Attachment 1 - Breakdown of Price by Divisions of Specifications.pdf

PDF 140 KB Posted

Attached to
Supply and Installation of Air Handling Unit and conduits for basement ventilation at US Embassy Madrid, Spain
Solicitation number
19SP5025Q0015
Issued by

About this file

Attachment 1 is a detailed pricing breakdown template from the United States Department of State for a construction project. The template requires offerors to provide a comprehensive cost breakdown across 16 different construction divisions, including labor, materials, overhead, and profit for each division. These divisions range from general requirements and site work to specialized areas like mechanical and electrical systems. The template is designed to capture a granular view of project costs, with columns for labor, materials, overhead, profit, and a total column for each construction division. The template is intended to be used for a solicitation related to an air handling unit and conduit installation project at the US Embassy in Madrid, Spain, with pricing to be submitted in Euros.

View the file

Other files

File Type Posted
RFQ 19SP5025Q0015.pdf PDF
SF1442.pdf PDF
Attachment 5 - Sample of Technical Sheet UTA 3600.pdf PDF
Invitation letter.pdf PDF
Attachment 4 - Total Cost Breakdown.xlsx XLSX spreadsheet
Attachment 3 - Drawings.pdf PDF
Attachment 2 - Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ No. 19SP5025Q0006 Page 53 of 55

ATTACHMENT #4

UNITED STATES DEPARTMENT OF STATE

BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS

(1) Division/Description

(2) Labor

(3) Materials

(4) Overhead

(5) Profit

(6) Total

1. General Requirements/ Mobilization

2. Site Work

3. Concrete

4. Masonry

5. Metals

6. Wood and Plastic

7. Thermal and Moisture

8. Doors and Windows

9. Finishes

10. Specialties

11. Equipment

12. Furnishings

13. Special Construction

14. Conveying Systems

15. Mechanical

16. Electrical

TOTAL EUROS:

Allowance Items: NONE

PROPOSAL PRICE TOTAL EUROS:

Alternates (list separately; do not total):

Offeror:

Date

File details come from the government source that posted it. Updated .