Attachment_1_-_Schedule_of_Unit_Pricing.xlsx
XLSX spreadsheet 210 KB Posted
- Solicitation number
- ITB-26-18-CW
- Issued by
- Volusia County, Florida
About this file
This is a Schedule of Unit Pricing attachment for an Invitation to Bid (ITB-26-18-CW) issued by the City of Port Orange, Florida, for the mitigation reconstruction of a flood-prone home located in a manufactured home park community. The project involves the complete rebuild and elevation of a 1,248 square foot home to a minimum height of 3.4 feet above existing conditions, with allowance for up to 10% additional square footage (1,372 square feet total) to accommodate entry features. The scope of work encompasses eighteen line items including boundary survey and geotechnical assessment, permits and bonds, site preparation, foundation construction, elevated structure installation with skirting and flood vents, multiple deck and stair configurations, a covered screen enclosure, carport, shed (minimum 80 square feet), concrete driveway, utility elevation and reconnection, landscaping and site restoration, project administration, and elevation certificates for before and after construction.
The pricing schedule is presented as a lump sum bid format with all eighteen line items priced individually, with totals to be calculated by the bidding contractor. Permit application fees are waived by the City. The document contains a blank vendor name and date field for contractor completion, with a notation that modifications to the attachment may render a bid non-responsive. No pricing data, award information, contract term, funding sources, or specific response deadlines are included in this attachment; these details would be contained in the associated solicitation documents and contract specifications.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Untitled
| ATTACHMENT 1 SCHEDULE OF UNIT PRICING | |
| 21 CYPRESS IN THE WOOD | |
| ERROR:#VALUE! | TITLE: ITB-26-18-CW - MITIGATION RECONSTRUCTION OF A FLOOD-PRONE HOMES |
| VENDOR NAME:_________________________________________________________ | |
| DATE:_________________________ |
| Modification to "Attachment 1" may cause your bid to be non-responsive | |||||
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 1 | Boundary Survey, Geotechnical Asessment, Structural Engineering, and Drawings | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2 | Permits and Bonds (permit application fees are waived) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3 | Mobilization, Temporary Pole, and Site Preparation for Mitigation | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4 | Dumpster / Trash Removal and Job Site Port-a-Potty | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5 | Erosion and Sediment Control | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6 | Permanent Foundation Construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7 | Installation of an Elevated Structure a minimum of 3.4 fteet or higher than existing conditions with skirting and flood vents (Size of structure to match the original square footage of 1,248 sf plus 10% (maximum) to accomodate entry deck, landing, stairs and lift for a total square footage of 1,372 sf. | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8 | Front Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9 | Side Entry Deck, Landing, and Stairs and Lift | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10 | Elevated Covered Screen Enclosure | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11 | Carport | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 12 | Shed minimum 80 SF | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 13 | Concrete driveway minimum 10 ft x 40 ft or 20 ft x 20 ft | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 14 | Elevate Utilities (Air Handler, Electric Outlets, etc.) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 15 | Utility Disconnects and Reconnects (Water, Sewer, Electric and HVAC) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 16 | Site Restoration / Final Grading, Sod, Irrigation, and Landscaping | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 17 | Project Administration - Coordination with the City and/or Homeowner during construction, as needed | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 18 | Elevation Certificates (Before and After Construction Work) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| Total | $ - 0 |
File details come from the government source that posted it. Updated .