This is a Price Schedule attachment for a USCG cutter and boat preservation contract at USCG Base Boston and Naval Station Newport. The schedule establishes unit pricing for labor, materials, and services required to perform preservation work on Coast Guard vessels in accordance with the associated Performance Work Statement. The contract is subject to Service Contract Act requirements.
The pricing schedule includes 23 line items organized into exterior and interior project categories. Exterior work encompasses touch-up preservation and overcoating services for freeboard/superstructure/mast, machinery, piping, weather deck non-skid coatings, flight deck, visual identification markings, and manlift operations, with quantities specified in square footage. Interior preservation tasks address bilges, cofferdams, forepeaks, bulkheads, overheads, and metal decks, also specified in square footage for both touch-up and overcoating applications. The schedule includes a travel expense line item with a not-to-exceed limit of $10,000 and actual expense categories for general labor, protective measures, ventilation, and consumables. Most line items show $0 extended pricing, indicating this is a template requiring contractor cost proposals for unit prices on the specified preservation tasks.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule B
| Item | Description | Unit | Unit Price | Estimated Quantity | Extended Price |
| 1 | Travel (Actual Expenses) | NTE | $ 10,000.00 | 1 | $ 10,000.00 |
| Exterior Projects | |||||
| 2 | Freeboard/Superstructure/Mast - "Touch-Up Preservation" (50 sqft) | EA | 1 | $ - 0 | |
| 3 | Freeboard/Superstructure/Mast - "Touch-Up Preservation" (200 sqft) | EA | 1 | $ - 0 | |
| 4 | Freeboard/Superstructure/Mast - "Overcoating" (100 sqft, continuous) | EA | 1 | $ - 0 | |
| 5 | Machinery - "Touch-Up Preservation" (50 sqft) | EA | 1 | $ - 0 | |
| 6 | Machinery - "Overcoating" (100 sqft, continuous) | EA | 1 | $ - 0 | |
| 7 | Piping - "Touch-Up Preservation" (50 sqft) | EA | 1 | $ - 0 | |
| 8 | Piping - "Overcoating" (100 sqft, continuous) | EA | 1 | $ - 0 | |
| 9 | Weather Deck Non-Skid (MIL-SPEC Coating) - "Touch-Up Preservation" (50 sqft) | EA | 1 | $ - 0 | |
| 10 | Weather Deck Non-Skid (MIL-SPEC Coating) - "Touch-Up Preservation" (200 sqft) | EA | 1 | $ - 0 | |
| 11 | Weather Deck Non-Skid (MIL-SPEC Coating) - "Overcoating" (100 sqft, continuous) | EA | 1 | $ - 0 | |
| 12 | Flight Deck - "Touch-Up Preservation" (50 sqft) | EA | 1 | $ - 0 | |
| 13 | Flight Deck - "Touch-Up Preservation" (200 sqft) | EA | 1 | $ - 0 | |
| 14 | Visual Identification or Safety Markings - "Overcoating" (50 sqft) | EA | 1 | $ - 0 | |
| 15 | Manlift | DY | 1 | $ - 0 | |
| Interior Projects | |||||
| 16 | Bilges, Cofferdams, and Forepeaks, Steel - "Touch-Up Preservation" (50 sqft) | EA | 1 | $ - 0 | |
| 17 | Bilges, Cofferdams, and Forepeaks, Steel - "Overcoating" (100 sqft) | EA | 1 | $ - 0 | |
| 18 | Interior Bulkheads and Overheads, Uninsulated Steel - "Touch-Up Preservation" (50 sqft) | EA | 1 | $ - 0 | |
| 19 | Interior Bulkheads and Overheads, Uninsulated Steel - "Overcoating" (100 sqft) | EA | 1 | $ - 0 | |
| 20 | Interior Metal Decks, No Deck Covering - "Touch-Up Preservation" (50 sqft) | EA | 1 | $ - 0 | |
| 21 | Interior Metal Decks, No Deck Covering - "Overcoating" (100 sqft) | EA | 1 | $ - 0 | |
| 22 | General Labor, Protective Measures & Ventilation (Actual Expenses) | HR | 40 | $ - 0 | |
| 23 | Consumables, Protective Measures (Actual Expenses) | JB | 1 | $ - 0 |