This is a Request for Bid (RFB) document prepared by the New Hampshire Department of Natural and Cultural Resources, Division of Parks and Recreation, for asphalt shingle roofing replacement and interior repairs at the Hikers Cabin located at Monadnock State Park in Jaffrey, New Hampshire (Project No. CAP-2505). The scope of work includes complete removal and disposal of existing asphalt shingle roofing with underlayments and ice and watershield protection, repair of existing roof sheathing, installation of ice and watershield leak barriers, drip edge, asphalt shingle underlayment, and new asphalt shingles. Additional work encompasses repointing the stone masonry chimney from foundation to cap, installing zinc-coated copper step flashing at the chimney, replacing all lead counter chimney flashing with new 3 lb/sqft lead, and replacing missing sheetrock in the interior of the building. The project also includes interior repairs consisting of replacement of R-15 faced fiberglass insulation batts, 6 mil polyethylene vapor barriers, 1/2-inch drywall, and Douglas fir trim boards. A mandatory pre-bid conference is scheduled for September 16, 2025, at 10:00 AM, with bid proposals due by 2:00 PM on September 25, 2025. The project is scheduled to commence on October 30, 2025 (pending Governor and Council approval) and must be completed no later than June 30, 2026.
The contract will be awarded to the lowest qualified bidder. Contractors must demonstrate a minimum of five years of successful roofing experience and be registered with the New Hampshire Secretary of State. The specifications require GAF Timberline UHDZ or CertainTeed LANDMARK PRO asphalt shingles with a 50-year manufacturer's warranty and 130 MPH wind warranty. All roofing materials must be UL-listed and meet applicable ASTM standards. An allowance of $10,000 is included for unanticipated modifications to the scope of work. Upon project completion, the contractor must provide two bundles of maintenance stock shingles. The state reserves the right to reject any or all proposals. The solicitation does not explicitly reference set-aside designations for disadvantaged enterprises or identify an incumbent vendor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| rfb-dncr-cap-2505-award.pdf | ||
| rfb-dncr-cap-2505.pdf | ||
| attachment_1_RFB DNCR CAP-2505.pdf | ||
| RFB DNCR CAP-2505.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
AutoCAD SHX Text
STATE OF NEW HAMPSHIRE
AutoCAD SHX Text
DEPARTMENT OF NATURAL AND CULTURAL RESOURCES
AutoCAD SHX Text
ASPHALT SHINGLE ROOF REPLACEMENT
AutoCAD SHX Text
HIKERS CABIN
AutoCAD SHX Text
CAPITAL PROJECTS & MAINTENANCE
AutoCAD SHX Text
OF
AutoCAD SHX Text
AutoCAD SHX Text
JAFFREY, NEW HAMPSHIRE
AutoCAD SHX Text
MONADNOCK STATE PARK
AutoCAD SHX Text
EDWARD MUSSEY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AUG 29, 2025
AutoCAD SHX Text
PROJECT #
AutoCAD SHX Text
CAP-2505
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text NOTES: 1. STRIP AND DISPOSE ALL OF THE STRIP AND DISPOSE ALL OF THE ASPHALT SHINGLE ROOFING INCLUDING UNDERLAYMENTS AND ICE AND WATERSHIELD PROTECTION. 2. REPAIR EXISTING SHEATHING PER REPAIR EXISTING SHEATHING PER ALLOWANCES 3. INSTALL ICE AND WATERSHIELD INSTALL ICE AND WATERSHIELD LEAK BARRIERS. 4. INSTALL DRIP EDGE. INSTALL DRIP EDGE. 5. INSTALL ASPHALT SHINGLE ROOF INSTALL ASPHALT SHINGLE ROOF UNDERLAYMENT. 6. INSTALL ASPHALT SHINGLES. INSTALL ASPHALT SHINGLES. 7. REPOINT STONE MASONRY REPOINT STONE MASONRY CHIMNEY FROM THE FOUNDATION TO CHIMNEY CAP. 8. INSTALL ZINC COATED COPPER INSTALL ZINC COATED COPPER STEP FLASHING AT THE CHIMNEY. 9. REPLACE ALL LEAD COUNTER REPLACE ALL LEAD COUNTER CHIMNEY FLASHING. 10. REPLACE MISSING SHEETROCK IN REPLACE MISSING SHEETROCK IN THE INTERIOR OF THE BUILDING.
AutoCAD SHX Text
1ST COURSE ICE & WATERSHIELD AT EAVES
AutoCAD SHX Text
2ND COURSE ICE & WATERSHIELD AT EAVES
AutoCAD SHX Text
ICE & WATERSHIELD AT RAKES
AutoCAD SHX Text
2ND COURSE ICE & WATERSHIELD AT EAVES
AutoCAD SHX Text
LINE OF BUILDING BELOW
AutoCAD SHX Text 1" x 5" FASCIA TRIM BOARD
AutoCAD SHX Text 2" x 8" FLYING RAFTER
AutoCAD SHX Text
ASPHALT SHINGLES
AutoCAD SHX Text
ICE & WATERSHIELD (2) 36" WIDE COURSES AT EAVES AND RAKES
AutoCAD SHX Text
SHINGLE UNDERLAYMENT ENTIRE ROOF DECK
AutoCAD SHX Text DRIP EDGE 5" DECK FLANGE WITH 1.5" DROP AND " 38" HEMMED DRIP "MILL FINISH" AT EAVES AND RAKES.
AutoCAD SHX Text 2 1
AutoCAD SHX Text
HIKERS CABIN ROOF PLAN
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text 6 1
AutoCAD SHX Text
STONE MASONRY CHIMNEY
AutoCAD SHX Text
SCALE: N/A
AutoCAD SHX Text 4 1
AutoCAD SHX Text
STONE MASONRY CHIMNEY
AutoCAD SHX Text
SCALE: N/A
AutoCAD SHX Text 1 1
AutoCAD SHX Text
MONADNOCK STATE PARK HIKERS CABIN (MOD03)
AutoCAD SHX Text
SCALE: N/A
AutoCAD SHX Text 3 1
AutoCAD SHX Text
DRIPEDGE DETAIL
AutoCAD SHX Text
SCALE: 1" = 1'-0"
AutoCAD SHX Text
REMOVE AND REPLACE ALL LEAD FLASHING WITH NEW 3LB/SQFT LEAD.
AutoCAD SHX Text
REMOVE HAT AND RECONSTRUCT.
AutoCAD SHX Text
RECONSTRUCT CHIMNEY HAT SUPPORTS.
AutoCAD SHX Text
REPOINT STONE MASONRY CHIMNEY FROM ROOFLINE UP.
AutoCAD SHX Text
REMOVE NAILS IN ENDS OF RAFTERS.
AutoCAD SHX Text
3/8" REBAR BOTH WAYS 6" O.C.
AutoCAD SHX Text 7 1
AutoCAD SHX Text
HIKERS CABIN CHIMNEY HAT
AutoCAD SHX Text
SCALE: 1/2" =1'-0"
AutoCAD SHX Text
WIRE TIE AT EACH INTERSECTION
AutoCAD SHX Text
NOTE: PRECAST CHIMNEY HAT CONCRETE SHALL BE 5000 PSI
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
STOVE PIPE PENETRATION
AutoCAD SHX Text
ICE & WATERSHIELD
AutoCAD SHX Text
REPOINT ENTIRE STONE MASONRY CHIMNEY
AutoCAD SHX Text 5 1
AutoCAD SHX Text
STONE MASONRY CHIMNEY
AutoCAD SHX Text
SCALE: N/A
AutoCAD SHX Text
REMOVE CHIMNEY HAT AND RECONSTRUCT.
AutoCAD SHX Text
RECONSTRUCT CHIMNEY HAT SUPPORTS.
AutoCAD SHX Text
REPOINT STONE MASONRY CHIMNEY FROM FOOTING TO TOP.
AutoCAD SHX Text
REMOVE AND REPLACE ALL LEAD COUNTER FLASHING WITH 3LB/SQFT LEAD.
AutoCAD SHX Text
ROCK FROM CHIMNEY HAT SUPPORT.
AutoCAD SHX Text
LOCATE CHIMNEY FOUNDATION BASE AND REPOINT CHIMNEY FROM BASE TO TOP.
AutoCAD SHX Text
3/8" REBAR BOTH WAYS 6" O.C.
AutoCAD SHX Text
APPLY ASPHALT SHINGLES OVER UNDERLAYMENT
AutoCAD SHX Text
APPLY ASPHALT SHINGLES OVER UNDERLAYMENT
AutoCAD SHX Text ASHPHALT SHINGLE ROOF REPLACEMENT AND INTERIOR REPAIRS MONADNOCK STATE PARK HIKERS CABIN (MOD03) 169 POOLE RD. JAFFEREY, NH 03452 PROJECT No. CAP-2505
NOTE: BIDDERS SHALL VERIFY ALL DIMESNIONS BEFORE SUBMITTING A BID AND BEFORE BEGINING ANY WORK. ANY DISCREPANCIES SHOULD BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE PROJECT MANAGER FOR CONSIDERATION.
ONE PIECE LEAD BASE FLASHING
(APRON) EXTEND AT LEAST 5" ONTO
ROOF DECK.
USE ONE PIECE LEAD STEP
FLASHING FOR EACH SHINGLE
COURSE. PLACE STEP FLASHING
OVER THE SHINGLE AND NAIL
EACH STEP FLASHING PIECE TO
THE ROOF DECK WITH 2 COPPER
NAILS. SEAL THE OVERLYING
ASPHALT SHINGLES TO THE STEP
FLASHING WITH ASPHALT PLASTIC
CEMENT.
EXTEND LEAD COUNTER FLASHING
OVER BASE FLASHING.
STONE MASONRY CHIMNEY RE-POINT
CHIMNEY FROM THE CHIMNEY BASE UP.
FIRST COURSE
SECOND COURSE
17"
(432mm)
THIRD COURSE
6"
(152mm)11"
(279mm)
FOURTH COURSE
FIFTH COURSE
UNDERLAYMENT
FOURTH COURSE:
THIRD COURSE:
SECOND COURSE:
FIRST COURSE:
PLACE FIRST COURSE OF SHINGLES 1/4"
- 3/4" OVER EAVE AND RAKE EDGES,
COVERING STARTER COURSE
OVERHANG, TO PROVIDE DRIP EDGE.
SHINGLE
INSTALLATION
REMAINING
COURSES:
NOTES:
DRIP EDGE HEM CORNERS
ALUMINUM MIL FINISH DRIP EDGE APPLIED
DIRECT TO THE ROOF DECK AT EAVES
DO NOT SAW CUT STONES FOR
THE LEAD COUNTER FLASHING
INSTALLATION. REUSE THE THE
EXISTING COUNTER FLASHING
LOCATIONS.
ONE PIECE LEAD BASE FLASHING
EXTEND AT LEAST 12" UP THE FACE OF
THE CHIMNEY'S
EXTEND LEAD COUNTER FLASHING
OVER LEAD COATED COPPER BASE
FLASHING.
WRAP CORNERS OF LEAD BASE
FLASHING AT LEAST 3"
ICE & WATERSHIELD
NOTE: DO NOT RUN ICE AND
WATERSHIELD OR OTHER
UNDERLAYMENTS UP THE FACE,
SIDEWALLS, OR BACK OF THE
CHIMNEYS'.
ALUMINUM MILL FINISH DRIP EDGE APPLIED
OVER ICE AND WATERSHIELD AT RAKES
13-1/4" (368 - 445mm)
39-3/8" (1m)
ENHANCED NAILING PATTERN - six nails per shingle*
* required by some local codes and required for enhanced wind coverage on certain products.
See limited warranty for details.
5-3/4" - 6-1/4" (146mm - 159mm) from bottom of shingle
(13 - 64mm) 1/2" - 2-1/2"
(165 - 241mm) 6-1/2" - 9-1/2"
14-1/2" - 17-1/2"
(165 - 241mm) 6-1/2" - 9-1/2"
(368 - 445mm) 14-1/2" - 17-1/2"
Cement locations (4 quarter-sized dabs of cement on back of shingle)
CEMENT
HAND SEALING REQUIRED: TO HAND-SEAL SHINGLES AND TO ENSURE IMMEDIATE
SEALING, APPLY 4 QUARTER-SIZED DABS OF SHINGLE TAB ADHESIVE ON THE BACK OF
THE SHINGLE 1" (25 MM) AND 13" (330 MM) IN FROM EACH SIDE AND
1" (25 MM) UP FROM BOTTOM OF THE SHINGLE. PRESS SHINGLE FIRMLY INTO THE
ADHESIVE.
CAUTION: APPLY ONLY A THIN UNIFORM LAYER OF ASPHALT PLASTIC CEMENT LESS THAN
1/8" (3 MM) THICK. EXCESS AMOUNTS CAN CAUSE BLISTERING OF THE SHINGLES AND MAY
SOFTEN THE ASPHALT IN UNDERLAYMENTS AND LEAK BARRIERS, RESULTING IN THE
ASPHALT DRIPPING AND STAINING.
AutoCAD SHX Text REPLACE R-15 FACED FIBERGLASS INSULATION BATTS. REPLACE 6 MIL-POLYETHYLENE VAPOR BARRIER. REPLACE 1/2" DRYWALL ALONG WALL AND CEILING. TAPE & MUD JOINTS. FINISH SAND AND PRIME COAT "WHITE". INSTALL DOUGLAS FIR TRIM BOARDS 3/8" X 2-3/4" PRE-PAINTED TO MATCH EXISTING GREEN TRIM BOARDS..
AutoCAD SHX Text
INTERIOR 2X4 PARTITION WALL
AutoCAD SHX Text
REPLACE 1/2" SHEETROCK
AutoCAD SHX Text
CEILING AT PEAK
AutoCAD SHX Text
RIDGE AT CEILING
AutoCAD SHX Text
EXISTING LIGHTING FIXTURE
AutoCAD SHX Text
CEILING IS SLOPED AT 4:12
AutoCAD SHX Text 6 2
AutoCAD SHX Text
HIKERS CABIN FLOOR PLAN
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
LIMIT OF INTERIOR WORK
AutoCAD SHX Text 8 2
AutoCAD SHX Text
HIKERS CABIN INTERIOR
AutoCAD SHX Text
SCALE: N/A
AutoCAD SHX Text 7 2
AutoCAD SHX Text
DRYWALL REPAIRS
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text
REPOINT EXTERIOR STONE MASONRY CHIMNEY
AutoCAD SHX Text REMOVE AND REPLACE INSULATION, & VAPOR BARRIERS WITH NEW R-15 FACED FIBERGLASS BATTS AND 15 MIL POLY VAPOR BARRIER. REPLACE " DRYWALL, 12" DRYWALL, AND WOOD TRIM ALONG CEILING AND WALL. PAINT TO MATCH EXISTING GREEN TRIM BOARDS.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
AutoCAD SHX Text
STATE OF NEW HAMPSHIRE
AutoCAD SHX Text
DEPARTMENT OF NATURAL AND CULTURAL RESOURCES
AutoCAD SHX Text
CAPITAL PROJECTS & MAINTENANCE
AutoCAD SHX Text
OF
AutoCAD SHX Text
AutoCAD SHX Text
EDWARD MUSSEY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text N/A
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AUG 29, 2025
AutoCAD SHX Text
PROJECT #
AutoCAD SHX Text
CAP-2505
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CHIMNEY FLASHING DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
TRIM 17" (432MM) OFF FIRST SHINGLE
AutoCAD SHX Text
TRIM 11" (279MM) OFF FIRST SHINGLE
AutoCAD SHX Text
TRIM 6" (152MM) OFF FIRST SHINGLE
AutoCAD SHX Text
START WITH FULL SHINGLE
AutoCAD SHX Text
START AT EITHER RAKE AND LAY IN EITHER DIRECTION
AutoCAD SHX Text
1. CONTINUE EACH COURSE WITH CONTINUE EACH COURSE WITH WHOLE SHINGLES.
AutoCAD SHX Text REPEAT THE 1ST - 4TH COURSE INSTRUCTIONS ON THE REMAINING COURSES, STARTING THE FIFTH COURSE WITH A FULL SHINGLE.
AutoCAD SHX Text
2. STRIKE A CHALK LINEABOUT STRIKE A CHALK LINEABOUT EVERY 6 COURSES TO CHECK PARALLEL ALIGNMENT WITH EAVES.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHINGLE INSTALLATION DETAILS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text Self seal adhesive on back
AutoCAD SHX Text Nail guide line
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GAF ENHANCED NAILING PATTERN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GAF CEMENT LOCATIONS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
ROOF REPLACEMENT
AutoCAD SHX Text
HIKERS CABIN
AutoCAD SHX Text
JAFFERY, NEW HAMPSHIRE
AutoCAD SHX Text
MONADNOCK STATE PARK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HAND SEALING DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text NOTES: 1. STRIP AND DISPOSE ALL OF THE STRIP AND DISPOSE ALL OF THE ASPHALT SHINGLE ROOFING INCLUDING UNDERLAYMENTS AND ICE AND WATERSHIELD PROTECTION. 2. REPAIR EXISTING SHEATHING PER REPAIR EXISTING SHEATHING PER ALLOWANCES 3. INSTALL ICE AND WATERSHIELD INSTALL ICE AND WATERSHIELD LEAK BARRIERS. 4. INSTALL DRIP EDGE. INSTALL DRIP EDGE. 5. INSTALL ASPHALT SHINGLE ROOF INSTALL ASPHALT SHINGLE ROOF UNDERLAYMENT. 6. INSTALL ASPHALT SHINGLES. INSTALL ASPHALT SHINGLES. 7. REPOINT STONE MASONRY REPOINT STONE MASONRY CHIMNEY FROM THE FOUNDATION TO CHIMNEY CAP. 8. INSTALL ZINC COATED COPPER INSTALL ZINC COATED COPPER STEP FLASHING AT THE CHIMNEY. 9. REPLACE ALL LEAD COUNTER REPLACE ALL LEAD COUNTER CHIMNEY FLASHING. 10. REPLACE MISSING SHEETROCK IN REPLACE MISSING SHEETROCK IN THE INTERIOR OF THE BUILDING.
AutoCAD SHX Text
REPOINT INTERIOR OF CHIMNEY FROM FLOOR TO CEILING BEFORE INSULATING AND DRYWALL
REPOINT INTERIOR OF CHIMNEY FROM FLOOR TO CEILING BEFORE INSULATION AND DRYWALL.
8"
NAIL APPROXIMATELY 11
2"- 3"
(38 - 76MM) ABOVE THE BUTT
EDGE OF THE SHINGLE AND
APPROXIMATELY 1" - 2" (25 -
51MM) AND 10" - 12" (254 -
305MM) IN FROM OF EACH SIDE
OVERLAP EAVE EDGE STARTER
STRIP AT LEAST 3" (76MM)
FOR MAXIMUM WIND
RESISTANCE ALONG RAKES,
INSTALL GAF STARTER STRIP
SHINGLES AND CEMENT
SHINGLES TO UNDERLAYMENT
AND EACH OTHER IN A 4" (102
MM) WIDTH OF ASPHALT
PLASTIC CEMENT.
TM
TRIM 5" (127MM) FROM END OF FIRST
SHINGLE
START AT EITHER RAKE AND LAY IN EITHER DIRECTION
PLACE STARTER SHINGLE 14"
-3 4" (6 - 19MM) OVER EAVES
AND RAKE EDGES TO
PROVIDE DRIP EDGE.
5"
(127mm)
ALUMINUM DRIP EDGE "WHITE".
6" DECK FLANGE WITH 1-1/2"
FASCIA AND HEMMED 3/8" DRIP.
ALONG
RAKE, PUT
NON-CORROSIVE
METAL DRIP
EDGE
ON TOP OF
SHINGLE-MATE
ROOF DECK
PROTECTION.
SHINGLE-MATE
ROOF DECK
PROTECTION
R
ALONG EAVES, PUT
SHINGLE-MATE ROOF DECK
PROTECTION ON TOP OF
NON-CORROSIVE METAL
DRIP EDGE.
6' min.
(1.83M)
4" END LAP
(102MM)
2" SIDE LAP
(52MM)
R
R
BETWEEN END
LAPS
*USE ICE & WATERSHIELD, WEATHER WATCH ,
STORMGUARD OR OTHER GAF LEAK BARRIER
ON ENTIRE ROOF DECK AS REQUIRED
R
R
12"
36" (914mm)
(305mm)
Perforations
9" (229mm)
12" (305mm)
Sealant
9" (229 mm)
12" (305 mm)
1" (25 mm)
1" (25 mm)
11.5" (292 mm)
Nail
FOR COLD WEATHER APPLICATION
· IN COLD WEATHER, WARM TIMBERTEX® RIDGE CAP SHINGLES
BEFORE BENDING.
· WHEN SELF-SEALING MAY BE DELAYED DUE TO COLD
WEATHER, APPLY QUARTER-SIZED DABS OF ASPHALT
PLASTIC CEMENT (MUST CONFORM TO ASTM D4586 TYPE I OR
TYPE II) BETWEEN RIDGE CAP PIECES AND PRESS FIRMLY TO
INSURE GOOD CONTACT BETWEEN PIECES.
FOR MAXIMUM WIND SPEED COVERAGE UNDER LTD. WARRANTY
· APPLY A 1/4” (6 MM) WIDE BEAD OF HENKEL PL® URETHANE
SEALANT OR SONNEBORN® NP-1™ URETHANE SEALANT TO
EACH RIDGE CAP SHINGLE 3/4”-1” (19MM - 25MM) FROM THE
SHINGLE EDGE, SET PARALLEL TO THE RIDGE (SEE FIGURE 3).
NOTE: EXCESSIVE APPLICATION OF TAB ADHESIVE CAN CAUSE
BLISTERING OF RIDGE CAP SHINGLE.
AutoCAD SHX Text (203mm)
AutoCAD SHX Text
EXPOSURE
AutoCAD SHX Text
NAIL 9" (229MM) FROM BOTTOM AND 1" (25MM) FROM EDGE
AutoCAD SHX Text
SELF-SEAL ADHESIVE ON BACK
AutoCAD SHX Text
BOTTOM BACKER
AutoCAD SHX Text
STARTER COURSE
AutoCAD SHX Text
TOP STRIP
AutoCAD SHX Text
GAF SHINGLE-MATE UNDERLAYMENT OVER ICE & WATERSHIELD ENTIRE ROOF DECK
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
AutoCAD SHX Text
STATE OF NEW HAMPSHIRE
AutoCAD SHX Text
DEPARTMENT OF NATURAL AND CULTURAL RESOURCES
AutoCAD SHX Text
OF
AutoCAD SHX Text
AutoCAD SHX Text
EDWARD MUSSEY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AUG 29, 2025
AutoCAD SHX Text
PROJECT #
AutoCAD SHX Text
CAP-2505
AutoCAD SHX Text
ROOF REPLACEMENT
AutoCAD SHX Text NOTES: 1. STRIP AND DISPOSE STRIP AND DISPOSE ALL ASPHALT SHINGLE ROOFING AND DRIP EDGE. 2. INSTALL ICE & INSTALL ICE & WATERSHIELD ON ENTIRE ROOF DECK & ALONG EAVES, RAKES AND VALLEYS. 3. INSTALL DRIPEDGE. INSTALL DRIPEDGE. 4. INSTALL ASPHALT INSTALL ASPHALT SHINGLES. 5. PROVIDE INSTALLERS & PROVIDE INSTALLERS & SHINGLE MANUFACTURER WARRANTIES.
AutoCAD SHX Text NOTES: 1. LEAK BARRIER'S SHALL BE APPLIED IN FAIR LEAK BARRIER'S SHALL BE APPLIED IN FAIR WEATHER WHEN THE AIR, ROOF DECK, AND MEMBRANE ARE AT TEMPERATURES OF 40 F OR HIGHER. ROOF COVERING MATERIAL SHALL BE APPLIED AT TEMPERATURES OF 40 F OR HIGHER.
AutoCAD SHX Text
GAF TIMBERTEX RIDGE CAP 12" IN "WEATHERD WOOD"
AutoCAD SHX Text
COBRA SNOW COUNTRY ADVANCED RIDGE VENT 11.5" (292 MM)
AutoCAD SHX Text
GAF UHDZ SHINGLES IN "WEATHERED WOOD"
AutoCAD SHX Text
GAF SHINGLEMATE
AutoCAD SHX Text
ICE & WATERSHIELD ENTIRE ROOF DECK
AutoCAD SHX Text
EXISTING 5/8" PLYWOOD DECKING
AutoCAD SHX Text
EXISTING TRUSS
AutoCAD SHX Text NOTE: USE SUPPLIED 3" (76 MM) CORROSION RESISTANT RING SHANK NAILS INCLUDED WITH THE RIDGE VENT.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HIKERS CABIN
AutoCAD SHX Text
CAPITAL PROJECTS & MAINTENANCE
AutoCAD SHX Text
STEWARTSTOWN, NEW HAMPSHIRE
AutoCAD SHX Text
COLEMAN STATE PARK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TIMBERTEX INSTALLATION DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROSTART INSTALLATION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHINGLE-MATE INSTALLATION DETAIL 4:12 OR MORE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RIDGE VENT DETAIL (TYPICAL)
NOT TO SCALE
| Sheets and Views |
| CAP-2505 HIKERS CABIN ROOFING-SHEET 1 |
| CAP-2505 HIKERS CABIN ROOFING-SHEET 2 |
| CAP-2505 HIKERS CABIN ROOFING-SHEET 3 |
File details come from the government source that posted it. Updated .