These are 100% construction documents for the VA North Texas Health Care System's project to upgrade chillers and cooling towers at the Energy Center (Building 70) located at 4500 S. Lancaster Road, Dallas, TX 75216. The project number is 549-23-601, dated December 6, 2023, and comprises 26 sheets of plans including general, structural, architectural, mechanical, and electrical drawings prepared by Spur Design, LLC as the architect/engineer of record.

The project scope involves the phased removal and replacement of existing chillers and associated equipment. Key mechanical components include four new 1,000-ton water-cooled chillers (70-CCU3 through 70-CCU6), new chilled water pumps (70-CHP3 through 70-CHP9), new condenser water pumps, and new cooling towers with basin heaters. New equipment is being installed on modified concrete pads with seismic anchoring and vibration isolation. The electrical work includes new starters, variable frequency drives, connections to existing motor control centers (MCC-CH1 and MCC-CH2), and integration with the existing 4160V and 480V electrical distribution system. Control systems integration with the existing Johnson Controls Building Automation System is specified, including optimized chiller/cooling tower sequencing to minimize energy consumption. The project is fully sprinklered and must comply with 2024 IBC, 2024 NFPA codes, ASHRAE 90.1-2019 energy standards, and VA design standards. Construction must be coordinated with ongoing facility operations, and temporary chillers may be required depending on construction phasing and seasonal timing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project NumberCONSULTANTS:

Drawing #

U.S. DEPARTMENT OF VETERANS AFFAIRS

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

TX ARCHITECTURE COA NO. BR 2171 EXP. 09/30/2024

TX ENGINEERING COA NO. F-17591 EXP. 02/29/2024

COMMISSIONING AGENT

ES2 - ENGINEERED SYSTEMS & ENERGY SOLUTIONS, INC.

13401 N. SANTA FE AVE.

OKLAHOMA CITY, OK 73114

(405) 528-4500

MECH / ELEC / PLUMB ENGINEER

SPUR DESIGN

2519 MADISON AVE. STE 100

KANSAS CITY, MO 64108

(913) 369-7200

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FULLY SPRINKLERED

STRUCTURAL

H2B, INC.

1225 N. LOOP W. STE 800

HOUSTON, TX 77008

(713) 864-2900

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD. STE 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/4

/2

:0 :1

A

M

COVER SHEET

EFB 01 OF 26MJA

100% CONSTRUCTION DOCUMENTS

UPGRADE CHILLERS & COOLING TOWERS

AT ENERGY CENTER (BLDG. 70)

VA PROJECT NUMBER: 549-23-601

UPGRADE CHILLERS &

COOLING TOWERS AT

ENERGY CENTER (BLDG. 70)

12/06/2023

549-23-601

VA N. TEXAS HEALTH CARE SYSTEM

4500 S. LANCASTER ROAD

DALLAS, TX 75216

VA NORTH TEXAS HEALTH CARE SYSTEM

4500 S. LANCASTER ROAD

DALLAS, TX 75216

100% CONSTRUCTION DOCUMENTS

GI000

SPUR #: 2090.10

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

[01] GENERAL

01 GI000 COVER SHEET

02 GI001 GENERAL INFORMATION

03 GI002 PHASING PLAN

[02] STRUCTURAL

04 SA001 STRUCTURAL GENERAL NOTES

05 SA010 STRUCTURAL SPECIAL INSPECTIONS

06 SB101 FOUNDATION PLAN

07 SB301 FOUNDATION DETAILS

[03] ARCHITECTURAL

08 AS001 ARCHITECTURAL SITE PLAN

09 A-100 OVERALL PLAN

10 AD101 DEMOLITION PLAN

11 AE101 REFERENCE PLAN

[04] MECHANICAL

12 M-000 LEGEND AND ABBREVIATIONS

13 M-101 MECHANICAL DEMOLITION PLAN

14 M-201 MECHANICAL RENOVATION PLAN

15 M-401 MECHANICAL ENLARGED PLANS

16 M-501 MECHANICAL DETAILS / SCHEDULES

17 M-701 MECHANICAL CONTROLS

18 M-702 MECHANICAL CONTROLS

19 M-703 MECHANICAL CONTROLS

[05] ELECTRICAL

20 E-001 ELECTRICAL LEGEND AND ABBREVIATIONS

21 E-101 ELECTRICAL SITE PLAN

22 ED201 ELECTRICAL DEMOLITION FLOOR PLAN

23 E-201 ELECTRICAL FLOOR PLAN

24 ED601 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM

25 E-601 ELECTRICAL ONE-LINE DIAGRAM

26 E-602 ELECTRICAL ONE-LINE DIAGRAM MCC-CH1 AND

MCC-CH2

TOTAL SHEETS: 26

NN

LOCATION

PLAN

AREA

PLAN

PROJECT LOCATION

No. REVISION DESCRIPTION DATE

BID ADD:

1. CONTRACTOR TO COORDINATE WITH THE VA THE USE OF

TEMPORARY CHILLERS IF REQUIRED TO SUPPLEMENT

EXISTING LOADS, DEPENDING ON CONSTRUCTION START

TIME AND TIME OF YEAR, DURING PHASED REMOVAL AND

REPLACEMENT OF EXISTING CHILLERS.

ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS

4' -0

M

A X

4' -0

M

A X

2' -1

0" M

A X

2' -3

M

IN

1'-6" MIN

1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT

BLOCKING FOR ALL WALL MOUNTED ACCESSORIES,

FIXTURES, AND EQUIPMENT.

2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN

COUNTERTOPS @ 36"-48" MAX ON CENTER.

3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER

FINISHED FLOOR TO THE OPERABLE PART OF THE FIXTURE.

4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL

FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR

FIXTURE TYPES USED IN THIS PROJECT.

5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,

BACKING TO BE PROVIDED AS SHIM FOR FLUSH

APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.

6" MAX

9" M

IN

SHOWER

VA TOILET ROOM

TURNING RADIUS

DRINKING

FOUNTAIN

PAPER TOWEL

DISPENSER

SANITARY

NAPKIN

DISPENSER

4' -0

"M A

X

WASTE

RECEPTACLE

LAVATORY

WITH MIRROR

ON CENTER

WALL

4' -0

M

A X

SOAP

DISPENSER

2' -1

0" M

A X

T O

B .O

. R E

F

LE

C T

IV

E

S U

R F

A C

E

3' -4

"M A

X

17 MIN

2' -3

M

IN

3' -0

M

A X

1'-6" MIN

WALL

2' -9

" 4' -0

M

IN

2'-0" MIN

8" MIN

WALL

LAVATORY

WITH APRON

1' -5

M

A X

1'-6" MIN

URINAL

WALL

1'-5" - 1'-7" (AMBULATORY)

1'-4" - 1'-6" (WHEELCHAIR)

CLEAR FLOOR

5'-6"

CLEAR FLOOR

6'-0"

3'-0" MIN

2' -9

3' -0

1'-0" MIN

3'-6" MIN 1'-0"MAX

4'-6" MIN

1' -5

'-7

1' -6

M

IN

A N

S I I

C C

A

7.

1)

1' -3

M

IN

A D

A /A

B A

2' -9

'-0

WALL

WALL

4' -0

M

A X

WALL HOOK

7' -0

CLOCK

WALL

FINISHED FLOOR

FIRE EXTINGUISHER

CABINET

WEIGHT > 40LBS

FIRE EXTINGUISHER

CABINET

WEIGHT < 40LBS

4' -0

"M A

X

4' -0

M

A X

TOILET SEAT

COVER

DISPENSER

BABY

CHANGING

STATION

CLEAR FLOOR SPACE

@ WATER CLOSET

5'-6"

2'-6"

4' -0

2'-6"

4' -0

HANDRAILS AND

BUMPER GUARDS

FIXTURE MOUNTING HEIGHTS AND CLEARANCES

18" MIN

M

IN

FRONT APPROACH,

PULL SIDE

36" MIN

M

IN

HINGE APPROACH,

PULL SIDE

HINGE APPROACH,

PULL SIDE

*12" MIN48

M

IN

FRONT APPROACH,

PUSH SIDE

M

IN

HINGE APPROACH,

PUSH SIDE

22" MIN 24" MIN

*4 8"

M

IN

LATCH APPROACH,

PULL SIDE

24" MIN*4

2"

M

IN

LATCH APPROACH,

PUSH SIDE

*IF BOTH CLOSER

AND LATCH ARE

PROVIDED

*54" MIN IF CLOSER

IS PROVIDED

*48" IF CLOSER IS

PROVIDED

FRONT APPROACH,

PUSH SIDE

M

IN

42" MIN

DOOR AND FIXTURE CLEARANCES

MATERIALS LEGEND

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN

VOLUNTARY STANDARD BODIES.

GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS. REFERENCE RELEVANT ADDENDA FOR EACH OF THE ADOPTED CODES AND STANDARDS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• 2024 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)

• 2024 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)

• 2024 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)

• 2024 NATIONAL FIRE CODES (NFPA)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• 2023 VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2024 INTERNATIONAL MECHANICAL CODE

• 2023 NATIONAL ELECTRICAL CODE (NEC), NFPA 70

• 2024 INTERNATIONAL PLUMBING CODE (IPC)

• 2022 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.

• ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)

• 2022 ANSI ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES

• 2022 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)

• 2023 STEEL CONSTRUCTION MANUAL (16TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND

NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS

• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

• 2022 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1

• 2022 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15

• 2023 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT

NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.

DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES

EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

ENERGY REQUIREMENTS

N

1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL CONFIRM

ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE ENTIRE

DOCUMENT SET.

2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY WORK,

TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY DISCREPANCIES TO

THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND

EXISTING STRUCTURAL CONDITIONS.

3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT

CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.

4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE

CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK

AREAS FROM THE EXISTING FACILITIES.

5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.

6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN

PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND REPAIR

ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.

7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR

REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.

8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT

PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.

9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE

ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.

10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER

DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A

WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE AND

OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND

ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS, BUT

DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL DRAWINGS.

CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE OTHER SHEETS

AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION DOCUMENTS THAT REFLECT

WORK REQUIRED TO ACHIEVE A COMPLETE AND OPERATIONAL GOAL. LACK OF

COORDINATION AND REVIEW OF DRAWINGS AND SPECIFICATIONS AS AN ENTIRE

DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS, BEING OBVIOUS AND

TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE DRAWINGS AND SPECIFICATIONS, SHALL

NOT BE IN ANY WAY AN ADDITIONAL COST TO THE GOVERNMENT.

11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH SERVICES

TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN ADVANCE OF

PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND

APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS OF ANY

SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60 CALENDAR DAYS PRIOR TO THE

DESIRED TIME AND SHALL BE PERFORMED AS DIRECTED BY THE COR. MAJOR

INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS AND MAY

NOT BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL

CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING AND APPROVED BY THE COR.

CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH

OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE

TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE

MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING

HOURS. SCHEDULE INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT

BE AN ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT

MAY AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING

THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.

12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING BUILDING MATERIALS

(ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE DESIGNED/SPECIFIED AS BUILDING

MATERIAL IN ANY OF THE CONSTRUCTION DOCUMENTS.

GENERAL NOTES

AREA NAME

150 SF

A101

A101

SIM

A

00.0

A101

1 1

A101

LEVEL NAME

00'-00"

00'-00" 4B

3A

FIBERGLASS BATT

INSULATION

RIGID INSULATION

CONCRETE / PRECAST

CONCRETE

EARTH / SOIL

SAND, EIFS FINISH, OR

PLASTER FINISH

GYPSUM BOARD FINISH

BRICK

CONCRETE MASONRY

UNIT

STONE / CAST STONE

GYPSUM BOARD SECTION

EXTERIOR SHEATHING

BOARD SECTION

PLYWOOD SECTION

CLEAN UTILITY

000A

150 SF

/1 A101

X0000

6"

3' -0

M

A X

ROOM TAG

AREA TAG

SPECIALTY EQUIPMENT TAG

DOOR TAG

KEYED NOTE TAG

WALL TAG

WINDOW TAG

A101

SIM

A101

SIM

A

ACB ACOUSTIC CEILING BAFFLE

ACP ACOUSTIC CEILING PANEL

ACST ACOUSTIC

ADA AMERICANS WITH DISABILITIES ACT

ACT ACOUSTICAL CEILING TILE

ADDL ADDITIONAL

ADDN ADDITION

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

AE ARCHITECT/ENGINEER

AF ACCESS FLOORING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINIUM (TRIM)

AMT AMOUNT

APPROX APPROXIMATE

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

AT ACOUSTIC CEILING TILE

AVG AVERAGE

B

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BOS BOTTOM OF STEEL

BOT BOTTOM

BRKT BRACKET

BTWN BETWEEN

C

CAB CABINET

CAV CAVITY

CBB CONCRETE BACKER BOARD

CD CONSTRUCTION DOCUMENTS

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CH BD CHALK BOARD

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CONTRACTING OFFICER

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CP CONTRACTOR PROVIDED

CP/CI CONTRACTOR PROVIDED /

CONTRACTOR INSTALLED

CPT CARPET/CARPET TILE

CS CONCRETE SEALED

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTR CENTER

CU FT CUBIC FEET

D

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

DWG DRAWING

DWP DIMENSIONAL WALL PANEL

E

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPY EPOXY FLOORING

EQ EQUAL

ETR EXISTING TO REMAIN

EX EXISTING

EXP EXPOSED

EXT EXTERIOR

F

FAB FABRIC

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FP FIRE PROTECTION

FR FIRE RESISTANT

FT FEET

FTG FOOTING

FV FIELD VERIFY

FWC FABRIC WALL COVERING

G

GDR GUARDRAIL

GL GLASS/GLAZING

GRAN GRANITE

GR FL GROUND FLOOR

GT GROUT

GSM GALVANIZED SHEET METAL

GYP BD GYPSUM BOARD

H

HDW HARDWARE

HEPA HIGH EFFICIENCY

PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

I

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J

J-BOX JUNCTION BOX

L

LAV LAVATORY

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIN LINEAR

LN LINOLEUM

LOC LOCATION

LT LIGHT

LVR LOUVER

LVT LUXURY VINYL TILE

M

MAT CARPET MAT / WALK-OFF MAT

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MOD MODIFY

MTG MOUNTING

MTL METAL

MVBL MOVABLE

N

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P

P PAINT

PA PUBLIC ADDRESS

PBD PARTICLE BOARD

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PNL PANEL

PR PAIR

PRB PROFILE BASE

PRKG PARKING

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PORCELAIN TILE

PWR POWER

Q

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QTY QUANTITY

REFERENCE SYMBOLS IDENTIFICATION TAGS

NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.

GRID HEAD AND

LINE

LEVEL INDICATOR

MATCH LINE AND

VIEW REFERENCE

NORTH ARROW W/

PROJECT NORTH

SPOT ELEVATION

DETAIL

SECTION

**48" MIN IF BOTH CLOSER

AND LATCH PROVIDED

WALL

SECTION

BUILDING

SECTION

DETAIL

ELEVATION

INTERIOR

ELEVATION

BUILDING

ELEVATION

1 1

6'- 0"

5'- 6"

BARIATRIC TOILET ROOM

TURNING RADIUS

CLEAR FLOOR SPACE

@ ADA LAVATORY

CLEAR FLOOR SPACE @ ADA

DRINKING FOUNTAIN

4"

6"

3"

6" 1'

-6

6" MAX

7" - 9" 11" MIN

17" - 25"

M

IN

6' -0

(ANSI ICC A117.1)

39"- 41"

(A N

S I I

C C

A

7.

1)

M

IN

(A N

S I I

C C

A

7.

1)

1"

3' -6

M

A X

5' -0

M

A X

R

RAF RESILIENT ATHLETIC FLOORING

RB RUBBER BASE/RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RES RESINOUS FLOORING

RES-W RESINOUS / EPOXY WALL / CEILING

RF RUBBER FLOORING

RFG ROOFING

RM ROOM

RO ROUGH OPENING

RP RESIN PANEL

RSF RESILIENT SHEET FLOORING

RV ROOF VENT

RWC RIGID VINYL WALLCOVERING

S

SC SPECIALTY COATING

SD STATIC DISSIPATIVE FLOORING/TILE

SCHED SCHEDULE

SECT SECTION

SF SQUARE FOOT (FEET)

SGL SINGLE

SIM SIMILAR

SJ SCORED JOINT

SLNT SEALANT

SM SHEET METAL

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SOLID SURFACE

ST STONE

STD STANDARD

STOR STORAGE

SV SHEET VINYL (ROLLED OR TILE)

T

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TOF TOP OF FOOTING/ FOUNDATION

TOM TOP OF MASONRY

TOS TOP OF SLAB/ STEEL

U

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

V

VAR VARIES

VC VA PROVIDED / CONTRACTOR

INSTALLED

VCT VINYL COMPOSITION TILE

VFAT VINYL FACED ACOUSTICAL TILE

VP VENEERED PLASTER

VT VINYL TILE

VV VA PROVIDED / VA INSTALLED

VWC VINYL WALLCOVERING

VWF VINYL WALL FABRIC

W

W/ WITH

W/O WITHOUT

W/C WATER CLOSET

WC WHEELCHAIR

WD WOOD

WFAB WALL FABRIC

WPM WATERPROOF MEMBRANE

WSF WELDED SHEET FLOOR

X

X BRACE CROSS BRACE

TRUE

NORTH

ASHRAE 90.1 - 2019 EDITION

BUILDING LOCATION: DALLAS, TX

CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 2A

INTERIOR DESIGN CONDITIONS:

THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM

AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.

BUILDING ENVELOPE REQUIREMENTS (5.5 )

BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 2 (A,B)

ROOFS REQUIRED DESIGNED

INSULATION: R-25 c.i. EXISTING

METAL BUILDINGS: R-10 + R-19 FC EXISTING

ATTIC AND OTHER: R-38 EXISTING

WALLS, ABOVE GRADE

MASS: R-5.7 c.i. EXISTING METAL BUILDING: R-0 + R-9.8 c.i. EXISTING STEEL-FRAMED: R-13 + R-3.8 c.i. EXISTING

WOOD-FRAMED AND OTHER: R-13 EXISTING

WALL, BELOW GRADE

BELOW-GRADE WALL: NR EXISTING

FLOORS

MASS: R-6.3 c.i. EXISTING

STEEL JOIST: R-30 EXISTING

WOOD-FRAMED AND OTHER: R-30 EXISTING

SLAB-ON-GRADE FLOORS

UNHEATED SLABS: NR EXISTING

HEATED SLABS: R-10 for 24 in. EXISTING

OPAQUE DOORS

SWINGING: U-0.370 EXISTING

NONSWINGING: U-0.310 EXISTING

FENESTRATION (TABLE 5.5-4):

VERTICAL FENESTRATION, U-FACTOR

FIXED: U-0.45 EXISTING

OPERABLE: U-0.60 EXISTING

ENTRANCE DOOR: U-0.77 EXISTING

DEFINITIONS

c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM

NR = NO (INSULATION) REQUIREMENT

FC = FILLED CAVITY

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project NumberCONSULTANTS:

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

TX ARCHITECTURE COA NO. BR 2171 EXP. 09/30/2024

TX ENGINEERING COA NO. F-17591 EXP. 02/29/2024

COMMISSIONING AGENT

ES2 - ENGINEERED SYSTEMS & ENERGY SOLUTIONS, INC.

13401 N. SANTA FE AVE.

OKLAHOMA CITY, OK 73114

(405) 528-4500

MECH / ELEC / PLUMB ENGINEER

SPUR DESIGN

2519 MADISON AVE. STE 100

KANSAS CITY, MO 64108

(913) 369-7200

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FULLY SPRINKLERED

STRUCTURAL

H2B, INC.

1225 N. LOOP W. STE 800

HOUSTON, TX 77008

(713) 864-2900

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD. STE 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/4

/2

:0 :1

A

M

GENERAL INFORMATION

EFB 02 OF 26MJA

100% CONSTRUCTION DOCUMENTS

UPGRADE CHILLERS &

COOLING TOWERS AT

ENERGY CENTER (BLDG. 70)

12/06/2023

549-23-601

VA N. TEXAS HEALTH CARE SYSTEM

4500 S. LANCASTER ROAD

DALLAS, TX 75216

GI001

SPUR #: 2090.10No. REVISION DESCRIPTION DATE

11109876

E

D

C

B

#3 #4 #5 #6 #7

CHILLER

PLANT

PHASE 1 PHASE 2 PHASE 3

PHASE 4PHASE 2 PHASE 3

PHASE 4

PHASE 1 PHASE 2 PHASE 3 PHASE 4

PHASE 1 PHASE 2 PHASE 3

PHASING PLAN NOTES

PHASE 1 - COMPLETE MODIFICATION OF CONCRETE PAD FOR CHILLER #3 AND

ASSOCIATED EQUIPMENT

PHASE 2 - COMPLETE MODIFICATION OF CONCRETE PAD FOR CHILLER #4 AND

ASSOCIATED EQUIPMENT

PHASE 3 - COMPLETE MODIFICATION OF CONCRETE PAD FOR CHILLER #5 AND

ASSOCIATED EQUIPMENT

PHASE 4 - COMPLETE MODIFICATION OF CONCRETE PAD FOR CHILLER #6 AND

ASSOCIATED EQUIPMENT

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project NumberCONSULTANTS:

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

TX ARCHITECTURE COA NO. BR 2171 EXP. 09/30/2024

TX ENGINEERING COA NO. F-17591 EXP. 02/29/2024

COMMISSIONING AGENT

ES2 - ENGINEERED SYSTEMS & ENERGY SOLUTIONS, INC.

13401 N. SANTA FE AVE.

OKLAHOMA CITY, OK 73114

(405) 528-4500

MECH / ELEC / PLUMB ENGINEER

SPUR DESIGN

2519 MADISON AVE. STE 100

KANSAS CITY, MO 64108

(913) 369-7200

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FULLY SPRINKLERED

STRUCTURAL

H2B, INC.

1225 N. LOOP W. STE 800

HOUSTON, TX 77008

(713) 864-2900

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD. STE 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/4

/2

:0 :1

A

M

PHASING PLAN

EFB 03 OF 26MJA

100% CONSTRUCTION DOCUMENTS

UPGRADE CHILLERS &

COOLING TOWERS AT

ENERGY CENTER (BLDG. 70)

12/06/2023

549-23-601

VA N. TEXAS HEALTH CARE SYSTEM

4500 S. LANCASTER ROAD

DALLAS, TX 75216

GI002

SPUR #: 2090.10

N

1/8" = 1'-0"

BUILDING 70 - LEVEL 1 - PHASING PLAN1

No. REVISION DESCRIPTION DATE

GENERAL NOTES

THE STRUCTURAL DRAWINGS DEPICT THE STRUCTURE IN ITS FINAL CONSTRUCTED CONFIGURATION.

NEITHER CONSTRUCTION MEANS AND METHODS NOR CONSTRUCTION SAFETY ARE PART OF THE

STRUCTURAL ENGINEER’S EXPERTISE OR SCOPE OF WORK. THE GENERAL CONTRACTOR AND THEIR

SUBCONTRACTORS ARE FULLY RESPONSIBLE FOR THE MEANS AND METHODS USED TO CONSTRUCT

THE STRUCTURE AND FOR FULL COMPLIANCE WITH ALL JOB SAFETY RELATED REGULATIONS AND CONDITIONS AT THE SITE. LIMITED SITE VISITS, IF ANY, BY THE STRUCTURAL ENGINEER ARE SOLELY

TO OBSERVE COMPLETED PARTS OF THE STRUCTURE. THE STRUCTURAL ENGINEER IS NEITHER

QUALIFIED TO OBSERVE NOR COMMENT ON CONSTRUCTION MEANS AND METHODS AND JOB SITE

SAFETY.

CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS PRIOR TO

FABRICATION/CONSTRUCTION. NOTIFY STRUCTURAL ENGINEER AND ARCHITECT OF ANY

DISCREPANCIES PRIOR TO FABRICATION/CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ALL

WORK FITTING AS INTENDED BY THE DRAWINGS AND SPECIFICATIONS.

PRINCIPAL OPENINGS ARE SHOWN ON THE DRAWINGS. SEE ARCHITECTURAL, MECHANICAL AND

ELECTRICAL DRAWINGS FOR OPENINGS, SLEEVES, CURBS, INSERTS, DEPRESSIONS, ETC NOT SHOWN.

ALL DETAILS ARE TYPICAL UNLESS NOTED OTHERWISE. DETAILS SHALL APPLY TO SIMILAR AND LIKE

CONDITIONS.

SHOP DRAWINGS SHALL BE NEW DRAWINGS PRODUCED BY THE CONTRACTOR, ILLEGIBLE

REPRODUCTIONS OF THE DESIGN DRAWINGS WILL BE REJECTED. ELECTRONIC FILES MAY BE

REQUESTED FROM THE ENGINEER OF RECORD FOR THE PURPOSE OF PREPARING SHOP DRAWINGS.

THE CONTRACTOR WILL BE REQUIRED TO SIGN AN INDEMNITY STATEMENT PRIOR TO TRANSMISSION

OF THE ELECTRONIC FILES TO THE CONTRACTOR. THE USE OF REPRODUCTIONS OF THESE

CONTRACT DRAWINGS BY ANY CONTRACTOR, SUBCONTRACTOR, ERECTOR, FABRICATOR, OR

MATERIAL SUPPLIER IN LIEU OF PREPARATION OF SHOP DRAWINGS SIGNIFIES THEIR ACCEPTANCE OF ALL INFORMATION SHOWN HEREIN AS CORRECT, AND OBLIGATES THEMSELF TO ANY JOB EXPENSE, REAL OR IMPLIED, ARISING DUE TO ANY ERRORS OR OMISSIONS THAT MAY OCCUR HEREIN.

MINIMUM SHOP DRAWING SUBMITTAL REQUIREMENTS INCLUDE:

CONCRETE MIX DESIGNS FOR EACH CLASS OF CONCRETE WITH TEST DATA

CONCRETE ACCESSORIES (VAPOR BARRIER, REINFORCING SUPPORT CHAIRS, ETC.)

CONCRETE REINFORCING SHOP DRAWINGS

THIS PROJECT CONSISTS OF A MODIFICATION TO AN EXISTING BUILDING. INFORMATION ON EXISTING

CONDITIONS HAS BEEN TAKEN FROM THE ORIGINAL DESIGN DRAWINGS AND SHOWN ON THESE

DRAWINGS. THESE DRAWINGS WERE ASSUMED TO BE “AS-BUILT” DRAWINGS SINCE EXISTING

CONDITIONS WERE NOT ACCESSIBLE OR SINCE FIELD OBSERVATION OF EXISTING CONDITION IS

BEYOND THE ENGINEER’S SCOPE OF WORK DURING THE DESIGN PHASE OF THIS PROJECT. THE

ACCURACY OF THIS INFORMATION HAS NOT BEEN VERIFIED. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO VERIFY ALL EXISTING DIMENSIONS SHOWN ON THESE DRAWINGS AND TO VERIFY

THE LOCATION OF ALL FRAMING MEMBERS AND OTHER OBSTRUCTIONS WHICH WILL AFFECT THE

WORK. AS PART OF THIS WORK THE CONTRACTOR SHALL PREPARE AN ACCURATE FIELD SURVEY OF

THE LOCATION OF ALL STRUCTURAL MEMBERS IN THE WORK AREA PRIOR TO BEGINNING SHOP

DRAWINGS AND CONSTRUCTION. THIS SURVEY SHALL BE SUBMITTED TO THE ARCHITECT WITH

VARIANCES NOTED. CLAIMS FOR ADDITIONAL TIME OR EXTRA COST DUE TO OBSTRUCTIONS AND VARIANCES IN THE LOCATION OF THE STRUCTURAL MEMBERS WILL NOT BE HONORED AFTER WORK

HAS BEGUN ON THE PROJECT.

BUILDING CODE: INTERNATIONAL BUILDING CODE, 2021 EDITION

DEAD LOAD:

ANY CHANGES IN CONSTRUCTION MATERIALS FROM THOSE SHOWN ON

THE ARCHITECTURAL OR STRUCTURAL DRAWINGS SHALL BE REPORTED BY

THE CONTRACTOR TO THE STRUCTURAL ENGINEER FOR VERIFICATION OF

LOAD CARRYING CAPACITY OF THE STRUCTURE.

LIVE LOAD:

MECHANICAL PLATFORMS: 150 PSF

WIND LOAD:

VELOCITY (ULT) : 115 MPH THREE SECOND GUST

EXPOSURE: C

RISK CATEGORY: IV

INTERNAL PRESSURE COEFFICIENT, Gcpi: +/- 0.18

SEISMIC LOAD:

RISK CATEGORY: IV

SEISMIC IMPORTANCE FACTOR (I): 1.5

MAPPED SPECTRAL RESP ACCEL (Ss/S1): 0.093g/0.053g

SITE CLASS: D

SPECTRAL RESPONSE COEFF (Sds/Sd1): 0.099g/0.085g

SEISMIC DESIGN CATEGORY: C

CONCRETE

1. ALL CONCRETE REINFORCING BARS SHALL CONFORM TO ASTM A615, GRADE 60, EXCEPT WHERE NOTED. NO. 3 BARS SHALL CONFORM TO ASTM A615, GRADE 40. DEFORMED BAR ANCHORS SHALL

CONFORM TO ASTM A496, GR 70.

2. CONCRETE IN THE FOLLOWING AREAS SHALL HAVE SAND AND CRUSHED CARBONATE AGGREGATE

CONFORMING TO ASTM C33, TYPE 1 PORTLAND CEMENT, FLYASH CONFORMING TO ASTM C618,

CLASS ‘C’ UP TO 20 PERCENT REPLACEMENT BY VOLUME AND THE FOLLOWING DESIGNATED

COMPRESSIVE STRENGTH (f’c) IN 28 DAYS:

• ALL CONCRETE ------------------------- 4500 PSI (w/c = 0.45 MAX)

CONCRETE SUPPLIER SHALL BE AWARE OF CEMENTS THAT CAN CAUSE ETTRINGITE FORMATION IN THE CEMENT PASTE AND BE PREPARED TO SHOW THAT THE CEMENTS USED WILL NOT CAUSE THIS

PROBLEM.

3. CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE AS FOLLOWS; SEE SEC 20.5 ACI 318, LATEST EDITION FOR CONDITIONS NOT NOTED, PROVIDE CHAIR SUPPORTS (AZTEC CASTLE CHAIR, WHC SERIES ‘B’ OR EQUAL) TO ADEQUATELY SUPPORT BARS FOR PROPER CLEARANCE AS

RECOMMENDED BY THE AMERICAN CONCRETE INSTITUTE AND THE CONCRETE REINFORCING

STEEL INSTITUTE. SLAB ON GRADE REINFORCEMENT SHALL BE SUPPORTED AT 42-INCH MAXIMUM

INTERVALS OR EVERY THIRD BAR.

• CONCRETE PADS ----- 1½ IN TOP

4. DETAILING OF CONCRETE REINFORCEMENT AND ACCESSORIES SHALL BE IN ACCORDANCE WITH

ACI PUBLICATION 315, LATEST EDITION. ALL HOOKED BARS SHOWN IN DETAILS SHALL HAVE

STANDARD HOOKS UNLESS NOTED OTHERWISE.

5. ALL MIXING, TRANSPORTING, PLACING AND CURING OF CONCRETE SHALL BE DONE IN

ACCORDANCE WITH THE RECOMMENDATIONS OF THE AMERICAN CONCRETE INSTITUTE, ACI 301,

LATEST EDITION.

6. REINFORCING BARS SHALL NOT BE WELDED WITHOUT APPROVAL OF THE STRUCTURAL ENGINEER.

7. UNLESS NOTED OTHERWISE CONTINUOUS BOTTOM REINFORCING BARS SHALL BE SPLICED AT

SUPPORTS AND CONTINUOUS TOP REINFORCING BARS SHALL BE SPLICED AT MID-SPAN.

8. ALL CONTINUOUS REINFORCEMENT SHALL HAVE CLASS B LAP AT SPLICES. PROVIDE (1) - #6 X 6’-0”

TOP AND BOTTOM (TWO 36” LEGS WITH 90 DEGREE BEND) AT EACH FACE OF GRADE BEAMS AT

CORNERS AND INTERSECTIONS, AND AT 18” ON CENTER VERTICALLY AT WALLS.

9. CONDUITS ARE NOT ALLOWED IN SLABS, BEAMS, WALLS OR COLUMNS. ALL CONDUITS SHALL BE

SUSPENDED FROM OR ATTACHED TO THE CONCRETE STRUCTURE.

10. ALL BASE PLATES AND ANCHOR RODS SHALL BE PROTECTED WITH 3” (MIN) OF CONCRETE.

ANCHOR RODS SHALL BE FABRICATED FROM FULL BODIED STEEL RODS CONFORMING TO ASTM

F1554 GR.36, WASHERS CONFORMING TO ASTM F884 AND NUTS CONFORMING TO ASTM A194 OR

A563 AND HAVING THE SAME DIAMETER AS THE BOLT DIAMETER AND USING CUT THREADS.

ROLLED THREADS ARE NOT ACCEPTABLE. BOLTS SHALL BE SET USING RIGID TEMPLATES.

11. PROVIDE (1) - #5 X 4’-0” AT RE-ENTRANT CORNERS AND AROUND RECTANGULAR HOLES IN SLABS

UNLESS NOTED OTHERWISE. PLACE BAR DIAGONAL TO CORNER WITH 1” CLEARANCE FROM TOP

AND THE SIDE OF THE SLAB AT THE CORNER.

12. WHERE FRESH CONCRETE IS DEPOSITED AGAINST HARDENED CONCRETE (GREATER THAN 8

HOURS OLD), CLEAN EXISTING SURFACE OF LAITANCE AND FOREIGN MATERIAL AND DAMPEN THE

EXISTING SURFACE. IF REQUIRED, ROUGHEN EXISTING CONCRETE TO ¼” AMPLITUDE.

FOUNDATIONS

1. THE EXISTING STRUCTURE CONSISTS OF DRILLED PIERS. THE ALLOWABLE SOIL PRESSURES ARE

SHOWN ON SHEET 70-S1 OF THE EXISTING "AS-BUILT" DRAWINGS BY EDWARD L WILSON, JR.

CONSULTING ENGINEERS, DATED 06/22/1994.

th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t

00 00

11 11 o n e in c h o n e fo o t o n e in c h o n e fo o t o n e in c h o n e fo o t o n e in c h o n e fo o t

00 00

22 22 th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t

00 00 22 22 o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t

00 00 44 44 th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t

00 00 44 44 o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

00 00 44 44

88 88 o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t

00 00 44 44

88 88

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project NumberCONSULTANTS:

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

TX ARCHITECTURE COA NO. BR 2171 EXP. 09/30/2024

TX ENGINEERING COA NO. F-17591 EXP. 02/29/2024

COMMISSIONING AGENT

ES2 - ENGINEERED SYSTEMS & ENERGY SOLUTIONS, INC.

13401 N. SANTA FE AVE.

OKLAHOMA CITY, OK 73114

(405) 528-4500

MECH / ELEC / PLUMB ENGINEER

SPUR DESIGN

2519 MADISON AVE. STE 100

KANSAS CITY, MO 64108

(913) 369-7200

FULLY SPRINKLERED

STRUCTURAL

H2B, INC.

1225 N. LOOP W. STE 800

HOUSTON, TX 77008

(713) 864-2900

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD. STE 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

12/06/23

/3

/2

:1 :1

P

M

STRUCTURAL GENERAL NOTES

ZAFGMG

100% CONSTRUCTION DOCUMENTS

UPGRADE CHILLERS &

COOLING TOWERS AT

ENERGY CENTER (BLDG. 70)

12/06/2023

549-23-601

VA N. TEXAS HEALTH CARE SYSTEM

4500 S. LANCASTER ROAD

DALLAS, TX 75216

SA001

STRUCTURAL ABBREVIATIONS

+/- PLUS OR MINUS

ADDNL ADDITIONAL

ADJ ADJACENT

AFF ABOVE FINISH FLOOR

ALT ALTERNATE

ARCH ARCHITECT OR ARCHITECTURAL

B/W BETWEEN

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BOD BOTTOM OF DECK

BOS BOTTOM OF STEEL

CF COLD FORMED

CFMF COLD-FORMED METAL FRAMING

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTERLINE

CLR CLEAR/CLEARANCE

COL COLUMN

CONC CONCRETE

CONN CONNECTION

CONT CONTINUOUS

CTR CENTER

db DIA OF REINF BAR, DIA OF BOLT

DBA DEFORMED BAR ANCHOR

DBL DOUBLE

DIA DIAMETER

DIAG DIAGONAL

DWL DOWEL

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

EOD EDGE OF DECK

EOS EDGE OF SLAB

EQ EQUAL

EW EACH WAY

EXIST EXISTING

EXT EXTERIOR

FLR FLOOR

FND FOUNDATION

FS FAR SIDE

FTG FOOTING

FV FIELD VERIFY

GA GAUGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

HORIZ HORIZONTAL

HSA HEADED STUD ANCHOR

HSS HOLLOW STRUCTURAL SECTION

IF INSIDE FACE

INT INTERIOR

JST JOIST

K KIPS (1000 LBS)

LCE COMPRESSION EMBEDMENT LENGTH

LCS COMPRESSION LAP SPLICE LENGTH

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LTE TENSION EMBEDMENT LENGTH

LTS TENSION LAP SPLICE LENGTH

LW LIGHTWEIGHT

MANUF MANUFACTURER

MTL METAL

NIC NOT IN CONTRACT

NS NEAR SIDE

NTS NOT TO SCALE

OC ON CENTER

OCEW ON CENTER, EACH WAY

OF OUTSIDE FACE

OH OPPOSITE HAND

OPP OPPOSITE

PAF POWDER ACTUATED FASTENER

PEMB PRE-ENGINEERED METAL BUILDING

PL PLATE

PLF POUNDS PER LINEAR FOOT

PREFAB PREFABRICATED

PRELIM PRELIMINARY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

RE: OR REF REFER TO

REINF REINFORCING

REQD REQUIRED

SIM SIMILAR

SJ SAW JOINT

SLV SHORT LEG VERTICAL

SOG SLAB ON GRADE

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STL STEEL

SW SHEAR WALL

SYM SYMMETRIC

T&B TOP AND BOTTOM

TOC TOP OF CONCRETE

TOD TOP OF DECK

TOS TOP OF STEEL

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

VERT VERTICAL

VIF VERIFY IN FIELD

W/ WITH

W/O WITHOUT

WF WIDE FLANGE

WP WORK POINT

WWF WELDED WIRE FABRIC

STRUCTURAL TESTING AND INSPECTIONS

SPECIAL INSPECTIONS

SPECIAL INSPECTION WORK AND THE FINAL LETTER OF COMPLIANCE HAVE NOT BEEN

INCLUDED IN THE STRUCTURAL ENGINEER OF RECORD’S SCOPE OF SERVICES. PER IBC

CHAPTER 17, THE OWNER IS RESPONSIBLE FOR OBTAINING THE SERVICES OF THE SPECIAL

INSPECTOR AND THE TESTING LABORATORY. PER DIVISION 1 OF THE SPECIFICATIONS, THE

OWNER IS REQUIRING THE CONTRACTOR TO INCLUDE THE COST OF THE SERVICES FOR THE

SPECIAL INSPECTOR AND TESTING LABORATORY WITHIN THEIR SCOPE OF WORK, BUT ALL

REPORTING OF TEST AND INSPECTION RESULTS SHALL BE DELIVERED DIRECTLY TO THE

OWNER NOT THE CONTRACTOR. SPECIAL INSPECTIONS CAN BE PROVIDED BY AN INDEPENDENT

SPECIAL INSPECTOR APPROVED BY THE BUILDING AUTHORITY OR BY THE ENGINEER OF

RECORD. THE SPECIAL INSPECTION WORK DOES NOT INCLUDE THE TESTING LABORATORY

SERVICES AS CALLED FOR ON THE DRAWINGS. ARRANGEMENTS FOR SPECIAL INSPECTIONS

SHOULD BE MADE PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR IS

RESPONSIBLE FOR NOTIFYING THE OWNER IF SPECIAL INSPECTIONS ARE REQUIRED ON THE

APPROVED PERMIT DRAWINGS AND FOR NOTIFYING THE TESTING LABORATORY AND SPECIAL

INSPECTOR IN A TIMELY MANNER PRIOR TO PROCEEDING WITH CONSTRUCTION OPERATIONS.

THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK REQUIRING INSPECTIONS WITHOUT

THE TESTING LABORATORY’S OR SPECIAL INSPECTOR’S PRESENCE. THE STRUCTURAL

ENGINEER WILL NOT PROVIDE A FINAL LETTER OF COMPLIANCE AFTER THE WORK IS

COMPLETE UNLESS THEY HAVE PERFORMED THE SPECIAL INSPECTIONS.

STRUCTURAL STATEMENT OF SPECIAL INSPECTIONS

INCLUDED HERE ARE SPECIAL INSPECTIONS REQUIRED FOR THE STRUCTURAL ELEMENTS FOR

THIS PROJECT. REFERENCE STATEMENT OF SPECIAL INSPECTIONS BY ARCHITECT AND OTHER

CONSULTANTS FOR SPECIAL INSPECTION DETAILS OF NON-STRUCTURAL ITEMS REQUIRED BY

IBC AND PROVIDED IN THE SPECIFICATIONS.

PER IBC 1704.2.4, THE STRUCTURAL SPECIAL INSPECTOR SHALL KEEP RECORDS OF ALL

STRUCTURAL INSPECTIONS AND SHALL FURNISH INSPECTION REPORTS TO THE OWNER AND

THE STRUCTURAL REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE (SRDP).

DISCOVERED DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR

FOR CORRECTION. IF SUCH DISCREPANCIES ARE NOT CORRECTED, THE DISCREPANCIES SHALL

BE BROUGHT TO THE ATTENTION OF THE OWNER AND THE SRDP. THE SPECIAL INSPECTION

PROGRAM DOES NOT RELIEVE THE CONTRACTOR OF THEIR RESPONSIBILITIES.

A FINAL REPORT OF SPECIAL INSPECTION DOCUMENTING COMPLETION OF ALL SPECIAL

INSPECTIONS, TESTING AND CORRECTION OF ANY DISCREPANCIES NOTED IN THE INSPECTIONS

SHALL BE SUBMITTED TO THE OWNER AND THE SRDP PRIOR TO THE ISSUANCE OF A

CERTIFICATE OF OCCUPANCY AND USE.

CONTRACTOR RESPONSIBILITY

PER IBC 1704.4, EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF A MAIN WIND-

OR SEISMIC FORCE-RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM OR A WIND- OR

SEISMIC-RESISTING COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS SHALL

SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE

OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. THE

CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL CONTAIN ACKNOWLEDGEMENT OF

AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL

INSPECTIONS.

STRUCTURAL SCHEDULE OF SPECIAL INSPECTIONS

QUALIFICATIONS OF INSPECTORS AND TESTING TECHNICIANS

THE QUALIFICATIONS OF ALL PERSONNEL PERFORMING SPECIAL INSPECTION AND TESTING

ACTIVITIES ARE SUBJECT TO THE APPROVAL OF THE OWNER. THE CREDENTIALS OF ALL

INSPECTORS AND TESTING TECHNICIANS SHALL BE PROVIDED TO THE SPECIAL INSPECTOR

FOR THEIR RECORDS.

KEY FOR MINIMUM QUALIFICATION OF INSPECTION AGENTS

WHEN THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE OR SPECIAL

INSPECTOR OF RECORD DEEMS APPROPRIATE THAT THE INDIVIDUAL PERFORMING THE

STIPULATED TEST OR INSPECTION HAVE A SPECIFIC CERTIFICATION, LICENSE OR EXPERIENCE

AS INDICATED BELOW. SUCH REQUIREMENT SHALL BE LISTED BELOW AND SHALL BE CLEARLY

IDENTIFIED WITHIN THE SCHEDULE UNDER THE AGENT QUALIFICATION DESIGNATION.

• PE/SE STRUCTURAL ENGINEER – A LICENSED SE OR PE SPECIALIZING IN THE DESIGN OF

BUILDING STRUCTURES

• PE/GE GEOTECHNICAL ENGINEER – A LICENSED PE SPECIALIZING IN SOIL MECHANICS

AND FOUNDATIONS

• EIT ENGINEER IN TRAINING – A GRADUATE ENGINEER WHO HAS PASSED THE

FUNDAMENTALS OF ENGINEERING EXAM

• ETT EXPERIENCED TESTING TECHNICIAN – AN EXPERIENCED TESTING TECHNICIAN

WITH A MINIMUM OF 5 YEARS EXPERIENCE WITH THE STIPULATED TEST OR INSPECTION

AMERICAN CONCRETE INSTITUTE (ACI) CERTIFICATION

• ACI-CFTT CONCRETE FIELD TESTING TECHNICIAN – GRADE 1

• ACI-CCI CONCRETE CONSTRUCTION INSPECTOR

• ACI-LTT LABORATORY TESTING TECHNICIAN – GRADE 1&2

• ACI-STT STRENGTH TESTING TECHNICIAN

AMERICAN WELDING SOCIETY (AWS) CERTIFICATION

• AWS-CWI CERTIFIED WELDING INSPECTOR

• AWS/AISC-SSICERTIFIED STRUCTURAL STEEL INSPECTOR

PERIODIC, CONTINUOUS, OBSERVE, PERFORM, AND DOCUMENT ARE DEFINED AS IN THE SPECIFIC

REFERENCE STANDARD.

SPECIAL CASES

1. PER IBC 1705.1.1, SPECIAL INSPECTIONS AND TESTS SHALL BE REQUIRED FOR PROPOSED WORK THAT IS, IN THE OPINION OF THE BUILDING OFFICIAL, UNUSUAL IN ITS NATURE SUCH AS:

A. MATERIALS AND SYSTEMS REQUIRED TO BE INSTALLED IN ACCORDANCE WITH ADDITIONAL

MANUFACTURER'S INSTRUCTIONS THAT PRESCRIBE REQUIREMENTS NOT CONTAINED IN IBC

OR IN STANDARDS REFERENCED BY IBC.

B. UNUSUAL DESIGN APPLICATIONS OF MATERIALS DESCRIBED IN IBC.

C. CONSTRUCTION MATERIALS AND SYSTEMS THAT ARE ALTERNATIVES TO MATERIALS AND

SYSTEMS PRESCRIBED BY THIS CODE.

CONCRETE TESTING

1. PER IBC 1705.3, SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION SHALL BE

PERFORMED.

2. CONCRETE MIX DESIGNS SHALL BE SUBMITTED FOR REVIEW INDICATING CONFORMANCE WITH

ACI 318, LATEST EDITION.

3. SLUMP TESTS, CONFORMING TO ASTM C143, SHALL BE TAKEN AT THE POINT OF DISCHARGE AT

THE SAME RATE AS NOTED BELOW IN NOTE NUMBER 6.

4. AIR CONTENT TESTS CONFORMING TO ASTM C173, VOLUMETRIC METHOD FOR LIGHTWEIGHT

OR NORMAL WEIGHT CONCRETE; ASTM C231 PRESSURE METHOD FOR NORMAL WEIGHT

CONCRETE; SHALL BE TAKEN FOR EACH DAY’S POUR OF EACH TYPE OF AIR-ENTRAINED

CONCRETE.

5. CONCRETE TEMPERATURE SHALL BE TESTED HOURLY WHEN AIR TEMPERATURE IS 40 DEG F (4

DEG C) AND BELOW, WHEN 80 DEG F (27 DEG C) AND ABOVE, AND EACH TIME A SET OF

COMPRESSION TEST SPECIMENS IS MADE.

6. ONE SET OF FOUR COMPRESSION TEST SPECIMENS CONFORMING TO ASTM C31 SHALL BE

MOLDED AND STORED FOR LABORATORY-CURED SPECIMENS. COMPRESSIVE STRENGTH TESTS

SHALL CONFORM TO ASTM C39 AND SHALL CONSIST OF ONE SET FOR EACH DAY’S POUR

EXCEEDING 5 CU YDS PLUS ADDITIONAL SETS FOR EACH 50 CU YDS MORE THAN THE FIRST 25

CU YDS OF EACH CONCRETE CLASS PLACED IN ANY ONE DAY. ONE SPECIMEN SHALL BE

TESTED AT 7 DAYS, TWO SPECIMENS SHALL BE TESTED AT 28 DAYS, AND ONE SPECIMEN SHALL

BE RETAINED FOR LATER TESTING AS REQUIRED.

7. IN THE ABSENCE OF SUFFICIENT DATA OR DOCUMENTATION PROVIDING EVIDENCE OF

CONFORMANCE TO QUALITY STANDARDS FOR MATERIALS IN THE LATEST EDITION OF ACI 318,

THE BUILDING OFFICIAL SHALL REQUIRE TESTING OF MATERIALS IN ACCORDANCE WITH THE

APPROPRIATE STANDARDS AND CRITERIA FOR THE MATERIAL IN THE LATEST EDITION OF ACI

318.

8. VERIFY CONCRETE IS BEING CONSOLIDATED IN ACCORDANCE WITH THE RECOMMENDATIONS

OF ACI 318 AND ACI 309R, LATEST EDITION.

9. VERIFY THAT POST INSTALLED ANCHORS ARE AS SPECIFIED AND THAT ANCHORS ARE

INSTALLED PER THE MANUFACTURER’S RECOMMENDATIONS AND REQUIREMENTS.

10. PER IBC 1705.5.4, REPORTS OF PRECONSTRUCTION TESTS FOR SHOTCRETE IN ACCORDANCE WITH IBC SECTION 1908.5, SHALL BE SUBMITTED BY THE OWNER OR THE OWNER'S AUTHORIZED

AGENT TO THE BUILDING OFFICIAL.

11. SPECIAL INSPECTIONS AND TESTS SHALL NOT BE REQUIRED FOR:

A. ISOLATED SPREAD CONCRETE FOOTINGS OF BUILDINGS THREE STORIES OR LESS ABOVE

GRADE PLANE AND THAT ARE FULLY SUPPORTED ON EARTH OR ROCK.

B. CONTINUOUS CONCRETE FOOTINGS SUPPORTING WALLS OF BUILDINGS THREES STORIES

OR LESS ABOVE GRADE PLANE THAT ARE FULLY SUPPORTED ON EARTH OR ROCK WHERE:

a. THE FOOTINGS SUPPORT WALLS OF LIGHT-FRAME CONSTRUCTION.

b. THE FOOTINGS ARE DESIGNED IN ACCORDANCE WITH IBC TABLE 1809.7.

c. THE STRUCTURAL DESIGN OF THE FOOTING IS BASED ON THE SPECIFIED COMPRESSIVE STRENGTH f'c, NOT MORE THAN 2,500 POUNDS PER SQUARE INCH (PSI), REGARDLESS OF

THE COMPRESSIVE STRENGTH SPECIFIED IN THE APPROVED CONSTRUCTION

DOCUMENTS OR USED IN THE FOOTING CONSTRUCTION.

C. NONSTRUCTURAL CONCRETE SLABS SUPPORTED DIRECTLY ON THE GROUND, INCLUDING

PRESTRESSED SLABS ON GRADE, WHERE THE EFFECTIVE PRESTRESS IN THE CONCRETE IS

LESS THAN 150 PSI.

D. CONCRETE FOUNDATION WALLS CONSTRUCTED IN ACCORDANCE WITH IBC TABLE

1807.1.6.2.

E. CONCRETE PATIOS, DRIVEWAYS, AND SIDEWALKS, ON GRADE.

SCHEDULE OF SPECIAL INSPECTIONS

VERIFICATION / INSPECTION CONCRETE INSPECTION

IBC 2021 SECTION 1705.6, TABLE 1705.6

EXTENT

CONTINUOUS,

PERIODIC

COMMENTS

AGENT

PE/GE, EIT,

OR ETT

INSPECT REINFORCEMENT, INCLUDING

PRESTRESSING TENDONS, AND VERIFY

PLACEMENT.

PERIODIC

PERIODIC

PERIODIC

PERIODIC

ETT

AWS-CWI

ETT

ETT

ACI 318: Ch. 20, 25.2, 25.3, 26.6.1-26.6.3

AWS D1.4

ACI 318: 26.6.4

ACI 318:17.8.2.4

ACI 318: 17.8.2

ACI 318: Ch. 19, 26.4.3, 26.4.4

CONTINUOUS

CONTINUOUS

PERIODIC

CONTINUOUS

PERIODIC

PERIODIC

PERIODIC

ACI-CFTT

OR ACI-STT

ETT

ETT

ETT

ETT

ETT

ETT

ASTM C31

ASTM C172

ACI 318: 26.5, 26.12

ACI 318: 26.5

ACI 318: 26.5.3-26.5.5

ACI 318: 26.10

ACI 318: 26.9

ACI 318: 6.2

ACI 318: 6.1.1

REINFORCING BAR WELDING:

a. VERIFY WELDABILITY OF

REINFORCING BARS OTHER THAN

ASTM A706;

b. INSPECT SINGLE-PASS FILLET

WELDS, MAXIMUM 5/16"; AND

c. INSPECT ALL OTHER WELDS.

INSPECT ANCHORS POST-INSTALLED IN

HARDENED CONCRETE MEMBERS.

A. ADHESIVE ANCHORS INSTALLED IN

HORIZONTALLY OR UPWARDLY

INCLINED ORIENTATIONS TO RESIST

SUSTAINED TENSION LOADS.

B. MECHANICAL ANCHORS AND

ADHESIVE ANCHORS NOT DEFINED IN

4.A.

VERIFY MAINTENANCE OF SPECIFIED

CURING TEMPERATURE AND

TECHNIQUES.

INSPECT ERECTION OF PRECAST

CONCRETE MEMBERS.

INSPECT FORMWORK FOR SHAPE,

LOCATION, AND DIMENSIONS OF THE

CONCRETE MEMBER BEING FORMED.

VERIFY USE OF REQUIRED DESIGN MIX.

PRIOR TO CONCRETE PLACEMENT,

FABRICATE SPECIMENS FOR STRENGTH

TESTS, PREFORM SLUMP AND AIR

CONTENT TESTS, AND DETERMINE THE

TEMPERATURE OF THE CONCRETE.

INSPECT CONCRETE AND SHOTCRETE

PLACEMENT FOR PROPER APPLICATION

TECHNIQUES.

INSPECTION OF PRESTRESSED

CONCRETE:

A. APPLICATION OF

PRESTRESSING FORCES

B. GROUTING OF BONDED

PRESTRESSING TENDONS IN

THE SEISMIC FORCE-

RESISTING SYSTEM.

VERIFICATION OF IN-SITU CONCRETE

STRENGTH, PRIOR TO STRESSING OF

TENDONS IN POST-TENSIONED

CONCRETE AND PRIOR TO REMOVAL OF

SHORES AND FORMS FROM BEAMS AND

STRUCTURAL SLABS.

INSPECT INSTALLATION TOLERANCES OF

PRECAST CONCRETE DIAPHRAGM

CONNECTIONS FOR COMPLIANCE WITH ACI

550.5.

FOR PRECAST CONCRETE DIAPHRAGM

CONNECTIONS OR REINFORCEMENT AT

JOINTS CLASSIFIED AS MODERATE OR

HIGH DEFORMABILITY ELEMENTS (MDE OR

HDE) IN STRUCTURES ASSIGNED TO

SEISMIC DESIGN CATEGORY C, D, E, OR F,

INSPECT SUCH CONNECTIONS AND

REINFORCEMENT IN THE FIELD FOR:

A. INSTALLATION OF THE EMBEDDED

PARTS

B. COMPLETION OF THE CONTINUITY

OF REINFORCEMENT ACROSS JOINTS

C. COMPLETION OF CONNECTIONS IN

THE FIELD.

ACI 318: 26.13.1.3

ACI 550.0

ACI 318: 26.13.1.3

ETT

ETT

CONTINUOUS

PERIODIC

PERIODIC

CONTINUOUS

PERIODIC ETTACI 318: 17.8.2INSPECT ANCHORS CAST IN CONCRETE

th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t

00 00

11 11 o n e in c h o n e fo o t o n e in c h o n e fo o t o n e in c h o n e fo o t o n e in c h o n e fo o t

00 00

22 22 th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t

00 00 22 22 o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t

00 00 44 44 th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t

00 00 44 44 o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

00 00 44 44

88 88 o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t

00 00 44 44

88 88

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project NumberCONSULTANTS:

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

TX ARCHITECTURE COA NO. BR 2171 EXP. 09/30/2024

TX ENGINEERING COA NO. F-17591 EXP. 02/29/2024

COMMISSIONING AGENT

ES2 - ENGINEERED SYSTEMS & ENERGY SOLUTIONS, INC.

13401 N. SANTA FE AVE.

OKLAHOMA CITY, OK 73114

(405) 528-4500

MECH / ELEC / PLUMB ENGINEER

SPUR DESIGN

2519 MADISON AVE. STE 100

KANSAS CITY, MO 64108

(913) 369-7200

FULLY SPRINKLERED

STRUCTURAL

H2B, INC.

1225 N. LOOP W. STE 800

HOUSTON, TX 77008

(713) 864-2900

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD. STE 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

12/06/23

/3

/2

:1 :1

P

M

STRUCTURAL SPECIAL INSPECTIONS

ZAFGMG

100% CONSTRUCTION DOCUMENTS

UPGRADE CHILLERS &

COOLING TOWERS AT

ENERGY CENTER (BLDG. 70)

12/06/2023

549-23-601

VA N. TEXAS HEALTH CARE SYSTEM

4500 S. LANCASTER ROAD

DALLAS, TX 75216

SA010

B

C

D

E

6 7 8 9 10 11

36' - 0" 18' - 0" 18' - 0" 36' - 0" 36' - 0"

144' - 0"

7 7

4 4

3 3 3

SB301

TYP

SB301

TYP

SB301

TYP

41,000 LBS

MAX

1 4 4

6 6

SB301

TYP

6 66

1 1 1 49

10' - 0" TYP

T Y

P

41,000 LBS

MAX

41,000 LBS

MAX

41,000 LBS

MAX

SB301

10TYP

FOUNDATION PLAN NOTES:

1. EXISTING EQUIPMENT PAD TO REMAIN.

2. EXISTING 8" THICK SLAB ON GRADE.

3. EXISTING 22" THICK CHILLER PAD SUPPORTED ON FOUR CONCRETE SHAFTS.

4. EXISTING PUMP PAD OVER SLAB ON GRADE.

5. NEW CHILLER UNIT, SEE MECHANICAL.

6. NEW 2,500 LBS MAX PUMP, SEE MECHANICAL.

7. EXISTING CHILLER PAD.

8. DEMO EXISTING PUMP PAD.

9. INSTALL NEW CONCRETE PUMP PAD.

10. EXISTING CONCRETE PIER.

GENERAL SHEET NOTES

A. FIELD VERIFY ALL EXISTING DIMENSIONS.

B. COORDINATE ALL EQUIPMENT LOCATIONS WITH MECHANICAL, ELECTRICAL AND

PLUMBING (MEP) DRAWINGS.

C. VERIFY DIMENSIONS WITH ARCHITECTURAL DRAWINGS.

th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t

00 00

11 11 o n e in c h o n e fo o t o n e in c h o n e fo o t o n e in c h o n e fo o t o n e in c h o n e fo o t

00 00

22 22 th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t

00 00 22 22 o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t

00 00 44 44 th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t

00 00 44 44 o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

00 00 44 44

88 88 o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t o n e e ig h th in c h…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .