Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Hood System Piping
Inspect piping for obstructions and proper support
261 (Aircraft Maintenance Hangar)
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Test with heat source to verify alarm initiation and receipt Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt Duct Detector
Operate to verify receipt. (IAW NFPA 72 10.4.3) Pull Stations
Operate to verify alarm receipt Fire Pumps Control Valve
Operate and lubricate valves to ensure operability Controllers
Calibrate pressure switches Exercise circuit breakers and switches to verify operability Inspect fuses
Pumps Check coupling alignment to ensure shaft aligned Check pump shaft end play Lubricate bearings Lubricate couplings Lubricate right-angle drives
Pressure Gauges Check reading and verify gauge operability
Wet Pipe Sprinkler System
Verify valve position
Water Flow Alarm Devices Operate to verify initiation and receipt of alarm Verify alarm test valve alignment and tamper switch (if supervised)
Alarm Valve and Trim Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Main Drain Conduct main drain test to verify supply (valve position)
Fire Department Connection
265 (Clinic/Dining Facility/COMM)
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices
Test with heat source to verify alarm initiation and receipt
Smoke Detectors (those required by MIL-HNBK-1008) Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt
Duct Detectors Operate to verify receipt. (IAW NFPA 72 10.4.3)
Wet Pipe Sprinkler System Control Valves (locked or supervised)
Verify valve position Operate valve through entire travel to verify function Lubricate valve and stems to ensure operability
Water Flow Alarm Devices Operate to verify initiation and receipt of alarm Verify alarm test valve alignment and tamper switch (if supervised)
Alarm Valve and Trim Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Fire Department Connection
Hood System Piping
Inspect piping for obstructions and proper support Storage Vessels
Inspect agent container for condition Verify storage pressure of propellant Conduct hydrostatic test for pressure cylinders IAW OSHA and DOT standards
Agent Verify quantity and quality of agent
Actuators
Inspect manual actuators for accessibility Replace detection devices (fusible links or heat detectors) Test actuation system without agent release Verify interfaces (gas shutoff, power shutoff) operate properly
269 (Headquarters Building)
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Heat Detectors (those required by MIL-HNBK-1008)
Test with heat source to verify alarm initiation and receipt Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt Pull Stations
Operate to verify alarm receipt
278 (Fuel Cell Repair Hangar) Fire Alarm Panel and Annunciator Equipment
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Heat Detectors (those required by MIL-HNBK-1008)
Test with heat source to verify alarm initiation and receipt Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt Duct Detector
Operate to verify receipt. (IAW NFPA 72 10.4.3) Pull Stations
Operate to verify alarm receipt Actuators
Verify all manual and automatic actuators function Fire Pumps Control Valve
Operate and lubricate valves to ensure operability Controllers
Calibrate pressure switches
Exercise circuit breakers and switches to verify operability Inspect fuses
Pumps Check coupling alignment to ensure shaft aligned Check pump shaft end play Lubricate bearings Lubricate couplings Lubricate right-angle drives
Pressure Gauges Check reading and verify gauge operability
Verify valve position
Verify alarm test valve alignment and tamper switch (if supervised)
Alarm Valve and Trim
Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Main Drain Conduct main drain test to verify supply (valve position)
Fire Department Connection
280-281 (Base Supply)
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Heat Detectors (those required by MIL-HNBK-1008)
Test with heat source to verify alarm initiation and receipt Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt Duct Detector
Operate to verify receipt. (IAW NFPA 72 10.4.3)
Wet Pipe Sprinkler System Control Valves (locked or supervised)
Verify valve position
Verify alarm test valve alignment and tamper switch (if supervised)
Alarm Valve and Trim Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Main Drain Conduct main drain test to verify supply (valve position)
Fire Department Connection Verify accessibility and condition If caps removed or missing check for obstructions
Dry Pipe System Control Valve
Verify valve position Operate valve through entire travel to verify function Lubricate valve stem
Water Flow Alarm Devices Operate to verify initiation and receipt of alarm Verify alarm test valve alignment and tamper switch
Dry Pipe Alarm Valve and Trim Visually inspect exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Trip valve to verify operability Inspect internal condition before resetting and clean valve seat Check priming water level (before and after trip test)
Conduct main drain test to verify supply
Quick Opening Devices
Test to verify operability Low Air Pressure Alarm
Test to verify initiation and receipt of supervisory alarm Automatic Air Pressure Maintenance Devices
Inspect to verify proper operation Fire Department Connection
282 (Hazardous Materials Storage)
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Heat Detectors (those required by MIL-HNBK-1008)
Test with heat source to verify alarm initiation and receipt
283 (Vehicle Maintenance)
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Heat Detectors (those required by MIL-HNBK-1008)
Test with heat source to verify alarm initiation and receipt Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt Pull Stations
Operate to verify alarm receipt Wet Pipe Sprinkler System Control Valves (locked or supervised)
Verify valve position Operate valve through entire travel to verify function Lubricate valve and stems to ensure operability
Water Flow Alarm Devices Operate to verify initiation and receipt of alarm Verify alarm test valve alignment and tamper switch (if supervised)
Alarm Valve and Trim Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Dry Pipe System Control Valve
Verify valve position
Lubricate valve stem
Waterflow Alarm Devices
Verify alarm test valve alignment and tamper switch
Dry Pipe Alarm Valve and Trim Visually inspect exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Trip valve to verify operability Inspect internal condition before resetting and clean valve seat Check priming water level (before and after trip test)
Main Drain Conduct main drain test to verify supply
Quick Opening Devices
Low Air Pressure Alarm Test to verify initiation and receipt of supervisory alarm
Automatic Air Pressure Maintenance Devices Inspect to verify proper operation
Fire Department Connection
284 (Security Forces)
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt Duct Detector
Operate to verify receipt. (IAW NFPA 72 10.4.3) Pull Stations
Operate to verify alarm receipt Wet Pipe Sprinkler System Control Valves (locked or supervised)
Verify valve position Operate valve through entire travel to verify function Lubricate valve and stems to ensure operability
Water Flow Alarm Devices Operate to verify initiation and receipt of alarm Verify alarm test valve alignment and tamper switch (if supervised)
Alarm Valve and Trim Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Pre-Action Automatic Sprinkler System
Verify valve position
Verify alarm test valve alignment and tamper switch (if supervised)
Pre-Action Valve and Trim Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Trip to verify proper operation Inspect internal condition and clean valve seat before resetting
286 (Fire Department)
Test to verify proper receipt of alarm supervisory and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).
Verify all lamps and Led’s are illuminated.
Load test backup batteries (when provided)
Initiating Devices Smoke Detectors (those required by MIL-HNBK-1008)
Test with smoke or aerosol to verify smoke entry and alarm initiation and receipt Pull Stations
Operate to verify alarm receipt
Wet Pipe Sprinkler System Control Valves (locked or supervised)
Verify valve position Operate valve through entire travel to verify function Lubricate valve and stems to ensure operability
Water Flow Alarm Devices Operate to verify initiation and receipt of alarm Verify alarm test valve alignment and tamper switch (if supervised)
Alarm Valve and Trim Visually check exterior of valves, gauges, and trim alignment Verify valve pressure and legibility of hydraulic nameplate Clean and inspect internally to verify condition
Main Drain Conduct main drain test to verify supply (valve position)
Fire Department Connection
Mass Notification System
Annual testing of (18) Mass Notification Systems with documentation done on NFPA 72 approved forms
BLDGs 220, 234, 235, 240, 241, 251, 252, 253, 254, 261, 265, 269, 278, 280, 283, 284, 286, 311
Fire Alarm Control Panels with Integrated Mass Notification OR Stand-Alone Systems
Test to verify proper receipt of signals (inputs) from Local Operating Consoles (LOCs) and the Installation’s site-wide system and operation of notification appliances and auxiliary functions (outputs)
Verify that all lamps and LEDs are illuminated Load test backup batteries using a meter (when provided) Verify condition of power supplies and batteries Resolve any trouble indications
LOCs
Verify station is accessible
Notification Appliances and Voice Communication (speakers and strobe lights)
| Site Plans - Floor Plans.pdf |
| 185ARW-INWS-DRAWINGS |
| 185ARW-INWS-B234FL1-03 |
| 185ARW-INWS-B235FL1-03 |
| 185ARW-INWS-B240FL1-03 |
| 185ARW-INWS-B241FL1-SH1-03 |
| 185ARW-INWS-B241FL1-SH2-03 |
| 185ARW-INWS-B241FL1-SH3-03 |
| 185ARW-INWS-B241FL2-03 |
| 185ARW-INWS-B251FL1-03 |
| 185ARW-INWS-B252FL1-03 |
| 185ARW-INWS-B253FL1-03 |
| 185ARW-INWS-B254FL1-03 |
| 185ARW-INWS-B261FL1-03 |
| 185ARW-INWS-B261FL2-03 |
| 185ARW-INWS-B265FL1-01 |
| 185ARW-INWS-B269FL1-03 |
| 185ARW-INWS-B278FL1-03 |
| 185ARW-INWS-B280FL1-03 |
| 185ARW-INWS-B280MEZZ-03 |
| 185ARW-INWS-B283FL1-03 |
| 185ARW-INWS-B284FL1-03 |
| 185ARW-INWS-B286FL2-03 |
| 185ARW-INWS-B286FL1-03 |
| 185ARW-INWS-B311FL1-03 |
| 185ARW-INWS-SITEPLAN-SH1-03 |
| 185ARW-INWS-SITEPLAN-SH2-03 |
185ARW-INWS-DRAWINGS-265