This is a Price Schedule for dockside repairs and maintenance services for the USCGC CALHOUN (WMSL-418), a 418-foot National Security Cutter, during the fourth quarter of fiscal year 2026. The schedule itemizes 22 work items divided between definite deliverables (prefixed with "D-") and optional services (prefixed with "O-"), encompassing inspection, testing, renewal, cleaning, preservation, and installation tasks across multiple ship systems. Definite items include stern boat launch and recovery operations, talon grid inspection, cargo handling elevator annual inspection, incinerator testing, oily water separator maintenance, fire detection system inspection, slip-resistant deck covering renewal for flight deck and hangars, tenting provision, aviation fuel tank cleaning, grey water and sewage tank cleaning, MP fuel storage tank inspection, oily waste tank cleaning, sewage system modification, sewage piping cleaning, and fire prevention services. Optional items include full and partial tank preservation and general welding services. The schedule also includes a layday provision for five days at a daily rate.

The pricing template establishes a composite labor rate of $55 per hour with assumed general and administrative factor of 15 percent and profit factor of 10 percent. The cost estimate breakdown columns capture direct labor hours by trade classification (engineering technician, machinist/pipe fitter, electrician, shipfitter, welder, firewatch, insulator/lagger, painter, and general labor/helper/rigger), material and subcontract costs, and supervision/quality assurance/non-destructive testing charges. The template includes geographic labor rate adjustments applicable to multiple coastal locations, with Charleston, South Carolina identified as the performance location for this requirement. The schedule contains error flags indicating that total prices for definite items, optional items, and combined pricing have not yet been calculated, indicating this is a draft version dated November 18, 2025, requiring contractor completion and submission.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC CALHOUN (WMSL-418) DOCKSIDE AVAILABILITY FQ4 FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Stern Boat Launch and Recovery, Level IIJOB
D-002Talon Grid (Type 18-08), Inspect and TestJOB
D-003Cargo Handling Elevator, Annual Inspection and Test, PerformJOB
D-004Incinerator, Inspect and TestJOB
D-005Oily Water Separator (OWS) System, Inspect and GroomJOB
D-006Fire Detection System, Inspect and TestJOB
D-007Deck Covering (Slip-Resistant) Flight Deck, RenewJOB
D-008Deck Covering (Slip-Resistant) Hangars, RenewJOB
D-009Deck Covering (Slip-Resistant), RenewJOB
D-010Tenting, ProvideJOB
D-011Tanks (Aviation Fuel Service), Clean and InspectJOB
D-012Tanks (Aviation Fuel Stowage and Overflow), Clean and InspectJOB
O-013Tanks, Preserve Full (100%)JOB
O-014Tanks, Partial PreserveJOB
D-015Grey Water Holding Tank(s) and Lift Stations, Clean and InspectJOB
D-016Sewage Holding Tank(s), Clean and InspectJOB
D-017Tanks (MP Fuel Storage and Overflow), Clean and InspectJOB
D-018Tanks (Oily Waste), Clean and InspectJOB
O-019Welding, Provide (General)JOB
D-020Sewage System, ModifyJOB
D-021Sewage Piping, Clean and FlushJOB
D-022Fire Prevention, ProvideJOB
O-00ZLaydaysDay5ERROR:#VALUE!
Total Price of Definite ItemsERROR:#VALUE!
Total Price of Option ItemsERROR:#VALUE!
Total Price of Definite and Optional ItemsERROR:#VALUE!

(11/18/2025)_x000D_ Draft-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate