Attachment 1 - PERFORMANCE WORK STATEMENT.pdf
PDF 5 MB Posted
- Solicitation number
- FA441926Q0016
About this file
This Performance Work Statement (PWS) describes the removal and replacement of hydraulic test stand chiller water plumbing at Building 285, Altus Air Force Base, Oklahoma. The contractor must complete all work within two weeks of receipt, providing labor, materials, travel, equipment, and supervision for a complete project including demolition, installation, testing, and cleanup.
The scope requires removal of existing HDPE piping and installation of new Aquatherm (or equal) piping spanning approximately 200 feet between the chiller and test stand. The replacement piping must be 2 inches in diameter, reducing to 1¼ inches at the test stand, and capable of withstanding extreme temperatures from -5°F to 200°F. The system must deliver 35 GPM at 60 degrees and 45-70 PSI. The contractor shall reuse existing hangers where sufficient and install new insulation as required. All work must comply with manufacturer specifications, NEC, NFPA codes, UFC standards, and applicable local, state, federal, Air Force, and DoD codes. The contractor is responsible for field-verifying existing conditions before proposal submission, patching any damage to the building or utilities, providing detailed part records and warranty information, obtaining base security clearance, and removing all refuse. A standard commercial product warranty certificate must be provided specifying the warranty period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR THE REMOVAL AND REPLACEMENT OF HYDRAULIC TEST STAND
CHILLER WATER PLUMBING
a) SCOPE: The Contractor shall provide all labor, materials, travel, equipment and supervision necessary to perform all work required for the removal and cleanup of old HDPE plumbing, installation of new Aquatherm (or equal) piping and insulation, and testing of new plumbing for water chilling systems in Building 285’s
Hydraulic Shop.
1) PERIOD OF PERFORMANCE: Work must be performed within 2 weeks of receipt and work will be accomplished in building 285 Altus AFB, OK 73523.
2) DESCRIPTION OF WORK:
a) Existing HDPE piping, insulation, and piping support/hangers are referenced according to
Attachment A.
b) The distance between chiller and test stand is approximately 200 ft and must have both pressure and return piping.
c) Remove and dispose of existing HDPE piping from chiller to Test Stand.
d) Replace HDPE piping with Aquatherm (or equal) from chiller to reservoir tank and pumps, and from reservoir tank to hydraulic test stand and connect to existing check valves and shutoff valves with the following characteristics:
i) Piping needs to be 2” diameter and reduced to 1¼” at test stand.
ii) The test stand requires 35GPM at 60 degrees and 45-70PSI.
iii) Replacement piping must be able to withstand extreme temperatures (-5F to 200F)
e) Existing hangers, specialty items and equipment may be reused. Provide additional hangers only if existing hangers are insufficient to hold new piping.
f) Furnish and install insulation as required for new piping.
g) Clean and dispose of all refuse
h) Test piping for leaks and serviceability.
4) GENERAL:
a) All work shall be performed in accordance with the manufacturer's installation specifications and procedures for each type of work required. When work is not covered by specifications, said work shall be performed in accordance with the manufacturer’s
"written" specifications, installation instructions, performance procedures and (NEC)
National Electrical Code, (NFPA) National Fire Protection Association Fire Code, UFC 3
-550-03N and 3-55-03FA, (UFC) Unified Facility Criteria.
b) All work performed on this project shall meet all local, state, federal, Air Force and DoD codes.
c) The Government depends on the existing as-built drawings provided by previous
Contractors for accuracy. The Contractor is advised to field-verify all required information before providing a proposal.
d) The Contractor shall be required to accomplish various other small items of incidental work which may become necessary to complete the project in a satisfactory and workmanlike manner meeting the approval of the contracting officer or their designated representative.
The Contractor shall include all such items of work as part of their detailed estimate for the work to be performed.
e) The Contractor shall provide all labor, materials, travel, equipment and supervision necessary to perform all work required for this project.
f) Damage to the building, utilities or any other element during the execution of this project shall be repaired and restored to its original condition by the Contractor provided workers, skilled in trades involved, at no additional cost to Government.
5) SUBMITTALS: Contractor is responsible to provide detailed records of all parts installed and any and all warranty information to the customer.
6) WARRANTY: Contractor must provide the standard commercial product warranty certificate specifying warranty period.
7) SECURITY REQUIREMENTS: The contractors will comply at all times with base security requirements to include base pass requirements and personnel security clearance.
8) ATTACHMENTS:
a) In-house Hydraulic Test Stand Plans
K Place
156 179
18572
TBD
Shed
Shed
Equipment
Natural Gas Fac
Fir Dr
F Ave
7th St
B Ave
Ordnance Rd
L Ave
Burr Dr
6TH St
E Ave
Ordnance Rd
Dogwood Dr
J Ave
Cedar Ave
E Ave
Bur Dr
K Place
Falcon Rd
Access Rd
523A
TAXIW
AY B-2
TAXIW
AY B-1
TAXIWAY E1
TAXIWAY D
119139
389391
334 342
340338
332330
PROJECT LOCATION
SCALE: NTS
ALTUS AFB, OKLAHOMA
INSTALL NEW HYDRAULIC TEST STAND
B285 1074128
HOST BASE COORDINATION/SIGNATURES
DESIGNED
IN-HOUSE
ASBESTOS CONTAINING MATERIAL(ACM)
& LEAD BASED PAINT(LBP) STATEMENT
ACM/LBP MATERIALS WILL BE LEFT IN PLACE FOR THIS PROJECT.
ACM/LBP MATERIALS WILL BE REMOVED UNDER THIS PROJECT.
NO SUSPECTED ACM/LBP WAS FOUND DURING VISUAL INSPECTIONS.
THIS PROJECT WILL NOT DISTURB ANY ACM/LBP MATERIALS.
BASE ENVIRONMENTAL:
REVIEWED/SIGNED BY:
GENERAL NOTES:
1. ALL DIMENSIONS GIVEN FOR EXISTING CONSTRUCTION ARE TO BE
CONSIDERED APPROXIMATE AND SHALL BE FIELD VERIFIED.
2. VERIFIED DIMENSIONS SHALL APPEAR ON CONTRACTOR SHOP
DRAWINGS PRIOR TO BEING SUBMITTED FOR APPROVAL.
3. SHEET NOTES PERTAIN SPECIFICALLY TO THE SHEET THEY APPEAR ON
UNLESS NOTED OTHERWISE.
4. PATCH AND REPAIR ALL HOLES CREATED BY ABANDONED AND REMOVED
MECH. OR ELECT. PIPING, DUCTWORK AND/OR MATERIALS.
5. THE WORK SHALL PROVIDE A COMPLETE, FINISHED, OPERATING/
FUNCTIONING ASSEMBLY, OR APPARATUS READY FOR USE BY OTHER
CONTRACTORS TO WHICH CONNECTION OR USE IS REQUIRED, AND FOR
ACCEPTANCE BY GOVERNMENT.
6. EACH CONTRACTOR SHALL PROVIDE ALL NECESSARY INCIDENTALS AS
REQUIRED BY HIS WORK EVEN IF NOT SHOWN OR SPECIFICALLY
MENTIONED ON THE DRAWINGS OR IN THE SPECIFICATIONS,
INCLUDING SPECIFIC ITEMS REQUIRED BY CODE TO MAKE THE WORK
COMPLETE.
7. THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE PROJECT
PRIOR TO BID. HE SHALL VISIT THE SITE, CHECK & VERIFY ALL
CONDITIONS. STUDY ALL SHEETS OF DRAWINGS AND READ THE
PROJECT STATEMENT OF WORK.
8. ANY SURFACE FINISHES DAMAGED BY DEMOLITION OR NEW
CONSTRUCTION SHALL BE REPAIRED TO MATCH PRIOR CONDITION
UNLESS NOTED OTHERWISE.
9. ALL MATERIALS, EQUIPMENT, DEVICES & INSTALLATION THEREOF
SHALL CONFORM WITH THE FOLLOWING CODES, STANDARDS,
REGULATIONS AND EDITIONS: INTERNATIONAL BUILDING CODE (IBC)
NATIONAL FIRE PROTECTION ASSOC. VOLS 1-16 (NFPA)
INTERNATIONAL PLUMBING CODE (IPC) UNDERWRITERS LABORATORY
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PARTS OF HIS WORK
WHICH MAY BE SHOWN ON ANY SHEET OF THIS SET OR CONTAINED ON
ANY PAGE OF THE SPECIFICATIONS & SHALL EXECUTE ALL WORK IN
A PROFESSIONAL AND EXPEDIENT MANNER.
ANTI-TERRORISM OFFICE:
COMMUNICATIONS:
CHIEF OF PROJECT MANAGEMENT:
ENGINEERING FLIGHT CHIEF:
GROUND SAFETY:
CORROSION CONTROL:
FIRE DEPARTMENT:
CE OPERATIONS:
BASE CIVIL ENGINEER:
THIS FACILITY CONTAINS NO ACM/LBP MATERIAL.
PROJECT INSPECTOR:
PROJECT MANAGER:
AIRFIELD MANAGEMENT:
USING AGENCY:
CHECKED BY:
DRAFTER(S):
BIOENVIRONMENTAL ENGINEERING:
SHEET ID
G-001
DRAWING INDEX:
DWG. NO. DESCRIPTION
G-001 COVER
G-002 LEGEND
CD-101 DEMO - DRIVEWAY ACCESS PLAN
C-101 NEW - DRIVEWAY ACCESS PLAN
M-101 MECHANICAL PLAN
M-201 MECHANICAL PIPING - ELEVATION
M-202 MECHANICAL PIPING - ELEVATION
M-203 MECHANICAL PIPING - ELEVATION
M-204 MECHANICAL DETAILS
M-601 MECHANICAL - SCHEDULES AND DETAILS
M-602 MECHANICAL DETAIL
E-101 NEW - ELECTRICAL PLAN
E-601 ELECTRICAL - DIAGRAM
E-602 ELECTRICAL PANEL SCHEDULE
BASE/VICINITY MAP
SCALE: NTS
CONTRACTING
FIRE DEPARTMENT
SECURITY FORCES
FRONT
GATE
SOUTH
GATE
CONSTRUCTION
MANAGEMENT
STATUS: ISSUED FOR CONSTRUCTION
PLAN
NORTH
Attachment A - In-house Hydraulic Test Stand Plans
DESIGNED
IN-HOUSE
SHEET ID
1 2 43 5
D
C
B
A
G-002
LEGEND:
EXISTING
DEMO
NEW
HIDDEN
COLD WATER SUPPLY
GRASS
CONCRETE
EARTH
BALL VALVE
PUMP
REFERENCE SYMBOL
SHEET NUMBER WHERE
DETAIL, SECTION OR
ELEVATION IS SHOWN
DETAIL, SECTION
OR ELEVATION
IDENTIFICATION
NOTE: THIS SYMBOL ONLY APPLIES IF DETAILS,
SECTIONS ARE PLACED ON ANOTHER DRAWING SHEET
PLAN
NORTH
WHEN THE TRUE NORTH ARROW
IS ILLEGIBLE ASSUME THAT IT
IS THE SAME AS PLAN NORTH
TRUE
NORTH
ACRONYM:
PRV: PRESSURE REDUCING VALVE
BFP: BACKFLOW PREVENTER
TDH: TOTAL DISPLACEMENT HEAD
TEFC: TOTALLY ENCLOSED FAN-COOLED
EG: ELECTROGALVANIZED
TP: TRANSFER PUMP
CP: CIRCULATING PUMP
0 4' 8' 12' PLAN
NORTH
DESIGNED
IN-HOUSE
SHEET ID
1 2 43 5
D
C
B
A
M-101
MECHANICAL PLAN
A1
A1 M601
CP
TP
A1 M201
C1 M201
MECHANICAL ROOM
B2 M203
C3 M202
A1 M202
C1 M204
C1 M204
GENERAL NOTES:
1. CONTRACTOR TO VERIFY THE ACCURACY OF MEASUREMENTS.
2. RE-CIRCULATING PUMP,TRANSFER PUMP AND RESERVE TANK TO BE
MOUNTED ON EXISTING PAD IN MECHANICAL ROOM.
KEY NOTES:
2" TO 1 1/4" TRANSITION FITTING.1
RETURN LINE
SUPPLY LINE
RESERVE TANK 2" HDPE PIPING IN/OUT
HANGAR BAY
HYDRAULIC SYSTEM
CHILLER
C1 M202
2' 4'0 1'
DESIGNED
IN-HOUSE
SHEET ID
1 2 43 5
D
C
B
A
M-201
KEY NOTES:
CONTRACTOR SHALL LABEL THE PANEL AS T STAND.
CONTRACTOR SHALL LABEL THE DISCONNECT SWITCH AS CP.
CONTRACTOR SHALL LABEL THE DISCONNECT SWITCH AS TP.
PLAN
NORTH
SOUTH WEST EXTERIOR ELEVATION
C1
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ACCURACY OF MEASUREMENTS.
2. PIPES DISTANCE FROM WALL MAY VARY DEPENDING ON
EXISTING INFRASTRUCTURE.
3. HANGER RODS SHALL BE SET AT 5' APART.
NORTH EAST INTERIOR ELEVATION - MECHANICAL ROOM
A1
EXISTING ELECTRICAL PANELS
2" HDPE PIPING IN/OUT
A3 M204
HANGER ROD
A1 M204
1'-5"
2 3
TP
INLET FROM
CHILLER
OUTLET TO
CHILLER
0 2' 4' 6'1'
0 2' 4' 6'1'
2' 4'0 1'
DESIGNED
IN-HOUSE
SHEET ID
1 2 43 5
D
C
B
A
M-202
PLAN
NORTH
NORTH WEST INTERIOR ELEVATION
C3
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ACCURACY OF MEASUREMENTS.
2. CONTRACT SHALL PLACE PIPE HANGER EVERY 5'.
SOUTH WEST INTERIOR ELEVATION
A1
PANEL BOARD
METAL BEAM
EXISTING METAL SUPPORT
B4 M204
SOUTH WEST INTERIOR ELEVATION
C1
HANGER ROD
INLET FROM CHILLER
OUTLET TO CHILLER
CP
INLET FROM TEST STAND
OUTLET TO
TEST STAND
IN-HOUSE
SHEET ID
1 2 43 5
D
C
B
A
M-203
KEY NOTES:
PIPE SHALL TAPER FROM 2" PIPE TO 1-1/4".
PIPES SHALL PROTRUDE 2' FROM THE WALL.
PLAN
NORTH
NORTH EAST INTERIOR ELEVATION - TEST STAND ROOM
B2
GENERAL NOTES:
1. CONTRACTOR SHALL VERIFY ACCURACY OF MEASUREMENT.
HYDRAULIC TEST STAND
2" HDPE PIPING IN/OUT
C3 M204
HANGER ROD
SHEET ID
1 2 43 5
D
C
B
A
M-204
GENERAL NOTES:
1. INSTALL BOLLARDS ON SIDES, FRONT AND REAR OF EQUIPMENT
SUBJECT TO DAMAGE FROM VEHICULAR TRAFFIC. MAXIMUM SPACING
SHALL NOT EXCEED 8'-0" O.C. AND BE LOCATED 3'-0" FROM
EQUIPMENT UNLESS SHOWN OTHERWISE ON THE DRAWINGS.
2. NO EQUIPMENT (I.E. METERING EQUIPMENT) SHALL BE ATTACHED TO
BOLLARD.
3. REFER SCHEDULE FOR PIPE SIZES AND DETIALS.
SCALE:NTS
PIPE HANGER - CLEVIS TYPE
A1
SCALE:NTS
PIPE PENETRATION THROUGH EXTERIOR WALL
C1
SCALE:NTS
PIPE SUPPORT DETAIL
C1
WALL
SCALE:NTS
BOLLARD DETAIL
A3
6" DIA. STEEL STD. SCHEDULE 40
PIPE COATED WITH 2 COATS OF OSHA
"SAFETY YELLOW" OIL BASE
ENAMEL. CONCRETE FILLED.
FINISHED GRADE
EARTH
CONCRETE
1'-0"
4'-0"
2'-0" MIN.
PIPE SLEEVE
BACKUP MATERIAL
SEALANT
INSULATION
PIPE
ESCUTCHEON
INTERIOR SIDE OF
EXTERIOR WALL
3/8" 3/8"
HANGER ROD
LOCKING UNIT
SUPPORT NUT
HEAVY DUTY
CLEVIS HANGER
INSULATION
14 GAUGE SHIELD 18" LONG
TO PROTECT INSULATION
PIPE
INSULATION
PIPE
14 GAUGE SHIELD 18" LONG
SCALE:NTS
TEST TIME BYPASS DETAIL
C3
SCALE:NTS
PIPE SUPPORT
B4
CONCRETE
A4 M204
1 5/8"
1 5/8"
7/8"
3/8"3/8"
SCALE:NTS
PIPE SUPPORT DETIAL
A4
A4 M204
2"
1 1/4"
2"
1 1/4"
SCALE:NTS
TUBING CLAMP DETAIL
A5
A5 M204
PIPE
INSULATION
14 GAUGE SHIELD 18" LONG
SHEET ID
1 2 43 5
D
C
B
A
M-601
GENERAL NOTES:
1. CONTRACTOR SHALL VERIFY THE ACCURACY OF MEASUREMENT.
PLAN
NORTH
SCALE:NTS
CHILLER TANK
A4
TANK SCHEDULE
MANUFACTURER/
PART#
VOLUME
GALLONS
DIAMETER
DIA
LENGTH
TL
VENT
A
DRAIN
B
CENTER OF IN/OUT
DIMENSION
C
D E WEIGHT
ELBI/*CWT-200 200 30" 72" 1" 3/4" 14" 24" 3" FLANGE 513 LBS
AIR VENT
A
OUTLET
E
DIVIDER
PLATE
12' X 16"
MANWAY
FOR 42" DIA
& GREATER
B
DRAIN
DIA
TL
D
8"
CHILLER
TEST STAND
SCALE:NTS
CHILLER - ONE LINE DIAGRAM
B1
RESERVE TANK
PRESSURE
REDUCING
VALVE
BACKFLOW
PREVENTER
TYPICAL BALL VALVE
SCALE:NTS
PRV-BFP ASSEMBLY
A1
ACRONYM:
PRV: PRESSURE REDUCING VALVE
BFP: BACKFLOW PREVENTER
TDH: TOTAL DISPLACEMENT HEAD
TEFC: TOTALLY ENCLOSED FAN-COOLED
EG: ELECTROGALVANIZED
PUMP SCHEDULE
PUMP HP ENCLOSURE TDH (FT) VOLTAGE FLOW (GPM)
CIRCULATING PUMP (CP) 0.3 TEFC 15 230/460 50
TRANSFER PUMP (TP) 3 TEFC 100 230/460 50
TPCP
2" PIPE
C
C
10"
TYPICAL SDR 17 (250 PSI)
PIPE SIZE AVG. O.D NOM. ID
MIN.
THICKNESS
APPROX. DIA
APPROX.
WEIGHT
2" 2.375" 2.078" 0.14" 2.94" 0.66"
UNISTRUT/BRACKET SCHEDULE
MANUFACTURER/PART NO.
CONDUIT
SIZE
LENGTH
OUTSIDE
DIAMETER
GAUGE
THICKNESS
FINISH
PRODUCT
WEIGHT/PIECE (LBS)
UNISTRUT/P1117 2" 2.375" 12 EG 0.34
UNISTRUT/P1000 3" 20' 12 PG 1.89 LBS/FT
UNISTRUT/2038 2" EG 0.31
SHEET ID
1 2 43 5
D
C
B
A
M-602
PLAN
NORTH
SCALE:NTS
WATER PIPING COMPONENT
B1
WATER PIPING COMPONENT
ITEM DESCRIPTION ITEM DESCRIPTION
1 BYPASS VALVE PI GAUGE
2 ISOLATION VALVES FT WATER FLOW SWITCH
3 VIBRATION ELIMINATORS T1 EVAP WATER INLET TEMP SENSOR
4 EVAPORATOR HEAT EXCHANGER T2 EVAP WATER OUTLET TEMP SENSOR
5 WATER HEATERS
BRAZED PLATE DIFFERENTIAL PRESSURE GAUGE AND PIPING NOT SUPPLIED. MUST ACCOUNT
FOR WATER HEAD HEIGHT DIFFERENCE WHEN CALCULATION BRAZED PRESSURE DIFFERENTIAL.
6 VALVE FOR PRESSURE POINT B
7 STRAINER
8 WATER HEATER (SLANT 20-35T UNITS ONLY)
4 6
T1
PI
T2 FT
B
UNIT CUSTOMER PIPING