Attachment 1 SCHEDULE B.xlsx
XLSX spreadsheet 77 KB Posted
- Solicitation number
- 70Z08426RDL950001
About this file
This document is a detailed pricing schedule (Attachment 1 SCHEDULE B.xlsx) for a Family Housing Maintenance Services contract for the United States Coast Guard at the Training Center (TRACEN) in Cape May, New Jersey. The contract is an Indefinite Delivery/Indefinite Quantity (IDIQ) 8(a) set-aside for facilities support services, with a base year and four option years. The comprehensive pricing schedule covers multiple maintenance categories including preventative maintenance, service work, and estimated quantity items across various housing facility components such as exterior repairs, painting, flooring, abatement, kitchen replacements, electrical work, bathroom upgrades, HVAC services, doors and windows, and interior miscellaneous repairs.
The pricing schedule is structured with detailed line items (CLINs) for each maintenance category, broken down by specific tasks and phases (Phase I, II, III, and IV), with quantities specified for each item. Notable features include provisions for change of occupancy maintenance, service call systems, annual inspections, and wage adjustments. The contract allows for variation in quantities as long as the total ceiling is not exceeded. The solicitation is specifically targeted at 8(a) certified small businesses under the NAICS code 561210 - Facilities Support Services, with proposals due by November 14, 2025, and is being issued on behalf of the Operational Logistics Command (LOGCOM) by the Department of Homeland Security's US Coast Guard.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE YR
| BASE YEAR | |||||
| LEVEL I WORK (PREVENTATIVE MAINTENANCE) | |||||
| CLIN | QTY | UNIT | UNIT PRICE | TOTAL | |
| 0001 | Change of Occupancy Maintenance (COM) | 12 | MO | $ - 0 | |
| 0002 | Service Call System | 12 | MO | $ - 0 | |
| 0003 | Self Help Store | 12 | MO | $ - 0 | |
| 0004 | Annual Inspections & Preventive Maintenance | 12 | MO | $ - 0 | |
| 0005 | Wage Adjustment | 12 | MO | $ - 0 | |
| TOTAL LEVEL I WORK (PREVENTATIVE MAINTENANCE) | $ - 0 |
| LEVEL II A WORK (SERVICE WORK) | |||||
| CLIN | EST QTY | UNIT | UNIT PRICE | TOTAL | |
| 0101 | General Repairs associated with Level II Service Call Work | 12 | MO | $ - 0 | |
| 0102 | Self Help Store 100% and Level II Service Call Work Material >$35 | 1 | LO | NTE | |
| 0103 | Subcontractor and Rental Equipment Associated with Service Call Work | 12 | MO | $ - 0 | |
| 0104 | Wage Adjustment | 12 | MO | $ - 0 | |
| TOTAL LEVEL II A WORK (SERVICE WORK) | $ - 0 |
| LEVEL II B SERVICE WORK - ESTIMATED QUANTITY ITEMS (EQI) | |||||
| CLIN | EST QTY | UNIT | UNIT PRICE | TOTAL | |
| 0201 | Exterior | ||||
| 0201AA | Roof sheathing repair/Shingle Repair (>25 SF) | 1,000 | SF | $ - 0 | |
| 0201AB | Replace roof ventilator structure screen (ALL APPLICABLE PHASES) | 2 | EACH | $ - 0 | |
| 0201AC | Repair Termite Damage (repair, treatment and replacement (>25 SF) | 200 | SF | $ - 0 | |
| 0201AD | Install water meter | 10 | EA | $ - 0 | |
| 0201AE | Close in AC sleeve 2nd Floor Phase IV (Complete, framing, siding etc.) | 10 | EACH | $ - 0 | |
| 0201AF | Perform Exterior EFIS Repair (> 50 SF) | 500 | SF | $ - 0 | |
| 0201AG | Install / replace dedicated satellite dish post (complete installation) | 5 | EACH | $ - 0 | |
| 0201AH | Replace entire individual "in yard shed" (complete structure including door & all finishes) | 1 | EACH | $ - 0 | |
| 0201AI | Replace "Good Neighbor" Fencing (> 25 LF) | 50 | LF | $ - 0 | |
| 0201AJ | Gutter & downspout installation (complete all fitting) (> 30 LF) | 100 | LF | $ - 0 | |
| 0201AK | Replacement of Vinyl siding (complete all components) (> 30 SF) | 500 | SF | $ - 0 | |
| 0201AL | Repair / replace sidewalk panels (> 25 LF) | 30 | LF | $ - 0 | |
| 0201AM | Install / replace frost free exterior hose bib | 5 | EACH | $ - 0 | |
| 0202 | Paint | ||||
| 0202AA | Perform interior painting IAW TE-1.9, Occupied unit NON COM tasking | 3,000 | SF | $ - 0 | |
| 0202AB | Perform Exterior painting IAW TE-1.9, (>50 SF) LEVEL II, III or COM tasking | 5,000 | SF | $ - 0 | |
| 0203 | Floor | $ - 0 | |||
| 0203AA | Replace 3/4" plywood subflooring (> 50 SF) | 1000 | SF | $ - 0 | |
| 0203AB | Replace 1/4" plywood/luan subflooring (> 50 SF) | 1000 | SF | $ - 0 | |
| 0203AC | Major Replacement (non ACM/PCM materials) of Vinyl Floor Tiles (> 10 SF) | 5000 | SF | $ - 0 | |
| 0203AD | Replacement of vinyl resilient sheet flooring (non ACM/PCM materials) (> 0 SF) | 7000 | SF | $ - 0 | |
| 0203AE | Installation of transition strips (various) between dissimilar floors | 300 | SF | $ - 0 | |
| 0203AF | Installation of 3/4" wooden round stock at Vinyl floor perimeters | 1000 | LF | $ - 0 | |
| 0203AG | Removal of existing carpet, carpet padding, tack strip etc. (> 50 SY) | 5000 | SY | $ - 0 | |
| 0203AH | Installation of new carpet, carpet pad, tack strips | 5000 | SY | $ - 0 | |
| 0203AI | Disposal of old wall base, carpet trimmings, floor installation scraps | 10 | CY | $ - 0 | |
| 0203AJ | Procurement and installation of wooden cove base (shoe) molding (> 10 LF) | 500 | LF | $ - 0 | |
| 0203AK | Installation of new carpet, carpet pad, tack strips-"Check Sisal Straw Carpet" #842 | 2500 | SY | $ - 0 | |
| 0203AL | Installation of wooden style vinyl flooring "Fusion Hybrid Flooring" or approved product equal | 2800 | SY | $ - 0 | |
| 0203AM | Replace Nonstandard Carpet in senior officer Quarters | 150 | SY | $ - 0 | |
| 0203AN | Replace Nonstandard flooring in senior officer Quarters | 150 | SY | $ - 0 | |
| 0204 | Abatement | ||||
| 0204AA | Cleaning and abatement of mold (> 0 SF) | 1000 | SF | $ - 0 | |
| 0204AB | ACM & PACM Abatement Part 1 - State, permit, & air Fees necessary for each job associated with ACM & PACM Removals/Abatement of VAT, Resilient sheet goods, mastics. This CLIN is ordered each time abatement is executed along with the ACM & PACM Abatement Part 2 CLIN which defines the quantity of actual materials to be removed. | 5 | Each | $ - 0 | |
| 0204AC | ACM & PACM Abatement Part 2 - Per square foot removal and abatement of VAT, Resilient sheet goods, and associated mastics (> 0 SF). This CLIN is always ordered in conjunction with ACM & PACM Abatement Part 1 which covers the fixed overhead costs associated with abatement regardless of the quantity of materials being abated. | 500 | SF | $ - 0 | |
| 0204AD | VAT Removals-Non Abatement, Level III, Recommended Best Work Practices | 2000 | SF | $ - 0 | |
| 0205 | Kitchen | ||||
| 0205AA | Replacement of Kitchen Countertops: Phase I, II, & III three & four bedroom unit kitchen countertops NON MEGANITE type: Residential grade plywood 3/4 inch substrate with formed laminate top & backsplash, OG/double reveal or rounded edges as applicable (current color: butterrum; future installation type to be approved by COR) | 25 | LF | $ - 0 | |
| 0205AB | Replacement Phase IV, two bedroom unit kitchen countertops: Residential grade plywood 3/4 inch substrate with formed laminate top & backsplash, OG/double reveal or rounded edge as applicable (current color: butterrum; future installation type to be approved by COR) | 60 | LF | $ - 0 | |
| 0205AC | Replacement Phase I, three bedroom unit kitchen base cabinets (current type: Mid-Continent Oak model, Kentwood door style, Chestnut color; future installation type to be approved by COR) | 100 | LF | $ - 0 | |
| 0205AD | Replacement Phase I, four bedroom unit kitchen base cabinets (current type: Kitchen Kompact, Richwood lite oak, raised panel oak doors cabinet grade plywood cabinet construction & shelves; future installation type to be approved by COR) | 25 | LF | $ - 0 | |
| 0205AE | Replacement Phase II & III, three & four bedroom unit kitchen base cabinets (current type: Mid-Continent Oak Model, Kentwood Door Style, Chestnut color; future installation type to be approved by COR) | 60 | LF | $ - 0 | |
| 0205AF | Replacement Phase IV, two bedroom unit kitchen base cabinets (current type: Mid-Continent Pro Series, Woodbury style, solid oak or maple frames; future installation type to be approved by COR) | 30 | LF | $ - 0 | |
| 0205AG | Replacement Phase I, three bedroom unit kitchen wall cabinets (current type: Mid-Continent Oak model, Kentwood door style, Chestnut color; future installation type to be approved by COR) | 100 | LF | $ - 0 | |
| 0205AH | Replacement Phase I, four bedroom unit kitchen wall cabinets (current type: Kitchen Kompact Brand, Richwood lite oak model, raised panel oak doors, cabinet grade construction & shelves; future installation type to be approved by COR) | 30 | LF | $ - 0 | |
| 0205AI | Replacement Phase II & III, three & four bedroom unit kitchen wall cabinets (current type: Mid-Continent Oak Model, Kentwood Door Style, Chestnut color; future installation type to be approved by COR) | 30 | LF | $ - 0 | |
| 0205AJ | Replacement Phase IV, two bedroom unit kitchen wall cabinets (current type: Mid-Continent Pro-Series, Woodbury style, Solid oak or maple frames; future installation type to be approved by COR) | 30 | LF | $ - 0 | |
| 0205AK | Replacement Phase I, three bedroom unit kitchen pantry cabinets (current type: Mid-Continent oak model, Kentwood door style, chestnut color; future installation type to be approved by COR) | 3 | EACH | $ - 0 | |
| 0205AL | Replacement Phase I, II & III, three & four bedroom unit kitchen pantry cabinet with built in cabinet grade plywood shelves (complete unit to match wall & base cabinet units); future installation type to be approved by COR | 25 | EACH | $ - 0 | |
| 0205AM | Replacement of Kitchen stove/range hood (All Phases); future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 0205AN | Replacement of Kitchen stove/range electric; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 0205AO | Replacement Phase I, four bedroom unit; electric kitchen range (current type: Maytag (model # MER7662WW) 42 inch power cook element; future installation type to be approved by COR) | 1 | EACH | $ - 0 | |
| 0205AP | Replacement of Kitchen stove/range gas; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 0205AQ | Replacement of Kitchen double bowl SS sink; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 0205AR | Replacement of Kitchen faucet set; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 0205AS | Replacement of Kitchen stove/range backsplash unit; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 0205AT | Replacement of Refrigerator 18 cubic foot capacity; future installation type to be approved by COR | 4 | EACH | $ - 0 | |
| 0205AU | Replacement of Refrigerator 20 cubic foot capacity; future installation type to be approved by COR | 6 | EACH | $ - 0 | |
| 0205AV | Replacement of Refrigerator 22 cubic foot capacity; future installation type to be approved by COR | 4 | EACH | $ - 0 | |
| 0205AW | Replacement Phase I, four bedroom unit (current type: Refrigerator: Maytag EcoConserve with ice maker (model # M9BXX6MYW); future installation type to be approved by COR) | 1 | EACH | $ - 0 | |
| 0205AX | Replacement of Dishwasher 18 cubic foot capacity; future installation type to be approved by COR | 4 | EACH | $ - 0 | |
| 0205AY | Replacement of Dishwasher 24 cubic foot capacity; future installation type to be approved by COR | 6 | EACH | $ - 0 | |
| 0205AZ | Replacement Phase I, four bedroom unit; dishwasher (current type: Maytag JetClean Plus (model # M9B4709AWW) (White); future installation type to be approved by COR) | 1 | EACH | $ - 0 | |
| 0205BA | Install / replace kitchen range hood 30" vented with light (rectangular or round); future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0205BB | Replacement Phase I, four bedroom unit; Over Range Microwave (current type: Maytag 1.6 cubic feet (model # MMV1164WW); future installation type to be approved by COR) | 2 | EACH | $ - 0 | |
| 0205BC | Replacement Phase I, four bedroom unit; front load high-efficiency washing machine (current type: Maytag (Model # MHWE201YW); future installation type to be approved by COR) | 1 | EACH | $ - 0 | |
| 0205BD | Replacement Phase I, four bedroom unit; front load high-efficiency electric cloths dryer (current type: Maytag (model # MEDE201YW); future installation type to be approved by COR) | 1 | EACH | $ - 0 | |
| 0206 | Electrical, Lighting & Fans | ||||
| 0206AA | Install / replace Kitchen 19" ceiling light fixtures (LED) | 40 | EACH | $ - 0 | |
| 0206AB | Install / replace hallway and closet light fixtures (LED) | 60 | EACH | $ - 0 | |
| 0206AC | Install / replace Dining Room Light fixture (LED) | 4 | EACH | $ - 0 | |
| 0206AD | Install / replace stairwell light fixture (LED) | 40 | EACH | $ - 0 | |
| 0206AE | Install /replace furnace room or laundry closet light fixture (LED) | 20 | EACH | $ - 0 | |
| 0206AF | Install / replace exterior light fixtures Coach Type (LED) | 25 | EACH | $ - 0 | |
| 0206AG | Install / replace exterior light fixtures "Jelly Jar" type (LED) | 25 | EACH | $ - 0 | |
| 0206AH | Install /replace interior light fixture, Bathroom, Phase IV (LED) | 10 | EACH | $ - 0 | |
| 0206AI | Install / replace interior light fixture, Bathroom, Phase I J. Officer type (LED) | 5 | EACH | $ - 0 | |
| 0206AJ | Install / replace interior light fixture, Bathroom, Phase II & III (LED) | 15 | EACH | $ - 0 | |
| 0206AK | Install / replace bathroom ceiling fan/light fixture heavy duty high CFM (LED) | 25 | EACH | $ - 0 | |
| 0206AL | Install / replace bathroom ceiling fan no light 60-80 CFM | 5 | EACH | $ - 0 | |
| 0206AM | Install / replace overhead light fixture Phase 4 shed (LED) | 5 | EACH | $ - 0 | |
| 0206AN | Install ceiling fan/light where no light existed (LED) | 10 | EACH | $ - 0 | |
| 0206AO | Install ceiling fan/light where ceiling light was present (LED) | 10 | EACH | $ - 0 | |
| 0206AP | Install ceiling fan/light where a ceiling fan was present (LED) | 20 | EACH | $ - 0 | |
| 0206AQ | Install / replace electrical distribution panel up to 200 AMP service, 16 circuits. | 1 | EACH | $ - 0 | |
| 0206AR | Install non-switched electrical outlet where previously none existed | 20 | EACH | $ - 0 | |
| 0206AT | Install / Replace Combination Combustible Gas Carbon Monoxide detector | 60 | EACH | $ - 0 | |
| 0206AU | Install / Replace Carbon Monoxide detector | 10 | EACH | $ - 0 | |
| 0206AV | Install / Replace Smoke detector | 60 | EACH | $ - 0 | |
| 0206AW | Terminate & remove Whole House Fan, close up ceiling to match adjacent area | 10 | EACH | $ - 0 | |
| 0207 | Bathroom | ||||
| 0207AA | Install / replace bathroom vanity cabinet, Phase I (2 Unit Bldgs); future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 0207AB | Install / replace bathroom vanity cabinet Phase I three bedroom townhome (combination unit); future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0207AC | Install / replace bathroom sink/vanity/top & faucet unit Phase II & III (combination unit); future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0207AD | Install / replace bathroom vanity cabinet, Phase IV 2 bedroom type; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0207AE | Install / replace bathroom sink vanity top Phase IV 2 bedroom style; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0207AF | Phase I, II, & III, Sink Vanity (current type: Brand, Project Source, Oak Finish (model # PS2418P2-0) (24 inch by 18 5/8 inch); future installation type to be approved by COR) | 5 | EACH | $ - 0 | |
| 0207AG | Install Phase I, II, & III, Sink Vanity (current type: Brand, Project Source; White finish (model # PS2418P2-WH) (24 inch by 18 5/8 inch); future installation type to be approved by COR) | 5 | EACH | $ - 0 | |
| 0207AH | Install /replace bathroom sink faucet set Phase IV 2 bedroom type; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0207AI | Install / replace bathroom Medicine cabinet Phase I recessed mounted; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0207AJ | Install / replace bathroom Medicine cabinet Phase I surface mounted; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0207AK | Install / replace bathroom Medicine cabinet Phase II & III recessed mounted; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0207AL | Install / replace bathroom Medicine cabinet Phase IV recessed mounted; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0207AM | Install / replace bathroom shower/tub enclosures 32" x 60" x 72"; future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 0207AN | Install / replace bathroom shower/tub enclosures 30" x 58" x 60"; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 0207AO | Install / replace bathroom "Over the John" cabinet Phase I three bedroom T/home; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 0207AP | Install / replace bathroom "Over the John" cabinet Phase I (2 Unit Bldgs); future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 0207AQ | Install / replace bathroom "Over the John" cabinet Phase II & III type; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 0207AR | Install / replace bathroom "Over the John" cabinet Phase IV 2 bedroom type; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0207AS | Install / replace bathroom half bath Pedestal sink floor mounted; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0207AT | Install / replace bathroom, bathtub, cast iron construction, all Phases; future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 0207AU | Install / replace bathroom water closet (toilet) all phases; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0207AV | Install / replace bathroom sink, wall mounted, Phase IV half bath type; future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 0207AW | Install / replace bathroom shower, mixing valves (completely); future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 0208 | HVAC & Furnace | ||||
| 0208AA | Install / replace AC circulator condensing pump; future installation type to be approved by COR | 4 | EACH | $ - 0 | |
| 0208AB | Install / replace AC Condenser coil; future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 0208AC | Clean interior HVAC duct work (> 10 LF) | 100 | LF | $ - 0 | |
| 0208AD | Install / replace AC condenser coil wooden platform/stand (all phases) | 1 | EACH | $ - 0 | |
| 0208AE | Install / replace HVAC blower motors (All Phases); future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 0208AF | Replace Thermostat with new; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0208AG | Install / replace Gas Fired Furnace Phases II, III & IV; future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 0208AH | Install / replace Gas Fired Furnace Phase I; future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 0208AI | Replace flue pipe rain cap | 2 | EACH | $ - 0 | |
| 0208AJ | Replace gas fired hot water heater; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0208AK | Replace electric hot water; future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 0208AL | Replace electric baseboard heat (< 2 LF) | 2 | EACH | $ - 0 | |
| 0208AM | Replace electric baseboard heat each additional foot (> 2 LF) | 5 | EACH | $ - 0 | |
| 0208AN | Install AC Condensor Fan Motor; future installation type to be approved by COR | 6 | EACH | $ - 0 | |
| 0209 | Doors & Windows | ||||
| 0209AA | Replace storm door, (Complete all HDWR); future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 0209AB | Replace Main Entry Door, Solid Wood (Complete all HDRW); future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 0209AC | Install / replace Interior Pre-hung Six panel composite doors; future installation type to be approved by COR | 80 | EACH | $ - 0 | |
| 0209AD | Install / replace Interior Slab (non-pre-hung) Six panel composite doors; future installation type to be approved by COR | 40 | EACH | $ - 0 | |
| 0209AE | Install / replace Interior Slab Flat Panel (non- pre-hung) wood constructed doors; future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 0209AF | Install/solid wood fully louvered interior door (sm); future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 0209AG | Install/solid wood fully louvered interior door (lg); future installation type to be approved by COR | 40 | EACH | $ - 0 | |
| 0209AH | Install / replace Interior Bi-Fold Six Panel composite doors; future installation type to be approved by COR | 100 | EACH | $ - 0 | |
| 0209AI | Replace Rear Entry Door, PHASE IV match existing; future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 0209AJ | Replace French Doors (Complete all hardware & Trim 100% weather tight); future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 0209AK | Replace French Door Sliding Screen Doors (Complete all HDWR & Fittings); future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 0209AL | Replace Sliding French Door Screens; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0209AM | Replace shed door, fiberglass faced, heavy duty exterior grade w/HDWR; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 0209AN | Replace Main & Rear Entry Door Locksets ("BEST SYSTEM") | 2 | EACH | $ - 0 | |
| 0209AO | Replace Shed door locksets ("BEST SYSTEM") | 2 | EACH | $ - 0 | |
| 0209AP | Replace Exterior Shed door Lockset ("BEST SYSTEM") | 10 | EACH | $ - 0 | |
| 0209AQ | Replace interior door passage lockset | 20 | EACH | $ - 0 | |
| 0209AR | Replace Exterior door HDWR, hinges, strike plates, etc. minus lockset; future installation type to be approved by COR | 5 | SET | $ - 0 | |
| 0209AS | Replace Interior door HDWR, hinges, strike plates, etc. minus lockset; future installation type to be approved by COR | 5 | SET | $ - 0 | |
| 0209AT | Replace main entry door chime and peep sight device (All Phases); future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0209AU | Install replacement windows (insert type); future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0209AV | Install replacement windows (new construction flanged type); future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0209AW | Replace window screens | 40 | EACH | $ - 0 | |
| 0209AX | Install / replace 1" horizontal mini-blinds (all sizes) | 200 | EACH | $ - 0 | |
| 0209AY | Install Sliding Patio Door complete with all hardware (current type: Stanley; future installation type to be approved by COR) | 16 | EACH | $ - 0 | |
| 0209AZ | Install Sliding Screen Patio Door complete with all hardware (current type: Stanley; future installation type to be approved by COR) | 10 | EACH | $ - 0 | |
| 0210 | Interior Misc... | ||||
| 0210AA | Install / replace gypsum board "mold resistant type" all thickness | 200 | SF | $ - 0 | |
| 0210AB | Replace gypsum board walls (> 32 SF) | 200 | SF | $ - 0 | |
| 0210AC | Replace gypsum board ceilings (> 32 SF) | 200 | SF | $ - 0 | |
| 0210AD | Install ventilation duct exhaust connections Kitchen & Laundry type all phases | 5 | EACH | $ - 0 | |
| 0210AE | Install / replace sanitary drain piping crawl space Phase IV (> 20 LF) | 60 | LF | $ - 0 | |
| 0210AF | Install / replace gas piping crawl space (> 25 LF) | 60 | LF | $ - 0 | |
| 0210AG | Install or replace inline water filters; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0210AH | Install or replace water system expansion tanks; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 0210AI | Replace oak stair tread | 25 | EACH | $ - 0 | |
| 0210AI1 | Wage Adjustment | 12 | MO | $ - 0 | |
| TOTAL LEVEL II B WORK - ESTIMATED QUANTITY ITEMS (EQI) | $ - 0 |
TOTAL FIRM FIXED PRICE BASE PERIOD $ - 0
| **Variation in CLIN quantities is acceptable as long as the ceiling in not exceeded. | ||||
| LEVEL III WORK (Additional Work issued via Separate Task Order) | ||||
| 0300 | Additional Services in accordance with Attachment | 1 | LOT | NTE |
TOTAL BASE YEAR $ - 0
| Notes: |
| (1) Firm-Fixed Unit Prices shall include all costs to provide the services/supplies, which includes, but is not limited to, all applicable Federal, State, and local taxes and duties. |
| (2) Level II B Service Work – Estimated Quantity Items – CLINs X0201-0210f will be fully funded each year and any variation in quantities for these CLINs is acceptable as long as the total ceiling is not exceeded. |
OP YR 1
| OPTION YEAR 1 | |||||
| LEVEL I WORK (PREVENTATIVE MAINTENANCE) | |||||
| CLIN | QTY | UNIT | UNIT PRICE | TOTAL | |
| 1001 | Change of Occupancy Maintenance (COM) | 12 | MO | $ - 0 | |
| 1002 | Service Call System | 12 | MO | $ - 0 | |
| 1003 | Self Help Store | 12 | MO | $ - 0 | |
| 1004 | Annual Inspections & Preventive Maintenance | 12 | MO | $ - 0 | |
| 1005 | Wage Adjustment | 12 | MO | $ - 0 | |
| TOTAL LEVEL I WORK (PREVENTATIVE MAINTENANCE) | $ - 0 |
| LEVEL II A WORK (SERVICE WORK) | |||||
| CLIN | EST QTY | UNIT | UNIT PRICE | TOTAL | |
| 1101 | General Repairs associated with Level II Service Call Work | 12 | MO | $ - 0 | |
| 1102 | Self Help Store 100% and Level II Service Call Work Material >$35 | 1 | LO | NTE | |
| 1103 | Subcontractor and Rental Equipment Associated with Service Call Work | 12 | MO | $ - 0 | |
| 1104 | Wage Adjustment | 12 | MO | $ - 0 | |
| TOTAL LEVEL II A WORK (SERVICE WORK) | $ - 0 |
| LEVEL II B SERVICE WORK - ESTIMATED QUANTITY ITEMS (EQI) | |||||
| CLIN | EST QTY | UNIT | UNIT PRICE | TOTAL | |
| 1201 | Exterior | ||||
| 1201AA | Roof sheathing repair/Shingle Repair (>25 SF) | 1,000 | SF | $ - 0 | |
| 1201AB | Replace roof ventilator structure screen (ALL APPLICABLE PHASES) | 2 | EACH | $ - 0 | |
| 1201AC | Repair Termite Damage (repair, treatment and replacement (>25 SF) | 200 | SF | $ - 0 | |
| 1201AD | Install water meter | 10 | EA | $ - 0 | |
| 1201AE | Close in AC sleeve 2nd Floor Phase IV (Complete, framing, siding etc.) | 10 | EACH | $ - 0 | |
| 1201AF | Perform Exterior EFIS Repair (> 50 SF) | 500 | SF | $ - 0 | |
| 1201AG | Install / replace dedicated satellite dish post (complete installation) | 5 | EACH | $ - 0 | |
| 1201AH | Replace entire individual "in yard shed" (complete structure including door & all finishes) | 1 | EACH | $ - 0 | |
| 1201AI | Replace "Good Neighbor" Fencing (> 25 LF) | 50 | LF | $ - 0 | |
| 1201AJ | Gutter & downspout installation (complete all fitting) (> 30 LF) | 100 | LF | $ - 0 | |
| 1201AK | Replacement of Vinyl siding (complete all components) (> 30 SF) | 500 | SF | $ - 0 | |
| 1201AL | Repair / replace sidewalk panels (> 25 LF) | 30 | LF | $ - 0 | |
| 1201AM | Install / replace frost free exterior hose bib | 5 | EACH | $ - 0 | |
| 1202 | Paint | ||||
| 1202AA | Perform interior painting IAW TE-1.9, Occupied unit NON COM tasking | 3,000 | SF | $ - 0 | |
| 1202AB | Perform Exterior painting IAW TE-1.9, (>50 SF) LEVEL II, III or COM tasking | 5,000 | SF | $ - 0 | |
| 1203 | Floor | $ - 0 | |||
| 1203AA | Replace 3/4" plywood subflooring (> 50 SF) | 1000 | SF | $ - 0 | |
| 1203AB | Replace 1/4" plywood/luan subflooring (> 50 SF) | 1000 | SF | $ - 0 | |
| 1203AC | Major Replacement (non ACM/PCM materials) of Vinyl Floor Tiles (> 10 SF) | 5000 | SF | $ - 0 | |
| 1203AD | Replacement of vinyl resilient sheet flooring (non ACM/PCM materials) (> 0 SF) | 7000 | SF | $ - 0 | |
| 1203AE | Installation of transition strips (various) between dissimilar floors | 300 | SF | $ - 0 | |
| 1203AF | Installation of 3/4" wooden round stock at Vinyl floor perimeters | 1000 | LF | $ - 0 | |
| 1203AG | Removal of existing carpet, carpet padding, tack strip etc. (> 50 SY) | 5000 | SY | $ - 0 | |
| 1203AH | Installation of new carpet, carpet pad, tack strips | 5000 | SY | $ - 0 | |
| 1203AI | Disposal of old wall base, carpet trimmings, floor installation scraps | 10 | CY | $ - 0 | |
| 1203AJ | Procurement and installation of wooden cove base (shoe) molding (> 10 LF) | 500 | LF | $ - 0 | |
| 1203AK | Installation of new carpet, carpet pad, tack strips-"Check Sisal Straw Carpet" #842 | 2500 | SY | $ - 0 | |
| 1203AL | Installation of wooden style vinyl flooring "Fusion Hybrid Flooring" or approved product equal | 2800 | SY | $ - 0 | |
| 1203AM | Replace Nonstandard Carpet in senior officer Quarters | 150 | SY | $ - 0 | |
| 1203AN | Replace Nonstandard flooring in senior officer Quarters | 150 | SY | $ - 0 | |
| 1204 | Abatement | ||||
| 1204AA | Cleaning and abatement of mold (> 0 SF) | 1000 | SF | $ - 0 | |
| 1204AB | ACM & PACM Abatement Part 1 - State, permit, & air Fees necessary for each job associated with ACM & PACM Removals/Abatement of VAT, Resilient sheet goods, mastics. This CLIN is ordered each time abatement is executed along with the ACM & PACM Abatement Part 2 CLIN which defines the quantity of actual materials to be removed. | 5 | Each | $ - 0 | |
| 1204AC | ACM & PACM Abatement Part 2 - Per square foot removal and abatement of VAT, Resilient sheet goods, and associated mastics (> 0 SF). This CLIN is always ordered in conjunction with ACM & PACM Abatement Part 1 which covers the fixed overhead costs associated with abatement regardless of the quantity of materials being abated. | 500 | SF | $ - 0 | |
| 1204AD | VAT Removals-Non Abatement, Level III, Recommended Best Work Practices | 2000 | SF | $ - 0 | |
| 1205 | Kitchen | ||||
| 1205AA | Replacement of Kitchen Countertops: Phase I, II, & III three & four bedroom unit kitchen countertops NON MEGANITE type: Residential grade plywood 3/4 inch substrate with formed laminate top & backsplash, OG/double reveal or rounded edges as applicable (current color: butterrum; future installation type to be approved by COR) | 25 | LF | $ - 0 | |
| 1205AB | Replacement Phase IV, two bedroom unit kitchen countertops: Residential grade plywood 3/4 inch substrate with formed laminate top & backsplash, OG/double reveal or rounded edge as applicable (current color: butterrum; future installation type to be approved by COR) | 60 | LF | $ - 0 | |
| 1205AC | Replacement Phase I, three bedroom unit kitchen base cabinets (current type: Mid-Continent Oak model, Kentwood door style, Chestnut color; future installation type to be approved by COR) | 100 | LF | $ - 0 | |
| 1205AD | Replacement Phase I, four bedroom unit kitchen base cabinets (current type: Kitchen Kompact, Richwood lite oak, raised panel oak doors cabinet grade plywood cabinet construction & shelves; future installation type to be approved by COR) | 25 | LF | $ - 0 | |
| 1205AE | Replacement Phase II & III, three & four bedroom unit kitchen base cabinets (current type: Mid-Continent Oak Model, Kentwood Door Style, Chestnut color; future installation type to be approved by COR) | 60 | LF | $ - 0 | |
| 1205AF | Replacement Phase IV, two bedroom unit kitchen base cabinets (current type: Mid-Continent Pro Series, Woodbury style, solid oak or maple frames; future installation type to be approved by COR) | 30 | LF | $ - 0 | |
| 1205AG | Replacement Phase I, three bedroom unit kitchen wall cabinets (current type: Mid-Continent Oak model, Kentwood door style, Chestnut color; future installation type to be approved by COR) | 100 | LF | $ - 0 | |
| 1205AH | Replacement Phase I, four bedroom unit kitchen wall cabinets (current type: Kitchen Kompact Brand, Richwood lite oak model, raised panel oak doors, cabinet grade construction & shelves; future installation type to be approved by COR) | 30 | LF | $ - 0 | |
| 1205AI | Replacement Phase II & III, three & four bedroom unit kitchen wall cabinets (current type: Mid-Continent Oak Model, Kentwood Door Style, Chestnut color; future installation type to be approved by COR) | 30 | LF | $ - 0 | |
| 1205AJ | Replacement Phase IV, two bedroom unit kitchen wall cabinets (current type: Mid-Continent Pro-Series, Woodbury style, Solid oak or maple frames; future installation type to be approved by COR) | 30 | LF | $ - 0 | |
| 1205AK | Replacement Phase I, three bedroom unit kitchen pantry cabinets (current type: Mid-Continent oak model, Kentwood door style, chestnut color; future installation type to be approved by COR) | 3 | EACH | $ - 0 | |
| 1205AL | Replacement Phase I, II & III, three & four bedroom unit kitchen pantry cabinet with built in cabinet grade plywood shelves (complete unit to match wall & base cabinet units); future installation type to be approved by COR | 25 | EACH | $ - 0 | |
| 1205AM | Replacement of Kitchen stove/range hood (All Phases); future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 1205AN | Replacement of Kitchen stove/range electric; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 1205AO | Replacement Phase I, four bedroom unit; electric kitchen range (current type: Maytag (model # MER7662WW) 42 inch power cook element; future installation type to be approved by COR) | 1 | EACH | $ - 0 | |
| 1205AP | Replacement of Kitchen stove/range gas; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 1205AQ | Replacement of Kitchen double bowl SS sink; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 1205AR | Replacement of Kitchen faucet set; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 1205AS | Replacement of Kitchen stove/range backsplash unit; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 1205AT | Replacement of Refrigerator 18 cubic foot capacity; future installation type to be approved by COR | 4 | EACH | $ - 0 | |
| 1205AU | Replacement of Refrigerator 20 cubic foot capacity; future installation type to be approved by COR | 6 | EACH | $ - 0 | |
| 1205AV | Replacement of Refrigerator 22 cubic foot capacity; future installation type to be approved by COR | 4 | EACH | $ - 0 | |
| 1205AW | Replacement Phase I, four bedroom unit (current type: Refrigerator: Maytag EcoConserve with ice maker (model # M9BXX6MYW); future installation type to be approved by COR) | 1 | EACH | $ - 0 | |
| 1205AX | Replacement of Dishwasher 18 cubic foot capacity; future installation type to be approved by COR | 4 | EACH | $ - 0 | |
| 1205AY | Replacement of Dishwasher 24 cubic foot capacity; future installation type to be approved by COR | 6 | EACH | $ - 0 | |
| 1205AZ | Replacement Phase I, four bedroom unit; dishwasher (current type: Maytag JetClean Plus (model # M9B4709AWW) (White); future installation type to be approved by COR) | 1 | EACH | $ - 0 | |
| 1205BA | Install / replace kitchen range hood 30" vented with light (rectangular or round); future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1205BB | Replacement Phase I, four bedroom unit; Over Range Microwave (current type: Maytag 1.6 cubic feet (model # MMV1164WW); future installation type to be approved by COR) | 2 | EACH | $ - 0 | |
| 1205BC | Replacement Phase I, four bedroom unit; front load high-efficiency washing machine (current type: Maytag (Model # MHWE201YW); future installation type to be approved by COR) | 1 | EACH | $ - 0 | |
| 1205BD | Replacement Phase I, four bedroom unit; front load high-efficiency electric cloths dryer (current type: Maytag (model # MEDE201YW); future installation type to be approved by COR) | 1 | EACH | $ - 0 | |
| 1206 | Electrical, Lighting & Fans | ||||
| 1206AA | Install / replace Kitchen 19" ceiling light fixtures (LED) | 40 | EACH | $ - 0 | |
| 1206AB | Install / replace hallway and closet light fixtures (LED) | 60 | EACH | $ - 0 | |
| 1206AC | Install / replace Dining Room Light fixture (LED) | 4 | EACH | $ - 0 | |
| 1206AD | Install / replace stairwell light fixture (LED) | 40 | EACH | $ - 0 | |
| 1206AE | Install /replace furnace room or laundry closet light fixture (LED) | 20 | EACH | $ - 0 | |
| 1206AF | Install / replace exterior light fixtures Coach Type (LED) | 25 | EACH | $ - 0 | |
| 1206AG | Install / replace exterior light fixtures "Jelly Jar" type (LED) | 25 | EACH | $ - 0 | |
| 1206AH | Install /replace interior light fixture, Bathroom, Phase IV (LED) | 10 | EACH | $ - 0 | |
| 1206AI | Install / replace interior light fixture, Bathroom, Phase I J. Officer type (LED) | 5 | EACH | $ - 0 | |
| 1206AJ | Install / replace interior light fixture, Bathroom, Phase II & III (LED) | 15 | EACH | $ - 0 | |
| 1206AK | Install / replace bathroom ceiling fan/light fixture heavy duty high CFM (LED) | 25 | EACH | $ - 0 | |
| 1206AL | Install / replace bathroom ceiling fan no light 60-80 CFM | 5 | EACH | $ - 0 | |
| 1206AM | Install / replace overhead light fixture Phase 4 shed (LED) | 5 | EACH | $ - 0 | |
| 1206AN | Install ceiling fan/light where no light existed (LED) | 10 | EACH | $ - 0 | |
| 1206AO | Install ceiling fan/light where ceiling light was present (LED) | 10 | EACH | $ - 0 | |
| 1206AP | Install ceiling fan/light where a ceiling fan was present (LED) | 20 | EACH | $ - 0 | |
| 1206AQ | Install / replace electrical distribution panel up to 200 AMP service, 16 circuits. | 1 | EACH | $ - 0 | |
| 1206AR | Install non-switched electrical outlet where previously none existed | 20 | EACH | $ - 0 | |
| 1206AT | Install / Replace Combination Combustible Gas Carbon Monoxide detector | 60 | EACH | $ - 0 | |
| 1206AU | Install / Replace Carbon Monoxide detector | 10 | EACH | $ - 0 | |
| 1206AV | Install / Replace Smoke detector | 60 | EACH | $ - 0 | |
| 1206AW | Terminate & remove Whole House Fan, close up ceiling to match adjacent area | 10 | EACH | $ - 0 | |
| 1207 | Bathroom | ||||
| 1207AA | Install / replace bathroom vanity cabinet, Phase I (2 Unit Bldgs); future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 1207AB | Install / replace bathroom vanity cabinet Phase I three bedroom townhome (combination unit); future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1207AC | Install / replace bathroom sink/vanity/top & faucet unit Phase II & III (combination unit); future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1207AD | Install / replace bathroom vanity cabinet, Phase IV 2 bedroom type; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1207AE | Install / replace bathroom sink vanity top Phase IV 2 bedroom style; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1207AF | Phase I, II, & III, Sink Vanity (current type: Brand, Project Source, Oak Finish (model # PS2418P2-0) (24 inch by 18 5/8 inch); future installation type to be approved by COR) | 5 | EACH | $ - 0 | |
| 1207AG | Install Phase I, II, & III, Sink Vanity (current type: Brand, Project Source; White finish (model # PS2418P2-WH) (24 inch by 18 5/8 inch); future installation type to be approved by COR) | 5 | EACH | $ - 0 | |
| 1207AH | Install /replace bathroom sink faucet set Phase IV 2 bedroom type; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1207AI | Install / replace bathroom Medicine cabinet Phase I recessed mounted; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1207AJ | Install / replace bathroom Medicine cabinet Phase I surface mounted; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1207AK | Install / replace bathroom Medicine cabinet Phase II & III recessed mounted; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1207AL | Install / replace bathroom Medicine cabinet Phase IV recessed mounted; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1207AM | Install / replace bathroom shower/tub enclosures 32" x 60" x 72"; future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 1207AN | Install / replace bathroom shower/tub enclosures 30" x 58" x 60"; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 1207AO | Install / replace bathroom "Over the John" cabinet Phase I three bedroom T/home; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 1207AP | Install / replace bathroom "Over the John" cabinet Phase I (2 Unit Bldgs); future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 1207AQ | Install / replace bathroom "Over the John" cabinet Phase II & III type; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 1207AR | Install / replace bathroom "Over the John" cabinet Phase IV 2 bedroom type; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1207AS | Install / replace bathroom half bath Pedestal sink floor mounted; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1207AT | Install / replace bathroom, bathtub, cast iron construction, all Phases; future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 1207AU | Install / replace bathroom water closet (toilet) all phases; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1207AV | Install / replace bathroom sink, wall mounted, Phase IV half bath type; future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 1207AW | Install / replace bathroom shower, mixing valves (completely); future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 1208 | HVAC & Furnace | ||||
| 1208AA | Install / replace AC circulator condensing pump; future installation type to be approved by COR | 4 | EACH | $ - 0 | |
| 1208AB | Install / replace AC Condenser coil; future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 1208AC | Clean interior HVAC duct work (> 10 LF) | 100 | LF | $ - 0 | |
| 1208AD | Install / replace AC condenser coil wooden platform/stand (all phases) | 1 | EACH | $ - 0 | |
| 1208AE | Install / replace HVAC blower motors (All Phases); future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 1208AF | Replace Thermostat with new; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1208AG | Install / replace Gas Fired Furnace Phases II, III & IV; future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 1208AH | Install / replace Gas Fired Furnace Phase I; future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 1208AI | Replace flue pipe rain cap | 2 | EACH | $ - 0 | |
| 1208AJ | Replace gas fired hot water heater; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1208AK | Replace electric hot water; future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 1208AL | Replace electric baseboard heat (< 2 LF) | 2 | EACH | $ - 0 | |
| 1208AM | Replace electric baseboard heat each additional foot (> 2 LF) | 5 | EACH | $ - 0 | |
| 1208AN | Install AC Condensor Fan Motor; future installation type to be approved by COR | 6 | EACH | $ - 0 | |
| 1209 | Doors & Windows | ||||
| 1209AA | Replace storm door, (Complete all HDWR); future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 1209AB | Replace Main Entry Door, Solid Wood (Complete all HDRW); future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 1209AC | Install / replace Interior Pre-hung Six panel composite doors; future installation type to be approved by COR | 80 | EACH | $ - 0 | |
| 1209AD | Install / replace Interior Slab (non-pre-hung) Six panel composite doors; future installation type to be approved by COR | 40 | EACH | $ - 0 | |
| 1209AE | Install / replace Interior Slab Flat Panel (non- pre-hung) wood constructed doors; future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 1209AF | Install/solid wood fully louvered interior door (sm); future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 1209AG | Install/solid wood fully louvered interior door (lg); future installation type to be approved by COR | 40 | EACH | $ - 0 | |
| 1209AH | Install / replace Interior Bi-Fold Six Panel composite doors; future installation type to be approved by COR | 100 | EACH | $ - 0 | |
| 1209AI | Replace Rear Entry Door, PHASE IV match existing; future installation type to be approved by COR | 1 | EACH | $ - 0 | |
| 1209AJ | Replace French Doors (Complete all hardware & Trim 100% weather tight); future installation type to be approved by COR | 2 | EACH | $ - 0 | |
| 1209AK | Replace French Door Sliding Screen Doors (Complete all HDWR & Fittings); future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 1209AL | Replace Sliding French Door Screens; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1209AM | Replace shed door, fiberglass faced, heavy duty exterior grade w/HDWR; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 1209AN | Replace Main & Rear Entry Door Locksets ("BEST SYSTEM") | 2 | EACH | $ - 0 | |
| 1209AO | Replace Shed door locksets ("BEST SYSTEM") | 2 | EACH | $ - 0 | |
| 1209AP | Replace Exterior Shed door Lockset ("BEST SYSTEM") | 10 | EACH | $ - 0 | |
| 1209AQ | Replace interior door passage lockset | 20 | EACH | $ - 0 | |
| 1209AR | Replace Exterior door HDWR, hinges, strike plates, etc. minus lockset; future installation type to be approved by COR | 5 | SET | $ - 0 | |
| 1209AS | Replace Interior door HDWR, hinges, strike plates, etc. minus lockset; future installation type to be approved by COR | 5 | SET | $ - 0 | |
| 1209AT | Replace main entry door chime and peep sight device (All Phases); future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1209AU | Install replacement windows (insert type); future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1209AV | Install replacement windows (new construction flanged type); future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1209AW | Replace window screens | 40 | EACH | $ - 0 | |
| 1209AX | Install / replace 1" horizontal mini-blinds (all sizes) | 200 | EACH | $ - 0 | |
| 1209AY | Install Sliding Patio Door complete with all hardware (current type: Stanley; future installation type to be approved by COR) | 16 | EACH | $ - 0 | |
| 1209AZ | Install Sliding Screen Patio Door complete with all hardware (current type: Stanley; future installation type to be approved by COR) | 10 | EACH | $ - 0 | |
| 1210 | Interior Misc... | ||||
| 1210AA | Install / replace gypsum board "mold resistant type" all thickness | 200 | SF | $ - 0 | |
| 1210AB | Replace gypsum board walls (> 32 SF) | 200 | SF | $ - 0 | |
| 1210AC | Replace gypsum board ceilings (> 32 SF) | 200 | SF | $ - 0 | |
| 1210AD | Install ventilation duct exhaust connections Kitchen & Laundry type all phases | 5 | EACH | $ - 0 | |
| 1210AE | Install / replace sanitary drain piping crawl space Phase IV (> 20 LF) | 60 | LF | $ - 0 | |
| 1210AF | Install / replace gas piping crawl space (> 25 LF) | 60 | LF | $ - 0 | |
| 1210AG | Install or replace inline water filters; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1210AH | Install or replace water system expansion tanks; future installation type to be approved by COR | 5 | EACH | $ - 0 | |
| 1210AI | Replace oak stair tread | 25 | EACH | $ - 0 | |
| 1210AI1 | Wage Adjustment | 12 | MO | $ - 0 | |
| TOTAL LEVEL II B WORK - ESTIMATED QUANTITY ITEMS (EQI) | $ - 0 |
TOTAL FIRM FIXED PRICE OPTION PERIOD 1 $ - 0
| **Variation in CLIN quantities is acceptable as long as the ceiling in not exceeded. | ||||
| LEVEL III WORK (Additional Work issued via Separate Task Order) | ||||
| 1300 | Additional Services in accordance with Attachment | 1 | LOT | NTE |
TOTAL BASE YEAR $ - 0
| Notes: |
| (1) Firm-Fixed Unit Prices shall include all costs to provide the services/supplies, which includes, but is not limited to, all applicable Federal, State, and local taxes and duties. |
| (2) Level II B Service Work – Estimated Quantity Items – CLINs X0201-0210f will be fully funded each year and any variation in quantities for these CLINs is acceptable as long as the total ceiling is not exceeded. |
OP YR 2
| OPTION YEAR 2 | |||||
| LEVEL I WORK (PREVENTATIVE MAINTENANCE) | |||||
| CLIN | QTY | UNIT | UNIT PRICE | TOTAL | |
| 2001 | Change of Occupancy Maintenance (COM) | 12 | MO | $ - 0 | |
| 2002 | Service Call System | 12 | MO | $ - 0 | |
| 2003 | Self Help Store | 12 | MO | $ - 0 | |
| 2004 | Annual Inspections & Preventive Maintenance | 12 | MO | $ - 0 | |
| 2005 | Wage Adjustment | 12 | MO | $ - 0 | |
| TOTAL LEVEL I WORK (PREVENTATIVE MAINTENANCE) | $ - 0 |
| LEVEL II A WORK (SERVICE WORK) | |||||
| CLIN | EST QTY | UNIT | UNIT PRICE | TOTAL | |
| 2101 | General Repairs associated with Level II Service Call Work | 12 | MO | $ - 0 | |
| 2102 | Self Help Store 100% and Level II Service Call Work Material >$35 | 1 | LO | NTE | |
| 2103 | Subcontractor and Rental Equipment Associated with Service Call Work | 12 | MO | $ - 0 | |
| 2104 | Wage Adjustment | 12 | MO | $ - 0 | |
| TOTAL LEVEL II A WORK (SERVICE WORK) | $ - 0 |
| LEVEL II B SERVICE WORK - ESTIMATED QUANTITY ITEMS (EQI) | |||||
| CLIN | EST QTY | UNIT | UNIT PRICE | TOTAL | |
| 2201 | Exterior | ||||
| 2201AA | Roof sheathing repair/Shingle Repair (>25 SF) | 1,000 | SF | $ - 0 | |
| 2201AB | Replace roof ventilator structure screen (ALL APPLICABLE PHASES) | 2 | EACH | $ - 0 | |
| 2201AC | Repair Termite Damage (repair, treatment and replacement (>25 SF) | 200 | SF | $ - 0 | |
| 2201AD | Install water meter | 10 | EA | $ - 0 | |
| 2201AE | Close in AC sleeve 2nd Floor Phase IV (Complete, framing, siding etc.) | 10 | EACH | $ - 0 | |
| 2201AF | Perform Exterior EFIS Repair (> 50 SF) | 500 | SF | $ - 0 | |
| 2201AG | Install / replace dedicated satellite dish post (complete installation) | 5 | EACH | $ - 0 | |
| 2201AH | Replace entire individual "in yard shed" (complete structure including door & all finishes) | 1 | EACH | $ - 0 | |
| 2201AI | Replace "Good Neighbor" Fencing (> 25 LF) | 50 | LF | $ - 0 | |
| 2201AJ | Gutter & downspout installation (complete all fitting) (> 30 LF) | 100 | LF | $ - 0 | |
| 2201AK | Replacement of Vinyl siding (complete all components) (> 30 SF) | 500 | SF | $ - 0 | |
| 2201AL | Repair / replace sidewalk panels (> 25 LF) | 30 | LF | $ - 0 | |
| 2201AM | Install / replace frost free exterior hose bib | 5 | EACH | $ - 0 | |
| 2202 | Paint | ||||
| 2202AA | Perform interior painting IAW TE-1.9, Occupied unit NON COM tasking | 3,000 | SF | $ - 0 | |
| 2202AB | Perform Exterior painting IAW TE-1.9, (>50 SF) LEVEL II, III or COM tasking | 5,000 | SF | $ - 0 | |
| 2203 | Floor | $ - 0 | |||
| 2203AA | Replace 3/4" plywood subflooring (> 50 SF) | 1000 | SF | $ - 0 | |
| 2203AB | Replace 1/4" plywood/luan subflooring (> 50 SF) | 1000 | SF | $ - 0 | |
| 2203AC | Major Replacement (non ACM/PCM materials) of Vinyl Floor Tiles (> 10 SF) | 5000 | SF | $ - 0 | |
| 2203AD | Replacement of vinyl resilient sheet flooring (non ACM/PCM materials) (> 0 SF) | 7000 | SF | $ - 0 | |
| 2203AE | Installation of transition strips (various) between dissimilar floors | 300 | SF | $ - 0 | |
| 2203AF | Installation of 3/4" wooden round stock at Vinyl floor perimeters | 1000 | LF | $ - 0 | |
| 2203AG | Removal of existing carpet, carpet padding, tack strip etc. (> 50 SY) | 5000 | SY | $ - 0 | |
| 2203AH | Installation of new carpet, carpet pad, tack strips | 5000 | SY | $ - 0 | |
| 2203AI | Disposal of old wall base, carpet trimmings, floor installation scraps | 10 | CY | $ - 0 | |
| 2203AJ | Procurement and installation of wooden cove base (shoe) molding (> 10 LF) | 500 | LF | $ - 0 | |
| 2203AK | Installation of new carpet, carpet pad, tack strips-"Check Sisal Straw Carpet" #842 | 2500 | SY | $ - 0 | |
| 2203AL | Installation of wooden style vinyl flooring "Fusion Hybrid Flooring" or approved product equal | 2800 | SY | $ - 0 | |
| 2203AM | Replace Nonstandard Carpet in senior officer Quarters | 150 | SY | $ - 0 | |
| 2203AN | Replace Nonstandard flooring in senior officer Quarters | 150 | SY | $ - 0 | |
| 2204 | Abatement | ||||
| 2204AA | Cleaning and abatement of mold (> 0 SF) | 1000 | SF | $ - 0 | |
| 2204AB | ACM & PACM Abatement Part 1 - State, permit, & air Fees necessary for each job associated with ACM & PACM Removals/Abatement of VAT, Resilient sheet goods, mastics. This CLIN is ordered each time abatement is executed along with the ACM & PACM Abatement Part 2 CLIN which defines the quantity of actual materials to be removed. | 5 | Each | $ - 0 | |
| 2204AC | ACM & PACM Abatement Part 2 - Per square foot removal and abatement of VAT, Resilient sheet goods, and associated mastics (> 0 SF). This CLIN is always ordered in conjunction with ACM & PACM Abatement Part 1 which covers the fixed overhead costs associated with abatement regardless of the quantity of materials being abated. | 500 | SF | $ - 0 | |
| 2204AD | VAT Removals-Non Abatement, Level III, Recommended Best Work Practices | 2000 | SF | $ - 0 | |
| 2205 | Kitchen | ||||
| 2205AA | Replacement of Kitchen Countertops: Phase I, II, & III three & four bedroom unit kitchen countertops NON MEGANITE type: Residential grade plywood 3/4 inch substrate with formed laminate top & backsplash, OG/double reveal or rounded edges as applicable (current color: butterrum; future installation type to be approved by COR) | 25 | LF | $ - 0 | |
| 2205AB | Replacement Phase IV, two bedroom unit kitchen countertops: Residential grade plywood 3/4 inch substrate with formed laminate top & backsplash, OG/double reveal or rounded edge as applicable (current color: butterrum; future installation type to be approved by COR) | 60 | LF | $ - 0 | |
| 2205AC | Replacement Phase I, three bedroom unit kitchen base cabinets (current type: Mid-Continent Oak model, Kentwood door style, Chestnut color; future installation type to be approved by COR) | 100 | LF | $ - 0 | |
| 2205AD | Replacement Phase I, four bedroom unit kitchen base cabinets (current type: Kitchen Kompact, Richwood lite oak, raised panel oak doors cabinet grade plywood cabinet construction & shelves; future installation type to be approved by COR) | 25 | LF | $ - 0 | |
| 2205AE | Replacement Phase II & III, three & four bedroom unit kitchen base cabinets (current type: Mid-Continent Oak Model, Kentwood Door Style, Chestnut color; future installation type to be approved by COR) | 60 | LF | $ - 0 | |
| 2205AF | Replacement Phase IV, two bedroom unit kitchen base cabinets (current type: Mid-Continent Pro Series, Woodbury style, solid oak or maple frames; future installation type to be approved by COR) | 30 | LF | $ - 0 | |
| 2205AG | Replacement Phase I, three bedroom unit kitchen wall cabinets (current type: Mid-Continent Oak model, Kentwood door style, Chestnut color; future installation type to be approved by COR) | 100 | LF | $ - 0 | |
| 2205AH | Replacement Phase I, four bedroom unit kitchen wall cabinets (current type: Kitchen Kompact Brand, Richwood lite oak model, raised panel oak doors, cabinet grade construction & shelves; future installation type to be approved by COR) | 30 | LF | $ - 0 | |
| 2205AI | Replacement Phase II & III, three & four bedroom unit kitchen wall cabinets (current type: Mid-Continent Oak Model, Kentwood Door Style, Chestnut color; future installation type to be approved by COR) | 30 | LF | $ - 0 | |
| 2205AJ | Replacement Phase IV, two bedroom unit kitchen wall cabinets (current type: Mid-Continent Pro-Series, Woodbury style, Solid oak or maple frames; future installation type to be approved by COR) | 30 | LF | $ - 0 | |
| 2205AK | Replacement Phase I, three bedroom unit kitchen pantry cabinets (current type: Mid-Continent oak model, Kentwood door style, chestnut color; future installation type to be approved by COR) | 3 | EACH | $ - 0 | |
| 2205AL | Replacement Phase I, II & III, three & four bedroom unit kitchen pantry cabinet with built in cabinet grade plywood shelves (complete unit to match wall & base cabinet units); future installation type to be approved by COR | 25 | EACH | $ - 0 | |
| 2205AM | Replacement of Kitchen stove/range hood (All Phases); future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 2205AN | Replacement of Kitchen stove/range electric; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 2205AO | Replacement Phase I, four bedroom unit; electric kitchen range (current type: Maytag (model # MER7662WW) 42 inch power cook element; future installation type to be approved by COR) | 1 | EACH | $ - 0 | |
| 2205AP | Replacement of Kitchen stove/range gas; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 2205AQ | Replacement of Kitchen double bowl SS sink; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 2205AR | Replacement of Kitchen faucet set; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 2205AS | Replacement of Kitchen stove/range backsplash unit; future installation type to be approved by COR | 10 | EACH | $ - 0 | |
| 2205AT | Replacement of Refrigerator 18 cubic foot capacity; future installation type to be approved by COR | 4 | EACH | $ - 0 | |
| 2205AU | Replacement of Refrigerator 20 cubic foot capacity; future installation type to be approved by COR | 6 | EACH | $ - 0 | |
| 2205AV | Replacement of Refrigerator 22 cubic foot capacity; future installation type to be approved by COR | 4 | EACH | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .