Attachment 1 - GROUNDS PRICING SHCEDULE (Solicitation FA302221Q0303) Dated 23 June 2021.pdf
PDF 197 KB Posted
- Attached to
- Grounds Maintenance Columbus AFB, Columbus, MS Federal contract opportunity
- Solicitation number
- FA302221Q0303
About this file
This document is a pricing schedule attachment for grounds maintenance services at Columbus Air Force Base and Shuqualak Auxiliary Airfield in Mississippi. The contractor shall provide all personnel, equipment, tools and supervision to maintain the improved, semi-improved, unimproved and vegetated grounds according to the performance work statement. Services include mowing, pruning, debris removal, fertilizing and leaf collection for the improved and semi-improved grounds. Tree pruning and removal are also required. The pricing schedule lists line items for the growing and non-growing seasons, with unit monthly pricing based on acreage ranges for the improved, semi-improved and airfield grounds. Additional line items cover drainage ditches, living facilities and medical facility grounds. The period of performance is from October 2021 through September 2022, with four optional one-year extensions. The Department of the Air Force Air Education and Training Command is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Line Item Description Quantity UM Unit Price Extended Price (Amount)
Maintain Improved Grounds, Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.
0001AA
Cost Improved Grounds, Growing Season, Reference Line Item 0001 for this Scope.
8 Months
0001AB
Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0001AC
Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0001AD
Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage Acre) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0001AE
Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0001AF
Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0001AG
Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0001AH
Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Improved Grounds, Non-Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 227. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.
ATTACHMENT 1 - GROUNDS PRICING SHCEDULE (Solicitation FA302221Q0303) Dated 23 June 2021
0002AA Cost Improved Grounds, Non-Growing Season, Reference Line Item 0002 for this Scope.
4 Months
0002AB
Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0002AC
Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0002AD
Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage Acre) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0002AE
Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0002AF
Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0002AG
Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0002AH
Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0003 Remove Debris/Police Grounds (PWS 1.1.5). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 6.
12 Months
0004 Leaf Removal Improved Grounds (PWS 1.1.6). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 7.
6 Each
Prune Shrubs (PWS 1.1.10). Period of Performance 1 Oct 21 - 30 Sep 22.
Reference PWS Appendix A, Item 9.
8 Months
Maintain Semi-Improved Grounds, Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep
22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.
0006AA Cost Semi-Improved Grounds, Growing Season, Reference Line Item 0006 for this Scope.
8 Months
0006AB
Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0006AC
Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0006AD
Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0006AE
Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0006AF
Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0006AG
Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0006AH
Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0006AI
Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0006AJ
Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Semi-Improved Grounds, Non-Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.
0007AA
Cost Semi-Improved Grounds, Non-Growing Season, Reference Line Item 0007 for this Scope.
4 Months
0007AB
Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0007AC
Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0007AD
Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0007AE
Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0007AF
Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0007AG
Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0007AH
Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0007AI
Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
0007AJ
Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Airfield, Semi-Improved Grounds/BASH, Growing Season (PWS 1.2 inclusive) Growing Season Mar-Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.
8 Months
Maintain Airfield, Semi-Improved Grounds/BASH, Non-Growing Season (PWS 1.2 inclusive) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.
4 Months
Maintain Unimproved Grounds (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 13.
0010AA Cost Maintain Unimproved Grounds, Reference Line Item 0010 for this Scope.
2 Each
0010AB
Cost to Maintain Unimproved Grounds, for 13-100 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Vegetative Inert Beds and Related Areas (PWS 1.4, 1.4.1).
Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 14.
12 Months
0012 Fertilization (PWS 1.1.7). Period of Performance 1 Oct 21 - 30 Sep 22.
Reference PWS Appendix A, Item 8.
2 Each
Maintain Temporary Living Facilities (TLF's), Growing Season (PWS 1.1.1.5) Growing Season Mar thru Oct Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.
8 Months
Maintain Temporary Living Facilities (TLF's), Non-Growing Season (PWS 1.1.1.5) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.
4 Months
0015 Maintain Surface Drainage Ditches (PWS 1.5 inclusive). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 15.
12 Months
Prune Trees (PWS 1.7.1, 1.7.1.1-1.7.1.2.1). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 17.
150 Each
Tree and Stump Removal, Medium (PWS 1.7.1.4). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 20.
5 Each
Tree and Stump Removal, Small (PWS 1.7.1.4). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 21.
5 Each
Maintain Improved Grounds, SHUQUALAK Growing Season SHUQUALAK (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 25 and 26.
8 Months
Maintain Improved Grounds, SHUQUALAK Non-Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 25 and 26.
Maintain Airfield, Semi-Improved Grounds/BASH, SHUQUALAK Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 27.
8 Months
Maintain Airfield, Semi-Improved Grounds/BASH, SHUQUALAK Non- Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 27.
4 Months
Maintain Unimproved Grounds SHUQUALAK (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 30.
2 Each
Maintain Surface Drainage Ditches SHUQUALAK (PWS 1.5 inclusive).
Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 28.
12 Months
Maintain Improved Grounds, Medical, Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 31.
8 Months
Maintain Improved Grounds, Medical, Non-Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 31.
4 Months
Total Base Year
Maintain Improved Grounds, Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.
1001AA
Cost Improved Grounds, Growing Season, Reference Line Item 0001 for this Scope.
8 Months
1001AB
Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1001AC
Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1001AD
Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1001AE
Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1001AF
Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1001AG
Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1001AH
Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Improved Grounds, Non-Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 227. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.
1002AA Cost Improved Grounds, Non-Growing Season, Reference Line Item 0002 for this Scope.
4 Months
1002AB
Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1002AC
Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1002AD
Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1002AE
Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1002AF
Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1002AG
Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly
1002AH
Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1003 Remove Debris/Police Grounds (PWS 1.1.5). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 6.
12 Months
1004 Leaf Removal Improved Grounds (PWS 1.1.6). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 7.
6 Each
Prune Shrubs (PWS 1.1.10). Period of Performance 1 Oct 21 - 30 Sep 22.
Reference PWS Appendix A, Item 9.
8 Months
Maintain Semi-Improved Grounds, Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep
22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.
1006AA Cost Semi-Improved Grounds, Growing Season, Reference Line Item 0006 for this Scope.
8 Months
1006AB
Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1006AC
Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1006AD
Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1006AE
Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1006AF
Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1006AG
Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly
1006AH
Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1006AI
Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1006AJ
Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Semi-Improved Grounds, Non-Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.
1007AA Cost Semi-Improved Grounds, Non-Growing Season, Reference Line Item 0007 for this Scope.
4 Months
1007AB
Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1007AC
Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1007AD
Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1007AE
Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1007AF
Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1007AG
Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1007AH
Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly
1007AI
Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
1007AJ
Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Airfield, Semi-Improved Grounds/BASH, Growing Season (PWS 1.2 inclusive) Growing Season Mar-Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.
8 Months
Maintain Airfield, Semi-Improved Grounds/BASH, Non-Growing Season (PWS 1.2 inclusive) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.
4 Months
Maintain Unimproved Grounds (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 13.
1010AA Cost Maintain Unimproved Grounds, Reference Line Item 0010 for this Scope.
2 Each
1010AB
Cost to Maintain Unimproved Grounds, for 13-100 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Vegetative Inert Beds and Related Areas (PWS 1.4, 1.4.1).
Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 14.
12 Months
Fertilization (PWS 1.1.7). Period of Performance 1 Oct 21 - 30 Sep 22.
Reference PWS Appendix A, Item 8.
2 Each
Maintain Temporary Living Facilities (TLF's), Growing Season (PWS 1.1.1.5) Growing Season Mar thru Oct Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.
8 Months
Maintain Temporary Living Facilities (TLF's), Non-Growing Season (PWS 1.1.1.5) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.
4 Months
Maintain Surface Drainage Ditches (PWS 1.5 inclusive). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 15.
12 Months
Prune Trees (PWS 1.7.1, 1.7.1.1-1.7.1.2.1). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 17.
150 Each
1017 Tree and Stump Removal, Medium (PWS 1.7.1.4). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 20.
5 Each
Tree and Stump Removal, Small (PWS 1.7.1.4). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 21.
5 Each
Maintain Improved Grounds, SHUQUALAK Growing Season SHUQUALAK (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 25 and 26.
8 Months
Maintain Improved Grounds, SHUQUALAK Non-Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 25 and 26.
4 Months
Maintain Airfield, Semi-Improved Grounds/BASH, SHUQUALAK Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 27.
8 Months
Maintain Airfield, Semi-Improved Grounds/BASH, SHUQUALAK Non- Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 27.
4 Months
Maintain Unimproved Grounds SHUQUALAK (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 30.
2 Each
Maintain Surface Drainage Ditches SHUQUALAK (PWS 1.5 inclusive).
Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 28.
12 Months
Maintain Improved Grounds, Medical, Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 31.
8 Months
Maintain Improved Grounds, Medical, Non-Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 31.
Total Option Year One
Maintain Improved Grounds, Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.
2001AA
Cost Improved Grounds, Growing Season, Reference Line Item 0001 for this Scope.
8 Months
2001AB
Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2001AC
Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2001AD
Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2001AE
Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2001AF
Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2001AG
Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2001AH
Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Improved Grounds, Non-Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 227. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.
2002AA Cost Improved Grounds, Non-Growing Season, Reference Line Item 0002 for this Scope.
4 Months
2002AB
Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly
2002AC
Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2002AD
Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2002AE
Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2002AF
Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2002AG
Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2002AH
Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2003 Remove Debris/Police Grounds (PWS 1.1.5). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 6.
12 Months
2004 Leaf Removal Improved Grounds (PWS 1.1.6). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 7.
6 Each
Prune Shrubs (PWS 1.1.10). Period of Performance 1 Oct 21 - 30 Sep 22.
Reference PWS Appendix A, Item 9.
8 Months
Maintain Semi-Improved Grounds, Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep
22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.
2006AA Cost Semi-Improved Grounds, Growing Season, Reference Line Item 0006 for this Scope.
8 Months
2006AB
Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
2006AC
Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2006AD
Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2006AE
Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2006AF
Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2006AG
Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2006AH
Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2006AI
Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2006AJ
Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Semi-Improved Grounds, Non-Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.
2007AA Cost Semi-Improved Grounds, Non-Growing Season, Reference Line Item 0007 for this Scope.
4 Months
2007AB
Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2007AC
Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly
2007AD
Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2007AE
Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2007AF
Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2007AG
Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2007AH
Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2007AI
Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
2007AJ
Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Airfield, Semi-Improved Grounds/BASH, Growing Season (PWS 1.2 inclusive) Growing Season Mar-Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.
8 Months
Maintain Airfield, Semi-Improved Grounds/BASH, Non-Growing Season (PWS 1.2 inclusive) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.
4 Months
Maintain Unimproved Grounds (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 13.
2010AA Cost Maintain Unimproved Grounds, Reference Line Item 0010 for this Scope.
2 Each
2010AB
Cost to Maintain Unimproved Grounds, for 13-100 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
Maintain Vegetative Inert Beds and Related Areas (PWS 1.4, 1.4.1).
Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 14.
12 Months
2012 Fertilization (PWS 1.1.7). Period of Performance 1 Oct 21 - 30 Sep 22.
Reference PWS Appendix A, Item 8.
2 Each
Maintain Temporary Living Facilities (TLF's), Growing Season (PWS 1.1.1.5) Growing Season Mar thru Oct Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.
8 Months
Maintain Temporary Living Facilities (TLF's), Non-Growing Season (PWS 1.1.1.5) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.
4 Months
2015 Maintain Surface Drainage Ditches (PWS 1.5 inclusive). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 15.
12 Months
Prune Trees (PWS 1.7.1, 1.7.1.1-1.7.1.2.1). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 17.
150 Each
2017 Tree and Stump Removal, Medium (PWS 1.7.1.4). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 20.
5 Each
Tree and Stump Removal, Small (PWS 1.7.1.4). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 21.
5 Each
Maintain Improved Grounds, SHUQUALAK Growing Season SHUQUALAK (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 25 and 26.
8 Months
Maintain Improved Grounds, SHUQUALAK Non-Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 25 and 26.
4 Months
Maintain Airfield, Semi-Improved Grounds/BASH, SHUQUALAK Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 27.
8 Months
Maintain Airfield, Semi-Improved Grounds/BASH, SHUQUALAK Non- Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 27.
Maintain Unimproved Grounds SHUQUALAK (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 30.
2 Each
Maintain Surface Drainage Ditches SHUQUALAK (PWS 1.5 inclusive).
Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 28.
12 Months
Maintain Improved Grounds, Medical, Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 31.
8 Months
Maintain Improved Grounds, Medical, Non-Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 31.
4 Months
Total Option Year Two`
Maintain Improved Grounds, Growing Season (PWS 1.1, 1.1.1-1.1.3, 1.2.1.2) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.
3001AA
Cost Improved Grounds, Growing Season, Reference Line Item 0001 for this Scope.
8 Months
3001AB
Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3001AC
Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3001AD
Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3001AE
Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3001AF
Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly
3001AG
Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3001AH
Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Improved Grounds, Non-Growing Season (PWS 1.1, 1.1.1- 1.1.3, 1.2.1.2) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 227. Reference PWS Appendix A, Items 1, 2, 3, 4, and 5.
3002AA Cost Improved Grounds, Non-Growing Season, Reference Line Item 0002 for this Scope.
4 Months
3002AB
Cost Improved Grounds for 300-349 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3002AC
Cost Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3002AD
Cost Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3002AE
Cost Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3002AF
Cost Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3002AG
Cost Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3002AH
Cost Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3003 Remove Debris/Police Grounds (PWS 1.1.5). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 6.
3004 Leaf Removal Improved Grounds (PWS 1.1.6). Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 7.
6 Each
Prune Shrubs (PWS 1.1.10). Period of Performance 1 Oct 21 - 30 Sep 22.
Reference PWS Appendix A, Item 9.
8 Months
Maintain Semi-Improved Grounds, Growing Season (PWS 1.2.1) Growing Season Mar thru Oct. Period of Performance 1 Oct 21 - 30 Sep
22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.
3006AA Cost Semi-Improved Grounds, Growing Season, Reference Line Item 0006 for this Scope.
8 Months
3006AB
Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3006AC
Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3006AD
Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3006AE
Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3006AF
Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3006AG
Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3006AH
Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3006AI
Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly
3006AJ
Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Semi-Improved Grounds, Non-Growing Season (PWS 1.2.1) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Items 11. Excluding BASH Areas and Including Perimeter Fence.
3007AA Cost Semi-Improved Grounds, Non-Growing Season, Reference Line Item 0007 for this Scope.
4 Months
3007AB
Cost Semi-Improved Grounds for 401-450 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3007AC
Cost Semi-Improved Grounds for 371-400 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3007AD
Cost Semi-Improved Grounds for 300-369 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3007AE
Cost Semi-Improved Grounds for 250-299 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3007AF
Cost Semi-Improved Grounds for 200-249 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage areas) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3007AG
Cost Semi-Improved Grounds for 150-199 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3007AH
Cost Semi-Improved Grounds for 100-149 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3007AI
Cost Semi-Improved Grounds for 50-99 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
3007AJ
Cost Semi-Improved Grounds for 0-49 Acres (Government reserves the right to pay lower Extended Price (Amount) of this or next higher acreage area) Unit Price per Acre will be used to determine a Monthly
Maintain Airfield, Semi-Improved Grounds/BASH, Growing Season (PWS 1.2 inclusive) Growing Season Mar-Oct. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.
8 Months
Maintain Airfield, Semi-Improved Grounds/BASH, Non-Growing Season (PWS 1.2 inclusive) Non-Growing Season Nov thru Feb. Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 12.
4 Months
Maintain Unimproved Grounds (PWS 1.3, 1.3.1). Period of Performance 1 Oct 21 -30 Sep 22. Reference PWS Appendix A, Item 13.
3010AA Cost Maintain Unimproved Grounds, Reference Line Item 0010 for this Scope.
2 Each
3010AB
Cost to Maintain Unimproved Grounds, for 13-100 Acres - Unit Price per Acre will be used to determine a Monthly Unit Price if adjustments are required
TBD Acres
Maintain Vegetative Inert Beds and Related Areas (PWS 1.4, 1.4.1).
Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 14.
12 Months
3012 Fertilization (PWS 1.1.7). Period of Performance 1 Oct 21 - 30 Sep 22.
Reference PWS Appendix A, Item 8.
2 Each
Maintain Temporary Living Facilities (TLF's), Growing Season (PWS 1.1.1.5) Growing Season Mar thru Oct Period of Performance 1 Oct 21 - 30 Sep 22. Reference PWS Appendix A, Item 10.
8 Months
Maintain Temporary Living Facilities (TLF's), Non-Growing…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .