This document appears to be a Pricing Schedule and Foreseeable Cost Worksheet for a federal contract opportunity related to the drydock availability of the USCGC KATHLEEN MOORE (WPC-154) in FY 2025. The document provides a detailed pricing schedule for various work items, including hull plating, tanks and voids, watertight closures, and other ship systems. It also includes a Foreseeable Cost Worksheet that estimates the contractor's transportation, per diem, cutter operations, and other costs associated with the drydock availability. The total duration of the drydock availability is anticipated to be 119 calendar days, with a start date of January 14, 2025 and an end date of May 13, 2025. The contract opportunity is being solicited by the Department of Homeland Security United States Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0005_ext.pdf | ||
| Amendment 0004_QA.pdf | ||
| Amendment 0003_QA.pdf | ||
| QA Attachment.pdf | ||
| Amendment 0002.pdf | ||
| Attachment 3_QA FORMS_.xlsx | XLSX spreadsheet | |
| Attachment 3_WISS v1.0 & VCS v1.0.pdf | ||
| Amendment 0001.pdf | ||
| Attachment 2_Specification.pdf | ||
| 70Z08024QPBPL0043.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: |
| USCGC KATHLEEN MOORE (WPC-154) DRYDOCK AVAILABILITY FY2025 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating | JOB | 1 | $0.00 | |
| D-002 | Tanks and Voids | JOB | 1 | $0.00 | |
| D-003 | Watertight Closures | JOB | 1 | $0.00 | |
| D-004 | Propulsion Shafting System | JOB | 1 | $0.00 | |
| D-005 | MSW/ASW/Firemain System | JOB | 1 | $0.00 | |
| D-006 | Electrical Power Distribution System | JOB | 1 | $0.00 | |
| D-007 | Ventilation Systems | JOB | 1 | $0.00 | |
| D-008 | Rudder System | JOB | 1 | $0.00 | |
| D-009 | Fin Stabilizer System | JOB | 1 | $0.00 | |
| D-010 | Bow Thruster System | JOB | 1 | $0.00 | |
| D-011 | Stern Launch Door System | JOB | 1 | $0.00 | |
| D-012 | Sewage and Grey Water System | JOB | 1 | $0.00 | |
| D-013 | Topside Structure and Coating Systems | JOB | 1 | $0.00 | |
| D-014 | Underwater Body | JOB | 1 | $0.00 | |
| D-015 | ICCP/Antifouling System | JOB | 1 | $0.00 | |
| D-016 | Interior Deck Coverings | JOB | 1 | $0.00 | |
| D-017 | Drydocking | JOB | 1 | $0.00 | |
| D-018 | Temporary Services | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | HOUR | 1 | 0.00 | |
| O-00B | GFP Report | NSP | EA | NSP | |
| O-00C | Laydays | DAY | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| Over and Above/Growth Work | |||||
| The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |||||
| OA/G-001 | **Provide breakdown, as follows: |
Over and Above/Growth Labor Rate
| Unit Price: $____; Quantity: 1,472 ; Unit of Issue: Hour; Extended Price: $____________ | Hour | 1472 | $0.00 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee |
Unit Price: $53,634.75; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [$53,634.75 X percentage quoted]: $______________ | $53,634.75 | $0.00 | ||
| Total Price of Over and Above/Growth | $0.00 |
(6/17/2024)
Rev-0 - Page &P of &N
Foreseeable Costs
| FORESEEABLE COST WORKSHEET | |
| USCGC KATHLEEN MOORE (WPC-1109) | FY25 |
| Contractor's Name: | |
| The contractor shall fill-in all yellow labeled boxes below to determine their foreseeable costs. Please read all notes and headers of sections for instructions in completing this worksheet. |
| DISTANCE FACTORS FOR: 100 Trumbo Point Rd. Key West, FL 33040 | |
| NAUTICAL MILES BASED ON ROUND-TRIP (TO AND FROM) | |
| NUMBER OF DAYS OF AVAILABILITY | 119 |
| (1) Port Engineer/COR Transportation: AIR TRAVEL | |
| (Applicable if > 50 miles from PE address |
(PE's desk location)
| A. Number of CG Representatives from NESU: | A= | 1 |
| B. The number of round trips between the contractor's facility and NESU | B= | 1 |
| C. A multiplied by B: | AxB=C= | 1 |
| D. Travel cost per trip: | D= |
Massey, Marc A CIV: Contractor shall utilize: https://www.gsa.gov/travel/plan-a-trip/transportation-airfare-rates-pov-rates-etc/airfare-rates-city-pair-program
| Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 driving miles from the PE's homeport OR (2) Enter "0" if their dry dock is less than 150 driving miles from the PE's homeport. | E. C multiplied by D =E, if >50 miles from NESU otherwise N/A. | E= | $0.00 |
| (2) Port Engineer Transportation: CAR TRAVEL | |||
| A. Number of CG Representatives from NESU: | A= | 1 | |
| B. Number of Driving miles Round-trip between the COR office and contractors facility: | B= | ||
| C. Travel cost per driving mile (rate at $0.58 per mile) | $0.580 | $0.00 | |
| (3) PER DIEM: (Applicable >50 miles CREW + PE) | |||
| A. Number of Ship's Crew & Port Engineer | A= | 25 | |
| B. Total number of day(s) in drydock. | B= | 119 | |
| C. Per diem cost at place of performance, per day: (if < 50 miles, enter "0" for all below) | C= | $0.00 | |
| C.1.1. Enter Lodging Daily Per Diem Rate | |||
| C.2.1. Enter Meals & Incidentals Total Daily Rate | |||
| C.2.1.1. Enter Meals & Incidentals First Day of Travel Daily Rate | |||
| D. AxBxC= D: (if >50 miles from NESU) | D= | $0.00 | |
| (4) PER DIEM: (Applicable >50 miles Contracting Officer Travel & Per Diem. KO location is Norfolk, VA 23510) | |||
| A. Number of KO authorized travel: | A= | 1 | |
| B. Total number of KO travel days: | B= | 3 | |
| C. Transportation cost for KO travel | C= |
Massey, Marc A CIV: Contractor shall utilize: https://www.gsa.gov/travel/plan-a-trip/transportation-airfare-rates-pov-rates-etc/airfare-rates-city-pair-program
| Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 miles from the KO's location in Norfolk, VA 23510 or (2) Enter "0" if their dry dock is less than 150 miles from the PE's homeport. | D. Per diem cost at place of performance, per day | D= | $0.00 |
| D.1.1. Enter Lodging Per Diem Rate | |||
| D.2.1. Enter Meals & Incidentals Total Daily Rate | |||
| D.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate | |||
| E. A [(B*D) + C] = | E= | $0.00 | |
| (5) CUTTER COST Operation Factors: | |||
| A. Round Trip Nautical Miles from the vessels pier to the contractors facility: | A= | 0 | |
| B. Cutter Cost Factor Per Nautical Mile: | B= | $51.04 | |
| C. A multiplied by B= C | C= | $0.00 | |
| (6) FAMILY SEPARATION ALLOWANCES (FSA) Applicable if > 50 miles from Homeport - for crew with dependents only (Daily Rate $8.33). If less than 50 miles enter 0 for A below. | |||
| A. Number of Personnel entitled to Family Separation Allowance: | A= | 12 |
Strawbridge, Tracey CIV: Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.
| B. Number of Days for Availability minus 30 days if availability is greather than 30 days: | B= | 119 |
| C. A multiplied by B = C (Daily FSA rate of $8.33) | C= | $11,895.24 |
| (7) CREW TRANSPORTATION FOR HOME VISIT (Applicable after 31 consecutive days if > 50 miles from Homeport - for crew with dependents only | ||
| A. Number of Personnel (with dependents) entitled to HOME visit: | A= | 12 |
| B. Number of Homeport Visits: | B= | 2 |
| C Mileage to homeport = (Roundtrip Ticket Cost) | C= |
Massey, Marc A CIV: If contractor's facility is:
- located < 50 miles from the ship's homeport, enter $0.
- located > 51 miles but less than 149 miles from the ship's homeport, multiply round trip vehicle mileage by $0.58
- located > 150 miles from ship's homeport, utilize https://www.gsa.gov/travel/plan-a-trip/transportation-airfare-rates-pov-rates-etc/airfare-rates-city-pair-program Massey, Marc A CIV: Contractor enters name here Massey, Marc A CIV: Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates Massey, Marc A CIV: Contractor will enter either (1) "0" if their dry dock is located less than 50 miles or more than 150 miles from the PE's homeport or (2) the total number of round trip driving miles if the contractor is located between 51 to 149 miles from PE's homeport.
Massey, Marc A CIV: Contractor shall utilize: https://nauticalcharts.noaa.gov/publications/docs/distances.pdf http://ports.com/sea-route/ Massey, Marc A CIV: Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates based on the location of their facility.
Strawbridge, Tracey CIV: Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.
| D. A multiplied by B, multiplied by C = D: | C= | $0.00 |
| GRAND TOTAL | ||
| 1. PE/COR Transportation (AIRFARE) | $0.00 | |
| 2. PE/COR Transportation (CAR) | $0.00 | |
| 3. Per Diem for Crew and PE/COR | $0.00 | |
| 4. Cutter Cost Operations Factors | $0.00 | |
| 5. Family Separation Allowance | $11,895.24 | |
| 6. Crew Transportation Home Visit | $0.00 | |
| Total Cost of Distance Factors: | $11,895.24 | |
| Total Contractor Quoted/Proposal Price: | $0.00 | |
| TOTAL EVALUATED QUOTE/PRICE | $11,895.24 |
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |