Attachment 1_Price Schedule CALHOUN (WMSL 418) DS FY26 FQ4.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- USCGC CALHOUN FQ4 FY26
- Solicitation number
- 70Z08526QLREP0015
About this file
This is a Price Schedule for dockside availability repairs to the USCGC CALHOUN (WMSL-418), a 418-foot National Security Cutter, for the fourth fiscal quarter of FY2026. The schedule outlines 22 definite line items and 2 option line items covering maintenance and repair work, including stern boat launch and recovery operations, talon grid inspection and testing, cargo handling elevator annual inspection, incinerator inspection, oily water separator system maintenance, fire detection system inspection, deck covering renewal on flight decks and hangars, tenting provision, aviation fuel tank cleaning and inspection, tank preservation services (both full and partial), grey water and sewage holding tank cleaning, MP fuel storage tank maintenance, oily waste tank inspection, general welding services, tank level indicator installation, temporary cutter services, and fire prevention services. The pricing schedule includes provisions for laydays calculated on a daily basis as an option item.
The document serves as a cost estimate breakdown template with labor rate factors applicable to various geographic locations (Baltimore, Biloxi, Boston, Charleston, Corpus Christi, Hampton Roads, Honolulu, Houston, Los Angeles, Miami, Narragansett Bay, New London, New Orleans, New York, Panama City, Philadelphia, Portland Maine, Portland Oregon, San Diego, San Francisco, Santa Barbara, North Carolina, Seattle, Tampa-St. Petersburg, and Wilmington). The pricing structure includes composite labor rates of $55 per hour with assumed G&A and profit factors of 15% and 10% respectively, and accounts for multiple labor categories including engineering technicians, machinists/pipe fitters, electricians, shipfitters, welders, firewatches, insulators/laggers, painters, general labor/helpers/riggers, and supervision/QA/NDT personnel, along with material and subcontracted costs.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: |
| USCGC CALHOUN (WMSL-418) DOCKSIDE AVAILABILITY FQ4 FY2026 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Stern Boat Launch and Recovery, Level II | JOB | |||
| D-002 | Talon Grid (Type 18-08), Inspect and Test | JOB | |||
| D-003 | Cargo Handling Elevator, Annual Inspection and Test, Perform | JOB | |||
| D-004 | Incinerator, Inspect and Test | JOB | |||
| D-005 | Oily Water Separator (OWS) System, Inspect and Groom | JOB | |||
| D-006 | Fire Detection System, Inspect and Test | JOB | |||
| D-007 | Deck Covering (Slip-Resistant) Flight Deck, Renew | JOB | |||
| D-008 | Deck Covering (Slip-Resistant) Hangars, Renew | JOB | |||
| D-009 | Deck Covering (Slip-Resistant), Renew | JOB | |||
| D-010 | Tenting, Provide | JOB | |||
| D-011 | Tanks (Aviation Fuel Service), Clean and Inspect | JOB | |||
| D-012 | Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect | JOB | |||
| O-013 | Tanks, Preserve Full (100%) | JOB | |||
| O-014 | Tanks, Partial Preserve | JOB | |||
| D-015 | Grey Water Holding Tank(s) and Lift Stations, Clean and Inspect | JOB | |||
| D-016 | Sewage Holding Tank(s), Clean and Inspect | JOB | |||
| D-017 | Tanks (MP Fuel Storage and Overflow), Clean and Inspect | JOB | |||
| D-018 | Tanks (Oily Waste), Clean and Inspect | JOB | |||
| O-019 | Welding, Provide (General) | JOB | |||
| D-020 | Tank Level Indicator (Gray Water Tanks), Install | JOB | |||
| D-021 | Temporary Services, Provide - Cutter | JOB | |||
| D-022 | Fire Prevention, Provide | JOB | |||
| O-00Z | Laydays | Day | 5 | ERROR:#VALUE! | |
| Total Price of Definite Items | ERROR:#VALUE! | ||||
| Total Price of Option Items | ERROR:#VALUE! | ||||
| Total Price of Definite and Optional Items | ERROR:#VALUE! |
(11/18/2025)_x000D_ Draft-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
(09/28/2009)_x000D_ Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .