This is a Price Schedule template for dockside repairs to the USCGC KIMBALL (WMSL-418) during FY2026. The schedule itemizes 21 specific maintenance and repair tasks (D-001 through D-021) required during the vessel's dockside availability, including cleaning and inspection of voids, aviation fuel tanks, ballast tanks, and high purity water tanks; maintenance of the oily water separator system, cargo handling elevator, and incinerator; renewal of deck coverings and davits; biennial maintenance of folding boom cranes; fire prevention services; and provision of weather deck tenting. Each line item is priced as a job-based unit with a quantity of one.

The schedule also includes a composite labor rate (D-00A) of 2,760 hours at a to-be-determined hourly rate and a markup rate calculation (D-00B) based on estimated material costs of $400,000 and subcontractor costs of $893,915 per ordering period. Five laydays are included at a daily rate to be determined. All pricing fields are currently blank ($0.00), indicating this is a template awaiting contractor pricing proposals. The performance period for the dockside availability is 18 August through 11 November 2026, and the solicitation is issued by the Department of Homeland Security US Coast Guard.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC KIMBALL (WMSL-418) DOCKSIDE AVAILABILITY FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Voids (Accessible), Clean and InspectJOB1$0.00
D-002Tanks (Aviation Fuel Stowage and Overflow), Clean and InspectJOB1$0.00
D-003Tanks (Aviation Fuel Service), Clean and InspectJOB1$0.00
D-004Tanks, Partial Preserve (33%)JOB1$0.00
D-005Tanks (MP Fuel Storage and Overflow), Clean and InspectJOB1$0.00
D-006Tanks (Ballast), Clean and InspectJOB1$0.00
D-007Compressed Air Receivers, Clean, Inspect and TestJOB1$0.00
D-008High Purity Water Tank, Clean and InspectJOB1$0.00
D-009Cargo Handling Elevator, Annual Inspection and Test, PerformJOB1$0.00
D-010Oily Water Separator (OWS) System, Inspect and GroomJOB1$0.00
D-011Stern Boat Launch and Recovery, Level IIJOB1$0.00
D-012Side Boat Davit, RenewJOB1$0.00
D-013Incinerator, Inspect and TestJOB1$0.00
D-014Circuit Breakers (Draw Out), Inspect and TestJOB1$0.00
D-015Deck Covering (Polymeric), Repair and SealJOB1$0.00
D-016Deck Covering (Slip-Resistant) Hangars, RenewJOB1$0.00
D-017Folding Boom Cranes, Biennial Maintenance, PerformJOB1$0.00
D-018QAWTDBLD 52x66 (Mafo), ReplaceJOB1$0.00
D-019Deck Covering Pilot house & MK46 Equip roomJOB1$0.00
D-020Tenting (weather Decks), provideJOB1$0.00
D-021Fire Prevention, ProvideJOB1$0.00
D-00AComposite Labor RateHour2760$0.00
D-00BMark Up Rate (Based on an estimated $400K of material cost and $493,915 of subcontractor cost in each ordering period.) Calculation: (markup percentage x 893,915.00) + 893,915.00 = Extended total893,915JobVendor shall insert its proposed markup percentage rate in this block.$0.00
O-00ZLaydaysDay5$0.00
Total Price of Work Items D-001through D-021:$0.00
Total Price of D-00A + D-00B:$0.00
Grand Total Price:$0.00