This document contains a projected costs spreadsheet and statement of work for preventative and corrective maintenance services for uninterruptible power supply (UPS) systems. The spreadsheet lists UPS equipment at various Navy and government facilities, including make, model, installation date and battery replacement schedules through 2028. The statement of work corresponds to solicitation N0024424Q0001 for preventative and corrective UPS services issued by the Department of the Navy Naval Supply Systems Command. The UPS maintenance and support services include battery replacements, capacitor changes, preventative maintenance, and on-call repairs. Pricing is provided for labor and materials for battery swaps and preventative maintenance visits escalating annually. The contract would have base and option years from 2024 to 2026.

View the file

Other files for this federal contract opportunity

Other files attached to J059-PREVENTATIVE & CORRECTIVE SERVICES FOR UNINTERRUPTED POWER SUPPLY (UPS), newest first.
File Type Posted
AMENDMENTS_10252023.pdf PDF
Attachment 1 - Equipment Parts List_Updated.xlsx XLSX spreadsheet
Attachment 2 - Offeror Past Performance Data.docx DOCX document
Attachment 3 - Table L3.xlsx XLSX spreadsheet
RFQ N0024424Q0001_Combined SS.pdf PDF
RFQ N0024424Q0001__Solicitation.pdf PDF
Attachment 3 - Table L1-L2-L3.xlsx XLSX spreadsheet
Attachment 2 - Offeror Past Performance Data.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY24 UPS KTR BASE Year

LocationAddressEquipmentUPS Date CodeBattery Date CodeBattery TypeBattery NumberPrice Per BatteryBattery Change PricesCapacitor Change PriceYearlyProjected Yearly TotalsFY
BatteriesBattery Change LaborCapacitorsCap Change LaborService Contract Price20242025202620272028
Bldg 4 Telcom4635 Pacific Hwy, SD CA 9215210 kVA Mitsubishi 1100Dec-11Mar-17MK ES20-1224$725.00No Caps$1,200.00$1,200.00$2,700.00$1,200.00$1,200.00$1,200.00
Building 6003901 N. Harbor Dr. SD CA300kVA Powerware 931510/1/2007 (Note 1)Nov-19Datasafe 12HX400FR120$1,900.00$10,000.00$1,700.00$4,400.00$4,400.00$4,400.00$4,400.00$4,400.00$4,400.00
Building 600

Patt, Michael A CIV USN COMNAVREG SW SAN CA (USA): Patt, Michael A CIV USN COMNAVREG SW SAN CA (USA):

NCTS - phone switch3901 N. Harbor Dr. SD CANew UPS (TBD)Nov-06Apr-18Deka 12AVR100-3ET4$550.00No caps$500.00$500.00$500.00$500.00$3,000.00$500.00
NAWS China Lake1 Admin Circle, China Lake CA 9355530kVA Mitsubishi 1100Jul-11Aug-19C&D UPS 12-540MR24$1,800.00No Caps$1,200.00$1,200.00$1,200.00$1,200.00$1,200.00$8,800.00FY24
NSSC Corona/Norco1999 4th St., Norco CA 9286030kVA Mitsubishi 1100Jul-11Nov-20Sprinter S12V550NGF24$1,100.00No Caps$1,200.00$8,800.00$1,200.00$1,200.00$1,200.00$1,200.00
NAF El Centro1605 3rd St Bldg 565 El Centro CA 9224330kVA 2033G Mitsubishi10/1/2010 (Note 1)Aug-19C&D UPS 12-300MR36$1,375.00$7,200.00$900.00$1,200.00$8,400.00$1,200.00$1,200.00$1,200.00$10,900.00
NWS FallbrookBuilding 41 Sparrow Rd Fallbrook CA30kVA Mitsubishi 1100Jul-11Dec-20Sprinter S12V550NGF24$990.00No Caps$1,200.00$8,800.00$1,200.00$1,200.00$1,200.00$1,200.00
NAS Fallon4755 Pasture Rd Bldg 800 Fallon NV30kVA Mitsubishi 1100Jul-11Aug-19C&D UPS 12-540MR24$1,800.00No Caps$2,100.00$1,200.00$1,200.00$1,200.00$1,200.00$1,200.00$8,800.00FY24
NAS LemooreBldg 767 Lemoore CA 9324650kVA Mitsubishi 2033C4/1/2005 (Note 1)May-19C&D UPS 12-400MR30$2,100.00$8,000.00$2,300.00$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00$9,100.00FY24
NPS Monterey1870 Morse Dr Bldg 767 Monterey CAMitubishi 1177b 60kVA8/1/2011 (Note 2)Aug-19CSB HRL 12280W FR24$2,500.00$30,000.00$6,500.00$2,400.00$2,400.00$2,400.00$2,400.00$2,400.00$2,400.00
NB Coronado678 McCain Blvd Bldg 678 SD CA 9213530kVA Liebert EXMNov-18Oct-18Datasafe 12HX205FR48$1,100.00$10,000.00$4,500.00$1,200.00$1,200.00$1,200.00$1,200.00$5,300.00$1,200.00FY24
Pt Hueneme/Pt Mugu4111 San Pedro Bldg 1443 Pt Hueneme CA20kVA Mitsubishi 2033C7/1/2004 (Note 1)Feb-21Yuasa NPX080FR30$990.00$3,000.00$1,100.00$1,500.00$4,000.00$1,500.00$1,500.00$1,500.00$1,500.00
San Clemente IslandSecurity Building Bldg. 6015112kVA Mitsubishi 7011AOct-11Jun-19ES7-12/ES20-1254$1,650.00no caps$2,000.00$2,000.00$2,000.00$2,000.00$2,000.00$6,500.00
San Nicholas IslandBuilding 21130kVA Mitsubishi 1100Jul-11Aug-19Datasafe 12HX505FR24$1,650.00No Caps$2,000.00$9,600.00$2,000.00$2,000.00$2,000.00$2,000.00
NWS Seal Beach 2800 Seal Beach Blvd30kVA Mitsubishi 1100Jul-11Dec-20Datasafe 12HX505FR24$990.00No Caps$2,400.00$10,000.00$2,400.00$2,400.00$2,400.00$2,400.00
NWS Seal Beach 1800 Seal Beach BlvdGE LP33UFeb-15Aug-19Genesis NP12-12T48$990.00$5,500.00$4,500.00$500.00$500.00$500.00$5,500.00$500.00$500.00
NBSD: Regional HQ750 Harbor DriveLiebert EXM 80Dec-1912HX330-FR24$725.00No Caps
Time and MaterialALL SITES$0.00$0.00$0.00$0.00$25,000.00$25,000.00$25,000.00$25,000.00$25,000.00
FY24Yearly Totals$90,700.00$52,100.00$55,600.00$57,200.00$87,600.00
Battery replacement time line
2024Yellow
2025Lt Green
2026Orange
Base (FY24)Option 1 (FY25)Option 2 (FY26)TOTAL Cost
Preventive Maintenance
T&M Labor Hours
T&M - Materials
Total Cost$0.00

&"-,Bold"&20Barona Casino UPS System Maintenance Projected Costs

Prepared by Sean Murphy Computer Protection Technology 2/16/2016

FY25 UPS KTR OY1

LocationAddressEquipmentUPS Date CodeBattery Date CodeBattery TypeBattery NumberPrice Per Battery2.5% Increase costNew cost per BatteryBattery Change PricesCapacitor Change PriceYearlyFY
BatteriesBattery Change LaborCapacitorsCap Change LaborService Contract Price
Bldg 4 Telcom4635 Pacific Hwy, SD CA 9215210 kVA Mitsubishi 1100Dec-11Mar-23MK ES20-1224$725.00No Caps$1,200.00
Building 6003901 N. Harbor Dr. SD CA300kVA Powerware 931510/1/2007 (Note 1)Jul-23Datasafe 12HX400FR120$1,900.00$10,000.00$1,700.00$4,400.00
Building 6003901 N. Harbor Dr. SD CANew UPS (TBD)Nov-06Apr-23Deka 12AVR100-3ET4$550.00No caps$500.00
NAWS China Lake1 Admin Circle, China Lake CA 9355530kVA Mitsubishi 1100Jul-11Aug-19C&D UPS 12-540MR24$1,800.00No Caps$1,200.00
NSSC Corona/Norco1999 4th St., Norco CA 9286030kVA Mitsubishi 1100Jul-11Nov-23Sprinter S12V550NGF24$1,100.00No Caps$1,200.00
NAF El Centro1605 3rd St Bldg 565 El Centro CA 9224330kVA 2033G Mitsubishi10/1/2010 (Note 1)Aug-23C&D UPS 12-300MR36$1,375.00$7,200.00$900.00$1,200.00
NWS FallbrookBuilding 41 Sparrow Rd Fallbrook CA30kVA Mitsubishi 1100Jul-11Dec-23Sprinter S12V550NGF24$990.00No Caps$1,200.00
NAS Fallon4755 Pasture Rd Bldg 800 Fallon NV30kVA Mitsubishi 1100Jul-11Aug-19C&D UPS 12-540MR24$1,800.00No Caps$2,100.00$1,200.00
NAS LemooreBldg 767 Lemoore CA 9324650kVA Mitsubishi 2033C4/1/2005 (Note 1)May-19C&D UPS 12-400MR30$2,100.00$8,000.00$2,300.00$1,500.00
NPS Monterey1870 Morse Dr Bldg 767 Monterey CAMitubishi 1177b 60kVA8/1/2011 (Note 2)Jul-23CSB HRL 12280W FR24$2,500.00$30,000.00$6,500.00$2,400.00FY25
NB Coronado678 McCain Blvd Bldg 678 SD CA 9213530kVA Liebert EXMNov-18Mar-23Datasafe 12HX205FR48$1,100.00$10,000.00$4,500.00$1,200.00
Pt Hueneme/Pt Mugu4111 San Pedro Bldg 1443 Pt Hueneme CA20kVA Mitsubishi 2033C7/1/2004 (Note 1)Feb-15Yuasa NPX080FR30$990.00$3,000.00$1,100.00$1,500.00
San Clemente IslandSecurity Building Bldg. 6015112kVA Mitsubishi 7011AOct-11Oct-19ES7-12/ES20-1254$1,650.00no caps$2,000.00
San Nicholas IslandBuilding 21130kVA Mitsubishi 1100Jul-11Oct-11Datasafe 12HX505FR24$1,650.00No Caps$2,000.00
NWS Seal Beach 2800 Seal Beach Blvd30kVA Mitsubishi 1100Jul-11Dec-23Datasafe 12HX505FR24$990.00No Caps$2,400.00FY25
NWS Seal Beach 1800 Seal Beach BlvdGE LP33UFeb-15Aug-23Genesis NP12-12T48$990.00$5,500.00$4,500.00$500.00FY25
NBSD: Regional HQ750 Harbor DriveLiebert EXM 8012HX330-FR24$725.00No CapsFY25
Time and MaterialALL SITES$0.00$0.00$0.00$0.00

Battery replacement time line

2024Yellow
2025Lt Green
2026Orange
Base (FY24)Option 1 (FY25)Option 2 (FY26)
Preventive Maintenance
T&M Labor Hours
T&M - Materials
Total Cost
Inflation Cost per year increase estimates. Battery cost increase by 2.5% and Pre Maintenance increase by 1.5% each year.

Projected Costs

Prepared by Sean Murphy

2/16/2016

FY26 UPS KTR OY2

LocationAddressEquipmentUPS Date CodeBattery Date CodeBattery TypeBattery NumberPrice Per Battery2.5% Increase costNew cost per BatteryBattery Change PricesCapacitor Change PriceYearly
BatteriesBattery Change LaborCapacitorsCap Change LaborService Contract Price
Bldg 4 Telcom4635 Pacific Hwy, SD CA 9215210 kVA Mitsubishi 1100Dec-11Mar-23MK ES20-1224$725.00No Caps$1,200.00
Building 6003901 N. Harbor Dr. SD CA300kVA Powerware 931510/1/2007 (Note 1)Jul-23Datasafe 12HX400FR120$1,900.00$10,000.00$1,700.00$4,400.00
Building 6003901 N. Harbor Dr. SD CANew UPS (TBD)Nov-06Apr-23Deka 12AVR100-3ET4$550.00No caps$500.00
NAWS China Lake1 Admin Circle, China Lake CA 9355530kVA Mitsubishi 1100Jul-11Aug-19C&D UPS 12-540MR24$1,800.00No Caps$1,200.00
NSSC Corona/Norco1999 4th St., Norco CA 9286030kVA Mitsubishi 1100Jul-11Nov-23Sprinter S12V550NGF24$1,100.00No Caps$1,200.00FY26
NAF El Centro1605 3rd St Bldg 565 El Centro CA 9224330kVA 2033G Mitsubishi10/1/2010 (Note 1)Aug-23C&D UPS 12-300MR36$1,375.00$7,200.00$900.00$1,200.00FY26
NWS FallbrookBuilding 41 Sparrow Rd Fallbrook CA30kVA Mitsubishi 1100Jul-11Dec-23Sprinter S12V550NGF24$990.00No Caps$1,200.00
NAS Fallon4755 Pasture Rd Bldg 800 Fallon NV30kVA Mitsubishi 1100Jul-11Aug-19C&D UPS 12-540MR24$1,800.00No Caps$2,100.00$1,200.00
NAS LemooreBldg 767 Lemoore CA 9324650kVA Mitsubishi 2033C4/1/2005 (Note 1)May-19C&D UPS 12-400MR30$2,100.00$8,000.00$2,300.00$1,500.00
NPS Monterey1870 Morse Dr Bldg 767 Monterey CAMitubishi 1177b 60kVA8/1/2011 (Note 2)Jul-23CSB HRL 12280W FR24$2,500.00$30,000.00$6,500.00$2,400.00
NB Coronado678 McCain Blvd Bldg 678 SD CA 9213530kVA Liebert EXMNov-18Mar-23Datasafe 12HX205FR48$1,100.00$10,000.00$4,500.00$1,200.00
Pt Hueneme/Pt Mugu4111 San Pedro Bldg 1443 Pt Hueneme CA20kVA Mitsubishi 2033C7/1/2004 (Note 1)Feb-15Yuasa NPX080FR30$990.00$3,000.00$1,100.00$1,500.00FY26
San Clemente IslandSecurity Building Bldg. 6015112kVA Mitsubishi 7011AOct-11Oct-19ES7-12/ES20-1254$1,650.00no caps$2,000.00
San Nicholas IslandBuilding 21130kVA Mitsubishi 1100Jul-11Oct-11Datasafe 12HX505FR24$1,650.00No Caps$2,000.00
NWS Seal Beach 2800 Seal Beach Blvd30kVA Mitsubishi 1100Jul-11Dec-23Datasafe 12HX505FR24$990.00No Caps$2,400.00
NWS Seal Beach 1800 Seal Beach BlvdGE LP33UFeb-15Aug-23Genesis NP12-12T48$990.00$5,500.00$4,500.00$500.00
NBSD: Regional HQ750 Harbor DriveLiebert EXM 8012HX330-FR24$725.00No Caps
Time and MaterialALL SITES$0.00$0.00$0.00$0.00

Battery replacement time line

2024Yellow
2025Lt Green
2026Orange
Base (FY24)Option 1 (FY25)Option 2 (FY26)
Preventive Maintenance
T&M Labor Hours
T&M - Materials
Total Cost
Inflation Cost per year increase estimates. Battery cost increase by 2.5% and Pre Maintenance increase by 1.5% each year.

Projected Costs

Prepared by Sean Murphy