This is a Cross Reference Matrix template attachment for RFQ N00244-25-Q-0104 detailing technical requirements for two Breathing Air Purification Systems to be procured by NAVSUP Fleet Logistics Center San Diego for Fleet Readiness Center Southwest. The systems must deliver 35 SCFM of Grade D Breathing Air with 42 SCFM inlet air supply at 100 psig max 150 psig, operate at 100°F inlet air temperature and 40-120°F ambient temperature, and include outdoor-rated NEMA4 controls with 115v single-phase 60Hz power.
The scope includes removing two obsolete breathing air systems (one outside Building 1540 Paint Booth and one inside Building 1541 Blast Booth), installing two new replacement systems inside Building 1541, repositioning Building 1540's system to Building 1541, and installing interconnecting piping between systems for redundancy. The procurement is a small business set-aside under NAICS 333413 with a 12-week delivery requirement. The contractor must provide system certification and training for W/C 92D personnel on proper usage and maintenance. The acquisition will use a best-value comparative source selection process under a firm-fixed-price purchase order.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFQ N00244-25-Q-0104 | |||
| Breathing Air Purification Systems Cross Reference Matrix | |||
| Description | Meets minimum requirements? | Quote | Contractor Response |
| Capable of delivering 35S CFM of Grade D Breathing Air | |||
| Inlet Air Supply of 42 SCFM at 100 psig Max 150 psig | |||
| 100°F inlet air temperature | |||
| 40-120°F ambient temperature | |||
| New piping, ¾" cleaned/capped copper piping intended for breathing air. | |||
| Outdoor-Rated NEMA4 Controls, l l 5v-l ph-60Hz. | |||
| Bldg. 1540's breathing air system will be repositioned from outside of Bldg. 1540 to inside Bldg. 1541 | |||
| Interconnecting piping installation between both systems, which will allow cross-over to either application/use in the event that one breathing air system is out of commission | |||
| Removal of two (2) obsolete breathing air systems located outside Bldg. 1540 (Paint Booth) and inside Bldg. 1541 (Blast Booth) | |||
| Removal and disposal of the 2 old units | |||
| Installation of two (2) new replacement breathing air system, both inside Bldg. 1541. | |||
| Certification that systems operate to manufacturer's specifications | |||
| Training of W/C 92D personnel on proper usage and all required regularly scheduled maintenance. | |||
| Delivery - 12 weeks ARO |