Attachment 1 - Breakdown of Price by Divisions of Specifications.pdf

PDF 140 KB Posted

Attached to
Installation of fireproofing insulation at Chief of Mission Residence in Madrid, Spain
Solicitation number
19SP5026Q0005
Issued by

About this file

This document is an attachment to a Request for Quote (RFQ) No. 19SP5025Q0006 issued by the United States Department of State, specifically a pricing breakdown template for construction or renovation work. The form requires offerors to detail costs across 16 different construction specification divisions, including labor, materials, overhead, and profit for each division. The pricing template covers comprehensive construction areas such as general requirements, site work, concrete, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveying systems, mechanical, and electrical work. The template is to be completed in Euros, with space for total pricing, and allows for listing separate alternate proposals, though no allowance items are specified in this version.

View the file

Other files

File Type Posted
Attachment 2 - Specifications with Drawings and Pictures.pdf PDF
RFQ 19SP5026Q0005.pdf PDF
Invitation letter.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ No. 19SP5025Q0006 Page 53 of 55

ATTACHMENT #4

UNITED STATES DEPARTMENT OF STATE

BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS

(1) Division/Description

(2) Labor

(3) Materials

(4) Overhead

(5) Profit

(6) Total

1. General Requirements/ Mobilization

2. Site Work

3. Concrete

4. Masonry

5. Metals

6. Wood and Plastic

7. Thermal and Moisture

8. Doors and Windows

9. Finishes

10. Specialties

11. Equipment

12. Furnishings

13. Special Construction

14. Conveying Systems

15. Mechanical

16. Electrical

TOTAL EUROS:

Allowance Items: NONE

PROPOSAL PRICE TOTAL EUROS:

Alternates (list separately; do not total):

Offeror:

Date

File details come from the government source that posted it. Updated .