Attachment_1_-_Schedule_of_Unit_Pricing.xlsx

XLSX spreadsheet 210 KB Posted

Attached to
Mitigation Reconstruction of a Flood Prone Home Project
Solicitation number
ITB-26-18-CW
Issued by
Volusia County, Florida

About this file

This is a Schedule of Unit Pricing attachment for an Invitation to Bid (ITB-26-18-CW) issued by the City of Port Orange, Florida, for the mitigation reconstruction of a flood-prone home located in a manufactured home park community. The project involves the complete rebuild and elevation of a 1,248 square foot home to a minimum height of 3.4 feet above existing conditions, with allowance for up to 10% additional square footage (1,372 square feet total) to accommodate entry features. The scope of work encompasses eighteen line items including boundary survey and geotechnical assessment, permits and bonds, site preparation, foundation construction, elevated structure installation with skirting and flood vents, multiple deck and stair configurations, a covered screen enclosure, carport, shed (minimum 80 square feet), concrete driveway, utility elevation and reconnection, landscaping and site restoration, project administration, and elevation certificates for before and after construction.

The pricing schedule is presented as a lump sum bid format with all eighteen line items priced individually, with totals to be calculated by the bidding contractor. Permit application fees are waived by the City. The document contains a blank vendor name and date field for contractor completion, with a notation that modifications to the attachment may render a bid non-responsive. No pricing data, award information, contract term, funding sources, or specific response deadlines are included in this attachment; these details would be contained in the associated solicitation documents and contract specifications.

View the file

Other files

File Type Posted
Mitigation_Reconstruction_of_a_Flood_Prone_Home_Project.pdf PDF
Attachment_J_Complete_Solicitation_Document.pdf PDF
Attachment_G_Location_Maps.pdf PDF
Attachment_H_Certification_Regarding_Lobbying.pdf PDF
Attachment_D_2_CFR_Part_200_Subpart_D_Appendix_II_(up_to_date_as_of_10-07-2026)_Current.pdf PDF
Attachment_I_Contract.pdf PDF
Attachment_F_Federal_Terms_Exhibit.pdf PDF
Attachment_E_Foreign_Country_of_Concern_(1).pdf PDF
Attachment_C_Debarment_Form.pdf PDF
Attachment_B-_Photographic_Documentation.pdf PDF
Attachment_A_Grant_Agreement_Excerpt_(FEMA_HMGP_4680-029-R).pdf PDF
Exhibit_A_-_Description_of_Confidential_Materials.pdf PDF
Affidavit_Regarding_Workers'_Compensation.pdf PDF
Form_7.15_-_No_Submittal.pdf PDF
APPENDIX_A_-_44_C.F.R_PART_18_CERTIFICATION_REGARDING_LOBBYING.pdf PDF
Current_Bonding_Capacity_Letter_(as_outlined_in_Section_6).pdf PDF
Leased_Employee_Affidavit.pdf PDF
Form_7.1_-_Bid_Submittal_Checklist.pdf PDF
Attachment_R_EXAMPLE_FOR_SOLICITATION_PUBLICATION_-_Payment_and_Performance_Bond.pdf PDF
Form_7.17_Compliance_with_200.321.pdf PDF
Form_7.16_-_Representative_Certification_Form.pdf PDF
Human_Trafficking_Affidavit.pdf PDF
Form_7.11_Hold_Harmless_and_Indemnity_Agreement.pdf PDF
Form_7.5_-_Public_Entity_Crimes_Statement.pdf PDF
Form_7.12_-_E-Verify_Affidavit.pdf PDF
Form_7.10_-_Scrutinized_Companies_Certification.pdf PDF
Form_7.7_-_Statement_of_Bidder's_Qualification.pdf PDF
Form_7.13_-_Debarment_Suspension_and_Other_Responsibility_Matters.pdf PDF
Form_7.6_-_Anti-Collusion.pdf PDF
Form_7.8_-_Professional_References_for_Previous_Experience.pdf PDF
Form_7.14_-_Affidavit_of_Compliance_with_F.S._287.138.pdf PDF
Form_7.9_-_List_of_Subcontractors.pdf PDF
Form_7.3_-_Addendum_and_Change_Order_Procedure_Acknowledgement.pdf PDF
Forn_7.2_-_Bidder's_Acknowledgement.pdf PDF
Cover_Page_Label_(1).pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Untitled

ATTACHMENT 1 SCHEDULE OF UNIT PRICING
21 CYPRESS IN THE WOOD
ERROR:#VALUE!TITLE: ITB-26-18-CW - MITIGATION RECONSTRUCTION OF A FLOOD-PRONE HOMES
VENDOR NAME:_________________________________________________________
DATE:_________________________
Modification to "Attachment 1" may cause your bid to be non-responsive
Line ItemDescriptionQuantityUnit of MeasureUnit CostTotal
1Boundary Survey, Geotechnical Asessment, Structural Engineering, and Drawings1LUMP SUM$ - 0$ - 0
2Permits and Bonds (permit application fees are waived)1LUMP SUM$ - 0$ - 0
3Mobilization, Temporary Pole, and Site Preparation for Mitigation1LUMP SUM$ - 0$ - 0
4Dumpster / Trash Removal and Job Site Port-a-Potty1LUMP SUM$ - 0$ - 0
5Erosion and Sediment Control1LUMP SUM$ - 0$ - 0
6Permanent Foundation Construction1LUMP SUM$ - 0$ - 0
7Installation of an Elevated Structure a minimum of 3.4 fteet or higher than existing conditions with skirting and flood vents (Size of structure to match the original square footage of 1,248 sf plus 10% (maximum) to accomodate entry deck, landing, stairs and lift for a total square footage of 1,372 sf.1LUMP SUM$ - 0$ - 0
8Front Entry Deck, Landing, and Stairs1LUMP SUM$ - 0$ - 0
9Side Entry Deck, Landing, and Stairs and Lift1LUMP SUM$ - 0$ - 0
10Elevated Covered Screen Enclosure1LUMP SUM$ - 0$ - 0
11Carport1LUMP SUM$ - 0$ - 0
12Shed minimum 80 SF1LUMP SUM$ - 0$ - 0
13Concrete driveway minimum 10 ft x 40 ft or 20 ft x 20 ft1LUMP SUM$ - 0$ - 0
14Elevate Utilities (Air Handler, Electric Outlets, etc.)1LUMP SUM$ - 0$ - 0
15Utility Disconnects and Reconnects (Water, Sewer, Electric and HVAC)1LUMP SUM$ - 0$ - 0
16Site Restoration / Final Grading, Sod, Irrigation, and Landscaping1LUMP SUM$ - 0$ - 0
17Project Administration - Coordination with the City and/or Homeowner during construction, as needed1LUMP SUM$ - 0$ - 0
18Elevation Certificates (Before and After Construction Work)1LUMP SUM$ - 0$ - 0
Total$ - 0

File details come from the government source that posted it. Updated .