Price Schedule Summary: Ft. Peck Recreation Area Mowing/Trimming

This is a price schedule for mowing and trimming services at Ft. Peck Recreation Area managed by the US Army Corps of Engineers. The contract covers a base year from May 1, 2026 through April 30, 2027, with four option years extending through April 30, 2031. The active performance period runs from May through November each year, while the inactive period from December through April requires no services. The schedule encompasses 19 tracts across the recreation area, with mowing/trimming frequencies ranging from three to six times annually per tract. Tracts requiring six services annually include the Interpretive Center, Downstream Campground, and Kiwanis Park, while those requiring three services include Boy Scout Park, Second Dredge North, Nelson Dredge, Rifle Range, Information Booth, and Wildlife Pasture.

Contractors must complete the price schedule by entering a bid cost per mowing/trimming for each tract, then calculating the total year cost by multiplying the bid cost by the number of services required. Annual totals must be calculated for each contract year (2026 through 2030). The schedule provides blank columns for "Bid Cost Per Mowing/Trimming" and "Total Year Cost" across all five contract years, with identical tract requirements and service frequencies for each year, allowing for consistent pricing throughout the contract period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

FT. PECK RECREATION AREA MOWING/TRIMMING

US ARMY CORPS OF ENGINEERS

Base Year: 01 May 2026 through 30 April 2027

• Active period of performance: 01 May 2026 through November 2026

• Inactive period of performance: 01 December 2026 through 30 April 2027

*Note: The Contractor is not required to perform any services during the inactive period of performance.

Please fill out each tract cost the total cost for the season (Number of Trimmings X Cost) and the sum total of the seasons mowing and trimming.

Tract Name Number of

Mowings/Trimmings Bid Cost Per

Mowing/Trimming Total Year Cost

Tract 1: I n t e r p r e t i v e C e n t e r 6 Tract 2: Downstream Campground 6 Tract 3: Kiwanis Park 6 Tract 4: Beaver Creek Nature Trail 5 Tract 5: Floodplain 5 Tract 6: 1st Dredge Swim Beach 5 Tract 7: Roundhouse Point 5 Tract 8: Boy Scout Park 3 Tract 9: Second Dredge North 3 Tract 10: Nelson Dredge 3 Tract 11: Flat Lake 4

Tract 12: Lewis & Clark Overlook 4

Tract 13: Rifle Range 3 Tract 14: Boomtown 5 Tract 15: Information Booth 3 Tract 16: Perch Point Recreation Area 4 Tract 17: West End Tent and Trailer 5 Tract 18: Duck Creek 4 Tract 19: Wildlife Pasture 3

2026 Total:

Option Year 1: 01 May 2027 through 30 April 2028

• Active period of performance: 01 May 2027 through November 2027

• Inactive period of performance: 01 December 2027 through 30 April 2028

Bid Cost Per

Mowing/Trimming Total Year Cost

Tract 1: I n t e r p r e t i v e C e n t e r 6 Tract 2: Downstream Campground 6 Tract 3: Kiwanis Park 6 Tract 4: Beaver Creek Nature Trail 5 Tract 5: Floodplain 5 Tract 6: 1st Dredge Swim Beach 5 Tract 7: Roundhouse Point 5 Tract 8: Boy Scout Park 3 Tract 9: Second Dredge North 3 Tract 10: Nelson Dredge 3 Tract 11: Flat Lake 4

Tract 12: Lewis & Clark Overlook 4

Tract 13: Rifle Range 3 Tract 14: Boomtown 5 Tract 15: Information Booth 3 Tract 16: Perch Point Recreation Area 4 Tract 17: West End Tent and Trailer 5 Tract 18: Duck Creek 4

2027 Total:

Option Year 2: 01 May 2028 through 30 April 2029

• Active period of performance: 01 May 2028 through November 2028

• Inactive period of performance: 01 December 2028 through 30 April 2029

Bid Cost Per Mowing/Trimming

Total Year Cost

Tract 1: I n t e r p r e t i v e C e n t e r 6 Tract 2: Downstream Campground 6 Tract 3: Kiwanis Park 6 Tract 4: Beaver Creek Nature Trail 5 Tract 5: Floodplain 5 Tract 6: 1st Dredge Swim Beach 5 Tract 7: Roundhouse Point 5 Tract 8: Boy Scout Park 3 Tract 9: Second Dredge North 3 Tract 10: Nelson Dredge 3 Tract 11: Flat Lake 4

Tract 12: Lewis & Clark Overlook 4

Tract 13: Rifle Range 3 Tract 14: Boomtown 5 Tract 15: Information Booth 3 Tract 16: Perch Point Recreation Area 4 Tract 17: West End Tent and Trailer 5 Tract 18: Duck Creek 4

2028 Total:

Option Year 3: 01 May 2029 through 30 April 2030

• Active period of performance: 01 May 2029 through November 2029

• Inactive period of performance: 01 December 2029 through 30 April 2030

Bid Cost Per

Mowing/Trimming Total Year Cost

Tract 1: I n t e r p r e t i v e C e n t e r 6 Tract 2: Downstream Campground 6 Tract 3: Kiwanis Park 6 Tract 4: Beaver Creek Nature Trail 5 Tract 5: Floodplain 5 Tract 6: 1st Dredge Swim Beach 5 Tract 7: Roundhouse Point 5 Tract 8: Boy Scout Park 3 Tract 9: Second Dredge North 3 Tract 10: Nelson Dredge 3 Tract 11: Flat Lake 4 Tract 12: Lewis & Clark Overlook 4 Tract 13: Rifle Range 3 Tract 14: Boomtown 5 Tract 15: Information Booth 3 Tract 16: Perch Point Recreation Area 4 Tract 17: West End Tent and Trailer 5 Tract 18: Duck Creek 4

2029 Total:

Option 4: 01 May 2030 through 30 April 2031

• Active period of performance: 01 May 2030 through November 2030

• Inactive period of performance: 01 December 2030 through 30 April 2031

Bid Cost Per Mowing/Trimming

Total Year Cost

Tract 1: I n t e r p r e t i v e C e n t e r 6 Tract 2: Downstream Campground 6 Tract 3: Kiwanis Park 6 Tract 4: Beaver Creek Nature Trail 5 Tract 5: Floodplain 5 Tract 6: 1st Dredge Swim Beach 5 Tract 7: Roundhouse Point 5 Tract 8: Boy Scout Park 3 Tract 9: Second Dredge North 3 Tract 10: Nelson Dredge 3 Tract 11: Flat Lake 4 Tract 12: Lewis & Clark Overlook 4 Tract 13: Rifle Range 3 Tract 14: Boomtown 5 Tract 15: Information Booth 3 Tract 16: Perch Point Recreation Area 4 Tract 17: West End Tent and Trailer 5 Tract 18: Duck Creek 4

2030 Total: