Attachment 1 537-19-904 IFC Drawings.pdf

PDF 30 MB Posted

Attached to
Y1DA--537-19-904 Security Corrections - Construction Federal contract opportunity
Solicitation number
36C25221B0033
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This document provides details for a federal construction solicitation. The solicitation seeks bids for security door replacements and creation of a sally port configuration on the 7th floor of a bed tower at the Jesse Brown VA Medical Center in Chicago, Illinois. The project is set aside for Service-Disabled Veteran-Owned Small Businesses and has a magnitude between $2 million and $5 million. Interested contractors must be registered in the System for Award Management and listed as verified in the Vendor Information Pages database. Bids are due by November 11, 2021 for the project which has a 418 calendar day period of performance and is issued under NAICS code 236220 with a size standard of $39.5 million. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--537-19-904 Security Corrections - Construction, newest first.
File Type Posted
36C25221B0033 0008.docx DOCX document
36C25221B0033 0007.docx DOCX document
36C25221B0033 0006.docx DOCX document
36C25221B0033 0005.docx DOCX document
S06 - VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.pdf PDF
S06 - Revised Bid Schedule_12.22.21_537-19-904.pdf PDF
S06 - Wage Determination_12.3.21.pdf PDF
S06 - 537-19-904 Construction SOW rev3.pdf PDF
36C25221B0033 0004.docx DOCX document
36C25221B0033 0003.docx DOCX document
36C25221B0033 0002.docx DOCX document
36C25221B0033 0001.docx DOCX document
Attachment 5 Exhibit2_537-19-904_Asbestos_Report.pdf PDF
Attachment 3 537-19-904 IFC Specifications.pdf PDF
Attachment 4 Exhibit1_537-19-904_JESSE_BROWN_SOC.pdf PDF
Attachment 6 Wage Determination 9.10.2021.pdf PDF
Attachment 2 537-19-904 Construction SOW Rev1.pdf PDF
36C25221B0033_1.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF DRAWINGS

DRAWING TITLE

DWG NO.

G001 COVER SHEET

G002 LEGENDS, ABBREVIATIONS AND NOTES

G003 PHASING, IRCA DETAILS, LEGENDS AND NOTES

A101 FIRST FLOOR PLAN - OVERALL HOSPITAL

JESSE BROWN VA MEDICAL CENTER

ISSUED FOR BID AND CONSTRUCTION

820 South Damen Ave., Chicago, Illinios 60612

PROJECT No: 537-19-904

SECURITY CORRECTIONS

PROJECT

SITE

MAIN

HOSPITAL

DRAWING TITLE

GENERAL

ARCHITECTURAL

DWG NO.

A401 ENLARGED FLOOR PLANS - POLICE OBSERVATION ROOM & SALLYPORT

A501 MISCELLANEOUS DETAILS

A601 DOOR SCHEDULE AND DETAILS

A602 DOOR DETAILS

SECURITY

ELECTRICAL

SC001 SECURITY COVER SHEET

SC002 SECURITY EQUIPMENT SCHEDULE

SC101 HOSPITAL OVERALL BUILDING LAYOUT ACCESS CONTROL PLAN

SC400 SECURITY DOOR DETAILS

SC401 SECURITY DOOR DETAILS

SC402 SECURITY DOOR DETAILS

SC403 SECURITY DOOR DETAILS

SC500 SECURITY CAMERA DETAILS

BLDG 1 EAST

BLDG 1 WEST

BLDG 30

BLDG 40 EAST

BLDG 40 WEST

BLDG 32

BLDG 11

PHASING AND LIFE SAFETY PLANS

E000 ELECTRICAL COVER SHEET

E101 HOSPITAL OVERALL BUILDING LAYOUT ACCESS CONTROL PLAN

1-E101E BUILDING 1 - FIRST FLOOR ELECTRICAL & TECHNOLOGY PLANS EAST

1-E101W BUILDING 1 - FIRST FLOOR ELECTRICAL & TECHNOLOGY PLANS WEST

1-E102E BUILDING 1 - SECOND FLOOR ELECTRICAL & TECHNOLOGY PLANS EAST

1-E102W BUILDING 1 - SECOND FLOOR ELECTRICAL & TECHNOLOGY PLANS WEST

1-E105E BUILDING 1 - FIFTH FLOOR ELECTRICAL & TECHNOLOGY PLANS EAST

1-E105W BUILDING 1 - FIFTH FLOOR ELECTRICAL & TECHNOLOGY PLANS WEST

11-E101 BUILDING 11 - FIRST FLOOR ELECTRICAL & TECHNOLOGY PLANS

30-E101 BUILDING 30 - FIRST FLOOR ELECTRICAL & TECHNOLOGY PLANS

32-E101 BUILDING 32 - FIRST FLOOR ELECTRICAL & TECHNOLOGY PLANS

40-E101 BUILDING 40 - FIRST FLOOR ELECTRICAL & TECHNOLOGY PLANS

40-E102 BUILDING 40 - SECOND FLOOR ELECTRICAL & TECHNOLOGY PLANS

40-E104 BUILDING 40 - FOURTH FLOOR ELECTRICAL & TECHNOLOGY PLANS

40-E105 BUILDING 40 - FIFTH FLOOR ELECTRICAL & TECHNOLOGY PLANS

40-E106 BUILDING 40 - SIXTH FLOOR ELECTRICAL & TECHNOLOGY PLANS

40-E107 BUILDING 40 - SEVENTH FLOOR ELECTRICAL & TECHNOLOGY PLANS

E400 ELECTRICAL DETAILS

1-SC101E BUILDING 1 - FIRST FLOOR ACCESS CONTROL PLANS EAST

1-SC101W BUILDING 1 - FIRST FLOOR ACCESS CONTROL PLANS WEST

1-SC102E BUILDING 1 - SECOND FLOOR ACCESS CONTROL PLANS EAST

1-SC102W BUILDING 1 - SECOND FLOOR ACCESS CONTROL PLANS WEST

1-SC105E BUILDING 1 - FIFTH FLOOR ACCESS CONTROL PLANS EAST

1-SC105W BUILDING 1 - FIFTH FLOOR ACCESS CONTROL PLANS WEST

11-SC101 BUILDING 11 - FIRST FLOOR ACCESS CONTROL PLANS

30-SC101 BUILDING 30 - FIRST FLOOR ACCESS CONTROL PLANS

32-SC101 BUILDING 32 - FIRST FLOOR ACCESS CONTROL PLANS

40-SC101 BUILDING 40 - FIRST FLOOR ACCESS CONTROL PLANS

40-SC102 BUILDING 40 - SECOND FLOOR ACCESS CONTROL PLANS

40-SC104 BUILDING 40 - FOURTH FLOOR ACCESS CONTROL PLANS

40-SC105 BUILDING 40 - FIFTH FLOOR ACCESS CONTROL PLANS

40-SC106 BUILDING 40 - SIXTH FLOOR ACCESS CONTROL PLANS

40-SC107 BUILDING 40 - SEVENTH FLOOR ACCESS CONTROL PLANS

1-G101E BUILDING 1 - FIRST FLOOR PLAN - EAST - PHASING & LIFE SAFETY

1-G101W BUILDING 1 - FIRST FLOOR PLAN - WEST - PHASING & LIFE SAFETY

1-G102E BUILDING 1 - SECOND FLOOR PLAN - EAST - PHASING & LIFE SAFETY

1-G102W BUILDING 1 - SECOND FLOOR PLAN - WEST - PHASING & LIFE SAFETY

1-G105E BUILDING 1 - FIFTH FLOOR PLAN - EAST - PHASING & LIFE SAFETY

1-G105W BUILDING 1 - FIFTH FLOOR PLAN - WEST - PHASING & LIFE SAFETY

11-G101 BUILDING 11 - FIRST FLOOR PLAN - PHASING & LIFE SAFETY

30-G101 BUILDING 30 - FIRST FLOOR PLAN - PHASING & LIFE SAFETY

32-G101 BUILDING 32 - FIRST FLOOR PLAN - PHASING & LIFE SAFETY

40-G101 BUILDING 40 - FIRST FLOOR PLAN - PHASING & LIFE SAFETY

40-G102 BUILDING 40 - SECOND FLOOR PLAN - PHASING & LIFE SAFETY

40-G104 BUILDING 40 - FOURTH FLOOR PLAN - PHASING & LIFE SAFETY

40-G105 BUILDING 40 - FIFTH FLOOR PLAN - PHASING & LIFE SAFETY

40-G106 BUILDING 40 - SIXTH FLOOR PLAN - PHASING & LIFE SAFETY

40-G107 BUILDING 40 - SEVENTH FLOOR PLAN - PHASING & LIFE SAFETY

1-A101E BUILDING 1 - FIRST FLOOR PLAN - EAST

1-A101W BUILDING 1 - FIRST FLOOR PLAN - WEST

1-A102E BUILDING 1 - SECOND FLOOR PLAN - EAST

1-A102W BUILDING 1 - SECOND FLOOR PLAN - WEST

1-A105E BUILDING 1 - FIFTH FLOOR PLAN - EAST

1-A105W BUILDING 1 - FIFTH FLOOR PLAN - WEST

11-A101 BUILDING 11 - FIRST FLOOR PLAN

30-A101 BUILDING 30 - FIRST FLOOR PLAN

32-A101 BUILDING 32 - FIRST FLOOR PLAN

40-A101 BUILDING 40 - FIRST FLOOR PLAN

40-A102 BUILDING 40 - SECOND FLOOR PLAN

40-A104 BUILDING 40 - FOURTH FLOOR PLAN

40-A105 BUILDING 40 - FIFTH FLOOR PLAN

40-A106 BUILDING 40 - SIXTH FLOOR PLAN

40-A107 BUILDING 40 - SEVENTH FLOOR PLAN

COVER SHEET

G001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

ISSUED FOR BIDS AND

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SECURITY CORRECTIONS

JESSE BROWN VAMC CHICAGO, IL

537-19-904

Project Director

08/06/21 J. Hirschhorn D. BrandtRevisions: Date:

MATERIAL LEGEND

ARCHITECTURAL GENERAL NOTESGENERAL PROJECT NOTES ARCHITECTURAL ABBREVIATIONSPROJECT CODE SUMMARY

A. APPLICABLE CODES

B. TYPE OF CONSTRUCTION

C. SPRINKLERED/UNSPRINKLERED

D. OCCUPANCY CLASSIFICATION GROUP

E. OCCUPANCY SEPARATION

F. ALLOWABLE AREA

G. CONSTRUCTION ELEMENTS

ARCHITECTURAL LEGEND

LEGENDS, ABBREVIATIONS AND

NOTES

G002

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

ISSUED FOR BIDS AND

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SECURITY CORRECTIONS

JESSE BROWN VAMC CHICAGO, IL

537-19-904

Project Director

08/06/21 J. Hirschhorn D. BrandtRevisions: Date:

AutoCAD SHX Text EARTH GRAVEL CONCRETE MORTAR, STUCCO, CEMENT PLASTER CONCRETE SECTION SECTION MASONRY UNIT PLAN PLAN STEEL INSULATION, RIGID INSULATION, BATT BRICK WOOD (ROUGH) WOOD (FINISH)

AutoCAD SHX Text A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: FACE OF EXISTING WALL SURFACE FACE OF NEW MASONRY FACE OF NEW WALL STUDS TOP OF SLAB TOP OF MASONRY ALIGN NEW WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED. B. COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE OPENINGS IN SLABS, ROOF, AND WALLS. WHERE NEW HOLES IN EXISTING WALLS AND SLABS ARE CREATED FOR CONDUIT, DUCT, OR PIPE PENETRATIONS, COORDINATE SIZE AND LOCATION. PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLES, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY. C. COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKING FOR WALL-MOUNTED ITEMS BETWEEN STUDS. COORDINATE LOCATIONS WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT. D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED. E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED PARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION. PROVIDE UL LISTED ASSEMBLIES. F. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING. G. AT ANY WORK ON SURGICAL FLOORS, SEE SPEC 013526 AT ANY WORK ON SURGICAL FLOORS, SEE SPEC 013526 FOR PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIREMENTS. H. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR IF APPLICABLE. I. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR NEW CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE REPAIRED TO ACCEPT NEAT INSTALLATION OF NEW CONSTRUCTION OR FINISHES. WHERE EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.) EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES SHALL BE PREPARED AS INDICATED OR SPECIFIED PRIOR TO INSTALLATION OF NEW MATERIALS. J. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. REPAIR DAMAGES FROM CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST. WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED.

AutoCAD SHX Text A. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED. B. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE WITH COR. C. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM. ALL SUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH COR. ALL FIRE ALARM DEVICES SHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENT IN WORK AREA. D. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER. E. SEE SPECIFICATION SECTIONS 01 00 00 AND 01 35 26 FOR SEE SPECIFICATION SECTIONS 01 00 00 AND 01 35 26 FOR INTERIM LIFE SAFETY MEASURES. F. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL EXISTING CONDITIONS PRIOR TO PROCEEDING WITH THE WORK. EXISTING CONDITIONS ARE BASED ON GOVERNMENT FURNISHED EXISTING DRAWINGS AND LIMITED FIELD INVESTIGATION. NOTIFY COR OF ANY DISCREPANCIES PRIOR TO PROCEEDING. G. ALL FINISH COLORS TO MATCH EXISTING ADJACENT FINISHES. ALL FINISH COLORS TO MATCH EXISTING ADJACENT FINISHES. ANY VARIATIONS TO BE SELECTED BY COR WHERE NOT OTHERWISE INDICATED. H. CONTRACTOR TO COORDINATE WITH COR FOR THE EXACT DATE CONTRACTOR TO COORDINATE WITH COR FOR THE EXACT DATE TO REPLACE EACH DOOR (AS NOTED IN DOOR SCHEDULE SHEET A601). FOR EACH DOOR, ALLOW THE VA 1 DAY NOTICE TO SALVAGE ANY HARDWARE AND/OR THE VA POLICE'S MULTIDISCIPLINARY FORCE (FBI, CHICAGO FIRE DEPARTMENT, ETC.) TO EXERCISE USING THEIR LOCKED DOOR DEFEATING TOOLS AND TECHNIQUES. EXISTING LOCKS, DOORS AND FRAMES WILL BE DAMAGED. REPAIRS FOR WALL DAMAGE IS NOT EXPECTED TO OCCUR AND IS NOT IN CONTRACT. I. PROVIDE MINIMUM (1) 16" x 16" ACCESS PANELS IN HARD PROVIDE MINIMUM (1) 16" x 16" ACCESS PANELS IN HARD CEILINGS WHERE DUCTS AND DAMPERS OR OTHER PIPES REQUIRE ACCESS. COORDINATE EXACT LOCATION W/COR. PROVIDE ADDITIONAL ACCESS PANELS IN CHASES AT EACH FLOOR TO ACCESS DUCTS AND DAMPERS. J. OPEN EXISTING DRYWALL AS NECESSARY TO INSTALL NEW OPEN EXISTING DRYWALL AS NECESSARY TO INSTALL NEW DUCTS, PLUMBING AND ELECTRICAL DEVICES. RECONSTRUCT WALL AND FINISH TO MATCH EXISTING.

AutoCAD SHX Text L

AutoCAD SHX Text

BUILDING:

AutoCAD SHX Text

MECHANICAL:

AutoCAD SHX Text

PLUMBING:

AutoCAD SHX Text

FUEL GAS:

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

FIRE:

AutoCAD SHX Text

ENERGY:

AutoCAD SHX Text

LIFE SAFETY:

AutoCAD SHX Text

ACCESSIBILITY:

AutoCAD SHX Text INTERNATIONAL BUILDING CODE (IBC), Latest Edition

AutoCAD SHX Text INTERNATIONAL MECHANICAL CODE (IMC), Latest Edition

AutoCAD SHX Text INTERNATIONAL PLUMBING CODE (IPC), Latest Edition

AutoCAD SHX Text INTERNATIONAL FUEL GAS CODE (IFGC), Latest Edition

AutoCAD SHX Text INTERNATIONAL FIRE CODE (IFC), Latest Edition INTERIOR FINISH PER NFPA 101 Latest Edition CHAPTER 10

AutoCAD SHX Text NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 101 LIFE SAFETY CODE (LSC), Latest Edition NFPA 99 HEALTH CARE FACILITIES CODE, Latest Edition NFPA 70 NATIONAL ELECTRIC CODE, Latest Edition NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, Latest Edition NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, Latest Edition

AutoCAD SHX Text VA PG-18-13 BARRIER FREE DESIGN STANDARD, ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS

AutoCAD SHX Text NATIONAL ELECTRIC CODE (NEC), Latest Edition

AutoCAD SHX Text INTERNATIONAL ENERGY CONSERVATION CODE (IECC), Latest Edition

AutoCAD SHX Text

VA MEDICAL CENTER

AutoCAD SHX Text

AUTHORITY HAVING JURISDICTION:

AutoCAD SHX Text

IBC, TABLE 601

AutoCAD SHX Text

SPRINKLERED

AutoCAD SHX Text NFPA 13, Latest Edition

AutoCAD SHX Text

PER NFPA 101, 6.1.5 AND CHAPTER 18

AutoCAD SHX Text

PER IBC, 308.4

AutoCAD SHX Text

TYPE IA

AutoCAD SHX Text

HEALTH CARE

AutoCAD SHX Text

INSTITUTIONAL GROUP, I-2

AutoCAD SHX Text

NFPA 101, TABLE 6.1.14.1

AutoCAD SHX Text

HEALTH CARE

AutoCAD SHX Text

HEALTH CARE

AutoCAD SHX Text

AMBULATORY HEALTH CARE

AutoCAD SHX Text

2 HR

AutoCAD SHX Text

BUSINESS

AutoCAD SHX Text

2 HR

AutoCAD SHX Text

AutoCAD SHX Text

ALLOWABLE AREA WITH MODIFICATIONS

AutoCAD SHX Text

IBC, TABLE 503, SECTION 506

AutoCAD SHX Text

HEALTH CARE

AutoCAD SHX Text

ACTUAL AREA PER FLOOR

AutoCAD SHX Text

ALLOWABLE AREA PER FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

UNLIMITED

AutoCAD SHX Text

UNLIMITED

AutoCAD SHX Text

RATING

AutoCAD SHX Text

STRUCTURAL FRAME

AutoCAD SHX Text

COMMENTS

AutoCAD SHX Text

CODE SECTION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FLOOR CONSTRUCTION

AutoCAD SHX Text

AutoCAD SHX Text

IBC T 601

AutoCAD SHX Text

3 HR

AutoCAD SHX Text

2 HR

AutoCAD SHX Text

IBC T 601

AutoCAD SHX Text

ROOF CONSTRUCTION

AutoCAD SHX Text

1 HR12 HR

AutoCAD SHX Text

AutoCAD SHX Text

BEARING WALLS

AutoCAD SHX Text

3 HR

AutoCAD SHX Text AC ABOVE CEILING ABOVE CEILING ACT ACOUSTICAL CEILING TILE ACOUSTICAL CEILING TILE AFF ABOVE FINISH FLOOR ABOVE FINISH FLOOR ALUM ALUMINUM ALUMINUM BATT BATT INSULATION BATT INSULATION BD BOARD BOARD BO BOTTOM OF BOTTOM OF CBB CEMENTITIOUS BACKER BOARD CEMENTITIOUS BACKER BOARD CFMF COLD-FORMED METAL FRAMING COLD-FORMED METAL FRAMING CG CORNER GUARD CORNER GUARD CJ CONTROL JOINT CONTROL JOINT C CENTERLINE CENTERLINE CMU CONCRETE MASONRY UNIT CONCRETE MASONRY UNIT CO CASED OPENING CASED OPENING COMM COMMUNICATION COMMUNICATION CONC CONCRETE CONCRETE CONT CONTINUOUS CONTINUOUS COR CONTRACTING OFFICER'S REPRESENTATIVE CONTRACTING OFFICER'S REPRESENTATIVE CT CERAMIC TILE CERAMIC TILE CP CARPET CARPET CPT CARPET TILE CARPET TILE DIA DIAMETER DIAMETER EJ EXPANSION JOINT EXPANSION JOINT ELECT ELECTRICAL ELECTRICAL EQ EQUAL EQUAL ES EXPOSED STRUCTURE EXPOSED STRUCTURE ETC ET CETERA ET CETERA EWC ELECTRIC WATER COOLER ELECTRIC WATER COOLER EXIST EXISTING EXISTING EXP EXPOSED EXPOSED FAC FIN FACTORY FINISH FACTORY FINISH FD FLOOR DRAIN FLOOR DRAIN FE FIRE EXTINGUISHER FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FIRE EXTINGUISHER CABINET FF FINISH FLOOR FINISH FLOOR FHC FIRE HOSE CABINET FIRE HOSE CABINET FIN FINISH FINISH FLR FLOOR FLOOR FO FACE OF FACE OF FV FIELD VERIFY (PRIOR TO ORDERING OR CUTTING) FIELD VERIFY (PRIOR TO ORDERING OR CUTTING) GA GAGE GAGE GWB GYPSUM WALL BOARD GYPSUM WALL BOARD GYP GYPSUM GYPSUM INSUL INSULATION INSULATION HC HANDICAPPED HANDICAPPED HM HOLLOW METAL HOLLOW METAL HPDL HIGH-PRESSURE DECORATIVE LAMINATE HIGH-PRESSURE DECORATIVE LAMINATE HVAC HEATING, VENTILATION AND AIR-CONDITIONING HEATING, VENTILATION AND AIR-CONDITIONING JT JOINT JOINT LVT LUXURY VINYL TILE LUXURY VINYL TILE MATL MATERIAL MATERIAL MAX MAXIMUM MAXIMUM MECH MECHANICAL MECHANICAL MFR MANUFACTURER MANUFACTURER MIN MINIMUM MINIMUM MO MASONRY OPENING MASONRY OPENING MTL METAL METAL NIC NOT IN CONTRACT NOT IN CONTRACT NTS NOT TO SCALE NOT TO SCALE OC ON CENTER ON CENTER OH OPPOSITE HAND OPPOSITE HAND P PAINT PAINT PLAM PLASTIC LAMINATE PLASTIC LAMINATE PLS PLASTER PLASTER POR PORCELAIN TILE PORCELAIN TILE PR PAIR PAIR PT PRESSURE TREATED PRESSURE TREATED QT QUARRY TILE QUARRY TILE RB RUBBER BASE RUBBER BASE REF REFRIGERATOR REFRIGERATOR REQ'D REQUIRED REQUIRED RES RESINOUS FLOORING RESINOUS FLOORING RES-C RESINOUS EPOXY CEILING COATING RESINOUS EPOXY CEILING COATING RES-W RESINOUS EPOXY WALL COATING RESINOUS EPOXY WALL COATING RF RUBBER FLOORING RUBBER FLOORING RO ROUGH OPENING ROUGH OPENING SC SPECIALTY HIGH BUILD GLAZED COATING SPECIALTY HIGH BUILD GLAZED COATING SCW SOLID CORE WOOD SOLID CORE WOOD SD SOAP DISPENSER SOAP DISPENSER SIM SIMILAR SIMILAR SND SANITARY NAPKIN DISPENSER SANITARY NAPKIN DISPENSER SP SPECIAL FACED SPECIAL FACED SS STAINLESS STEEL STAINLESS STEEL SSM SOLID SURFACE MATERIAL SOLID SURFACE MATERIAL ST STEEL STEEL SUBS SUBSTRATE SUBSTRATE TB TACK BOARD TACK BOARD TELE TELEPHONE TELEPHONE TO TOP OF TOP OF TP TOILET PAPER TOILET PAPER TYP TYPICAL TYPICAL UNO UNLESS NOTED OTHERWISE UNLESS NOTED OTHERWISE VCT VINYL COMPOSITION TILE VINYL COMPOSITION TILE VWC VINYL WALL COVERING VINYL WALL COVERING WD WOOD WOOD WR WATER RESISTANT WATER RESISTANT WSF WELDED SHEET FLOORINGWELDED SHEET FLOORING

AutoCAD SHX Text A

AutoCAD SHX Text + 0'-6"

AutoCAD SHX Text F.E.C.

AutoCAD SHX Text FIRE EXTINGUISHER CABINET ROOM NAME AND NUMBER DOOR NUMBER DEMOLITION NOTE KEY NOTE WINDOW TYPE PARTITION TYPE DETAIL CALLOUT DETAIL NUMBER SHEET WHERE DETAIL IS DRAWN SECTION CALLOUT SECTION NUMBER SHEET WHERE SECTION IS DRAWN VERTICAL ELEVATION COLUMN CENTERLINE DESIGNATION EXTERIOR ELEVATION CALLOUT ELEVATION NUMBER SHEET WHERE ELEVATION IS DRAWN INTERIOR ELEVATION CALLOUT ELEVATION NUMBER SHEET WHERE ELEVATION IS DRAWN

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

NAME

AutoCAD SHX Text

AutoCAD SHX Text A401

AutoCAD SHX Text

AutoCAD SHX Text A301

AutoCAD SHX Text

AutoCAD SHX Text A201

AutoCAD SHX Text

AutoCAD SHX Text

GA4

AutoCAD SHX Text A401

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

INFECTION CONTROL PROJECT INFORMATION

INFECTION CONTROL PROJECT INFORMATION

INFECTION CONTROL PLAN NOTES

PHASING GENERAL NOTES

PHASING NOTES LEGEND AND

DETAILS

G003

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

ISSUED FOR BIDS AND

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SECURITY CORRECTIONS

JESSE BROWN VAMC CHICAGO, IL

537-19-904

Project Director

08/06/21 J. Hirschhorn D. BrandtRevisions: Date:

AutoCAD SHX Text CONSTRUCTION ACTIVITY-FIRE RISK: TYPE C+D PATIENT RISK GROUP: HIGH OR HIGHEST, PER SPEC. CLASS OF PRECAUTION MATRIX: III & IV

AutoCAD SHX Text A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED BY CLASS IN REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED BY CLASS IN SPECIFICATION 013526 FOR ADDITIONAL INFORMATION. B. REFER TO DRAWINGS, SECURITY (SC) DOCUMENTS, SPECIFICATIONS AND DOOR HARDWARE REFER TO DRAWINGS, SECURITY (SC) DOCUMENTS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE FOR ADDITIONAL INFORMATION. C. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS (E & SC) AND FIELD COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS (E & SC) AND FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE CEILING WORK REQUIRED. D. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER WALL CONSTRUCTION COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER WALL CONSTRUCTION AND INFECTION CONTROL(IC) MEASURES WITH COR AND PATIENT SAFETY/INFECTION CONTROL REPRESENTATIVE. TEMPORARY IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE APPROXIMATE. CONTRACTOR SHALL PROVIDE MEASURED DRAWINGS TO COR AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA PROTOCOLS AND SCHEDULE IS APPROVED. E. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR, HOSPITAL SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR, HOSPITAL ADMINISTRATION AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING INFORMATION INCLUDING ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED CONSTRUCTION SCHEDULE (PER SPECIFICATIONS) FOR WORK ALSO REQUIRED ABOVE THE FLOOR PLATE OF THE PROJECT BOUNDARY. F. ALL WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00PM AND 5:00 AM THE NEXT DAY ALL WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00PM AND 5:00 AM THE NEXT DAY DURING WORK WEEK AND ON WEEKE3NDS BASED ON SUBMITTED AND APPROVED SCHEDULE. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGES AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR. G. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED DURING NORMAL EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED DURING NORMAL BUSINESS HOURS. ANY INTERRUPTIONS MUST BE REQUESTED AHEAD OF TIME AND APPROVED. SEE SPECIFICATION 013526 AND MEMO 001S-08-18 FOR PROCEDURES AND HOURS OF OPERATION. H. WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE BETWEEN THE HOURS OF WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM AND 5:00 AM DURING WORK WEEK AND ON WEEKE3NDS BASED ON SUBMITTED AND APPROVED SCHEDULE. EVERY EFFORT SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM. I. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES: A 24"X36" STICKY WALK OFF MAT PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES: A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY. J. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH TEMPORARY DOOR PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH TEMPORARY DOOR LOCATION. K. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC, MULTI-PURPOSE CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC, MULTI-PURPOSE SPILL CONTROL SORBETS TO ABSORB NON AGGRESSIVE LIQUIDS UP TO 30 GALLONS. L. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH 4 MIL. POLY ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH 4 MIL. POLY SHEET. M. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT BOUNDARY THROUGH THE ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED WITH A LID. N. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY STORED IN ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE FACILITY. O. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE PROJECT BOUNDARY.PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE PROJECT BOUNDARY.

AutoCAD SHX Text

1. PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION PER NFP1 PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION PER NFP1 241. REFER TO DETAIL 1/G003. 2. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD READER PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD READER ACCESS. REFER TO ELEVATION 2/G003. 3. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION. REFER TO DETAIL PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION. REFER TO DETAIL 3/G003. SYSTEM SHALL BE 1 HR RATED.

AutoCAD SHX Text

AutoCAD SHX Text A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT CONSTRUCTION. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT CONSTRUCTION. B. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURING FOR EACH REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURING FOR EACH PHASE AND AREA OF WORK.

AutoCAD SHX Text

ADJUSTABLE UPPER PANEL(S). SLIDES TO CEILING HEIGHT UP TO 10'-0".

AutoCAD SHX Text

ADJUSTABLE HYDRAULIC CLOSER AVAILABLE

AutoCAD SHX Text

1" X 1" ANGLE MOUNTED TO GASKET AND ADHERED TO FORM SEAL WITH FRAME

AutoCAD SHX Text

1" X 1" ANGLE MOUNTED TO GASKET AND ADHERED TO FORM SEAL WITH FRAME

AutoCAD SHX Text 1/4" X 2" SOLID ALUMINUM THRESHOLD STRIP WITH NEOPRENE GASKET MATERIAL SEAL TO THE FLOOR.

AutoCAD SHX Text TEMPORARY IC BARRIER WALL CONSTRUCTION SYSTEM MUST BE 1HR RATED, PER NFPA 241. (ALTERNATIVELY PROVIDE FULL FIRE-WATCH)

AutoCAD SHX Text G003

AutoCAD SHX Text

AutoCAD SHX Text 1/2" = 1'-0"

AutoCAD SHX Text

TEMPORATY INFECTION CONTROL BARRIER

AutoCAD SHX Text

ADJUSTABLE UPPER PANEL(S). SLIDES TO CEILING HEIGHT UP TO 10'-0".

AutoCAD SHX Text

ADJUSTABLE HYDRAULIC CLOSER AVAILABLE

AutoCAD SHX Text

1" X 1" ANGLE MOUNTED TO GASKET AND ADHERED TO FORM SEAL WITH FRAME

AutoCAD SHX Text

CONTINUOUS POLYETHYLENE HINGE

AutoCAD SHX Text SELF LATCHING, LOCKING HANDLE WITH KEYED OUTSIDE AND THUMBTURN INSIDE. 4 DIGIT COMBINATION PUSHBUTTON LOCKED AVAILABLE

AutoCAD SHX Text

GASKETED SWEEP TO PREVENT DUST AND DEBRIS ESCAPE

AutoCAD SHX Text 1/4" X 2" SOLID ALUMINUM THRESHOLD STRIP WITH NEOPRENE GASKET MATERIAL SEAL TO THE FLOOR.

AutoCAD SHX Text

SYSTEM MUST BE 1HR RATED, PER NFPA 241. (ALTERNATIVELY PROVIDE FULL FIRE-WATCH)

AutoCAD SHX Text

PUBLIC SIDE

AutoCAD SHX Text G003

AutoCAD SHX Text

AutoCAD SHX Text 1/2" = 1'-0"

AutoCAD SHX Text

TEMPORARY INFECTION CONTROL BARRIER DOOR

AutoCAD SHX Text

CONSTRUCTION SIDE

AutoCAD SHX Text

EXISTING DECK

AutoCAD SHX Text

CONTINUOUSLY ADHERE 6-MIL. FIRE RETARDANT POLY TO DECK WITH TAPE

AutoCAD SHX Text

2" DEEP LEF 3 " STEEL SLIP TRACK58" STEEL SLIP TRACK

AutoCAD SHX Text

12" VINYL FACED BATT INSULATION

AutoCAD SHX Text

CEILING

AutoCAD SHX Text

6-MIL FIRE RETARDANT POLY INTERIOR SIDE

AutoCAD SHX Text

3 " STEEL STUD TRACK @ 16" O.C.58" STEEL STUD TRACK @ 16" O.C.

AutoCAD SHX Text

3 " STEEL STUD TRACK58" STEEL STUD TRACK

AutoCAD SHX Text

COMPRESSIBLE FOAM OR RUBBER SILL

AutoCAD SHX Text

CONTINUOUSLY ADHERE FIRE RETARDANT POLY TO FLOOR WITH TAPE

AutoCAD SHX Text

TEMPORARY IC BARRIER WALL CONSTRUCTION( DUST WALL)

AutoCAD SHX Text G003

AutoCAD SHX Text

AutoCAD SHX Text 1/2" = 1'-0"

TEMPORARY DUST CONTROL BARRIER

ROLLING SHUTTER ROLLING SHUTTER

OVER HEAD DOOR

HAC

STORAGE

FIRE

CLOSET

PNEUMATIC

TUBE

FAC

FAC

TEL

FIRE

HOSE

11E1

CLOSET

1541A

CLOSET

1545B

TELECOMMUNICATION

STAFF OFFICE

ELEVATOR

NO S5

ELEVATOR

NO S6

ELEVATOR

NO P1

ELEVATOR

NO P2

CORRIDOR

C1511

CORRIDOR

C1404

TOILET

1491A

ELECTRICAL

CLEAN SUPPLY

CORRIDOR

C1102

ENTRANCE

CORRIDOR

C1401

CORRIDOR

C1403

CORRIDOR

C1402

CORRIDOR

C1405

CORRIDOR

C1407

CORRIDOR

C1406

CORRIDOR

C1409

CORRIDOR

C1445

WAITING RM

WOMENS

TOILET

MENS TOILET

HEALTH VET

CO-ORDR

CREDIT

UNION

FIRE

CONTROL

PATIENT

ADVOCATE

OFFICE

OPTICAL

DISPENSARY

1410A

TRIAGE

TRIAGE

ELECTRICAL

SWITCH RM

14E2

TRIAGE

PHYSICIAN

ASSIST

ELECTRICAL

14E1

ADDICTION

CONSULT

RM

RECEPTION

CONSULT

RM

PROGRAM

SUPPORT

1459A

E D OFFICE

ELECTRICAL

14E3

FLU

CLINIC

CONSULT

RM

HAC

TOILET

TEL

14T1

VESTIBULE/STAIR

STAIR

NO 2

PAC

CO-ORDR

OFFICE

CHIEF

CONSULT

RM

CONSULT

RM

CONSULT

RM

EMS

HOUSE

KEEPING

ELEVATOR

NO P7

ELEVATOR

NO P8

TEL

CLOSET

14T2

14E4

STAIR

NO 1

ELEVATOR

NO P3

ELEVATOR

NO P4

NURSE STATION EMERGENCY RM

EQUIP STORAGE

LOUNGE

ELECTRICAL

14E6

COMM

14T3

BEREAVEMENT

RM

1475A

SOILED

UTILITY

EXAM RM-7

1470G

EXAM RM-6

1470F

EXAM RM-5

1470E

EXAM RM-4

1470D

EXAM RM-3

1470C

EXAM RM-2

1470B

E D MGR

ICE MACH

EXAM RM-1

1470AER HALLWAY

TRAVEL PAY

STORAGE

RECEPTION AND

ADMISSION

AMBULATORY

CARE SUPV

OFFICE

CHIEF

AMBULATORY

CORRIDOR

C1411

VTS MANAGER

EMS STORAGE

1431A

ER STORAGE

1431B

TRIAGE

E D ATTENDING

TRIAGE

MEDICAL

SUPPORT

SUPERV

1431C

TELEPHONE

TRIAGE

TOILET

VESTIBULE

C1408

GARAGE

EMS

CLEAN

SUPPLY

CLEAN

LINEN

TOILET

EXAM RM-15

1470R

EXAM RM-14

1470Q

EXAM RM-13

1470P

EXAM RM-12

1470N

EXAM RM-11

1470M

EXAM RM-10

1470L

MEDS

1470H

EXAM RM-8

1470J

EXAM RM-9

1470K

MENS

TOILET

CONFERENCE RM

WOMENS

TOILET

TOILET

1497 ON CALL

ADMIN OFFICE

EXAM RM

ON CALL

1491B

STAIR

EXAM

RM

EXAM RM

EXAM RM

DONATED

CLOTHING

STORAGE

EMS LINEN RM

CORRIDOR

C1501

PHARMACY IV

STORAGE

BIOHAZARD

CONTAINER

GAS STORAGE

ELEVATOR MECH

ELEVATOR

FOYER

MORGUE

ELEVATOR

STAIR

NO 5

TELECOMMUNICATION RM

14T4

ELECTRICAL

14E7

TOILET

1499A

DOCTOR

OFFICE

DOCTOR

OFFICE

DOCTOR

OFFICE

SECRET

OFFICE

STORAGE

COMP AND

PENS STAFF

WAITING RM

SUPV OFFICE

EXAM RM

EXAM RM

FORENSIC

PSY

FELLOW

MECH RM

POLICE

OPERATION

ARMORY RM

TOILET

STORAGE

1554B

SQUAD RM OFFICE

PHYSICAL

SECURITY

1540B

PHYSICAL

SECURITY

1540A

EVIDENCE

STORAGE

1542A

EVIDENCE

OFFICE VIEW

1544A

OPERATION

CAPTAIN

DEPUTY CHIEF

VESTIBULE

CORRIDOR

C1505

CORRIDOR

C1504

ENTRANCE/LOBBY

C1103

ELECTRICAL

1541B

VESTIBULE

C1116

SECY OFFICE

OFFICE/

COPIER

1545A

HOLD

CELL

1556 HOLD

CELL

WAITING RM

CONSULT

RM - 1

CONSULT

RM - 2

WAITING

RECEPTION

TECH WORK

TOILET

HOLDING

CORRIDOR

C1508

CLEAN

CLEAN

SUPPLY

CORRIDOR

C1502

HAC

FIRE ALARM

CORRIDOR

C1503

GAS CYLINDER

STORAGE

EMS STORAGE

CT IMAGING RM - 2

CONTROL RM - 2

1528B TOILET

1528A

CONTROL RM - 1

1530A

TOILET

1530B

SWITCHGEAR RM15E5

CORRIDOR

STAIRWELL

VESTIBULE

VESTIBULE

CORRIDOR

CLOSET

VESTIBULE

ELECTRICAL

CLOSET

OPTICAL

WAITING RM

CORRIDOR

C1506B

1570A

1521A

C1505

1555B

1499B

1490AM1

NO 5A

1436A

1467NO 2

1410B

C1404

C1404

ATS RM

1570C

ELECTRIC

CLOSET

14E5

POLICE

OFFICE

DAYLIGHT

WELL

MATCH LINE MATCH LINE

BLDG 1 EAST

BLDG 1 WEST

PHASING

GENERAL NOTES

BUILDING 1 PHASED CONSTRUCTION KEY

NOTES - FIRST FLOOR - EAST

DOOR AND FRAME DELIVERY NOTES

BLDG 1 - 1ST FLR PLAN - EAST -

PHASING & LIFE SAFETY

1-G101E

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

ISSUED FOR BIDS AND

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SECURITY CORRECTIONS

JESSE BROWN VAMC CHICAGO, IL

537-19-904

Project Director

08/06/21 J. Hirschhorn D. BrandtRevisions: Date:

AutoCAD SHX Text 0'

AutoCAD SHX Text

SCALE: 3/32"=1'-0"

AutoCAD SHX Text 32'

AutoCAD SHX Text 24'

AutoCAD SHX Text 16'

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text 1-G101E

AutoCAD SHX Text

AutoCAD SHX Text 3/32" = 1'-0"

AutoCAD SHX Text

BUILDING 1 - FIRST FLOOR PLAN - EAST

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 11A

AutoCAD SHX Text 11B

AutoCAD SHX Text

AutoCAD SHX Text A401

AutoCAD SHX Text 1-4

AutoCAD SHX Text A. THIS IS A CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE THIS IS A CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE PHASING IN HIS/HER BID IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. B. THE PRIMARY GOAL OF THIS PHASING DOCUMENT IS TO IDENTIFY THE THE PRIMARY GOAL OF THIS PHASING DOCUMENT IS TO IDENTIFY THE ADJACENCIES THAT WILL REQUIRE THE SEPARATE TIMING OF THE WORK ON PARTICULAR DOORS AGAINST NEARBY DOORS TO BE WORKED ON. WORK IN ALL PHASES WILL REQUIRE COORDINATION WITH HOSPITAL DEPARTMENTS (THROUGH THE COR) AS DOORS WITHIN THE PROJECT SCOPE IN CLOSE PROXIMITY CAN NOT BE WORKED ON SIMULTANEOUSLY. C. THE EXACT SEQUENCE OF WORK IS TO BE WORKED OUT THROUGH THE EXACT SEQUENCE OF WORK IS TO BE WORKED OUT THROUGH MEETINGS WITH COR AND AFFECTED HOSPITAL DEPARTMENTS. D. ANTICIPATED WORK AREAS ARE INDICATED TO PROVIDE FOR ON-GOING ANTICIPATED WORK AREAS ARE INDICATED TO PROVIDE FOR ON-GOING VAMC HEALTHCARE FUNCTIONS DURING CONSTRUCTION. THE CONSTRUCTION BARRIERS ARE IDENTIFIED AND LOCATED ON THE ARCHITECTURAL DRAWINGS. E. CONSTRUCTION WORK WILL BE RESTRICTED TO OVERNIGHT AND WEEKEND CONSTRUCTION WORK WILL BE RESTRICTED TO OVERNIGHT AND WEEKEND HOURS (U.N.O.) AS STATED IN THE SPECIFICATIONS. F. COORDINATE AND SCHEDULE ALL WORK WITH THE COR. COORDINATE AND SCHEDULE ALL WORK WITH THE COR. G. PHASING WILL ALSO REQUIRE TEMPORARY ALTERNATE EMERGENCY EGRESS PHASING WILL ALSO REQUIRE TEMPORARY ALTERNATE EMERGENCY EGRESS ROUTES WHICH WILL BE INCLUDED IN PHASING KEY NOTES BELOW.

AutoCAD SHX Text (KEY NOTES APPLY TO THIS SHEET ONLY) 1. WORK ON EXTERIOR DOOR 04 AT MORGUE ELEVATOR FOYER HAS NO WORK ON EXTERIOR DOOR 04 AT MORGUE ELEVATOR FOYER HAS NO NEARBY DOOR CONFLICTS. GC TO COORDINATE WITH COR (FOR MORGUE CONTACT) FOR TIMING OF CONSTRUCTION. 2. WORK ON EXTERIOR DOOR 06 AT VESTIBULE 1499B WILL CONFLICT WITH WORK ON EXTERIOR DOOR 06 AT VESTIBULE 1499B WILL CONFLICT WITH DOOR 07 AT STAIR 5. TELECOM DEPT MUST EXIT THROUGH STAIR 5 WHILE DOOR 06 IS WORKED ON. GC TO COORDINATE WITH COR (FOR TELECOMMUNICATIONS DEPT. CONTACT) FOR TIMING OF CONSTRUCTION. 3. WORK ON EXTERIOR DOOR 07 AT STAIR NO.5 WILL CONFLICT WITH DOOR WORK ON EXTERIOR DOOR 07 AT STAIR NO.5 WILL CONFLICT WITH DOOR 06 AT TELECOM. DEPT. STAIR NO.5 PROVIDES EMERGENCY EGRESS FOR BASEMENT THROUGH 10TH FLOOR OF BLDG 1 EAST. ANY DEPT'S IN THESE AREAS OPEN DURING WORK ON THIS DOOR WILL BE ROUTED THROUGH STAIR NO.1 ADJACENT TO ELEVATOR P4. GC TO COORDINATE WITH COR (FOR ALL AFFECTED DEPT.) FOR TIMING OF CONSTRUCTION. 4. WORK ON INTERIOR DOOR 09 BETWEEN CORRIDOR C1404 AND SERVICE WORK ON INTERIOR DOOR 09 BETWEEN CORRIDOR C1404 AND SERVICE ELEVATOR FOYER HAS NO NEARBY DOOR CONFLICTS. SERVICE ELEVATOR S6 WILL BE OUT OF SERVICE WHILE WORK ON THIS DOOR IS PERFORMED. GC TO COORDINATE WITH COR (FOR ALL AFFECTED DEPT.) FOR TIMING OF CONSTRUCTION. 5. WORK ON EXTERIOR DOOR 10 AT STAIR NO.5A WILL CONFLICT WITH DOOR WORK ON EXTERIOR DOOR 10 AT STAIR NO.5A WILL CONFLICT WITH DOOR 07 AT STAIR 5A AND DOOR 18 AT NEW POLICE OBSERVATION ROOM 1438. STAIR NO.5A PROVIDES EMERGENCY EGRESS FOR THE EMERGENCY SUITE AND THE AUDITORIUM ON 2ND FLOOR OF BLDG 1 EAST. THE AUDITORIUM WILL NOT BE USABLE WHILE DOOR 10 IS WORKED ON. THE EMERGENCY SUITE EGRESS ROUTE THROUGH CORRIDOR C1404 BACK TO STAIR NO.5 AND DOOR 07. GC TO COORDINATE WITH COR (FOR ALL AFFECTED DEPT.) FOR TIMING OF CONSTRUCTION. 6. WORK ON EXTERIOR OVERHEAD DOORS 11A AND 11B AT GARAGE 1430 WORK ON EXTERIOR OVERHEAD DOORS 11A AND 11B AT GARAGE 1430 WILL ONLY CONFLICT WITH EACH OTHER. WHILE WORK ON DOOR 11A IS BEING PERFORMED, DOOR 11B WILL BE LEFT OPEN TO PERMIT AMBULANCE ACCESS TO THE EMERGENCY SUITE. THIS IS SWAPPED WHEN WORK ON DOOR 11B IS DONE. 7. WORK ON INTERIOR DOOR 18 AT NEW POLICE OBSERVATION ROOM 1438 WORK ON INTERIOR DOOR 18 AT NEW POLICE OBSERVATION ROOM 1438 WILL CONFLICT WITH DOOR 07 AT STAIR 5A AND DOOR 10 AT STAIR NO.5A. ADDITIONALLY, WORK ON ROOM 1438 WILL RESULT IN A SINGLE MEANS OF EGRESS FOR THE EMERGENCY SUITE THROUGH A SINGLE 3'-0" WIDE DOOR. THE SINGLE EMERGENCY SUITE EGRESS ROUTE IS THROUGH CORRIDOR C1404 TO STAIR NO.5A AND DOOR 10. GC TO COORDINATE WITH COR (FOR EMERGENCY DEPT.) FOR TIMING OF CONSTRUCTION. 8. WORK ON INTERIOR DOOR 28 BETWEEN CORRIDORS C1406 AND C1404 WORK ON INTERIOR DOOR 28 BETWEEN CORRIDORS C1406 AND C1404 HAS NO NEARBY DOOR CONFLICTS. GC TO COORDINATE WITH COR (FOR HOSPITAL ADMIN.) FOR TIMING OF CONSTRUCTION.

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DELIVERY AND INSTALLATION THE CONTRACTOR SHALL BE RESPONSIBLE FOR DELIVERY AND INSTALLATION MEANS AND METHODS FOR ALL NEW DOORS AND FRAMES TO THE WORK SITES THROUGHOUT THE BUILDING. 2. THE CONTRACTOR SHALL REVIEW THE DRAWINGS, SPECIFICATIONS AND THE CONTRACTOR SHALL REVIEW THE DRAWINGS, SPECIFICATIONS AND EXISTING BUILDING DRAWINGS TO DETERMINE DELIVERY ROUTES FOR THE DOORS AND FRAMES TO THE PROJECT WORK SITES THROUGHOUT THE BUILDING. THE CONTRACTOR SHALL PROVIDE DRAWINGS DEMONSTRATING THAT THE DELIVERY PATH IS ACCEPTABLE FOR REVIEW AND APPROVAL BY THE VA (COR) PRIOR TO PROCEEDING WITH DOOR AND FRAME DELIVERY INTO THE FACILITY. 3. THE DOOR AND FRAME DELIVERY TO THE PROJECT WORK SITE SHALL BE THE DOOR AND FRAME DELIVERY TO THE PROJECT WORK SITE SHALL BE SCHEDULED FOR SAME DAY INSTALLATION. STOCK PILING DOORS AND FRAMES WITHIN THE BUILDING WILL NOT BE PERMITTED UNLESS IT IS DEMONSTRATED TO BE ACCEPTABLE THROUGH THE REVIEW PROCEDURE NOTED ABOVE. 4. ALL EXISTING EXTERIOR AND INTERIOR FINISHES OR CONDITIONS DAMAGED ALL EXISTING EXTERIOR AND INTERIOR FINISHES OR CONDITIONS DAMAGED AS A RESULT OF THE DOOR AND FRAME DELIVERY SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AT NO COST TO THE OWNER.

FIRE

HOSE

11E1

CLOSET

CLOSET

1541A

FAC

1575B

CLOSET

1545B

DIGITAL RADIOLOGY

ELEVATOR

NO P1

ELEVATOR

NO P2

CORRIDOR

C1511

PREP/

RECOVERY

CORRIDOR

C1405

CORRIDOR

C1409

HEALTH VET

CO-ORDR

CREDIT

UNION

FIRE

CONTROL

PATIENT

ADVOCATE

OFFICE

OPTICAL

DISPENSARY

1410A

TRIAGE

ADDICTION CONSULT CONSULT

PAC

CO-ORDR

OFFICE

CHIEF

CONSULT

RM

CONSULT

RM

CONSULT

RM

EMS

ELEVATOR

NO P7

ELEVATOR

NO P8

ELEVATOR

NO P3

DONATED

CLOTHING

STORAGE

EMS LINEN RM

VESTIBULE

C1507

CORRIDOR

C1606

POLICE

OPERATION

CORRIDOR

C1510

CORRIDOR

C1505

PREPARATION

SOILED RECEIVING /

DECONTAM

SPD CHIEF

SPD

STAFF

OFFICE

1646TOILET

1646A

STAFF

LOCKER

TOILET

1643A

STAFF

LOUNGE

ETO

SVC

ETO

RM

1639A

HAC

16H6

CART STAGING

AREA

CART

WASH

VENDING MACHS

CHAPLAIN

OFFICE

CHIEF CHAPLAIN

ELEVATOR

PIT

P-27

ELECTRICAL RM

16E1

ELEVATOR

MACH RM

SECURED

ITEMS

WHEELCHAIR

WASH

ESCORT

WAITING RM

FIRE COMMAND

CENTER

STAIR

NO 13

SECY

VESTIBULE

BLESSED

SACRAMENT

CHAPEL

SACRISTY

CORRIDOR

C1607

ELEVATOR

P-26

HAC

16H5

TOILET

STAFF LOCKER

STAFF

LOUNGE

STAFF LOCKER

TOILET

MANUAL

EQUIP WASH

ARMORY RM

TOILET

STORAGE

1554B

SQUAD RM OFFICE

PHYSICAL

SECURITY

1540B

PHYSICAL

SECURITY

1540A

EVIDENCE

STORAGE

1542A

EVIDENCE

OFFICE VIEW

1544A

OPERATION

CAPTAIN

DEPUTY CHIEF

VESTIBULE

CORRIDOR

C1505

CORRIDOR

C1504

ENTRANCE/LOBBY

C1103

ELECTRICAL

1541B

VESTIBULE

C1116

SECY OFFICE

OFFICE/

COPIER

1545A

CORRIDOR

C1509

POLICE CHIEF

RAD EXAM

DOCTOR

OFFICE

RAD

OFFICE

ULTRASOUND

HOLD

CELL

1556 HOLD

CELL

RADIOLOGY

OFFICE

RADIOLOGY

READING RM

RADIOLOGY

OFFICE

RAD

OFFICE

READING RM

TOILET

SPD SUPV

OFFICE

SPD RECEIVING

STORAGE

SECY OFFICE

RADIOLOGY SVC

CONFERENCE RM

FAN RM

CHIEF OF

SPS

COMPUTER

CABINET

1581A

OPERATION MGR

RADIOLOGY SVC

CHIEF RADIOLOGY

ELECTRICAL

CLOSET

15E2

TELEPHONE

CLOSET

15T1

HAC

STAIR

NO 3

WAITING RM

CONSULT

RM - 1

CONSULT

RM - 2

GOWNED

WAITING

COPY

RECEPTION

TECH WORK

TOILET

MENS

CHANGING

WOMENS

CHANGING

INPT

HOLDING

CORRIDOR

C1506

CORRIDOR

CORRIDOR

C1508

CLEAN

CLEAN

SUPPLY

HAC

FIRE ALARM

CORRIDOR

C1503

GAS CYLINDER

STORAGE

EMS STORAGE

CT IMAGING RM - 2

CONTROL RM - 2

1528B TOILET

1528A

CONTROL RM - 1

1530A

TOILET

1530B

CT IMAGING RM - 1

ELECTRICAL RM

15E3

RADIOLOGY /

FLUOROSCOPIC RM

TOILET

1533A

MECH

ULTRASOUND

RADIOLOGY

SUPPLY

DIGITAL RADIOLOGY

ELECTRICAL

15E4

SWITCHGEAR RM15E5

TOILET

1538A

STAIR

NO 04

I R READING

RM

1539A

COMMUNICATIONS

1538F

ANTE

RM

1538B

EQUIP RM

1538E

CONTROL RM - 3

1538D

SPECIAL

PROCEDURES

INTERVENTIONAL

1538C

STAIRWELL

VESTIBULE

VESTIBULE

CORRIDOR

CLOSET

SALLY

PORT

VESTIBULE

STEAM

STERILIZER

OPTICAL

WAITING RM

1538G

C1506B

1570A

C1506A

1521A

C1505

1555B

1635A

1602A

1410B

ATS RM

1570C

SUPERVISOR

OFFICE

POLICE

OFFICE

DAYLIGHT

WELL

MATCH LINEMATCH LINE

BLDG 1 - 1ST FLR PLAN - WEST -

PHASING & LIFE SAFETY

1-G101W

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

ISSUED FOR BIDS AND

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SECURITY CORRECTIONS

JESSE BROWN VAMC CHICAGO, IL

537-19-904

Project Director

08/06/21 J. Hirschhorn D. BrandtRevisions: Date:

PHASING

GENERAL NOTES

BUILDING 1 PHASED CONSTRUCTION KEY

NOTES - FIRST FLOOR - WEST

DOOR AND FRAME DELIVERY NOTES

DAYLIGHT

WELL

KEY PLAN

MATCH

LINE

MATCH

LINE

BLDG

BLDG

BLDG 1

WEST

BLDG

BLDG

WEST

BLDG

EAST

BLDG 1

EAST

AutoCAD SHX Text 0'

AutoCAD SHX Text

SCALE: 3/32"=1'-0"

AutoCAD SHX Text 32'

AutoCAD SHX Text 24'

AutoCAD SHX Text 16'

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text 1-G101W

AutoCAD SHX Text

AutoCAD SHX Text 3/32" = 1'-0"

AutoCAD SHX Text

BUILDING 1 - FIRST FLOOR PLAN - WEST

AutoCAD SHX Text 30A

AutoCAD SHX Text 30B

AutoCAD SHX Text 31A

AutoCAD SHX Text 31B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 17A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 38A

AutoCAD SHX Text

AutoCAD SHX Text 17B

AutoCAD SHX Text A. THIS IS A CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE THIS IS A CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE PHASING IN HIS/HER BID IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. B. THE PRIMARY GOAL OF THIS PHASING DOCUMENT IS TO IDENTIFY THE THE PRIMARY GOAL OF THIS PHASING DOCUMENT IS TO IDENTIFY THE ADJACENCIES THAT WILL REQUIRE THE SEPARATE TIMING OF THE WORK ON PARTICULAR DOORS AGAINST NEARBY DOORS TO BE WORKED ON. WORK IN ALL PHASES WILL REQUIRE COORDINATION WITH HOSPITAL DEPARTMENTS (THROUGH THE COR) AS DOORS WITHIN THE PROJECT SCOPE IN CLOSE PROXIMITY CAN NOT BE WORKED ON SIMULTANEOUSLY. C. THE EXACT SEQUENCE OF WORK IS TO BE WORKED OUT THROUGH THE EXACT SEQUENCE OF WORK IS TO BE WORKED OUT THROUGH MEETINGS WITH COR AND AFFECTED HOSPITAL DEPARTMENTS. D. ANTICIPATED WORK AREAS ARE INDICATED TO PROVIDE FOR ON-GOING ANTICIPATED WORK AREAS ARE INDICATED TO PROVIDE FOR ON-GOING VAMC HEALTHCARE FUNCTIONS DURING CONSTRUCTION. THE CONSTRUCTION BARRIERS ARE IDENTIFIED AND LOCATED ON THE ARCHITECTURAL DRAWINGS (#.A100'S). E. CONSTRUCTION WORK WILL BE RESTRICTED TO OVERNIGHT AND WEEKEND CONSTRUCTION WORK WILL BE RESTRICTED TO OVERNIGHT AND WEEKEND HOURS (U.N.O.) AS STATED IN THE SPECIFICATIONS. F. COORDINATE AND SCHEDULE ALL WORK WITH THE COR. COORDINATE AND SCHEDULE ALL WORK WITH THE COR. G. PHASING WILL ALSO REQUIRE TEMPORARY ALTERNATE EMERGENCY EGRESS PHASING WILL ALSO REQUIRE TEMPORARY ALTERNATE EMERGENCY EGRESS ROUTES WHICH WILL BE INCLUDED IN PHASING KEY NOTES BELOW.

AutoCAD SHX Text (KEY NOTES APPLY TO THIS SHEET ONLY) 1. WORK ON EXTERIOR DOOR 02 AT LOADING DOCK HAS NO NEARBY DOOR WORK ON EXTERIOR DOOR 02 AT LOADING DOCK HAS NO NEARBY DOOR CONFLICTS. ACCESS TO LOADING DOCK WILL BE RE-ROUTED WHILE DOOR 02 IS WORKED ON. GC TO COORDINATE WITH COR (FOR LOADING DOCK DEPT. CONTACT) FOR TIMING OF CONSTRUCTION. 2. WORK ON EXTERIOR DOORS 15 & 16 AT ELECTRICAL ROOM 15E3 WILL ONLY WORK ON EXTERIOR DOORS 15 & 16 AT ELECTRICAL ROOM 15E3 WILL ONLY CONFLICT WITH EACH OTHER. GC TO WORK ON ONE DOOR AT A TIME. GC TO COORDINATE WITH COR (FOR FACILITIES DEPT. CONTACT) FOR TIMING OF CONSTRUCTION. 3. WORK ON EXTERIOR DOOR 17A AT VESTIBULE C1507 WILL CONFLICT WITH DOORS WORK ON EXTERIOR DOOR 17A AT VESTIBULE C1507 WILL CONFLICT WITH DOORS 17B,33,34&39 IN PUBLIC CORRIDORS. DOOR 17A PROVIDES EMERGENCY EGRESS FOR RADIOLOGY AND POLICE DEPT. OF BLDG 1 WEST. ANY DEPT'S IN THESE AREAS OPEN DURING WORK ON THIS DOOR WILL BE ROUTED THROUGH LOBBIES OF BUILDING 40. 4. WORK ON INTERIOR DOORS 30A&B BETWEEN CORRIDOR C1505 AND ENTRANCE WORK ON INTERIOR DOORS 30A&B BETWEEN CORRIDOR C1505 AND ENTRANCE LOBBY C1103 CONFLICTS WITH DOORS 31A&B. THESE DOORS ARE A PRIMARY PUBLICWAY. GC TO COORDINATE WITH COR (HOSPITAL ADMIN) FOR TIMING OF CONSTRUCTION. 5. WORK ON INTERIOR DOORS 31A&B BETWEEN CORRIDOR C1505 AND CORRIDOR WORK ON INTERIOR DOORS 31A&B BETWEEN CORRIDOR C1505 AND CORRIDOR C1504 CONFLICTS WITH DOORS 30A&B. THESE DOORS ARE A PRIMARY PUBLICWAY. GC TO COORDINATE WITH COR (HOSPITAL ADMIN) FOR TIMING OF CONSTRUCTION. 6. WORK ON INTERIOR DOORS 32 BETWEEN CORRIDOR C1504 AND WAITING 1515 IN WORK ON INTERIOR DOORS 32 BETWEEN CORRIDOR C1504 AND WAITING 1515 IN CT SUITE HAS CONFLICTS WITH DOORS 34&17A. IF DEPT. IS OPEN DURING WORK ON THIS DOOR, STAFF WILL BE ROUTED THROUGH CORRIDOR C1506 AND VESTIBULE C1507. 7. WORK ON INTERIOR DOOR 33 AT CORRIDOR C1509 WILL CONFLICT WITH DOOR 34 WORK ON INTERIOR DOOR 33 AT CORRIDOR C1509 WILL CONFLICT WITH DOOR 34 AT CORRIDOR C1506. IF RADIOLOGY DEPT IS OPEN DURING WORK ON THIS DOOR, STAFF WILL BE ROUTED THROUGH BUILDING 40. 8. WORK ON INTERIOR DOOR 34 AT CORRIDOR C1506 WILL CONFLICT WITH DOOR 33 WORK ON INTERIOR DOOR 34 AT CORRIDOR C1506 WILL CONFLICT WITH DOOR 33 AT CORRIDOR C1509. IF RADIOLOGY OR CT DEPT'S ARE OPEN DURING WORK ON THIS DOOR, STAFF WILL BE ROUTED THROUGH CORRIDOR C1505. 9. WORK ON EXTERIOR DOORS 35 & 36 AT SWITCHGEAR ROOM 15E5 WILL ONLY WORK ON EXTERIOR DOORS 35 & 36 AT SWITCHGEAR ROOM 15E5 WILL ONLY CONFLICT WITH EACH OTHER. GC TO WORK ON ONE DOOR AT A TIME. GC TO COORDINATE WITH COR (FOR FACILITIES DEPT. CONTACT) FOR TIMING OF CONSTRUCTION. 10. WORK ON EXTERIOR DOOR 37 AT STAIRWELL C1506B WILL CONFLICT WITH DOOR WORK ON EXTERIOR DOOR 37 AT STAIRWELL C1506B WILL CONFLICT WITH DOOR 36 AT SWITCHGEAR RM AND DOOR 38B ON FLOOR ABOVE. GC TO WORK ON ONE DOOR AT A TIME. GC TO COORDINATE WITH COR (FOR FACILITIES DEPT. CONTACT) FOR TIMING OF CONSTRUCTION. 11. WORK ON EXTERIOR DOOR 38A AT ATS ROOM 1570C HAS NO NEARBY DOOR WORK ON EXTERIOR DOOR 38A AT ATS ROOM 1570C HAS NO NEARBY DOOR CONFLICTS. GC TO COORDINATE WITH COR (FOR ATS CONTACT) FOR TIMING OF CONSTRUCTION. 12. WORK ON INTERIOR DOOR 39 BETWEEN CORRIDOR C11510 AND BUILDING 40 WILL WORK ON INTERIOR DOOR 39 BETWEEN CORRIDOR C11510 AND BUILDING 40 WILL CONFLICT WITH DOOR 17 AT VESTIBULE C1507. GC TO WORK ON ONE DOOR AT A TIME. GC TO COORDINATE WITH COR (FOR HOSPITAL ADMIN.) FOR TIMING OF CONSTRUCTION. 13. WORK ON EXTERIOR DOOR 17B AT STAIR NO.3 WILL CONFLICT WITH DOOR 17A. WORK ON EXTERIOR DOOR 17B AT STAIR NO.3 WILL CONFLICT WITH DOOR 17A. DOOR 17B PROVIDES EMERGENCY EGRESS FOR FLOORS ABOVE IN BLDG 1 WEST. ANY DEPT'S IN THESE AREAS OPEN DURING WORK ON THIS DOOR WILL BE ROUTED THROUGH LOBBIES OF BUILDING 40. 14. WORK ON INTERIOR DOOR 27 BETWEEN CORR'S C1505 & C1504 CONFLICTS WITH WORK ON INTERIOR DOOR 27 BETWEEN CORR'S C1505 & C1504 CONFLICTS WITH DOORS 32. THESE DOORS ARE A PRIMARY PUBLICWAY. WORK ON THIS DOOR WILL ALSO IMPACT MAIN ENTRY INTO POLICE. GC TO COORDINATE WITH COR (HOSPITAL ADMIN & POLICE) FOR TIMING OF CONSTRUCTION.

AutoCAD SHX Text

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DELIVERY AND INSTALLATION THE CONTRACTOR SHALL BE RESPONSIBLE FOR DELIVERY AND INSTALLATION MEANS AND METHODS FOR ALL NEW DOORS AND FRAMES TO THE WORK SITES THROUGHOUT THE BUILDING. 2. THE CONTRACTOR SHALL REVIEW THE DRAWINGS, SPECIFICATIONS AND THE CONTRACTOR SHALL REVIEW THE DRAWINGS, SPECIFICATIONS AND EXISTING BUILDING DRAWINGS TO DETERMINE DELIVERY ROUTES FOR THE DOORS AND FRAMES TO THE PROJECT WORK SITES THROUGHOUT THE BUILDING. THE CONTRACTOR SHALL PROVIDE DRAWINGS DEMONSTRATING THAT THE DELIVERY PATH IS ACCEPTABLE FOR REVIEW AND APPROVAL BY THE VA (COR) PRIOR TO PROCEEDING WITH DOOR AND FRAME DELIVERY INTO THE FACILITY. 3. THE DOOR AND FRAME DELIVERY TO THE PROJECT WORK SITE SHALL BE THE DOOR AND FRAME DELIVERY TO THE PROJECT WORK SITE SHALL BE SCHEDULED FOR SAME DAY INSTALLATION. STOCK PILING DOORS AND FRAMES WITHIN THE BUILDING WILL NOT BE PERMITTED UNLESS IT IS DEMONSTRATED TO BE ACCEPTABLE THROUGH THE REVIEW PROCEDURE NOTED ABOVE. 4. ALL EXISTING EXTERIOR AND INTERIOR FINISHES OR CONDITIONS DAMAGED ALL EXISTING EXTERIOR AND INTERIOR FINISHES OR CONDITIONS DAMAGED AS A RESULT OF THE DOOR AND FRAME DELIVERY SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AT NO COST TO THE OWNER.

AutoCAD SHX Text

PLAN NORTH

TRUE NORTH

MATCH LINE MATCH LINE

TV

OCCUPATIONAL

THERAPY

2514A

TEL

24E2

STORAGE

FAC

2479A

ELECTRICAL

CLOSET

24E3

COAT CLOSET

2438C

STORAGE

2438A

TOILET

2438B

STORAGE

2440A

STORAGE

2447A

CONNECTING

CORRIDOR

C2307

ASSOCIATE

DIRECTOR

PATIENT

CARE

CORRIDOR

C2401

ELEVATOR

ELEVATOR

CORRIDOR

C2409

CORRIDOR

C2404

WOMENS

TOILET

2521A 2548

CORRIDOR

C2501

IRM STORAGE

WAITING RM

CORRIDOR

C2408

STORAGE

CANTEEN STORAGE

STORAGE

STORAGE

AUTOPSY

AREA

ELEVATOR

NO P4

ELEVATOR

NO P3

ELEVATOR

NO P2

ELEVATOR

NO P1

SOILED

UTILITY

TOILET/

SHOWER

2497A

MORGUE CLEAN UTILITY

REFR

2477A

2457MECH SPACE

VOLUNTARY

STORAGE

FLEET OPERATION

OFFICE

2449A

SUPV

OFFICE

2449B

ELEVATOR

NO P7

ELEVATOR

NO P8

PATIENT

ADVOCATE OFFICE

CORRIDOR

C2405

CONFERENCE RM

DIRECTORS STAFF

OFFICE AREA

2443 TELEPHONE

CLOSET

24T1

STAIR

NO 1

CORRIDOR

C2407

MENS TOILET

TEL

STAIR

NO 2

DIRECTOR

OFFICE

TOILET

2413B

STORAGE

2413A

ELECTRICAL

24E1

SECRET

AREA

LOUNGE /

KITCHEN

ASSOCIATE

DIRECTOR

SECRET

SECRET

PUBLIC

RELATIONS

STAFF

OFFICE

ASST TO

DIRECTOR

AUDITORIUM

ELECTRICAL

24E6

CORRIDOR

C2406

STAFF

ATTORNEY

MGR

ANALYST

SECY STAFF

OFFICE

DOCTOR

OFFICE

AD OFFICE

ACOS CLINIC

AFFAIRS

OFFICE

STORAGE

BREAK

RM

WOMENS

TOILET

COMPLIANCE

OFFICER

OFFICE

STORAGE

2446D

LOBBY

P I

OFFICE

ELECTRICAL

RECEPTION

2444A

VESTIBULE

MENS TOILET

STORAGE

2446A

WOMENS TOILET

UNISEX

TOILET

KITCHEN

2446B

CORRIDOR

C2402

STAIR

CORRIDOR

C2403

MECH SPACE

ELEVATOR

FAMILY VIEWING

TOILET

STORAGE

2492A

STAIR

NO 5

ELEVATOR

LAB

INJECTION

RM

PROCESSING

RM

ELECTRICAL

24E5

NUCLEAR MEDICINE

SCANNING AREA

TREATMENT RM

CHIEF OF STAFF

ASST

DIRECTOR

STORAGE

AND EQUIP

2446C

DRESSING RM

2462A

PIV

PIV

PIV

VISUAL

CO-ORDR

TOILET

2474A

LOW AND

BLIND VISION

TREATMENT RM

STRESS LAB

WAITING

CARDIOLOGY

TREATMENT

NUCLEAR

MED

RECEPTION

HAC

FILE RM

NUCLEAR

MED CHIEF

NUCLEAR MED

READING RM

BONE DENSITY

PROCEDURE RM

TECHNICAL

DIRECTOR

STAFF

OFFICE

M-1

NO 5A

2446H2446F 2446G

2554B

WALL PARTITION CLOSETWALL PARTITION CLOSET

FIRE

CLOSET

CLEAN

UTILITY

IRM STORAGEIRM

STORAGE

STORAGE

OFFICE

ASSOCIATE

DIRECTOR

ROOF

ROOF

ROOF

EMERGENCY

SUBSTATION

RM

2556B

VESTIBULE

NORMAL

SUBSTATION

RM

2556A

ELECTRICAL

CLOSET

24E4

CANTEEN

STORAGE

2505A

FIRE

CLOSET

DAYLIGHT

WELL

BLDG 1 EAST

BLDG 1 WEST

BLDG 1 - 2ND FLR PLAN - EAST -

PHASING & LIFE SAFETY

1-G102E

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

ISSUED FOR BIDS AND

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SECURITY CORRECTIONS

JESSE BROWN VAMC CHICAGO, IL

537-19-904

Project Director

08/06/21 J. Hirschhorn D. BrandtRevisions: Date:

PHASING

GENERAL NOTES

BUILDING 1 PHASED CONSTRUCTION KEY

NOTES - SECOND FLOOR - EAST

DOOR AND FRAME DELIVERY NOTES

DAYLIGHT

WELL

KEY PLAN

MATCH

LINE

MATCH

LINE

BLDG 1

WEST

BLDG 1

EAST

BLDG

BLDG

BLDG

WEST

BLDG

EAST

AutoCAD SHX Text 0'

AutoCAD SHX Text

SCALE: 3/32"=1'-0"

AutoCAD SHX Text 32'

AutoCAD SHX Text 24'

AutoCAD SHX Text 16'

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text 1-G102E

AutoCAD SHX Text

AutoCAD SHX Text 3/32" = 1'-0"

AutoCAD SHX Text

BUILDING 1 - SECOND FLOOR PLAN - EAST

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A. THIS IS A CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE THIS IS A CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE PHASING IN HIS/HER BID IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. B. THE PRIMARY GOAL OF THIS PHASING DOCUMENT IS TO IDENTIFY THE THE PRIMARY GOAL OF THIS PHASING DOCUMENT IS TO IDENTIFY THE ADJACENCIES THAT WILL REQUIRE THE SEPARATE TIMING OF THE WORK ON PARTICULAR DOORS AGAINST NEARBY DOORS TO BE WORKED ON. WORK IN ALL PHASES WILL REQUIRE COORDINATION WITH HOSPITAL DEPARTMENTS (THROUGH THE COR) AS DOORS WITHIN THE PROJECT SCOPE IN CLOSE PROXIMITY CAN NOT BE WORKED ON SIMULTANEOUSLY. C. THE EXACT SEQUENCE OF WORK IS TO BE WORKED OUT THROUGH THE EXACT SEQUENCE OF WORK IS TO BE WORKED OUT THROUGH MEETINGS WITH COR AND AFFECTED HOSPITAL DEPARTMENTS. D.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .