This is a Performance Work Statement (PWS) for grounds maintenance services at Homestead Air Reserve Base in Florida, dated 30 March 2026, with a base period from 23 May 2026 through 22 May 2027 and four one-year option periods extending through 22 May 2031.

The contractor shall provide comprehensive non-personal grounds maintenance services across approximately 1,190 acres of improved grounds (343 acres weekly mowing at 2-4 inches), 148 acres of semi-improved grounds (4-10 inches, twice monthly), and 699 acres of Bird Area Strike Hazard (BASH) airfield areas (7-14 inches height, twice monthly). Key service requirements include mowing, edging, trimming, weed control, leaf removal (15 times annually), pest control (25 times annually), irrigation system operation and maintenance (twice yearly maintenance, 72 hours annually), tree care and pruning (882 small trees, 28 medium trees, 24 large trees twice annually), emergency tree and stump removal across multiple size categories, landscaping maintenance of vegetative beds, and drainage ditch maintenance (4,000 linear feet weekly). The contractor must comply with all applicable Federal, State, and local environmental regulations, including wetlands protection, hazardous materials management, and pesticide application by certified personnel. Services are performed Monday through Friday, 7:00 a.m. to 5:00 p.m. EST, excluding federal holidays, with 30 calendar days allowed for initial phase-in before performance deficiency penalties apply. Quality assurance metrics establish performance thresholds ranging from "Excellent" (zero defects) to "Unsatisfactory" (more than five defects) based on customer complaints and periodic inspection validation. The Government provides approximately 1,500 square feet of indoor space and 1,000 square feet of exterior space at Building 813, but does not furnish utilities, telephone services, or materials. Contractor must obtain work clearance requests for excavation, maintain hazardous materials inventories with Safety Data Sheets, submit monthly pesticide application reports, and respond to emergency requests within two hours. All employees working on airfield grounds must obtain AF Form 483 (Certificate of Competency) and valid POV passes, with constant radio contact maintained near runways.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Homestead Grounds Maintenance PWS v5.0, 30 March 2026

GROUNDS MAINTENANCE

PERFORMANCE WORK STATEMENT (PWS)

30 March 2026

Prepared by

HOMESTEAD AIR RESERVE BASE

Para. TABLE OF CONTENTS pg.

1 Description Of Services 4

1.1 MAINTAIN IMPROVED GROUNDS 4

1.1.1 MOW 4

1.1.2 EDGE 5

1.1.3 TRIM 5

1.1.4 WEED CONTROL 5

1.1.5 MUNITIONS STORAGE AREA 5

1.1.6 IRRIGATION 5

1.1.6.1 OPERATION OF IRRIGATION SYSTEMS 6

1.1.6.2 MAINTENANCE OF IRRIGATION SYSTEMS 6

1.1.6.3 WINTERIZATION OF IRRIGATION SYSTEMS – RESERVED 6

1.1.7 REMOVE DEBRIS/POLICE GROUNDS 6

1.1.7.1 DEAD ANIMALS 6

1.1.8 LEAF REMOVAL 7

1.19 LAWN CONDITIONING 7

1.1.9.1 FERTILIZATION 7

1.1.9.2 AERATION 7

1.1.10 PEST CONTROL 7

1.1.11 LAWN RENOVATION 7

1.1.12 PRUNE SHRUB, HEDGES AND OTHER PLANTS 8

1.1.13 RESERVED 8

1.1.14 RESERVED 8

1.2 MAINTAIN SEMI-IMPROVED GROUNDS 8

1.2.1 MOW 8

1.2.2 TRIM 8

1.2.3 PERIMETER FENCE LINE 8

1.3 MAINTAIN BIRD AREA STRIKE HAZARD (BASH) 8

1.3.1 MOW 9

1.3.2 AIRFIELD LIGHT FIXTURES 9

1.3.3 HERBICIDES AND INSECTICIDES 9

1.3.4 AIRFIELD COORDINATION 9

1.3.5 FLIGHT-LINE DRIVERS 9

1.3.6 AIRFIELD TOWER COMMUNICATIONS 10

1.4 UN-IMPROVED GROUNDS 10

1.5 MAINTAIN VEGETATIVE BEDS, INERT BEDS, ROCK BEDS AND RELATED AREAS 10

1.6 MAINTAIN SURFACE DRAINAGE DITCHES 10

1.6.1 DRAINAGE CANALS 10

1.7 RESERVED 11

1.8 SPECIAL REQUIREMENTS 11

1.8.1 TREES 11

1.8.1.1 TREE CARE 11

1.8.1.2 TREE STANDARDS 11

1.8.1.3 EMERGENCY SPOT PRUNING/TRIMMING 12

1.8.1.4 TREE AND STUMP REMOVAL 12

1.8.1.5 EMERGENCY TREE AND STUMP REMOVAL 12

1.8.2 EMERGENCY AND SPECIAL EVENTS SERVICES 13

1.8.3 RESERVED 13

Para. TABLE OF CONTENTS pg.

1.8.4 SPECIAL CUTS 13

1.8.5 PLANTING TREES, SHRUBS, AND VEGETATIVE BEDS 13

2 SERVICE SUMMARY 13

2.1 QUALITY CONTROL 14

2.2 QUALITY ASSURANCE 14

3 GOVERNMENT FURNISHED PROPERTY AND SERVICES 15

3.1 FACILITIES 15

3.2 UTILITIES 15

3.3 MATERIALS 15

3.4 SECURITY, FIRE, AND MEDICAL SERVICES 15

3.5 TELEPHONE 15

3.6 SOLID WASTE COLLECTION AND DISPOSAL 15

4 GENERAL INFORMATION 16

4.1 MISSION 16

4.2 BACKGROUND 16

4.3 DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT, OR VEGETATION 16

4.4 ENVIRONMENTAL REQUIREMENTS 16

4.4.1 HAZARDOUS MATERIALS 17

4.4.2 SPILL CONTROLS 17

4.4.3 PESTICIDES 17

4.4.3.1 PESTICIDES STORAGE AND MIXING 17

4.4.3.2 MONTHLY REPORTS 18

4.4.4 HAZARDOUS MATERIALS INVENTORY 18

4.4.5 HAZARDOUS MATERIALS MANAGEMENT 18

4.4.6 ENVIRONMENTALLY RESTRICTED AREAS 18

4.4.7 FINAL REPORT 18

4.5 PERMITS, LICENSES AND CERTIFICATIONS 18

4.6 HOURS OF OPERATION 19

4.7 RECOGNIZED HOLIDAYS 19

4.7.1 BASE CLOSURES 19

4.8 SECURITY REQUIREMENTS 19

4.9 PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY 19

4.10 SPECIAL QUALIFICATIONS 20

4.11 INTERFACES 20

4.12 CONTRACTING OFFICER AND CONTRACTING OFFICER REPRESENTATIVE (QUALITY

ASSURANCE PERSONNEL)

4.13 WORK CLEARANCE REQUESTS 20

4.14 SAFETY REQUIREMENTS AND REPORTS 20

4.15 SCHEDULES 21

4.15.1 SCHEDULE CHANGES 21

5 APPENDIXES 22

1 DESCRIPTION OF SERVICES

The contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed at Homestead Air Reserve Base (ARB) in a manner that shall promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance.

Areas maps and workloads depicting the service described in this PWS are identified in the Appendices. The contractor’s performance shall be based on the Contracting Officer’s Representative (COR) and Contracting Officer’s (CO) evaluation of the results required by the Service Summary (SS) and not the method of performance. The evaluation of results will be based on COR surveillance, tenant satisfaction, and customer complaints. Final results of the evaluations will be the determining factor for the success or failure of this contract. The contractor shall comply with applicable Federal, Regional, State, and local laws and commercial standards.

The growing season at Homestead ARB is considered to be year round (365 days) 1 January – 31 December. All damage caused by the contractor or its employees to Government property and personal property (to include facilities, fences, equipment, trees and shrubs, etc.) due to contractor operations shall be repaired or replaced by the contractor within fifteen (15) calendar days after identification/notification at no additional cost to the Government. If a plant should die or become unhealthy due to damage, the contractor shall be responsible for replacing the damaged plant with a plant of same size and type. Plant replacement shall occur within fifteen (15) calendar days after identification or notification or as otherwise agreed to by the parties.

Fence lines identified shall be trimmed to prevent vegetation growth in the fence, including removal of vegetation growing up the links of the fence. All areas shall be trimmed concurrent with mowing. Application of nonselective herbicides to control grass, weeds and vegetation around obstacles to include fence lines, fire hydrants, light poles, etc. shall only be allowed with the COR approval.

Base Period: 23 May 2026–22 May 2027 Option Period 1: 23 May 2027–22 May 2028 Option Period 2: 23 May 2028–22 May 2029 Option Period 3: 23 May 2029–22 May 2030 Option Period 4: 23 May 2030–22 May 2031

1.1 MAINTAIN IMPROVED GROUNDS

Improved grounds are identified in Appendix A and B.

1.1.1 MOW

The contractor shall mow all improved grounds to look well-manicured, with a neat and professional appearance. Maintain grass height between two (2) and four (4) inches uniform in appearance, free of skips, gaps, rutting, or scalping. The contractor shall be required to pick up debris, natural and manmade, prior to mowing any area. The contractor shall remove or mulch grass clippings when visible after mowing, before leaving work area. Removed debris shall be disposed of IAW with the base’s solid waste management plan.

1.1.2 EDGE

The contractor shall edge sidewalks, driveways, street edges, curbs, and other hard surfaced areas located within the improved grounds so that grass height matches surrounding area grasses. Grass, vegetation and weeds shall be cut back no more than ½-inch from the surface edged, maintaining an even contour with the edged surface, uniform in appearance and free of scalping, rutting, and uneven or rough cutting.

1.1.3 TRIM

The contractor shall trim grass and weeds around trees, shrubs, buildings, fences, poles, fire hydrants, parking lots bumper blocks, boulders, and other fixed obstacles and temporary obstacles/objects on improved grounds. Trimming height shall match surrounding area grass height. All areas shall be trimmed concurrent with mowing. The contractor shall remove or mulch grass clippings when visible after trimming, before leaving work area.

1.1.4 WEED CONTROL

Control weeds in identify improved grounds through execution of a weed control program appropriate for the area to maintain a professional appearance. Restore grounds made barren where weeds are removed to the level of care of the surrounding area (i.e. semi-improved, improved, etc.). The contractor shall use only approved pesticides as stated in DoD Instruction 4150.07, DoD Pest Management Program, Encl 4 para 4.2.2 and AFI 32-1053, Pest Management Program, para 4.7.4 and 4.7.6. All pesticides, herbicides, and rodenticides are defined in DoD and Air Force documents. The contractor shall comply with current Federal, State, local, DoD, and Air Force regulations, plans, and policies. The contractor shall comply with all applicable parts of 29 Code of Federal Regulations (CFR) 1910, Labor, Occupational Safety and Health Standards, 29 CFR 1925, Labor, Safety and Health Standards for Federal Service Contracts, 40 CFR 150- 189, Protection of Environment, Pesticide Program, and 49 CFR 171, Transportation, General Information, Regulations, and Definitions. The contractor shall ensure that all workers have current state certification for the pest control services being performed. Civil Engineer Asset Management Flight must approve all herbicides prior to use. All herbicides and pesticides used must be on the installation-approved inventory list and applied by certified personnel.

1.1.5 MUNITION STORAGE AREA

The contractor shall maintain grass within five (5) feet from munition igloo/bunker/magazine vent stacks to improved grounds standard of two (2) to four (4) inches in height. Herbicide shall not applied to minimize ground erosion. Additionally, areas within fifty (50) feet of designated Potential Explosive Sites (PES) shall be maintained between two (2) and four (4) inches in height to minimize fire hazards. All adjacent concrete areas shall be trimmed and/or edged to maintain improved grounds standards.

1.1.6 IRRIGATION

The contractor shall maintain, adjust, and repair identified irrigation systems during the growing season.

1.1.6.1 OPERATION OF IRRIGATION SYSTEMS

The contractor shall irrigate improved grounds to maintain the health of the turf ensuring no ponding of water, excessive runoff, etc. This includes lawns, plants, flowers, landscaped areas, and all areas requiring manual watering (see Appendix A and B). Contractor shall position hoses, etc., for manual watering and then remove/store hoses, etc., between watering to ensure neat, clean appearance of areas. The contractor is prohibited from connecting to any hydrant within the boundaries of the installation without prior approval from CO/COR. Contractor shall practice water conservation measures whenever possible and shall position all watering systems to avoid overspray onto pavements, sidewalks, roadways, etc. Watering shall be performed during nighttime hours from sunset to sunrise. If daytime watering is necessary, contractor shall notify the CO and the COR of the reason for daytime watering, and the duration daytime watering will be in progress. Irrigation responsibilities also include setup, monitoring, adjusting, etc., of irrigation system computer, clocks/timers, controllers, pumps, etc. Contractor shall be responsible for day-to-day operation of the base-wide automated irrigation system.

1.1.6.2 MAINTENANCE OF IRRIGATION SYSTEMS

The contractor shall maintain irrigation systems at minimum twice a year. Maintenance includes but is not limited to draining and charging systems, replacing damaged or broken control devices and sprinkler heads, and repair of ruptured pipes. Maintain equipment and systems to be efficient and in good operational working order. Replacement of pumps, controllers, clocks/timers, or backflow prevention devices is not included in routine maintenance of irrigation systems.

Maintenance records will be kept and maintained by contractor; copy of maintenance records shall be provided to CO/COR at end of each calendar year. The irrigation system to be maintained and related workload data is identified in Appendix A and B.

1.1.6.3 WINTERIZATION OF IRRIGATION SYSTEMS – RESERVED

1.1.7 REMOVE DEBRIS/POLICE GROUNDS

The contractor shall perform general litter patrol in areas of improved grounds identified in Appendix A and B. Remove and dispose of natural debris, (tree limbs, dry brush, etc.), and man-made debris. Police areas to maintain a neat and professional appearance. Seasonal leaves are not part of this debris removal.

1.1.7.1 DEAD ANIMALS

All dead animals are to be collected for disposal. Prior to disposing, report number and type (bird, dog, cat, unrecognizable, etc.) to the COR, who will forward report to Pest Management and Natural Resources. Contractor shall contact pest management and public health within ten (10) business days after contract award to get instructions on the protocols for handling dead animals (e.g., PPE and local disease protections).

1.1.8 LEAF REMOVAL

The contractor shall mulch in place leaves in areas of improved grounds to maintain a neat and professional appearance. Leaf removal to be included natural debris (i.e. Tree limbs, dry brush, rodent habitats), and man-made debris. Leaf removal must be completed within two (2) workdays upon issue of the work task by the CO or COR. Leaves must be disposed IAW the base solid waste management plan.

1.1.9 LAWN CONDITIONING

1.1.9.1 FERTILIZATION

No Fertilizer shall be used on base grass due to proximity to Biscayne National Park and negative effects on its ecosystem.

1.1.9.2 AERATION

The contractor shall aerate lawns on improved grounds once per year during the month that best suited for the grounds and type of grass. Contractor shall notify CO/COR prior starting. Aeration shall be performed with a core aerator to remove soil plugs at a minimum of two (2) to four (4) inches deep and two (2) to three (3) inches apart. Plugs will be left on the lawn to disintegrate.

1.1.10 PEST CONTROL

The contractor shall provide all management, licenses, laboratory testing, tools, supplies, equipment, transportation and labor to develop and implement an Integrated Pest Management (IPM) plan in the areas covered by this Grounds Maintenance PWS in a manner that will ensure the health and general well-being of installation personnel. The following types of pests include;

ants, roaches, mice, bees and wasps are common on this installation and their abatement should be specifically addressed in the IPM plan and used to determine the workload. Pests found inside real property are not included in this contract. The contractor shall use only approved pesticides as stated in DoD Instruction 4150.07, DoD Pest Management Program, Encl 4 para 4.2.2 and AFI 32-1053, Pest Management Program, para 4.7.4 and 4.7.6. All pesticides, herbicides, and rodenticides are defined in DoD and Air Force documents. The contractor shall comply with current Federal, State, local, DoD, and Air Force regulations, plans, and policies. The contractor shall comply with all applicable parts of 29 Code of Federal Regulations (CFR) 1910, Labor, Occupational Safety and Health Standards, 29 CFR 1925, Labor, Safety and Health Standards for Federal Service Contracts, 40 CFR 150-189, Protection of Environment, Pesticide Program, and 49 CFR 171, Transportation, General Information, Regulations, and Definitions. The contractor shall ensure that all workers have current state certification for the pest control services being performed. Civil Engineer Asset Management Flight must approve all herbicides prior to use. All products used must be on the installation-approved inventory list and applied by certified personnel.

1.1.11 LAWN RENOVATION

The contractor shall renovate lawns in improved grounds as identified by the CO and the COR.

This work will be issued via a separate Work task. Renovate deteriorated lawn area to match surrounding areas.

1.1.12 PRUNE SHRUB, HEDGES AND OTHER PLANTS

The contractor shall prune/trim shrubs and other plants to maintain their natural growth characteristics to enhance the beauty and health of the plant. Hedges shall be maintained to their natural mature height and shape. Shrubs, plants, hedges, and ground cover/vines shall be pruned/trimmed three (3) inches away from buildings, fences, curbing, sidewalks, and other fixed obstacles. All ground cover and plants shall be kept within the bed borders. All plants around landscape and ground lights shall be pruned/trimmed to allow light usage for its intended purpose.

Shrubs and hedges located on street corners, curb easements, etc. shall be pruned/trimmed to keep from obstructing view of oncoming traffic. Areas beneath shrubs and hedges shall be kept free (clean) of all grass, weeds, vegetation, and debris.

1.1.13 RESERVED

1.1.14 RESERVED

1.2 MAINTAIN SEMI-IMPROVED GROUNDS

Semi-improved grounds are identified in Appendix A and B.

1.2.1 MOW

The contractor shall maintain grass height between four (4) and ten (10) inches in all semi-improved grounds areas. Maintain a uniform appearance in all areas. Where possible, maintain adjacent areas at or near the same grass heights.

1.2.2 TRIM

The contractor shall trim grass and weeds around trees, shrubs, buildings, fences, poles, fire hydrants, parking lots bumper blocks, boulders, and other fixed obstacles and temporary obstacles/objects on semi-improved grounds. Trimming height shall match surrounding area grass height. All areas shall be trimmed concurrent with mowing.

1.2.3 PERIMETER FENCE LINE

The contractor shall maintain a fifteen (15) foot strip on each side of the perimeter fence (thirty

(30) feet total) as Semi-Improved Grounds where applicable. The fence line is identify in Appendix A and B.

1.3 MAINTAIN BIRD AREA STRIKE HAZARD (BASH)

BASH are identified in Appendix A and B.

1.3.1 MOW

Grass, weeds and vegetation shall be maintained between seven (7) to fourteen (14) inches. The grass shall not be shorter than seven (7) inches in height to prevent dust and debris on the airfield and never be more than fourteen (14) inches in height to prevent bird habitation. The contractor shall begin mowing operations at the active Airfield surfaces and move to the outermost area. This causes insects and animals to move toward the inside of the field and away from the runway. The contractor shall be responsible for ensuring that all foreign objects and debris produced by grounds maintenance is cleared off all taxiways, and aircraft parking aprons before leaving the work area.

1.3.2 AIRFIELD LIGHT FIXTURES

The contractor shall maintain vegetative cover between four (4) to seven (7) inches within ten (10) feet surrounding all airfield navigation aids or visual air navigation facilities (e.g., instrument landing system, tactical air navigation, lighting, signage, etc.) regardless of each object’s location within the Aircraft Movement Area (DAFI91-212 paragraph 3.2.1.4.5), to include trimming around objects IAW Improved Grounds standards. Grass, vegetation, and weeds shall not extend over the edge of concrete, pads, taxiways, runways, and paved or asphalt areas.

1.3.3 HERBICIDES AND INSECTICIDES

The contractor shall follow the BASH plan to minimize seeds and flowers that attract insects/birds.

The CO/COR to review and approval the timing and frequency of herbicide/insecticide products.

The contractor shall use only approved products as stated in DoD Instruction 4150.07, DoD Pest Management Program, Encl 4 para 4.2.2 and AFI 32-1053, Pest Management Program, para 4.7.4 and 4.7.6. All pesticides, herbicides, and rodenticides are defined in DoD and Air Force documents. The contractor shall comply with current Federal, State, local, DoD, and Air Force regulations, plans, and policies. The contractor shall comply with all applicable parts of 29 Code of Federal Regulations (CFR) 1910, Labor, Occupational Safety and Health Standards, 29 CFR 1925, Labor, Safety and Health Standards for Federal Service Contracts, 40 CFR 150-189, Protection of Environment, Pesticide Program, and 49 CFR 171, Transportation, General Information, Regulations, and Definitions. The contractor shall ensure that all workers have current state certification for the pest control services being performed. Civil Engineer Asset Management Flight must approve all herbicides/insecticides prior to use.

1.3.4 AIRFIELD COORDINATION

The contractor shall coordinate all activities on the airfield by contacting Airfield Management POC and contact information will be provided at pre con after award. Work shall be accomplished only after Airfield Management has approved scheduled times.

1.3.5 FLIGHT-LINE DRIVERS

Training must be completed prior to operating vehicles or mowers on the flight line, POC and contact information will be provided at pre con after award. All employees working on airfield grounds shall be required to have an AF Form 483, Certificate of Competency (flight-line driver’s license) with them at all times. Vehicles must have a valid POV pass issued by Airfield Management prior to operating on the flight line. No equipment will be left unattended while working in these areas. The contractor shall be responsible for ensuring that all foreign objects and debris produced by grounds maintenance is cleared off of all taxiways, runways, and aircraft parking aprons before leaving the work area.

1.3.6 AIRFIELD TOWER COMMUNICATIONS

The contractor shall be radio-equipped by request and sign out radio-equipment from Airfield Operations to maintain constant two-way radio contact with the control tower and Airfield Management when operating near runways, overruns, and taxiways, POC and contact information will be provided at pre con after award. The contractor shall maintain contact with the control tower when operating on or within one hundred and fifty (150) feet of the runway. The contractor shall provide all communication equipment required for this contract. The Government will provide the transceiver frequency to the contractor. All equipment shall be VHF type with a minimum five-mile range and shall have private line capability. The contractor shall be responsible for any changes to radio types that the base makes in the course of this contract, i.e.

frequency changes. The contractor shall respond immediately to the directions of the Air Traffic Control tower personnel.

1.4 UN-IMPROVED GROUNDS

Un-improved grounds are identified in Appendix A and B. The contractor to mow grass and vegetation in un-improved grounds to prevent woody encroachment. The contractor shall mow un-improved grounds once per year to a height between ten (10) to fourteen (14) inches.

1.5 MAINTAIN VEGETATIVE BEDS, INERT BEDS, ROCK BEDS AND RELATED AREAS

The contractor shall maintain vegetative beds, inert beds, rock beds, and related areas as identified in Appendix A and B to present a neat and professional appearance. Maintenance activities may include but are not limited to fertilizing, watering, weeding, mulching, and repairing or replacing of damaged plants and shrubs. When replacing plants, shrubs, and performing repairs, conform to good Xeriscaping practices for the area. Mulch will be placed as needed as determined by

CO/COR.

1.6 MAINTAIN SURFACE DRAINAGE DITCHES

The contractor shall maintain surface drainage ditches to be free of shrubs, trees, and trash to prevent erosion and ensure continuous flow of water. Drainage ditches to be maintained are identified in Appendix A and B.

1.6.1 DRAINAGE CANALS

Drainage canals (fifteen (15) feet on both sides) and ditches shall be maintained at the same height of surrounding vegetation. Cut must be consistent with the drainage scheme and free flow of water. Care shall be taken to keep all cut vegetation, soil and sediment out of canals. Minimal soil disturbance is allowed in the wetlands areas. Wetlands equipment to be used shall not exceed ground pressure of approximately two (2) psi. This equipment shall be fully amphibious capable to allow access to swamps, marshes and wetland terrain inaccessible by other equipment. Areas where vegetation (ex: cattails, etc.) is growing in canals shall be cut at water level. Contractor may maintain vegetation by using herbicide. Those that are growing in front of culverts shall be removed with its root system. Care shall be taken to minimize disturbing sediment while removing vegetation from canals. No dredging of canals is authorized. Canals containing water shall be cut four (4) to six (6) inches above the water line. Canals that are dry (no water) shall be cut at a height of no higher than three (3) inches.

1.7 RESERVED

1.8 SPECIAL REQUIREMENTS

All work under this section shall be executed via a work task by the CO or/and COR (except for whereas, referring to, “the contractor shall identify ……”). The contractor shall be responsible for removing all debris generated from all trees related operations. All non-emergency work tasks shall be completed within five (5) workdays from the work task date unless noted otherwise within subsections.

1.8.1 TREES

The contractor shall identify trees that pose public safety hazards or threats to structures/buildings.

These hazards include minimum safety clearances, which are: fourteen (14) feet over streets, twelve (12) feet over driveways, eight (8) feet over walk areas, four (4) feet over buildings, and five (5) feet from buildings.

Topping and de-horning are not permitted. Trimming or pruning of trees touching or hanging over energized utility poles or power lines is the responsibility of the contractor. Minimum clearance from primary lines (over 600 volts) shall be eight (8) feet. Minimum clearance from secondary lines (under 600 volts, i.e. electric service drops, telephone, and cable TV) shall be four (4) feet.

Miami Dade County’s tree care regulations shall be followed.

1.8.1.1 TREE CARE

The contractor shall brace, cable, guy (to keep tree vertical), and deep water all damaged trees after identification. The contractor shall remove all guy wires, cables, straps, and stakes when the trees remain vertical (normally, after one growing season). The contractor shall adjust wires, cables, and straps as required, to prevent girdling.

1.8.1.2 TREE STANDARDS

The contractor shall perform all tree work IAW contract specifications and the following tree care standards, latest addition, unless otherwise directed by the CO.

• ANSI A300 - Standard Practices for Tree Care Operations including referenced Combined

Federal Regulations (Utility Pruning and Emergency Service Restoration)

• ANSI A300 (Part 1) – Tree Pruning

• ANSI A300 (Part 3) – Tree Support Systems (Cabling, Bracing, and Guying)

• ANSI Z60.1 – American Standards for Nursery Stock

• ANSI Z133.1 – Safety Requirements for Tree Care Operations

1.8.1.3 EMERGENCY SPOT PRUNING/TRIMMING

The contractor shall complete an emergency spot pruning/trimming within one (1) workday from the work task date. Typically, emergency spot pruning/trimming includes removal of dead and/or broken limbs or removal of limbs for required clearances.

1.8.1.4 TREE AND STUMP REMOVAL

The contractor shall perform stump and perimeter roots removal by completely removing, by cutting and grinding all growth to a minimum of eight (8) inches below grade. Stumps shall be ground within five (5) workdays after approval of dig permit. Stump-grinding debris shall be removed the same day grinding is performed. The contractor shall backfill with topsoil, and lay sod to match the existing ground grade and the type of grass. The contractor shall maintain the patch area IAW manufacturer’s recommendation until the grass has become established.

Trees identified for removal shall be considered within the following categories, Large, Medium, Small and Sapling, as based on their diameter. The diameter of the tree shall be determined by measuring 4.5 feet above the ground. Trees with multiple trunks shall be measured as follows: All trunk diameters shall be measured. The largest trunk diameter shall be recorded. Each remaining trunk diameter shall be halved. All values will then be added together to obtain the final tree diameter.

• Large Trees: Diameter thirty-six (36) inches and above, remove within ten (10) workdays from the work task date. [Due to the complexity and difficulty of removing large trees, the bid schedule shall have large trees on a proposal basis and not a firm fixed cost.]

• Medium Trees: Diameter twenty-four (24) to less than thirty-six (36) inches, remove within ten (10) workdays from the work task date.

• Small Trees: Diameter three (3) to less than twenty-four (24) inches, remove within five

(5) workdays from the work task date.

• Extra Small Trees: Diameter three (3) inches and smaller, remove within two (2) workdays from the work task date.

1.8.1.5 EMERGENCY TREE AND STUMP REMOVAL.

The following timeframe shall be apply for emergency tree and stump removal by the contractor:

• Large Trees: Remove within two (2) workdays from the work task date

• Medium Trees: Remove within two (2) workdays from the work task date

• Small Trees: Remove within one (1) workday from the work task date

1.8.2 EMERGENCY AND SPECIAL EVENTS SERVICES

Upon notification of an emergency, the contract manager shall respond within one (1) hour to meet with the CO or COR and Government evaluator and initiate emergency services. Upon receiving direction by the CO or COR, contractor personnel shall begin emergency work within two (2) hours. Oral work tasks for emergency services to minimize damages or mitigate hazardous conditions shall be confirmed with written work tasks.

1.8.3 RESERVED

1.8.4 SPECIAL CUTS.

The contractor shall upon notification by the CO and/or COR through the issuance of a work task, perform special cuts. Provide unit pricing for Special Cuts as shown in Appendix A.

1.8.5 PLANTING TREES, SHRUBS, AND VEGETATIVE BEDS.

The contractor shall upon notification by the CO and the COR through the issuance of work tasks to perform planting of trees, shrubs, and vegetative beds to include but not limited to: removal and disposal of trees, shrubs, or vegetative beds being replaced; and performance of maintenance after planting to include watering, pruning, and insect and disease prevention to promote survivability.

Provide unit pricing for planting trees, shrubs, and vegetative beds as shown in Appendix A.

2. SERVICE SUMMARY

The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The Services Summary (SS) and the contractor’s Quality Control Plan provide information on contract requirements, the expected level of contractor performance and the expected method of Government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the RFO 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/ Acceptance, shall be used to remedy all deficiencies. During the first initial 30 calendar days of the contract, two (2) additional errors on each work shall be allowed in an effort to identify normal phase-in problems.

Performance Objective

(PO)

PWS

Section Performance Threshold Method of Surveillance

PO-1 - Maintain Improved Grounds 1.1

Excellent: 0 defects Customer Complaint:

100% Inspection:

Periodic Validation

Very Good: 1 defect Satisfactory : 4 defects Marginal: 5 defects Unsatisfactory: More than 5 defects

PO-2 - Maintain Semi- Improved Grounds 1.2 Excellent: 0 defects Customer Complaint:

100% Very Good: 1 defect

Performance Objective

(PO)

PWS

Section Performance Threshold Method of Surveillance

Satisfactory : 4 defects Inspection:

Periodic Validation Marginal: 5 defects

Unsatisfactory: More than 5 defects

PO-3 - Maintain BASH 1.3

Excellent: 0 defects Customer Complaint:

100% Inspection:

Periodic

Very Good: 1 defect Satisfactory : 4 defects Marginal: 5 defects Unsatisfactory: More than 5 defects

PO - 4 Maintain Unimproved Grounds 1.4 Satisfactory : 1 defect 100%

Inspection

PO-5 - Maintain Vegetative Beds, Inert Beds and related Areas

1.5

Excellent: 0 defects

100% Inspection

Very Good: 1 defect Satisfactory : 4 defects Marginal: 5 defects Unsatisfactory: More than 5 defects

2.1 QUALITY CONTROL

The contractor shall provide a written description of the quality control system to include identification of the commercial practices and procedures to be used, such as those of the Professional Grounds Management Society (PGMS), Tree Care Industry Association, American Society of Landscape Architects, the American National Standards Institute (ANSI), and local Extension Offices of the Federal Cooperative Extension Service. Include the inspection system requirements of FAR 52.246-4 in this document. The contractor shall develop and implement procedures to identify, prevent, and ensure non-performance and continual repeat of defective service does not occur. A written Quality Control Plan shall be submitted to the CO for review and feedback. The plan shall be submitted no later than the pre-performance conference. The plan shall specifically address the contractor’s strategy to provide quality workmanship, continual process improvement and for correcting deficiencies as required.

2.2 QUALITY ASSURANCE

The Government will inspect and evaluate the contractor’s performance to ensure services are received IAW requirements set forth in this contract. The CO or COR shall inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS. The CO or COR shall use the contractor’s work schedule or modified version thereof, to record validation results. Results of the validation then become the official Air Force record of the contractor’s performance. When a performance threshold has not been met or contractor performance has not been accomplished, the COR shall initiate and provide the CO a Contract Discrepancy Report (CDR) DD Form 2772 for issuance to the contractor. The contractor shall respond to the CDR IAW instructions provided and return it to the CO within one (1) calendar day of receipt.

3 GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1 FACILITIES

The Government will provide the facilities identified below for contractor use in support of the requirements of this contract. The facilities are provided “as is.” Obtain CO approval in advance of making any changes to the facilities. Such changes shall be at no cost to the Government unless otherwise approved by the CO. The contractor shall ensure facilities are maintained in a neat, clean and professional manner. The CO reserves the right to reallocate and relocate assigned facilities during the term of the Contract. Upon completion or termination of this Contract, or upon such reallocations or relocations, return facilities to the Government in the same condition as received, fair wear and tear and approved modifications.

Approximately 1500 square feet of indoor floor space and 1000 square feet of exterior space is provided at Bldg. 813.

3.2 UTILITIES

The Government will not furnish electricity, water, and sewage as necessary for accomplishment of work IAW this contract. All facilities do not receive the same utility services. The contractor shall not change or modify any utility system or component; or connect any contractor property, equipment or system without prior CO review and approval. The contractor shall practice energy conservation in the Government provided facilities.

3.3 MATERIALS

None

3.4 SECURITY, FIRE, AND MEDICAL SERVICES

The Government will provide police and fire protection. In the event of a medical emergency, base ambulance service for transporting an injured employee to a local hospital is available on a cost reimbursement basis, POC and contact information will be provided at pre con after award.

2.5 TELEPHONE

The Government will not provide telephone line(s) in the Government provided facility for contractor use in making local commercial calls and on base calls in support of contract requirements. Long distance calls and toll calls are not authorized on Government phones.

3.6 SOLID WASTE COLLECTION AND DISPOSAL

The contractor shall use existing bulk containers to dispose of trash or solid waste generated from accomplishment of services detailed in this PWS (except for the work describes in section 1.8 Special Requirements). The contractor shall adhere to all base level recycling programs to include disposal of yard/tree waste in specified dumpster collection stations or at the recycling collection center on base. The CO or COR shall identify these specific dumpsters for yard/tree waste.

4 GENERAL INFORMATION

4.1 MISSION

The overall Civil Engineer mission at Homestead ARB is to plan, maintain, operate, and protect the infrastructure, facilities, and environment for assigned airmen, families, and civilian employees.

4.2 BACKGROUND

HARB is in the Southern Florida Coastal Plain ecoregion, which covers an area of approximately 22,407 square kilometers (km2) (8,651 square miles [mi2]) across the lower portion of the Florida peninsula, from Lake Okeechobee south to the Florida Keys. It consists of flat plains with wet soils, marshland and swamp land cover with everglades and palmetto prairie vegetation types. Due to this region specialized marsh and wetland grounds maintenance equipment is required.

The environment of this ecoregion is generally nutrient-poor, particularly in the Everglades, which has historically been subject to runoff from urban and agricultural sources, leading to changes in habitat health and diversity. Surface water levels and sheet flow in the Everglades are sensitive to differences in topography. The ecoregion is large and features a flat terrain, with changes of only a few centimeters in elevation; this can have significant impacts on types of plant and animal communities present.

4.3 DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT, OR VEGETATION

Damages to Government buildings, equipment, or vegetation are addressed in clause 52.237-2 – “Protection of Government Buildings, Equipment, and Vegetation.”

4.4 ENVIRONMENTAL REQUIREMENTS

In addition to all applicable Federal, State and local environmental codes and regulations, the following specific guidance is provided:

Currently, the USACE regulates wetlands under Section 404 of the Federal Water Pollution Control Act Amendments of 1972 to the CWA. Jurisdictional wetlands are defined by the USACE as “…those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and other areas.” (USACE, 1987).

Natural resource management practices on HARB are designed to meet regulatory requirements and foster sound stewardship of natural resources within the constraints of military mission requirements and BASH and other safety concerns. The primary environmental management issues on HARB include:

• Protecting and maintaining wetland functions

• Restoring pine rockland habitat without using fire

• Controlling/eradicating invasive/exotic species

• Managing water quality

• Maintaining and enhancing natural habitat values and ecosystem functions

4.4.1 HAZARDOUS MATERIALS

The CO shall approve all hazardous materials after approval from CEV (Civil Engineer Environmental office) brought on-site by the contractor prior to use. The contractor shall obtain approval using the application requirements of the Chemical Hazardous Material Request Authorization Form (AF3952). Once the process is implemented and contractor is trained, the contractor may submit the AF3952 electronically. The CO with recommendation of CEV has the right to prohibit the use of hazardous materials it deems to be especially hazardous to human health and environment. In the event the CO with recommendation of CEV does not approve a hazardous material for use, the CO with recommendation of CEV may provide the contractor a list of suitable substitutes; however, the contractor shall retain responsibility for finding an acceptable substitute.

The contractor shall take appropriate actions to comply with waste minimization and pollution prevention practices and policies.

4.4.2 SPILL CONTROLS

The contractor shall maintain spill control material on hand at all times sufficient to contain a worse case spill, both volume and hazard level.

4.4.3 PESTICIDES

All pesticides must be approved prior to use by the Command Entomologist if not on base approved list (Submit list with intended uses via the CO). The contractor shall provide an inventory of hazardous materials with the applicable Safety Data Sheet (SDS) that shall be used to perform the required services. In addition, use reasonable care to avoid releasing hazardous material or hazardous waste, which may cause environmental damage to Government structures, public land, water, or other natural resources. If the contractor’s failure to use reasonable care causes damage to any of this property, the contractor shall replace or repair the damage at no expense to the Government as the CO directs. If the contractor fails or refuses to make such repair or replacement, the contractor shall be liable for the cost, which may be deducted from the contract price.

4.4.3.1 PESTICIDE STORAGE AND MIXING

Perform pesticide storage and mixing operations off base. No cleaning of pesticide/herbicide application equipment is to be done on base.

4.4.3.2 MONTHLY REPORTS

The contractor shall submit a report to the COR within ten (10) workdays following each month listing all pesticide applications made. Include pesticide name, use concentration, amount applied, date, and detailed location of use. A DD Form 1532 shall be provided on request to facilitate record keeping.

The contractor is subject to inspection by DOD certified applicators/inspectors as well as State Department of Agriculture Pesticides Division or equivalent agency.

4.4.4 HAZARDOUS MATERIALS INVENTORY

The contractor shall maintain an up-to-date hazardous material inventory with copies of SDS(s) for all materials used on the job site. The contractor shall maintain a complete copy of all approved SDS and AF3952s.

4.4.5 HAZARDOUS MATERIALS MANAGEMENT

The contractor shall remove all hazardous materials by the end of each workday. Contractor shall not conduct process treatments (e.g. paint thinner solvent recycling) on base.

4.4.6 ENVIRONMENTALLY RESTRICTED AREAS.

OU-15 (Bldg. 153) restricted area is identified in the aerial photographs contained in Appendix B. These areas will be permanently flagged for contractor’s reference during performance of contract. Mowing frequency in these areas shall not be greater than once every four (4) weeks or as indicated by the CO and COR.

4.4.7 FINAL REPORT

The contractor shall submit a final inventory, not later than ten (10) workdays following termination/completion of this contract, of all hazardous materials used since the last hazardous usage report to the CO or COR. The final inventory shall list all hazardous materials used, total amount of each used, and a description of the disposition of any remaining hazardous material.

4.5 PERMITS, LICENSES AND CERTIFICATIONS

Unless otherwise specified in this contract, obtain necessary permits, licenses, and certifications;

give all required notices; and comply with applicable Federal, State, County, and local laws, codes, and regulations in performance of the requirements of this contract. Maintain records of such requirements and make the documentation available to the Government for review. All pesticide application shall be made by State or Host Nation certified applicator as prescribed in DoDI 4150.07.

4.6 HOURS OF OPERATION

Perform grounds maintenance services during normal duty hours which are 7:00 am EST to 5pm EST, Mondays through Fridays, excluding federal holidays, unless otherwise required in the contract or approved by the CO. There may be situations that require the contractor to work at times other than normal working hours. When the contractor’s work schedule conflicts with an Air Force mission requirement, advise the CO and reschedule the work to minimize disruption.

4.7 RECOGNIZED HOLIDAYS.

The following federal holidays shall be observed by the contractor except where Service Contract Act specifies differently:

• New Year’s Day - 1 January

• Martin Luther King Day - 3rd Monday in January

• Washington’s Birthday - 3rd Monday in February

• Memorial Day - last Monday in May

• Juneteenth – 19 June

• Independence Day - 4 July

• Labor Day - 1st Monday in September

• Columbus Day - 2nd Monday in October

• Veteran’s Day - 11 November

• Thanksgiving Day - 4th Thursday in November

• Christmas Day - 25 December

If these holidays fall on Saturday, the preceding Friday shall be observed. If these holidays fall on Sunday, the following Monday shall be observed. If a holiday falls on a scheduled service day, the contractor shall be responsible for rescheduling services for the first day post the holiday observance.

4.7.1 BASE CLOSURES

Work scheduled but not accomplished because of base closure due to weather, exercises, or actual alert, shall be accomplished as soon as possible after reopening the base.

4.8 SECURITY REQUIREMENTS

The contractor shall comply with Homestead Air Reserve Base Security Regulations. These regulations are available for review in the Contracting Office. Security and base access requirements are contained in clause 5352.242-9000 “Contractor Access to Air Force Installations.” Contractor employees shall be required to obtain and display identification badges.

Anticipate delays in getting commercial vehicles on base and allow time for commercial vehicles to reach their destination by driving designated routes at posted speed limits throughout the base.

Procedures for commercial vehicle access to the base are subject to change without prior notice.

4.9 PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY

In the event of crisis or heightened security caused by a national emergency, natural disaster, or other causes, continue performance as necessary in support of the Air Force mission. IAW DoDI 3020.37, Continuation of Essential Contract Services During Crisis, and the Air Force implementation thereof, unless otherwise directed by an authorized Government representative, it is determined that the following Grounds Maintenance Service requirements are essential to be performed during a crisis: maintenance of improved, semi-improved and unimproved grounds to include removal of trees and other vegetation subsequent to a major tropical storm or hurricane.

The contract price and delivery schedule may be adjusted to reflect any change of work that may be directed.

4.10 SPECIAL QUALIFICATIONS

The contractor shall provide the name and telephone number of the contractor’s on-site contract manager and alternate responsible for all requirements in the PWS. The contractor’s on-site manager must be able to speak and write in the English language. Provide telephone numbers of contractor manager and alternate(s) for after duty hours. The contract manager and alternate(s) must be able to read, write, speak and understand English, or an interpreter must be provided to work alongside the contract manager or alternate(s) at no additional cost to the Government.

4.11 INTERFACES

Do not unduly interfere with regularly scheduled Government operational activities in the performance of contract requirements. In the event a Government supervisor so requests, temporarily cease work in the area and report the instructions, to include name of the Government person involved, to the CO immediately by the most expedient means. Notify the CO verbally of disputes with customers or other base contractors and follow-up in writing.

4.12 CONTRACTING OFFICER AND CONTRACTING OFFICER REPRESENTATIVE (QUALITY

ASSURANCE PERSONNEL)

The CO will appoint a primary and alternate representative for management of the day-to-day activities of the contract. The identity, title, and authority of this representative will be provided in writing to the contractor after contact award.

4.13 WORK CLEARANCE REQUESTS

The contractor shall obtain an approved Work Clearance Request for all work which involves excavation including minor digging. Digging permits are available from Base Civil Engineer Department.

4.14 SAFETY REQUIREMENTS AND REPORTS

The contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements. Provide a verbal report to the CO as soon as possible of each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of required Accident Investigation Reports to the CO within five (5) calendar days of each occurrence.

4.15 SCHEDULES

The contractor shall submit a schedule for all services described in this PWS and Appendices to the CO for review at the post-award conference and at each option year. The schedule shall identify plots, acreages, or base areas and days of the week service will occur. The schedule may be submitted electronically using a file format compatible with Government software programs such as "Microsoft Office", PDF or Google Docs software.

4.15.1 SCHEDULE CHANGES

Occurrence based (non-permanent and no more than once a month) schedule changes due to customer requests or base exercises shall be supported by the contractor. The COR will request the changes to the contractor ten (10) calendar days before the schedule change takes place for improved grounds mowing only at no additional cost to the Government.

5 APPENDIXES

APPENDIX A – GROUNDS DESCRIPTION/WORKLOAD ESTIMATES

APPENDIX B –AREA MAPS OR SITE PLANS

APPENDIX C – DATA REQUIREMENTS APPENDIX D – DEFINITIONS

APPENDIX D – DEFINITIONS

APPENDIX E – XERISCAPING AND URBAN FOREST MASTER PLAN - RESERVED

APPENDIX F - IRRIGATION SYSTEM DESCRIPTION AND SYSTEM MAINTENANCE PROJECTED

WORKLOAD DATA - RESERVED

APPENDIX G – LIST OF NATIVE PLANTS

APPENDIX A – GROUNDS DESCRIPTION/WORKLOAD ESTIMATES

Estimated Workload Data (Annually)

Item Description Estimated Quantities

Frequency Qty Unit

2 Maintain Improved grounds growing season 343 ACRES 1 time weekly

3 RESERVED - Maintain Improved Grounds, Non-growing Season

4 Maintain Irrigation System 72 HR 12 times annually

5 Reimbursement for Irrigation Repairs 24 and

Heads and Zones as needed

6 Remove Debris/Police Grounds 1868 MSF 2 times monthly

7 Leaf Removal Improved Grounds 48 MSF 15 times annually

8 RESERVED - Fertilization and Soil Aeration

9 Pest Control 10,000 SQFT 25 times annually

10 Lawn Repair JOB as needed

11 Prune Shrubs and Hedges 500 EACH 2 times

12 Maintain Semi-Improved Grounds growing season 148 ACRES 2 times monthly

12 Trim w/weed whacker perimeter fence 74,073 LF 2 times

13 RESERVED - Maintain Semi-Improved Grounds, Non-Growing Season

14 Maintain Airfield, BASH, Growing Season 699 ACRES 2 times

15 RESERVED - Maintain Airfield, BASH, Non-Growing Season

16 Maintain Unimproved grounds

17 Maintain Vegetative, Inert Beds, Rock Beds, and Related Areas 80 MSF 2 times

18 Maintain Surface Drainage Ditches 4000 LF 1 time weekly

19 RESERVED - Perform Snow/Ice Removal

20 Prune Trees Small 882…