Attachment 1 - GROUNDS PRICING SHCEDULE (Solicitation FA302221Q0303) Dated 23 June 2021.pdf

PDF 197 KB Posted

Attached to
Grounds Maintenance Columbus AFB, Columbus, MS Federal contract opportunity
Solicitation number
FA302221Q0303
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is a pricing schedule attachment for grounds maintenance services at Columbus Air Force Base and Shuqualak Auxiliary Airfield in Mississippi. The contractor shall provide all personnel, equipment, tools and supervision to maintain the improved, semi-improved, unimproved and vegetated grounds according to the performance work statement. Services include mowing, pruning, debris removal, fertilizing and leaf collection for the improved and semi-improved grounds. Tree pruning and removal are also required. The pricing schedule lists line items for the growing and non-growing seasons, with unit monthly pricing based on acreage ranges for the improved, semi-improved and airfield grounds. Additional line items cover drainage ditches, living facilities and medical facility grounds. The period of performance is from October 2021 through September 2022, with four optional one-year extensions. The Department of the Air Force Air Education and Training Command is the contracting agency.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Line Item Description Quantity UM Unit Price Extended Price (Amount)

Maintain Improved Grounds, Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.

0001AA

Cost Improved Grounds, Growing Season, Reference Line Item 0001 for this Scope.

8 Months

0001AB

Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0001AC

Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0001AD

Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage Acre) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0001AE

Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0001AF

Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0001AG

Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0001AH

Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Improved Grounds, Non-Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 227. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.

ATTACHMENT 1 - GROUNDS PRICING SHCEDULE (Solicitation FA302221Q0303) Dated 23 June 2021

0002AA Cost Improved Grounds, Non-Growing Season, Reference Line Item 0002 for this Scope.

4 Months

0002AB

Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0002AC

Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0002AD

Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage Acre) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0002AE

Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0002AF

Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0002AG

Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0002AH

Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0003 Remove Debris/Police Grounds (PWS 1.1.5). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 6.

12 Months

0004 Leaf Removal Improved Grounds (PWS 1.1.6). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 7.

6 Each

Prune Shrubs (PWS 1.1.10). Period of Performance 1 Oct 21 - 30 Sep 22.

Reference PWS Appendix A, Item 9.

8 Months

Maintain Semi-Improved Grounds, Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep

22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.

0006AA Cost Semi-Improved Grounds, Growing Season, Reference Line Item 0006 for this Scope.

8 Months

0006AB

Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0006AC

Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0006AD

Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0006AE

Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0006AF

Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0006AG

Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0006AH

Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0006AI

Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0006AJ

Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Semi-Improved Grounds, Non-Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.

0007AA

Cost Semi-Improved Grounds, Non-Growing Season, Reference Line Item 0007 for this Scope.

4 Months

0007AB

Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0007AC

Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0007AD

Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0007AE

Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0007AF

Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0007AG

Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0007AH

Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0007AI

Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

0007AJ

Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Airfield, Semi-Improved Grounds/BASH, Growing Season (PWS 1.2 inclusive) Growing Season Mar-Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.

8 Months

Maintain Airfield, Semi-Improved Grounds/BASH, Non-Growing Season (PWS 1.2 inclusive) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.

4 Months

Maintain Unimproved Grounds (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 13.

0010AA Cost Maintain Unimproved Grounds, Reference Line Item 0010 for this Scope.

2 Each

0010AB

Cost to Maintain Unimproved Grounds, for 13-100 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Vegetative Inert Beds and Related Areas (PWS 1.4, 1.4.1).

Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 14.

12 Months

0012 Fertilization (PWS 1.1.7). Period of Performance 1 Oct 21 - 30 Sep 22.

Reference PWS Appendix A, Item 8.

2 Each

Maintain Temporary Living Facilities (TLF's), Growing Season (PWS 1.1.1.5) Growing Season Mar thru Oct Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.

8 Months

Maintain Temporary Living Facilities (TLF's), Non-Growing Season (PWS 1.1.1.5) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.

4 Months

0015 Maintain Surface Drainage Ditches (PWS 1.5 inclusive). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 15.

12 Months

Prune Trees (PWS 1.7.1, 1.7.1.1-1.7.1.2.1). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 17.

150 Each

Tree and Stump Removal, Medium (PWS 1.7.1.4). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 20.

5 Each

Tree and Stump Removal, Small (PWS 1.7.1.4). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 21.

5 Each

Maintain Improved Grounds, SHUQUALAK Growing Season SHUQUALAK (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 25 and 26.

8 Months

Maintain Improved Grounds, SHUQUALAK Non-Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 25 and 26.

Maintain Airfield, Semi-Improved Grounds/BASH, SHUQUALAK Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 27.

8 Months

Maintain Airfield, Semi-Improved Grounds/BASH, SHUQUALAK Non- Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 27.

4 Months

Maintain Unimproved Grounds SHUQUALAK (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 30.

2 Each

Maintain Surface Drainage Ditches SHUQUALAK (PWS 1.5 inclusive).

Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 28.

12 Months

Maintain Improved Grounds, Medical, Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 31.

8 Months

Maintain Improved Grounds, Medical, Non-Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 31.

4 Months

Total Base Year

Maintain Improved Grounds, Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.

1001AA

Cost Improved Grounds, Growing Season, Reference Line Item 0001 for this Scope.

8 Months

1001AB

Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1001AC

Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1001AD

Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1001AE

Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1001AF

Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1001AG

Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1001AH

Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Improved Grounds, Non-Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 227. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.

1002AA Cost Improved Grounds, Non-Growing Season, Reference Line Item 0002 for this Scope.

4 Months

1002AB

Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1002AC

Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1002AD

Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1002AE

Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1002AF

Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1002AG

Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly

1002AH

Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1003 Remove Debris/Police Grounds (PWS 1.1.5). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 6.

12 Months

1004 Leaf Removal Improved Grounds (PWS 1.1.6). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 7.

6 Each

Prune Shrubs (PWS 1.1.10). Period of Performance 1 Oct 21 - 30 Sep 22.

Reference PWS Appendix A, Item 9.

8 Months

Maintain Semi-Improved Grounds, Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep

22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.

1006AA Cost Semi-Improved Grounds, Growing Season, Reference Line Item 0006 for this Scope.

8 Months

1006AB

Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1006AC

Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1006AD

Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1006AE

Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1006AF

Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1006AG

Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly

1006AH

Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1006AI

Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1006AJ

Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Semi-Improved Grounds, Non-Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.

1007AA Cost Semi-Improved Grounds, Non-Growing Season, Reference Line Item 0007 for this Scope.

4 Months

1007AB

Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1007AC

Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1007AD

Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1007AE

Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1007AF

Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1007AG

Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1007AH

Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly

1007AI

Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

1007AJ

Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Airfield, Semi-Improved Grounds/BASH, Growing Season (PWS 1.2 inclusive) Growing Season Mar-Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.

8 Months

Maintain Airfield, Semi-Improved Grounds/BASH, Non-Growing Season (PWS 1.2 inclusive) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.

4 Months

Maintain Unimproved Grounds (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 13.

1010AA Cost Maintain Unimproved Grounds, Reference Line Item 0010 for this Scope.

2 Each

1010AB

Cost to Maintain Unimproved Grounds, for 13-100 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Vegetative Inert Beds and Related Areas (PWS 1.4, 1.4.1).

Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 14.

12 Months

Fertilization (PWS 1.1.7). Period of Performance 1 Oct 21 - 30 Sep 22.

Reference PWS Appendix A, Item 8.

2 Each

Maintain Temporary Living Facilities (TLF's), Growing Season (PWS 1.1.1.5) Growing Season Mar thru Oct Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.

8 Months

Maintain Temporary Living Facilities (TLF's), Non-Growing Season (PWS 1.1.1.5) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.

4 Months

Maintain Surface Drainage Ditches (PWS 1.5 inclusive). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 15.

12 Months

Prune Trees (PWS 1.7.1, 1.7.1.1-1.7.1.2.1). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 17.

150 Each

1017 Tree and Stump Removal, Medium (PWS 1.7.1.4). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 20.

5 Each

Tree and Stump Removal, Small (PWS 1.7.1.4). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 21.

5 Each

Maintain Improved Grounds, SHUQUALAK Growing Season SHUQUALAK (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 25 and 26.

8 Months

Maintain Improved Grounds, SHUQUALAK Non-Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 25 and 26.

4 Months

Maintain Airfield, Semi-Improved Grounds/BASH, SHUQUALAK Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 27.

8 Months

Maintain Airfield, Semi-Improved Grounds/BASH, SHUQUALAK Non- Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 27.

4 Months

Maintain Unimproved Grounds SHUQUALAK (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 30.

2 Each

Maintain Surface Drainage Ditches SHUQUALAK (PWS 1.5 inclusive).

Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 28.

12 Months

Maintain Improved Grounds, Medical, Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 31.

8 Months

Maintain Improved Grounds, Medical, Non-Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 31.

Total Option Year One

Maintain Improved Grounds, Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.

2001AA

Cost Improved Grounds, Growing Season, Reference Line Item 0001 for this Scope.

8 Months

2001AB

Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2001AC

Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2001AD

Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2001AE

Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2001AF

Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2001AG

Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2001AH

Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Improved Grounds, Non-Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 227. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.

2002AA Cost Improved Grounds, Non-Growing Season, Reference Line Item 0002 for this Scope.

4 Months

2002AB

Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly

2002AC

Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2002AD

Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2002AE

Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2002AF

Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2002AG

Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2002AH

Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2003 Remove Debris/Police Grounds (PWS 1.1.5). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 6.

12 Months

2004 Leaf Removal Improved Grounds (PWS 1.1.6). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 7.

6 Each

Prune Shrubs (PWS 1.1.10). Period of Performance 1 Oct 21 - 30 Sep 22.

Reference PWS Appendix A, Item 9.

8 Months

Maintain Semi-Improved Grounds, Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep

22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.

2006AA Cost Semi-Improved Grounds, Growing Season, Reference Line Item 0006 for this Scope.

8 Months

2006AB

Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

2006AC

Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2006AD

Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2006AE

Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2006AF

Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2006AG

Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2006AH

Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2006AI

Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2006AJ

Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Semi-Improved Grounds, Non-Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.

2007AA Cost Semi-Improved Grounds, Non-Growing Season, Reference Line Item 0007 for this Scope.

4 Months

2007AB

Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2007AC

Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly

2007AD

Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2007AE

Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2007AF

Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2007AG

Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2007AH

Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2007AI

Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

2007AJ

Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Airfield, Semi-Improved Grounds/BASH, Growing Season (PWS 1.2 inclusive) Growing Season Mar-Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.

8 Months

Maintain Airfield, Semi-Improved Grounds/BASH, Non-Growing Season (PWS 1.2 inclusive) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.

4 Months

Maintain Unimproved Grounds (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 13.

2010AA Cost Maintain Unimproved Grounds, Reference Line Item 0010 for this Scope.

2 Each

2010AB

Cost to Maintain Unimproved Grounds, for 13-100 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

Maintain Vegetative Inert Beds and Related Areas (PWS 1.4, 1.4.1).

Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 14.

12 Months

2012 Fertilization (PWS 1.1.7). Period of Performance 1 Oct 21 - 30 Sep 22.

Reference PWS Appendix A, Item 8.

2 Each

Maintain Temporary Living Facilities (TLF's), Growing Season (PWS 1.1.1.5) Growing Season Mar thru Oct Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.

8 Months

Maintain Temporary Living Facilities (TLF's), Non-Growing Season (PWS 1.1.1.5) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.

4 Months

2015 Maintain Surface Drainage Ditches (PWS 1.5 inclusive). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 15.

12 Months

Prune Trees (PWS 1.7.1, 1.7.1.1-1.7.1.2.1). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 17.

150 Each

2017 Tree and Stump Removal, Medium (PWS 1.7.1.4). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 20.

5 Each

Tree and Stump Removal, Small (PWS 1.7.1.4). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 21.

5 Each

Maintain Improved Grounds, SHUQUALAK Growing Season SHUQUALAK (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 25 and 26.

8 Months

Maintain Improved Grounds, SHUQUALAK Non-Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 25 and 26.

4 Months

Maintain Airfield, Semi-Improved Grounds/BASH, SHUQUALAK Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 27.

8 Months

Maintain Airfield, Semi-Improved Grounds/BASH, SHUQUALAK Non- Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 27.

Maintain Unimproved Grounds SHUQUALAK (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 30.

2 Each

Maintain Surface Drainage Ditches SHUQUALAK (PWS 1.5 inclusive).

Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 28.

12 Months

Maintain Improved Grounds, Medical, Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 31.

8 Months

Maintain Improved Grounds, Medical, Non-Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 31.

4 Months

Total Option Year Two`

Maintain Improved Grounds, Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.

3001AA

Cost Improved Grounds, Growing Season, Reference Line Item 0001 for this Scope.

8 Months

3001AB

Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3001AC

Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3001AD

Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3001AE

Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3001AF

Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly

3001AG

Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3001AH

Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Improved Grounds, Non-Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 227. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.

3002AA Cost Improved Grounds, Non-Growing Season, Reference Line Item 0002 for this Scope.

4 Months

3002AB

Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3002AC

Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3002AD

Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3002AE

Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3002AF

Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3002AG

Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3002AH

Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3003 Remove Debris/Police Grounds (PWS 1.1.5). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 6.

3004 Leaf Removal Improved Grounds (PWS 1.1.6). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 7.

6 Each

Prune Shrubs (PWS 1.1.10). Period of Performance 1 Oct 21 - 30 Sep 22.

Reference PWS Appendix A, Item 9.

8 Months

Maintain Semi-Improved Grounds, Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep

22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.

3006AA Cost Semi-Improved Grounds, Growing Season, Reference Line Item 0006 for this Scope.

8 Months

3006AB

Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3006AC

Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3006AD

Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3006AE

Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3006AF

Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3006AG

Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3006AH

Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3006AI

Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly

3006AJ

Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Semi-Improved Grounds, Non-Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.

3007AA Cost Semi-Improved Grounds, Non-Growing Season, Reference Line Item 0007 for this Scope.

4 Months

3007AB

Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3007AC

Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3007AD

Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3007AE

Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3007AF

Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3007AG

Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3007AH

Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3007AI

Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

3007AJ

Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly

Maintain Airfield, Semi-Improved Grounds/BASH, Growing Season (PWS 1.2 inclusive) Growing Season Mar-Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.

8 Months

Maintain Airfield, Semi-Improved Grounds/BASH, Non-Growing Season (PWS 1.2 inclusive) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.

4 Months

Maintain Unimproved Grounds (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 13.

3010AA Cost Maintain Unimproved Grounds, Reference Line Item 0010 for this Scope.

2 Each

3010AB

Cost to Maintain Unimproved Grounds, for 13-100 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required

TBD Acres

Maintain Vegetative Inert Beds and Related Areas (PWS 1.4, 1.4.1).

Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 14.

12 Months

3012 Fertilization (PWS 1.1.7). Period of Performance 1 Oct 21 - 30 Sep 22.

Reference PWS Appendix A, Item 8.

2 Each

Maintain Temporary Living Facilities (TLF's), Growing Season (PWS 1.1.1.5) Growing Season Mar thru Oct Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.

8 Months

Maintain Temporary Living Facilities (TLF's), Non-Growing…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .