Attachment 07 - FOR CONSTRUCTION - Drawings Volume 2 Shaw AFB B1130.pdf

PDF 27 MB Posted

Attached to
B1130 ROOF REPLACEMENT
Solicitation number
VLSB260069
Issued by

About this file

This is Attachment 07, a comprehensive construction drawings volume for a Design-Build repair project at Shaw Air Force Base Building 1130, specifically the USAFCENT Headquarters renovation issued for construction on March 11, 2016 under contract FA4803-14-C-0021. The document comprises detailed architectural, structural, mechanical, plumbing, electrical, fire protection, and civil engineering drawings organized across basement, first floor, second floor, and roof levels, divided into three building areas (A, B, and C) plus a secure annex section.

The drawings specify complete system demolition and replacement including HVAC equipment with multiple Variable Refrigerant Flow (VRF) systems, dedicated outdoor air units (DOAU), and controls; new plumbing infrastructure with electric water heaters, water service entrance upgrades, and comprehensive sanitary/storm drainage redesign; mechanical rooms with housekeeping pads and vibration isolation; fire protection systems with sprinkler coordination; structural repairs with concrete patching and reinforced penetrations; and interstitial space coordination requirements for cable trays, ductwork, and piping systems. Key specifications include maintaining minimum 6'-8" clearance in mechanical rooms, providing fire dampers at floor penetrations, installing ASSE 1070 mixing valves at lavatories, grounding refrigerant piping on secure side penetrations, and coordinating with existing Command Operations Center (COC) and Red Switch server room systems that remain operational. The contractor is responsible for field verification of existing conditions, coordination with structural requirements per sheet S-001, and development of detailed coordination plans before installation to ensure efficient use of interstitial space between ceiling systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SW

EE

NEY

ST

REE

T

HEADQUARTERS ST

EXCHANGE ST

RECREATION ST

SH

AW

D R

STUART ST

STUART ST

G-001.1

AS NOTED

CO

VE

R

SH

EE

T

DMP FJR DMP

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO DATE

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

MICHAEL BAKER JR, INC

MOON TOWNSHIP, PA 15108

(412) 269-6300

100 AIRSIDE DRIVE

VLSB 12-0009

143384

BISHOPVILLECAMDEN

(N.T.S)

ORANGEBURG

COLUMBIA

MANNING

15 95

SUMTER

FLORENCE

PROJECT LOCATION

SITE MAP

N

VICINITY MAP

B1130

LOCATION MAP

NN

FA 4803-14-C-0021

REPAIR USAFCENT HQ, B1130

SHAW AIR FORCE BASE, SUMTER, SC

ISSUED FOR CONSTRUCTION

11 MARCH 2016

VOLUME 2 OF 2

SHAW AFB

PROJECT LOCATION

& ANNEX

G-002

AS NOTED

SH

EE

T

IN

DE

X

DMP FJR DMP

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO DATE

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

MICHAEL BAKER JR, INC

MOON TOWNSHIP, PA 15108

(412) 269-6300

100 AIRSIDE DRIVE

VLSB 12-0009

143384

G-001 COVER

G-101 LIFE SAFETY CODE ANALYSIS

G-103 LIFE SAFETY - BASEMENT FLOOR PLAN

IN001 INTERIOR DESIGN GENERAL NOTES & SYMBOLS

SHEET # SHEET NAME SHEET # SHEET NAME SHEET # SHEET NAME

ELECTRICAL

INTERIORS

FIRE PROTECTION

MECHANICAL

GENERAL ARCHITECTURAL-CONT.

LIFE SAFETY

SHEET INDEX - VOLUME 1

SHEET INDEX

SHEET # SHEET NAME

S-001 STRUCTURAL DESIGN CRITERIA & GENERAL NOTES

STRUCTURAL

S-002 STRUCTURAL GENERAL NOTES

S-003 SPECIAL INSPECTIONS

SB101 FOUNDATION PLAN - AREA A

SB102 FOUNDATION PLAN - AREA B

SB103 FOUNDATION PLAN - AREA C

SF111 FIRST FLOOR FRAMING PLAN - AREA A & C

SF112 FIRST FLOOR FRAMING PLAN - AREA B

SF121 SECOND FLOOR FRAMING PLAN - AREA A

SF122 SECOND FLOOR FRAMING PLAN - AREA B

SF123 SECOND FLOOR FRAMING PLAN - AREA C

SF131 ROOF FRAMING PLAN - AREA A

SF132 ROOF FRAMING PLAN - AREA B

S-301 SECTIONS

S-302 SECTIONS

S-303 SECTIONS

S-501 FOUNDATION TYPICAL DETAILS

S-502 MASONRY TYPICAL DETAILS

S-503 FRAMING TYPICAL DETAILS

S-601 ABBREVIATIONS, SYMBOLS & SCHEDULES

AD101 BASEMENT DEMOLITION PLAN - AREA A

AD102

AD103

AD121 SECOND FLOOR DEMOLITION PLAN - AREA A

AD122

AD123

A-101 BASEMENT FLOOR PLAN - AREA A

A-102 A-103

A-111 FIRST FLOOR PLAN - AREA A

A-112 A-113

A-121 SECOND FLOOR PLAN - AREA A

A-122 A-123

AR101 BASEMENT REFLECTED CEILING PLAN - AREA A

AR102

AR111 FIRST FLOOR REFLECTED CEILING PLAN - AREA A

AR112

AR113

AR121 SECOND FLOOR REFLECTED CEILING PLAN - AREA A

AR122

AR123

BASEMENT DEMOLITION PLAN - AREA B

BASEMENT DEMOLITION PLAN - AREA C

SECOND FLOOR DEMOLITION PLAN - AREA B

SECOND FLOOR DEMOLITION PLAN - AREA C

A-100 BASEMENT FLOOR PLAN - OVERALL

BASEMENT FLOOR PLAN - AREA B

BASEMENT FLOOR PLAN - AREA C

A-110 FIRST FLOOR PLAN - OVERALL

FIRST FLOOR PLAN - AREA B

FIRST FLOOR PLAN - AREA C

A-120 SECOND FLOOR PLAN - OVERALL

SECOND FLOOR PLAN - AREA B

SECOND FLOOR PLAN - AREA C

A-130 ROOF PLAN - OVERALL

AR100 BASEMENT REFLECTED CEILING PLAN - OVERALL

BASEMENT REFLECTED CEILING PLAN - AREA B

AR110 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL

FIRST FLOOR REFLECTED CEILING PLAN - AREA B

FIRST FLOOR REFLECTED CEILING PLAN - AREA C

AR120 SECOND FLOOR REFLECTED CEILING PLAN - OVERALL

SECOND FLOOR REFLECTED CEILING PLAN - AREA B

SECOND FLOOR REFLECTED CEILING PLAN - AREA C

A-201 BUILDING ELEVATIONS

A-202 BUILDING ELEVATIONS

A-301

A-401 ENLARGED PLANS & ELEVATIONS - TOILET ROOMS

A-501 EXTERIOR DETAILS

A-601 DOOR SCHEDULE & DOOR TYPES

A-602 A-603

A-610

DOOR SCHEDULE

DOOR SCHEDULE

PARTITION TYPES & DETAILS

G-002 INDEX SHEET

G-102 LIFE SAFETY CODE ANALYSIS

G-104 LIFE SAFETY - FIRST FLOOR PLAN

G-105 LIFE SAFETY - SECOND FLOOR PLAN

IN101 BASEMENT FINISH & SIGNAGE PLAN - AREA A

IN102

IN103

BASEMENT FINISH & SIGNAGE PLAN - AREA B

BASEMENT FINISH & SIGNAGE PLAN - AREA C

IN111 FIRST FLOOR FINISH & SIGNAGE PLAN - AREA A

IN112 FIRST FLOOR FINISH & SIGNAGE PLAN - AREA B

IN113 FIRST FLOOR FINISH & SIGNAGE PLAN - AREA C

IN121 SECOND FLOOR FINISH & SIGNAGE PLAN - AREA A

IN122 SECOND FLOOR FINISH & SIGNAGE PLAN - AREA B

IN123 SECOND FLOOR FINISH & SIGNAGE PLAN - AREA C

IN601 INTERIOR FINISH SCHEDULES

IN602 INTERIOR FINISH SCHEDULES

IG501

IG502

SIGNAGE DETAILS

SIGNAGE DETAILS

IG601 SIGNAGE SCHEDULES

IG602 SIGNAGE SCHEDULES

IG603 SIGNAGE SCHEDULES

FA100 FIRE ALARM SYMBOLS AND GENERAL NOTES

FA101 FIRE ALARM - BASEMENT FLOOR PLAN - AREA A

FA102 FIRE ALARM - BASEMENT FLOOR PLAN - AREA B

FA103 FIRE ALARM - BASEMENT FLOOR PLAN - AREA C

FA111 FIRE ALARM - FIRST FLOOR PLAN - AREA A

FA112 FIRE ALARM - FIRST FLOOR PLAN - AREA B

FA113 FIRE ALARM - FLOOR PLAN - AREA C

FA121 FIRE ALARM - SECOND FLOOR PLAN - AREA A

FA122 FIRE ALARM - SECOND FLOOR PLAN - AREA B

FA123 FIRE ALARM - SECOND FLOOR PLAN - AREA C

FA501 FIRE ALARM DETAILS

FA502 FIRE ALARM DETAILS

FX100 FIRE PROTECTION SYMBOLS AND GENERAL NOTES

FX101 FIRE PROTECTION - BASEMENT FLOOR PLAN - AREA A

FX102 FIRE PROTECTION - BASEMENT FLOOR PLAN - AREA B

FX103 FIRE PROTECTION - BASEMENT FLOOR PLAN - AREA C

FX111 FIRE PROTECTION - FIRST FLOOR PLAN - AREA A

FX112 FIRE PROTECTION - FIRST FLOOR PLAN - AREA B

FX113 FIRE PROTECTION - FIRST FLOOR PLAN - AREA C

FX121 FIRE PROTECTION - SECOND FLOOR PLAN - AREA A

FX122 FIRE PROTECTION - SECOND FLOOR PLAN - AREA B

FX123 FIRE PROTECTION - SECOND FLOOR PLAN - AREA C

FX501 FIRE PROTECTION DETAILS

FX502 FIRE PROTECTION ISOMETRIC DIAGRAM - DEMOLITION

FX601 FIRE PROTECTION RISER DIAGRAM

FX503 FIRE PROTECTION ISOMETRIC DIAGRAM - NEW WORK

C-001 GENERAL NOTES AND LEGEND

CS101 SITE PLAN

CIVIL

CD101 EXISTING CONDITIONS AND DEMOLITION PLAN

C-501 SITE DETAILS

C-502 SITE DETAILS

CE001

CE101

EROSION AND SEDIMENT CONTROL NOTES AND DETAILS

EROSION AND SEDIMENT CONTROL PLAN

P-001 GENERAL NOTES, ABBREVIATIONS & SYMBOLS

PD100 BASEMENT DEMOLITION PLAN

PD110 FIRST FLOOR DEMOLITION PLAN

PD120 SECOND FLOOR DEMOLITION PLAN

PP100 BASEMENT FLOOR PLAN - OVERALL

PP101 BASEMENT FLOOR PLAN - AREA A

PP102 BASEMENT FLOOR PLAN - AREA B

PP103 BASEMENT FLOOR PLAN - AREA C

PP110 FIRST FLOOR PLAN - OVERALL

PP111 FIRST FLOOR PLAN - AREA A

PP112 FIRST FLOOR PLAN - AREA B

PP113 FIRST FLOOR PLAN - AREA C

PP120 SECOND FLOOR PLAN - OVERALL

PP121 SECOND FLOOR PLAN - AREA A

PP122 SECOND FLOOR PLAN - AREA B

PP123 SECOND FLOOR PLAN - AREA C

P-401 ENLARGED PLANS

P-402 ENLARGED PLANS

P-501 DETAILS

P-601 SCHEDULES

P-701 SANITARY RISER DIAGRAM

P-702 WATER RISER DIAGRAM

M-001 ABBREVIATIONS & SYMBOLS

MD101 HVAC - BASEMENT DEMOLITION PLAN - AREA A

MD102 HVAC - BASEMENT DEMOLITION PLAN - AREA B

MD103 HVAC - BASEMENT DEMOLITION PLAN - AREA C

M-100 BASEMENT FLOOR PLAN - OVERALL

MH101 HVAC - BASEMENT FLOOR PLAN - AREA A

MH102 HVAC - BASEMENT FLOOR PLAN - AREA B

M-110 FIRST FLOOR PLAN - OVERALL

MH111 HVAC - FIRST FLOOR PLAN - AREA A

MH112 HVAC - FIRST FLOOR PLAN - AREA B

MH113 HVAC - FIRST FLOOR PLAN - AREA C

M-120 SECOND FLOOR PLAN - OVERALL

MH121 HVAC - SECOND FLOOR PLAN - AREA A

MH122 HVAC - SECOND FLOOR PLAN - AREA B

MH123 HVAC - SECOND FLOOR PLAN - AREA C

M-002 GENERAL NOTES

MP101 PIPING - BASEMENT FLOOR PLAN - AREA A

MP102 PIPING - BASEMENT FLOOR PLAN - AREA B

MP111 PIPING - FIRST FLOOR PLAN - AREA A

MP112 PIPING - FIRST FLOOR PLAN - AREA B

MP113 PIPING - FIRST FLOOR PLAN - AREA C

MP121 PIPING - SECOND FLOOR PLAN - AREA A

MP122 PIPING - SECOND FLOOR PLAN - AREA B

MP123 PIPING - SECOND FLOOR PLAN - AREA C

M-501 DETAILS

M-502

M-601 M-602

DETAILS

MECHANICAL SCHEDULES

E-001 ELECTRICAL NOTES, SYMBOLS & ABBREVIATIONS

ES100 SITE ELECTRICAL, TELECOMM & GROUNDING PLAN

ED100 DEMOLITION NOTES

ED110

EL101 LIGHTING BASEMENT FLOOR PLAN - AREA A

EL102 LIGHTING BASEMENT FLOOR PLAN - AREA B

EL103 LIGHTING BASEMENT FLOOR PLAN - AREA C

EL111 LIGHTING FIRST FLOOR PLAN - AREA A

EL112 LIGHTING FIRST FLOOR PLAN - AREA B

EL113 LIGHTING FIRST FLOOR PLAN - AREA C

EL121 LIGHTING SECOND FLOOR PLAN - AREA A

EL122 LIGHTING SECOND FLOOR PLAN - AREA B

EL123 LIGHTING SECOND FLOOR PLAN - AREA C

EP101 POWER BASEMENT FLOOR PLAN - AREA A

EP102 POWER BASEMENT FLOOR PLAN - AREA B

EP103 POWER BASEMENT FLOOR PLAN - AREA C

EP111 POWER FIRST FLOOR PLAN - AREA A

EP112 POWER FIRST FLOOR PLAN - AREA B

EP113 POWER FIRST FLOOR PLAN - AREA C

EP121 POWER SECOND FLOOR PLAN - AREA A

EP122 POWER SECOND FLOOR PLAN - AREA B

EP123 POWER SECOND FLOOR PLAN - AREA C

E-401 POWER - ENLARGED PLANS - BASEMENT

E-402 POWER - ENLARGED PLANS - BASEMENT

E-411 POWER - ENLARGED PLANS - FIRST FLOOR

E-501 ELECTRICAL WIRING DIAGRAMS

E-601 LIGHTING FIXTURE SCHEDULE AND DETAILS

E-602 DIMMING PANEL SCHEDULES

SINGLE LINE DIAGRAME-604

SINGLE LINE DIAGRAM - EMERGENCYE-605

E-606 SCHEMATIC - LIGHTING CONTROL RISER DIAGRAM

E-607 E-608

AD130 ROOF DEMOLITION PLAN - OVERALL

PD401 ENLARGED DEMOLITION PLANS

PD402 ENLARGED DEMOLITION PLANS

A-604 DOOR SCHEDULE & WINDOW TYPES

A-142

A-141 ENLARGED PLANS - ADDITIONS

ENLARGED PLANS - ADDITIONS

A-311 ELEVATOR SECTIONS & DETAILS

BUILDING SECTIONS

MD111 HVAC - FIRST FLOOR DEMOLITION PLAN - AREA A

MD112 HVAC - FIRST FLOOR DEMOLITION PLAN - AREA B

MD113 HVAC - FIRST FLOOR DEMOLITION PLAN - AREA C

MD121 HVAC - SECOND FLOOR DEMOLITION PLAN - AREA A

MD122 HVAC - SECOND FLOOR DEMOLITION PLAN - AREA B

MD123 HVAC - SECOND FLOOR DEMOLITION PLAN - AREA C

M-401 ENLARGED PLANS & SECTIONS

P-403 ENLARGED PLANS

A-001 ARCHITECTURAL ABBREVIATIONS AND NOTES

ARCHITECTURAL

A-002 ARCHITECTURAL ADA DETAILS

A-402 ENLARGED PLANS & ELEVATIONS

A-403 ENLARGED PLANS & ELEVATIONS

A-404 ENLARGED PLANS & ELEVATIONS

A-405 ENLARGED PLANS & ELEVATIONS

AD111 FIRST FLOOR DEMOLITION PLAN - AREA A

AD112

AD113

FIRST FLOOR DEMOLITION PLAN - AREA B

FIRST FLOOR DEMOLITION PLAN - AREA C

A-502 EXTERIOR DETAILS

A-503 EXTERIOR DETAILS

C-503 SITE DETAILS

A-605 HARDWARE SETS

A-406 CASEWORK ELEVATIONS

A-407 CASEWORK SECTIONS

S-304 SECTIONS

S-201 ELEVATIONS

A-310 WALL SECTIONS

E-609 E-610 E-611 E-612 E-613 E-614 E-615 E-616

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

E-617 E-618 E-619

E-412 POWER - ENLARGED PLANS - FIRST FLOOR

E-421 POWER - ENLARGED PLANS - SECOND FLOOR

E-422 POWER - ENLARGED PLANS - SECOND FLOOR

TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS NOTES, SYMBOLS & ABBREVIATIONS

T-101 T-102 T-103 T-111 T-112 T-113 T-121 T-122 T-123 T-401

T-501

BASEMENT TELECOMMUNICATIONS PLAN - AREA A

BASEMENT TELECOMMUNICATIONS PLAN - AREA B

BASEMENT TELECOMMUNICATIONS PLAN - AREA C

FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA A

FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA B

FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA C

SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA A

SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA B

SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA C

TELECOMMUNICATIONS ENLARGED PLANS

TELECOMMUNICATIONS DETAILS

T-502 TELECOMMUNICATIONS DETAILS

S-202 ELEVATIONS

MD104 PIPING - BASEMENT DEMOLITION PLAN - AREA A

MD105 PIPING - BASEMENT DEMOLITION PLAN - AREA B

MD114 PIPING - FIRST FLOOR DEMOLITION PLAN - AREA A

MD115 PIPING - FIRST FLOOR DEMOLITION PLAN - AREA B

MD130 HVAC - ROOF DEMOLITION PLAN - OVERALL

MH103 HVAC - BASEMENT FLOOR PLAN - AREA C

M-603 M-604 M-605 M-606 M-607 M-608 M-609 M-610 M-611 M-612

MECHANICAL SCHEDULES

MECHANICAL SCHEDULES

MECHANICAL SCHEDULES

MECHANICAL SCHEDULES

MECHANICAL SCHEDULES

MECHANICAL SCHEDULES

MECHANICAL SCHEDULES

MECHANICAL SCHEDULES

MECHANICAL SCHEDULES

MECHANICAL SCHEDULES

MECHANICAL SCHEDULES

M-701 VARIABLE REFRIGERANT FLOW SYSTEM 1 DIAGRAMS

M-702 VARIABLE REFRIGERANT FLOW SYSTEM 1 DIAGRAMS

M-712 VARIABLE REFRIGERANT FLOW SYSTEM 2 DIAGRAMS

M-713 VARIABLE REFRIGERANT FLOW SYSTEM 2 DIAGRAMS

M-714 VARIABLE REFRIGERANT FLOW SYSTEM 2 DIAGRAMS

M-721 VARIABLE REFRIGERANT FLOW SYSTEM 3 DIAGRAMS

M-722 VARIABLE REFRIGERANT FLOW SYSTEM 3 DIAGRAMS

M-723 VARIABLE REFRIGERANT FLOW SYSTEM 3 DIAGRAMS

MP103 PIPING - BASEMENT FLOOR PLAN - AREA C

M-613 MECHANICAL SCHEDULES

PLUMBING

S-004 ATFP - PLAN

T-503 TELECOMMUNICATIONS DETAILS

T-601 TELECOMMUNICATIONS DIAGRAM

SF133 ROOF FRAMING PLAN - AREA C

IN501 ENLARGED FLOOR PATTERNS

IN502 ENLARGED FLOOR PATTERNS

T-402 ANNEX TELECOMMUNICATIONS ENLARGED PLANS

DEMOLITION NOTES

ED120 DEMOLITION NOTES

M-503 DETAILS

PP130 ROOF PLAN - OVERALL

FX220 SPRINKLER - SECOND FLOOR PLAN - PIPING HEIGHTS

FX210 SPRINKLER - FIRST FLOOR PLAN - PIPING HEIGHTS

FX200 SPRINKLER - BASEMENT FLOOR PLAN - PIPING HEIGHTS

FA601 FIRE ALARM / MNS PANEL RISER DIAGRAM

MD124 PIPING - SECOND FLOOR DEMOLITION PLAN - AREA A

MD125 PIPING - SECOND FLOOR DEMOLITION PLAN - AREA B

MECHANICAL - CONT.

SHEET INDEX - VOLUME 1 SHEET INDEX - VOLUME 2 SHEET INDEX - VOLUME 2

M-703 VARIABLE REFRIGERANT FLOW SYSTEM 1 DIAGRAMS

M-704 VARIABLE REFRIGERANT FLOW SYSTEM 1 DIAGRAMS

M-711 VARIABLE REFRIGERANT FLOW SYSTEM 2 DIAGRAMS

GENERAL

G-002 INDEX SHEET

G-001.1 COVER2

MICHAEL BAKER JR, INC

MOON TOWNSHIP, PA 15108

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

VLSB 12-0009

143384

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

M

CO

CO

CO

"A"

ANGLE GATE - ELEV.

ANGLE GATE - PLAN

BALL VALVE

BUTTERFLY VALVE

CAP

CHECK VALVE

CLEAN-OUT IN VERTICAL

CLEAN-OUT

ELBOW DOWN

ELBOW UP

FLOOR DRAIN W/ P-TRAP

GATE VALVE

HOSE BIBB

METER

PLUG VALVE

REDUCER

STRAINER

TEE OUTLET UP

TEE OUTLET DOWN

TRAP - ELEVATION

TRAP - PLAN

UNION

VENT THROUGH ROOF

VALVE IN RISE

DIRECTION OF FLOW

WALL HYDRANTWH

FD

FS

SYMBOL DESCRIPTION SYMBOL DESCRIPTION

PLUMBING SYMBOLS LEGEND

ACCESS PANEL

BACKFLOW PREVENTER

BRANCH - BOTTOM CONNECTION

BRANCH - TOP CONNECTION

CLEAN-OUT IN HORIZONTAL

FLOOR SINK W/ P-TRAP

FLEXIBLE PIPING CONNECTION

PRESSURE GAGE W/PET COCK

PRESSURE REDUCING VALVE

WATER HAMMER ARRESTOR

THERMOMETER

GLOBE VALVE

BALANCING VALVE

COMPRESSED AIR OUTLET

FILTER

FILTER/REGULATOR/LUBRICATOR

GAS REGULATOR

RECIRCULATING PUMP

F/R/L

F/R

ROOF DRAIN

RD

FLOOR CLEANOUTFCO

DRAIN VALVE

FILTER/REGULATOR

HOSE BIBB & QUICK COUPLERS

LUBRICATOR

MIXING VALVE

POINT OF DISCONNECTION

POINT OF CONNECTION

PRESSURE REGULATOR

RELIEF VALVE (TEMPERATURE &

PRESSURE)T & P

QUICK DISCONNECT

NOTE: THIS LEGEND IS ALL INCLUSIVE AND SOME OF THE SYMBOLS INDICATED MAY

NOT BE PART OF THIS PROJECT.

\\\ RELIEF VALVE (TEMPERATURE)

\\\ RELIEF VALVE (PRESSURE)

P

T

CW DOMESTIC COLD WATER

G

HW DOMESTIC HOT WATER

SAN

HW140

HWS140

ST

V SANITARY VENT

SANITARY SEWER

STORM SEWER

NATURAL GAS

DOMESTIC HOT WATER (140°F)

DOMESTIC HOT WATER RETURN (140°F)

SYMBOL ABBREV DESCRIPTION

PLUMBING PIPE LEGEND

G

SAN

ST

HWR DOMESTIC HOT WATER RETURN

COMPRESSED AIRCACA

V

NOTE: THIS LEGEND IS ALL INCLUSIVE AND SOME OF THE PIPING SYSTEMS INDICATED

MAY NOT BE PART OF THIS PROJECT.

PUMP DISCHARGEPDPD

FP FIRE PROTECTIONFP

(140°)

(140°)

ABOVEABV

AFF ABOVE FINISHED FLOOR

ABOVE FINISHED GRADEAFG

BLW BELOW

BOTTOM OF FOOTINGBOF

DFU DRAINAGE FIXTURE UNIT

DOWNDN

DRAWINGDWG

ELECTRICAL CONTRACTOREC

ELECTRIC WATER COOLEREWC

ELECTRIC WATER HEATEREWH

ELEVATIONELEV

EXPANSION LOOPEL

EMERGENCY EYE WASHEW

FINISHED FLOOR ELEVATIONFFE

FLOORFLR

FIBERGLASS REINFORCED

PLASTIC PIPINGFRP

FOOT OR FEETFT

GAS WATER HEATERGWH

GENERAL CONTRACTORGC

LAVATORYL

INVERT ELEVATIONIE

MECHANICAL CONTRACTORMC

MINIMUMMIN

NOT IN CONTRACTNIC

PLUMBING CONTRACTORPC

PRESSURE & TEMPERATUREP&T

RAIN WATER LEADERRWL

SINKS

SUPPLY FIXTURE UNITSFU

SQUARE FEETSF

SUMP PUMPSP

TRAP PRIMER VALVETP

TYPICALTYP

URINALU

UNLESS NOTED OTHERWISEUNO

WASH FOUNTAINWF

WASTEW

WALL CLEAN OUTWCO

WALL HYDRANTWH

WITHW/

WITHOUTW/O

DESCRIPTIONABBREV

PLUMBING ABBREVIATIONS

TOP ELEVATIONTE

RAIN WATER CONDUCTORRWC

TOP OF FOOTINGTOF

MOP RECEPTORMR

AIR COMPRESSORAC

ABOVE FINISHED ROOFAFR

AIR HANDLING UNITAHU

ABOVE GROUND STORAGE TANKAST

BTU BRITISH THERMAL UNIT

CATCH BASINCB

CUBIC FEET PER HOURCFH

CONCRETECONC

CONNECTIONCONN

CONDENSATIONCOND

CONTINUATIONCONT

DF DRINKING FOUNTAIN

EMERGENCY SHOWER & EYE

WASHESEW

EXTEND TO DRAINETD

EXISTINGEX

FLOOR CLEANOUTFCO

FOOTINGFTG

FINISHEDFIN

GARBAGE DISPOSALGD

HEATING AND VLENTILATIONHV

DESCRIPTIONABBREV

INFRARED RADIANT HEATERIRH

KITCHEN SINKKS

MAXIMUMMAX

1,000 BTUHMBH

NORMALLY CLOSEDNC

NORMALLY OPENNO

OUTLET BOXOB

PLUMBING & DRAINAGE INSTITUTEPDI

PETROLEUM / OIL / LUBRICANTPOL

POUNDS PER SQUARE INCHPSI

SHOWERSH

SAFE WASTE CONNECTIONSWC

TRENCH DRAINTD

TOP OF PIPETOP

WATER COLUMNWC

WASHER BOXWB

NOTE: THIS LEGEND IS ALL INCLUSIVE AND SOME OF THE ABBREVIATIONS INDICATED

MAY NOT BE PART OF THIS PROJECT.

AIR DRYERAD

GENERAL NOTES:

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED, TO INSTALL

COMPLETE FOR AN OPERABLE PLUMBING SYSTEM AS INDICATED ON THE DRAWINGS, AS

SPECIFIED, AND AS REQUIRED BY CODE. ALL MATERIAL SHALL BE NEW AND OF GOOD QUALITY.

ALL WORK SHALL BE INSTALLED IN A NEAT AND WORKMAN LIKE MANNER.

2. CONTRACT DOCUMENT DRAWINGS FOR PLUMBING WORK ARE DIAGRAMMATIC AND ARE

INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. THE LOCATIONS OF ALL

ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT

DEFINITIVELY FIXED BY DRAWING DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT

LOCATION NECESSARY TO ACHIEVE THE BEST CONDITIONS AND RESULTS MUST BE

DETERMINED BY THE PROJECT SITE CONDITIONS. DO NOT SCALE DRAWINGS. CERTAIN ITEMS

SUCH AS RISES AND DROPS IN PIPING, ACCESS DOORS, ETC., ARE INDICATED ON THE

CONTRACT DOCUMENT DRAWINGS FOR CLARITY NOT FOR A SPECIFIC LOCATION

REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE EXTENT OF THE REQUIREMENTS FOR

THESE TYPES OF ITEMS.

3. INSTALL ALL PLUMBING EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE

CODES AND REGULATIONS. COORDINATE ALL EQUIPMENT CONNECTIONS WITH

MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL

TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT.

FIELD VERIFY AND COORDINATE ALL PIPING DIMENSIONS BEFORE FABRICATION. LOCATE ALL

PLUMBING EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS,

VALVING, ETC.

4. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH ARCHITECTURAL, STRUCTURAL,

CIVIL, SOILS, MECHANICAL, ELECTRICAL WORK, ETC., AS SHOWN IN OTHER CONTRACT

DOCUMENTS. PROPERLY CONSTRUCTED OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST. LOCATIONS AND SIZES OF ALL FLOOR, WALL AND

ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER TRADES INVOLVED.

5. MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, SUSPENDED

EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS.

6. ALL TESTS SHALL BE COMPLETED BEFORE ANY EQUIPMENT OR PIPING INSULATION IS APPLIED, OR CONCEALED.

7. LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE

LOCATIONS WITH A STRAIGHT SECTION OF PIPE UPSTREAM AND DOWNSTREAM, AS

RECOMMENDED BY THE DEVICE MANUFACTURER FOR ACCURACY. INSTALL THERMOMETER IN

A VERTICAL AND TILTED POSITION TO ALLOW READING BY OBSERVER STANDING ON FLOOR.

8. WHERE TWO OR MORE PRODUCTS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE

PRODUCTS OF A SINGLE MANUFACTURER SHALL BE USED.

9. PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS, WHERE REQUIRED, TO

SERVICE VALVES AND OTHER CONCEALED PLUMBING EQUIPMENT, DEVICES, ETC. ACCESS

PANELS SHALL BE TURNED OVER TO THE GENERAL CONTRACTOR FOR INSTALLATION.

10. ALL OPENINGS IN FIRE RESISTANCE RATED WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM E 814 & UL

1479. SIMILARLY, SEAL/FIRESTOP AS REQUIRED AT SMOKE RATED SURFACES AS WELL.

11. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER

APPURTENANCES REQUIRING ACCESS ARE EASILY ACCESSIBLE. ALL VALVES SHALL BE

INSTALLED SO THAT THE VALVE REMAINS IN SERVICE WHEN EQUIPMENT OR PIPING ON

EQUIPMENT SIDE OF VALVE IS REMOVED. ALL VALVES (EXCEPT CONTROL VALVES) AND

STRAINERS SHALL BE FULL SIZE OF PIPE BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO

EQUIPMENT AND CONTROLS.

12. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT AND IN

BYPASSES TO PERMIT DISASSEMBLY FOR ALTERATION AND REPAIRS. INSTALL ALL PIPING

WITHOUT FORCING OR SPRINGING.

13. DRAIN PIPING IN MECHANICAL ROOMS SHALL BE ROUTED SO AS NOT TO CREATE TRIPPING

HAZARDS.

14. LOCATIONS WHERE SANITARY, WASTE, AND VENT PIPING PENETRATES THE SLAB, THE

TRANSITION FROM PVC PIPE TO CAST IRON PIPE SHALL OCCUR ABOVE THE SLAB.

15. PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR MATERIALS.

16. REFER TO ARCHITECTURAL DRAWINGS FOR PENETRATIONS.

17. PROPERLY SEAL ALL PLUMBING SYSTEMS PIPING AND COMPONENT'S PENETRATIONS OF

BUILDING AIR BARRIER.

18. SHUT-OFF VALVES SHALL BE INTEGRATED INTO THE PLUMBING DISTRIBUTION SYSTEMS TO

PERMIT THE ISOLATION OF A FIXTURE OR EQUIPMENT TO PERMIT REPAIR OR MAINTENANCE,

WITHOUT DISRUPTION OF OTHER FIXTURES OR EQUIPMENT.

19. WATER HAMMER ARRESTORS SHALL BE INSTALLED AT FLUSH VALVE-OPERATED FIXTURES,

SOLENOID VALVES, AND ANY OTHER QUICK CLOSING VALVES TO MINIMIZE NOISE IN

ACCORDANCE WITH THE INTERNATIONAL PLUMBING CODE AND PDI STANDARD WH201.

ARRESTORS SHALL BE INSTALLED WITH PROPER ACCESS PANELS. AIR CHAMBERS SHALL NOT

BE PERMITTED.

20. ALL FLOOR DRAINS SHALL BE PROVIDED WITH TRAP PRIMERS TO REDUCE TRAP SEAL

EVAPORATION.

SERVICE SINKSS

KILOWATT(S)KW

FLOOR DRAINFD

WATER CLOSETWC

DISHWASHERDW

INTERSTITIAL SPACE COORDINATION IS CRITICAL FOR THIS PROJECT. THE DESIGN PLANS HAVE BEEN DEVELOPED WITH SPECIFIC ZONES ESTABLISHED BASED ON KNOWN BUILDING INFORMATION.

THE EXISTING STRUCTURE HAS BEEN SHOWN ON THE STRUCTURAL DRAWINGS TO ASSIST IN COORDINATION, BEAMS SUPPORTING JOISTS ARE 2.5 INCHES LOWER. EXISTING CONDITIONS UNCOVERED DURING DEMOLITION, PARTICULARLY ANY ELECTRICAL CONDUIT THAT SERVES COC OR RED SWITCH THAT ARE WITHIN THE ZONES OF SYSTEMS ESTABLISHED BELOW, WILL REQUIRE CAREFUL COORDINATION. THE CONTRACTOR AND SUBCONTRACTORS MUST DEVELOP DETAILED COORDINATION PLANS TO MAKE CERTAIN THE INTERSTITIAL SPACE IS USED EFFICIENTLY BEFORE ACTUAL INSTALLATION BEGINS. THE CONSTRUCTION DRAWINGS INDICATE ANTICIPATED CEILING ELEVATION, BOTTOM OF CABLE TRAY ELEVATIONS, AND TYPICAL TOP OF DUCT ELEVATIONS.

1. THE FIRST 3 INCHES ABOVE THE CEILING IS NOT TO BE USED AS IT IS NEEDED FOR CEILING TILE ACCESS.

2. SPRINKLER PIPING WILL BE RAISED UP TO BOTTOM OF STRUCTURE IN ITS CURRENT LOCATIONS WHERE POSSIBLE.

3. CABLE TRAYS ARE ROUTED TO PROVIDE AT LEAST 12 INCH CLEAR VERTICAL ABOVE TOP OF TRAY, EXCEPT PIPES, DUCTS, JOISTS, THAT CROSS THE TRAY WILL ENCROACH INTO THE SPACE AND IN SOME CASES THE CLEARANCE IS ZERO AS THE CABLE TRAY CROSSES DUCTWORK.

4. WHERE STRUCTURE RUNS PARALLEL TO TRAY, THE CLEARANCE OF 12 INCHES IS TO BE MAINTAINED TO ALLOW A ZONE 12 INCHES WIDE AND 12 INCHES TALL DIRECTLY IN FRONT OF

THE TRAY.

5. AIR CONDITIONING UNITS (ACU) IN THE CEILING SPACE HAVE SPECIFIC CLEAR MAINTENANCE ZONES THAT MUST BE CLEAR OF OTHER DISCIPLINE SYSTEMS.

6. THE HIGH STATIC ACU UNITS ARE TALLER THAN THE MEDIUM STATIC UNITS AND THE TOP OF UNIT WILL GENERALLY NEED TO BE CLOSE TO BOTTOM OF STRUCTURE AND THE DUCTWORK WILL NEED TO TRANSITION DOWN TO THE TYPICAL TOP OF DUCT ELEVATION. BOTTOM OF ACU IS MIN 3” ABOVE FINISHED CEILING.

7. IF SPRINKLER PIPING IS INDICATED TO CROSS OVER THE HIGH EFFICIENCY ACU UNITS, THE SPRINKLER PIPING WILL NEED TO BE REROUTED AROUND THE ACU AND MAINTENANCE

ZONE. SEE MECH DRAWING DETAILS FOR MAINTENANCE ZONES

8. FIRE ALARM, ELECTRICAL AND TELECOMM CONDUIT AND REFRIGERANT PIPING ROUTINGS ARE NOT DEFINED BUT SHOULD UTILIZE THE SPACES AT THE PERIMETER AND WITHIN OR ABOVE THE JOISTS. TELECOMM ROUTING IS THE MOST CRITICAL HAVING THE RESTRICTION FOR A MAXIMUM OF 180 DEGREES IN BENDS IN THE RUN FROM OUTLETS TO CABLE TRAY.

ACCESS PANELAP

EXPANSION TANKET

PUMP DISCHARGEPD

ROOF DRAINRD

STORMST

W WATERW

WATER HAMMER ARRESTORWHA

NEW PIPING

EXISTING PIPING TO REMAIN

EXISTING PIPING TO BE DEOMOLISHED

AS NOTED

GE

NE

RA

L

NO

TE

S, A

BB

RE

VI

AT

IO

NS

S

YM

BO

LS

P-001

RCP AJK DWH

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

C

B A

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

1HR1HR

1H R

1H R

1H R

1H R1H

R

1H R

1HR

1H R

1H R

1HR

SP

SP

SP

SP

1HR

SPSP

SP

SP

1HR

1H R

1HR

SECURE

SE

CU

RE

SE

CU

RE

SE

CU

RE

SE

CU

RE

SECURE

SECURE

SE

CU

RE

AREA C

AREA A

AR

EA

A

AR

EA

B

SE

CU

RE

SE

CU

RE

SE

CU

RE

SE

CU

RE

SECURE

SECURE

SECURE

SE

CU

RE

UP

UP

UP

RED

SWITCH

REST

ROOM

RED

SWITCH

SCIF

OSI

OFFICES

OSI

OFFICES

OSI

OFFICES

STOR.

STOR.

STOR.

GCCS

SERVERS/

OFFICE

COC

OFFICE

COC

OFFICE

COC

OFFICE

COC

OFFICE

SERVER

SERVER

MECH.

VTC

COC

VTC

3COC

CONF./

VTC

KIT

VTC

EQUIP.

RR

SERVER

MECH.

NSA

OFFICE

RR

OFFICE

B22

AFCENT

A4MW

CONFERENCE

5 1

B24

AFCENT

A4MW

OFFICE

OFFICE

OFFICE

B25 A4R

BOILER

MEN'S

WOMEN'S

STAIR SWITCH

GEAR

OFFICE

SURGEON

GENERAL

MULTIPLE

OFFICE

OFFICE

COPIER

SEC.

OFFICE

OFFICE

UNKNOWN

B31

A4RC

OFFICE

OFFICE

STOR.

B33 A4

RSP

OFFICE

OFFICE

B36

A4RA

OFFICE

OFFICE

B34

A4RB

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

B32

9TH AFLG

B30

SG

B28

SG

STAIR

1HR

1H R

EXISTING PLUMBING FIXTURES IN

TOILET ROOM TO REMAIN

EXISTING PLUMBING FIXTURES

IN TOILET ROOMS TO REMAIN

EXISTING PLUMBING FIXTURES

IN TOILET ROOMS TO REMAIN

EXISTING PLUMBING FIXTURES

IN JANITOR CLOSET TO REMAIN

EXISTING PLUMBING FIXTURES

IN BREAK ROOM TO REMAIN

REMOVE EXISTING SUMP PUMP,

CHECK VALVE, GATE VALVE, &

2" PIPING TO ELEVATOR WALL

2"

EXISTING 4" WCO TO REMAIN

1 FDFD

FD

LEGEND

NOT IN CONTRACT

EXISTING TO REMAIN

G G

G

HB

EX WH EX WH

EX WH

EX WHEX WH

EX WH

FUEL TANK AND PIPING TO BE REMOVED.

SEE CIVIL DWGS

CAP SLEEVE

REMOVE GAS PIPING

TO CURB VALVE

EX WATER SERVICE TO REMAIN

REMOVE EXISTING UNDERGROUND

WATER LINE SEE CIVIL DRAWINGS

FUEL TANK VENT PIPE

REMOVE EXISTING UNDERGROUND WATER METER

PD100

CW

CW CW

G

FIELD LOCATE CURB VALVE, TURN TO THE OFF

POSITION, DISCONNECT PIPING & CAP VALVE.

PROVIDE EXCAVATION & BACKFILL AS REQUIRED

REMOVE CW PIPING & BFP TO BOILER

MAKE UP WATER & CAP AT MAIN

REMOVE FD & CAP BELOW FLOOR

REMOVE HB & PIPING, CAP AT MAIN

EXISTING CW PIPING UNDER

FLOOR TO BE ABANDON

ABANDON 3/4" CW

UP TO WH

ABANDON 3/4" CW

UP TO WH

REMOVE HW & HWR

PIPING FROM TUNNEL

REMOVE GAS PIPING THROUGH ATTIC SPACE,

PATCH ENTRANCE & EXIT HOLES IN BLDG

3/4" CW UP TO WH

TO BE ABANDON

EXISTING CW IN

UNEXCAVATED AREA

TO BE ABANDON

EXISTING DEACTIVATED

CW LINE TO BE ABANDON

HW

HW

R

CONTRACTOR TO KEEP EXISTING TOILET ROOM IN TACT,

EXISTING ROUTING OF PLUMBING LINES UNKOWN

W W

EX 2" PUMP DISCHARGE LINE TO

REMAIN

SA

N

REMOVE & REPLACE EXIST PUMP

DISHCARGE LINE AT CEILING

EXISTING SAN LINE ROUTING & SERVICE

UNKNOWN. REMOVE IF ABANDONED.

EXISTING TO REMAIN IF ACTIVE.

CONTRACTOR TO SNAKEOUT, FLUSH

CLEAN AND VIDEO EXISTING SEWER

LINE & PROVIDE RECORDING TO

OWNER & SEWER LINE CONDITION

REPORT. PROVIDE CUT AWAY OF

EXISTING PIPE AT CONNECTION POINT

AS PART OF CONDITION REPORT. SEE

NEW WORK PLANS FOR LOCATION.

EXISTING MANHOLE

CAP WATER LINE

CAP WATER LINE

REMOVE CITY WATER SERVICE INTO

BUILDING, CAP AT MAIN

EXISTING PIPE

TUNNEL

SLAB ON GRADE

CW

CW

CW

REMOVE EXISTING ABANDON 3" SAN VENT

STACK & CAP SAN BELOW FLR. REMOVE ANY

ABANDON HW & CW LINES. PATCH WALL &

FLOOR TO MATCH EXISTING. (PIPING USED TO

SERVE SERVICE SINK ON EACH FLOOR) EXISTING SAN

UP TO REMIAN

REMOVE EXISTING

PIPING & CAP AT MAIN

REMOVE & RELOCATE

EXISTING WH & PATCH

WALL TO MATCH EXISTING

1. REMOVE EXISTING GRATE, FURNISH & INSTALL NEW

SOLID BRONZE COVER, USE SILICONE CAULKING

AROUND EDGE TO MAKE AIR & WATER TIGHT, REUSE

EXISTING SCREWS TO SECURE NEW COVER (TYP OF

3 FD's IN MECH ROOM).

2. REMOVE EXISTING GAS PIPING & FUEL OIL SUPPLY &

RETURN PIPING TO BOILER.

3. REMOVE 2 EXISTING GAS METERS, DDC WIRING, &

ASSOCIATED PIPING TO EQUIPMENT.

4. REMOVE EXISTING GAS REGULATOR, VALVES &

PIPING TO BOILER.

5. REMOVE EXISTING GAS PIPING FROM SLEEVE UNDER

BUILDING. CAP SLEEVE AT BOTH ENDS BELOW

GRADE.

6. EXISTING CW TO TOILET ROOMS TO REMAIN (FIELD

VERIFY LOCATION, RELOCATE TO INSTALL NEW

EQUIPMENT) (DO NOT DISRUPT PENETRATION

THROUGH EXISITNG SECURE WALL).

7. REMOVE GAS REGULATOR VENT PIPING TO ROOF.

8. REMOVE EXISITNG ELECTRIC WATER HEATER AND

ALL ASSOCIATED PIPING AND WIRING.

KEYNOTES

EXISTING SUMP PIT &

PUMP TO REMAIN

EXISTING FD TO REMAIN

EXISTING FD TO REMAIN

EXISTING FD TO REMAIN

EXISTING FD TO REMAIN

REMOVE EXISTING HW LINE.

FIELD VERIFY THAT IT DOES

NOT FEED ANY FIXTURES

REMOVE HW RISER

EXISTING CHIMNEY

HW

BOILER

G G

G

HW

R

HWRHW

SA

N

REMOVE CW

MAKEUP LINE TO

BOILER

CW BELOW GRADE

REMOVE ABANDON CITY WATER LINE AT

FLOOR & PATCH FLOOR, REMOVE EXISTING

WATER LINE THRU WALL & PATCH

REMOVE 2" CW RISER

UP TO TOILET ROOMS

EX 1" CW TO WH'S

TO BE ABANDON

UNDER SLAB ON

GRADE

REMOVE HW &

HWR LINES

CW

CW

EXISTING FD

TO REMAIN

REMOVE CW

PIPING TO HB

CW

REMOVE EXISTING GAS LINE

ALONG BLDG EXT

REMOVE CW PIPING

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

BA

SE

ME

NT

D

EM

OL

IT

IO

N

PL

AN

PD100

RCP AJK DWH

SCALE: 1/16" = 1'-0"

BASEMENT DEMOLITION PLAN1

SCALE: 1/16" = 1'-0"

0 8'-0" 16'-0" 32'-0"

SCALE: 1/8" = 1'-0"

DEMOLITION - MECHANICAL ROOM2

SLAB ON GRADE BASEMENT

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

C

B A

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

AREA C

AREA A

AR

EA

A

AR

E A B

AREA D

AREA C

UP

MEN

1M2

WOMEN

1W2

WOMEN

1W1

MEN

1M1

DN

DNUP

UP

UPUP

DN

A1

OFFICE

OFFICE

CCY

OFFICE

RECEPTION

OFFICES

OFFICES

OFFICES

OFFICES

A1S

SERVICES

A1S

SERVICES

A1S

SERVICES

CONFERENCE

STOR TELEPHONE

BLDG

CUST.

STOR

STOR

HVAC

WOMAN

OFFICE

OFFICE

111 CSS

MULTIPLE

OFFICE

INS

MENS

CONF

9AF EXEC.

SUP.

OFFICE

OFFICE

OFFICE

9AF

PROTOCOL

OFFICE

A5 DIR.

A5 NCOIC

A5

STAIR HVAC

STOR

VAULT

A5

115B A5

RECEPTION

A5 DEP.

DIR.

OFFICE

OFFICE

OFFICE

KITCHEN

VIDEO

CONF.

EQUIP

VTC

A3 CHIEF

OFFICE

OFFICE

A3 JOPES

COPIER

KIT.

A3T DIV.

CHIEF

MULTIPLE

OFFICES

OFFICE

OFFICE

OFFICE

A3W

9 OFFICE

OFFICE

OFFICE

VIDEO

CONF.

EQUIP

VTC

STAIR

MENS

WOMENS

HVAC

UPS

ROOM

TELE

OFFICE

AXR

OFFICE

OFFICE

A4

LOGISTICS

OFFICE

OFFICE

OFFICE

A4XX

VAULT

OFFICE

A7X

OFFICE

CONF.

A4X

135B

OFFICE

A4XP

OFFICE

A7P

CLOS.

TELE

PD401

PD401

EXISTING PLUMBING FIXTURES IN

TOILET ROOM TO REMAIN

EXISTING PLUMBING FIXTURES

IN JANITOR CLOSET TO REMAIN

EXISTING CHIMNEY

CAP SAN LINE

LEGEND

NOT IN CONTRACT

EXISTING TO REMAIN

TUNNEL BELOW FLOOR

EXISTING MANHOLE

TO REMAIN

EX WH

EX WH

EX WH

EX WH

TO REMAIN

TO REMAIN

REMOVE EXISTING SAN STACK UP TO TOILET

ROOM ABOVE. EXISTING SAN DOWN TO REMAIN.

TO REMAIN

TO REMAIN

REMOVE H & CW UP TO

SINK AND CAP AT MAINS

CW

HWHWR

REMOVE HW & HWR

PIPING ABOVE CLG

REMOVE CW PIPING SERVING

FIXTURES ABOVE & CAP AT MAIN

REMOVE EXISTING ABANDON 3" SAN &

VENT STACK. REMOVE ANY ABANDON

HW & CW LINES. PATCH FLOOR TO

MATCH EXISTING.

1. REMOVE EXISTING FD & PIPING FROM MECH

ROOM (FUTURE TELECOM ROOM ), CAP SAN PIPE

AT MAIN.

2. DISCONNECT 3/4" CW FROM WH, REMOVE RISER &

CAP BELOW FLOOR.

KEYNOTES

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

FI

RS

T

FL

OO

R

DE

MO

LI

TI

ON

P

LA

N

PD110

RCP AJK DWH

SCALE: 1/16" = 1'-0"

DEMOLITION - FIRST FLOOR PLAN1

SCALE: 1/16" = 1'-0"

0 8'-0" 16'-0" 32'-0"

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

C

B A

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

AREA C

AREA A

AR

EA

A

AR

E A B

AREA D

AREA C

K-3346-4TO CCATASINKSSTAINLESS STEEL

REFRIGERATOR

215A

DN

DN

DN

DN

DN

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

A3

OPS

OFFICE

CMSGT

OFFICE

A3

A3AY

A3AO

A3A

DIV. CHIEF

9TH AF

DIR. OPS

A3A

CONF.

WOMEN

A3

A3EA

A3X

A3X

MENS

OFFICE

OFFICE

STAIR

STOR

HVAC

CONF

STO

PLANNING

PLANNING

CONF.

SERVER

PLANNING

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

1 OFFICE

221C

NCOIC

222B

CHIEF

OFFICE

KITCHEN/

STOR

LIBRARY/

CONF.

9AF JAG

223 9AF

AR/AG

ADVISOR

OFFICE

OFFICE

MENS

WOMENS

HVAC

STAIR

TELE

SERVER

9AF ANG

ASST.

OFFICE

OFFICE

SPEC.

ASST.

FP

FP1

FP4

OFFICE

OFFICE

STOR STAIR

CONF

A7 DIR.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STOR

OFFICE

OSI

GUN VAULT/

SERVER

A7K-A7XE

USAFCENT

OSI

FOREIGN

POLICY

1 CONF.

FP

COMMAND

MECH

IT

STOR.

STAIR

KITCHEN

STOR.

PD402

PD402

EXISTING PLUMBING FIXTURES

IN TOILET ROOM TO REMAIN

EXISTING PLUMBING FIXTURES

IN JANITOR CLOSET TO REMAIN

EXISTING CHIMNEY

EWH

REMOVE EXISTING

EWH & ALL PIPING

& ACCESSORIES

2 1

FD

FD

EXISTING RWC

TO REMAIN

SEE NOTE 1

EXISTING RWC

TO REMAIN

SEE NOTE 1

EXISTING RWC

TO REMAIN

SEE NOTE 1

EXISTING RWC

TO REMAIN

SEE NOTE 1

EXISTING RWC

TO REMAIN

SEE NOTE 1

EXISTING RWC

TO REMAIN

SEE NOTE 1

EXISTING RWC

TO REMAIN

SEE NOTE 1

ST LINE UP TO EXISTING RD

SEE NOTE 1

REMOVE ABANDON VENT STACK.

REMOVE ANY ABANDON HW & CW

LINES. PATCH WALL & FLOOR TO

MATCH EXISTING.

EXISTING ST UP TO

RD ABOVE (TYP)

REMOVE KITCHEN SINK, SAN, V,

HW & CW PIPING, REMOVE VTR

SAN

REMOVE EXISTING WC, LAV,

SHR & ALL RELATED PIPING

AND CAP AT ACTIVE MAINS,

HW & CW FED FROM BELOW

REVOVE SAN PIPING

BELOW FLOOR

1. ALL EXISTING ROOF DRAINS TO HAVE DOME AND

EXTENSION COLLAR REPLACED. REMOVE

EXISTING PIPE INSULATION FROM RD TO

CONDUCTOR.

NOTES

1. REMOVE EXISTING (2) FD'S & PIPING FROM MECH

ROOM (FUTURE TELECOM ROOM) CAP SAN PIPE

AT MAIN.

2. REMOVE EXISTING CW, HW, & HWR PIPING FROM

MECH ROOM (FUTURE TELECOM ROOM). NO

WATER PIPING TO REMAIN IN TELECOM ROOM.

KEYNOTES

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

SE

CO

ND

F

LO

OR

D

EM

OL

IT

IO

N

PL

AN

PD120

RCP AJK DWH

SCALE: 1/16" = 1'-0"

DEMOLITION - SECOND FLOOR PLAN1

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

C

B A

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

1HR1HR

1H R

1H R

1H R

1H R1H

R

1H R

1HR

1H R

1H R

1HR

SP

SP

SP

SP

1HR

SPSP

SP

SP

1HR

1H R

1HR

SECURE

SE

CU

RE

SE

CU

RE

SE

CU

RE

SE

CU

RE

SECURE

SECURE

SE

CU

RE

SE

CU

RE

SE

CU

RE

SE

CU

RE

SE

CU

RE

SECURE

SECURE

SECURE

SE

CU

RE

CONFERENCE

BD2

STAIR

BS2

ELECTRICAL

BE2

OPEN

OFFICE

B13

CORRIDOR

BC4

OFFICE

B16D

OFFICE

B16B

STAIR

BS3

VESTIBULE

BV2

STORAGE

B16F

OPEN

OFFICE

B14

TELECOM

OFFICE

B11A

OFFICE

B11C

CONFERENCE

B11D

OFFICE

B09

OFFICE

B09A

OPEN

OFFICE

B11

STORAGE

B11E

OFFICE

B11B

OFFICE

B16E

OPEN

OFFICE

B16

OFFICE

B16C

OPEN

OFFICE

B15

OFFICE

B12D

OFFICE

B16G

OFFICE

B15C

OFFICE

B15B

OFFICE

B12C

OFFICE

B12B

BRIEFING

B12

OFFICE

B12A

WOMEN

BW3

MEN

BM3

JANITOR

BJ1

STORAGE

B07E

DATA/

VIDEO

B07D

COC

B07C

OPEN

OFFICE

B08A

VTC

B07F

CONFERENCE

B07B

BREAK

ROOM

B07H

STORAGE

B07G

WOMEN

BW2

MEN

BM2

CORRIDOR

BC1

STORAGE

B15A

CORRIDOR

BC3

SERVER

B11F

OPEN

OFFICE

B08

ELECTRICAL/

MECHANICAL

B07J

OPEN

OFFICE

B04

TELECOM

BT1

CONFERENCE

BD1

MECHANICAL

BH2

OFFICE

B07M

ELECTRICAL/

MECHANICAL

B07K CORRIDOR

B07

OFFICE

B07L

OFFICE

B07N

STAIR

BS1

ELEVATOR

LOBBY

BL1

STORAGE

B03

OPEN

OFFICE

B01

TOILET

BM1

MECHANICAL

BH1

ELECTRICAL

BE1

VESTIBULE

BV3

CORRIDOR

BC2

SECURE

ENTRY

B10

VESTIBULE

BV1

SECURE

ENTRY

B06

ELEVATOR

EQUIPMENT

B02

HALL

1C3

TEAM ROOM

B16A

UP

UP

UP

PP101

PP101

PP102

PP103

MECHANICAL ROOM

COC

AREA

RED SWITCH

SERVER AREA

OSI

AREA

ARC

AREA

PA

AREA

A3EA

AREA

SG

AREA

FP

AREA

P-501

CW LINE AT CLG

WATER LINE BELOW GRADE &

EXTEND INTO BUILDING, SEE

CW LINE AT CLG

2" CW UP TO 1ST FLR

2" CW UP TO 2ND FLR

/2 P-501

2" CW

2" CW

1 1/2" CW

1 1/2" CW

CW ABV CLG

SAN

RUN NEW 2" CW

LINE ABV CLG

EX MANHOLE

4" SAN UP TO

FD-2 ABOVE

4" SAN UP

2" V UP

4"

SLEEVE

THRU WALL

COORDIONATE

INSTALLATION WITH

REMAININ ELEC CONDUIT

DROP AT WALL TO

CLEAR BEAM

SA

N

SAN

SP-1

1. ROUTE ALL PIPING TO AVOID CONFLICT WITH

STRUCTURE, MECHANICAL EQUIPMENT,

DUCTWORK, ETC. RELOCATE EXISTING PIPING TO

ACCOMMODATE INSTALLATION OF NEW WORK.

NOTES

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

BA

SE

ME

NT

F

LO

OR

P

LA

N

- O

VE

RA

LL

PP100

RCP AJK DWH

SCALE: 1/16" = 1'-0"

0 8'-0" 16'-0" 32'-0"SCALE: 1/16" = 1'-0"

BASEMENT PLAN - OVERALL1

SE

CU

RE

SE

CU

RE

SE

CU

RE

SE

CU

RE

SECURE

SECURE

SECURE

SE

CU

RE

CONFERENCE

BD2

STAIR

BS2

ELECTRICAL

BE2

OPEN

OFFICE

B13

TELECOM

OFFICE

B11A

OFFICE

B11C

CONFERENCE

B11D

OFFICE

B09

OFFICE

B09A

OPEN

OFFICE

B11

STORAGE

B11E

OFFICE

B11B

OFFICE

B12B

BRIEFING

B12

OFFICE

B12A

WOMEN

BW3

MEN

BM3

JANITOR

BJ1

STORAGE

B07E

DATA/

VIDEO

B07D

COC

B07C

OPEN

OFFICE

B08A

VTC

B07F

CONFERENCE

B07B

BREAK

ROOM

B07H

STORAGE

B07G

WOMEN

BW2

MEN

BM2

CORRIDOR

BC1

CORRIDOR

BC3

SERVER

B11F

OPEN

OFFICE

B08

ELECTRICAL/

MECHANICAL

B07J

OPEN

OFFICE

B04

TELECOM

BT1

CONFERENCE

BD1

MECHANICAL

BH2

OFFICE

B07M

ELECTRICAL/

MECHANICAL

B07K CORRIDOR

B07

OFFICE

B07L

OFFICE

B07N

STAIR

BS1

ELEVATOR

LOBBY

BL1

STORAGE

B03

OPEN

OFFICE

B01

TOILET

BM1

VESTIBULE

BV3

CORRIDOR

BC2

SECURE

ENTRY

B10

VESTIBULE

BV1

SECURE

ENTRY

B06

ELEVATOR

EQUIPMENT

B02

HALL

1C3

UP

UP

MICHAEL BAKER JR, INC

MOON TOWNSHIP, PA 15108

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

A

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

PP103

SP-1

SP-1 ALARM & CONTROL PANEL

1 1/2" PD UP ALONG WALL

COC

AREA

RED SWITCH

SERVER AREA

PP

P-501

P-401

2" CW LINE

1 1/2" CW

1 1/2" CW 1 1/2" CW

2" PD UP ALONG WALL

EXISTING TOILET ROOM TO

REMAIN. (CONTRACTOR TO

FIELD VERIFY HOW HW IS

SERVED TO THIS AREA)

RUN NEW 2" CW

LINE ABV CLG

EXIST CW

PIPING TO

REMAIN

EX WH

EX WH

2"

2" CW ABV CLG

PROVIDE ASSE 1070 MIXING VALVES AT EACH

LAVATORY IN EACH TOILET FOR A TOTAL OF 4

SAN

4" SAN UP TO FD ABV

4" SAN UP

2" V UP

DROP TO CLEAR BEAM

UP TO UNDER

SIDE OF DECK

3/4"

CW ABV CLG & EXTEND

TO RELOCATED WH

3/4" CW DN IN WALL

RELOCATED WH

PROVIDE DIELECTRIC

UNION & GROUNDING WIRE

ON PIPING ON SECURE

SIDE OF SECURE WALL

MAIN RISER

SHUTOFF VALVE

2" PD ABOVE CLG

PROVIDE SECURE PIPE

PENETRATION ON VENT PIPE UP

THROUGH FLOOR IF PIPE IS

METALIC MATERIAL.

1. DO NOT ROUTE PIPING OVER THIS AREA

2. PROVIDE GROUNDING WIRE ON PIPING ON

SECURE SIDE OF SECURE WALL/PENETRATION.

SEE DETAIL 7/P-501.

KEYNOTES

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

BA

SE

ME

NT

F

LO

OR

P

LA

N

- A

RE

A A

PP101

RCP AJK DWH

SCALE: 1/8" = 1'-0"

BASEMENT PLAN - AREA A1 SCALE: 1/8" = 1'-0"

0 4'-0" 8'-0" 16'-0"

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

B

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

CORRIDOR

BC4

OFFICE

B16D

OFFICE

B16B

STAIR

BS3

VESTIBULE

BV2

STORAGE

B16F

OPEN

OFFICE

B14

OFFICE

B16E

OPEN

OFFICE

B16

OFFICE

B16C

OPEN

OFFICE

B15

OFFICE

B12D

OFFICE

B16G

OFFICE

B15C

OFFICE

B15B

OFFICE

B12C

STORAGE

B15A

TEAM ROOM

B16A

UP

PP101

CONNECT TO EXISTING 2" SAN

LINE & EXTEND TO NEW FINISH

FLOOR LINE. PROVIDE NEW

CLEANOUT AT FLOOR.

EXIST 2" SAN

EXIST CO

EXISTING CW PIPING

TO REMAIN

SAN

EX WH

EX WH

EX WH

SA

N

SAN

1. DO NOT ROUTE PIPING OVER THIS AREA

2. ROUTE ALL PIPING TO AVOID CONFLICT WITH

STRUCTURE, MECHANICAL EQUIPMENT,

DUCTWORK, ETC. RELOCATE EXISTING PIPING TO

ACCOMMODATE INSTALLATION OF NEW WORK.

KEYNOTES

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

BA

SE

ME

NT

F

LO

OR

P

LA

N

- A

RE

A B

PP102

RCP AJK DWH

SCALE: 1/8" = 1'-0"

BASEMENT PLAN - AREA B1

SCALE: 1/8" = 1'-0"

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

C

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

MECHANICAL

BH1

ELECTRICAL

BE1

PP101

1 1/2" PD DOWN ALONG WALL,

DISCHARGE INTO SUMP PIT

EXISTING SUMP PIT W/ PUMP

TU

NN

EL

P-401

4" SAN

3" SAN UP ALONG

COLUMN

3" UP TO MR

2" UP TO LAV

4" SAN BELOW FLOOR

PROVIDE CUT OUT PIECE FOR CONDITION REPORT

1 1/2" UP TO LAV ABV

EXISTING 4" SAN

4" SAN UP TO

WC'S ABV

4" SAN UP ALONG COLUMN

4" SAN

SEE NOTE 1

1. CONTRACTOR TO FIELD LOCATE EXISTING TUNNEL

WITH NEW SANITARY CONNECTION, CONTRACTOR

CAN ELECT TO RUN PIPING IN TUNNEL OR REMOVE

CONCRETE FLOORING TO INSTALL REQUIRED

LINES.

NOTES

1. SAW CUT EXISTING FLOOR, REMOVE & REPLACE

CONCRETE IN KIND. SEE STRUTURAL DRAWINGS

FOR PATCH WORK.

KEYNOTES

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

BA

SE

ME

NT

F

LO

OR

P

LA

N

- A

RE

A C

PP103

RCP AJK DWH

SCALE: 1/8" = 1'-0"

BASEMENT PLAN - AREA C1

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

C

B A

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

UP

MEN

1M2

WOMEN

1W2

WOMEN

1W1

MEN

1M1

STAIR

1S3

STORAGE

189H

STORAGE

189G

OFFICE

189F

OFFICE

189E

OFFICE

189D

OFFICE

188B

OFFICE

188A

OPEN

OFFICE

188OFFICE

STAIR

1S2

OPEN

OFFICE

185STORAGE

185B

STORAGE

182B

STORAGE

182A

OFFICE

182C

CONFERENCE

1D2

STORAGE

OFFICE

183D

OFFICE

182D

OPEN

OFFICE

ELECTRICAL

1E2

FOOD PREP

1D2B

CORRIDOR

1C2

OFFICE

183C

FOYER

1D2A

OPEN

OFFICE

OFFICE

182E

MECHANICAL

1H1

STAIR

1S1

VESTIBULE

1V2

WOMEN

1W2

MEN

1M2

OFFICE

180A

OFFICE

180B

OFFICE

180C

OPEN

OFFICE

WOMEN

1W1

CORRIDOR

1C1

OPEN

OFFICE

179B

MECHANICAL

1H2

TELECOM

1T3

OFFICE

179A

RECYCLING

MEN

1M1

STAIR

1S4

ELEC/TELE

1E1

CONFERENCE

1D1

LOBBY

1L1

OPEN

OFFICE

TELECOM

1T2

MEN

1M3

JANITOR

1J1

WOMEN

1W3

CONFERENCE

189A

OPEN

OFFICE

OFFICE

189B

OFFICE

189C

JANITOR

CORRIDOR

1C3

OFFICE

185A

CORRIDOR

1C4

HALL

1C5

MECHANICAL

1H3

OPEN OFFICE

OFFICE

183B

OPEN OFFICE

183A

OFFICE

OFFICE

175B

VESTIBULE

1V1

OPEN

OFFICE

SERVER

175C

OPEN

OFFICE

175A

OFFICE

179C

TEAM ROOM

180D

STORAGE

DN

DNUP

UP

UPUP

DN

PP113

PP111

PP112PP111

A5

AREA

MAIN ENTRY

AI

AREA

A3A, A3O, A3T

AREA

CONFERENCE ROOM

A7

AREA

SE

AREA

3" SAN UP

4" SAN UP ALONG COLUMN

SAN

SA

N

SA

N

4" SAN BELOW FLR

FD-22" V UP

4" SAN

UP & DN 4"

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

FI

RS

T

FL

OO

R

PL

AN

OV

ER

AL

L

PP110

RCP AJK DWH

SCALE: 1/16" = 1'-0"

FIRST FLOOR PLAN - OVERALL1

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

A

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

MEN

1M2

WOMEN

1W2

OFFICE

STAIR

1S2

OPEN

OFFICE

185STORAGE

185B

STORAGE

182B

STORAGE

182A

OFFICE

182C

CONFERENCE

1D2

STORAGE

OFFICE

183D

OFFICE

182D

OPEN

OFFICE

ELECTRICAL

1E2

FOOD PREP

1D2B

CORRIDOR

1C2

OFFICE

183C

FOYER

1D2A

OPEN

OFFICE

OFFICE

182E

MECHANICAL

1H1

STAIR

1S1

VESTIBULE

1V2

WOMEN

1W2

MEN

1M2

TELECOM

1T2

MEN

1M3

JANITOR

1J1

WOMEN

1W3

CONFERENCE

189A

CORRIDOR

1C3

OFFICE

185A

CORRIDOR

1C4

HALL

1C5

OPEN OFFICE

OFFICE

183B

OPEN OFFICE

183A

OFFICE

DN

DNUP

UP

PP113

PP112

P-401

2" CW UP

3/4" CW ABV CLG

CO

3/4" CW DN IN WALL,

RECONNECT TO

EXISTING WH

EX WH

PIPING ABV CLG

4" UP TO FD ABV

4" SAN & 3" V UP

PROVIDE ASSE 1070 MIXING

VALVES AT EACH LAVATORY IN

EACH TOILET FOR A TOTAL OF 4

4" SAN UP TO FD ABV

2" V UP

2" V STACK

FD-2

4" SAN AT CLG

COORDINATE

W/ DUCTWORK

4" SAN STACK

1. DO NOT ROUTE PIPING OVER THIS AREA

KEYNOTES

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

FI

RS

T

FL

OO

R

PL

AN

- A

RE

A A

PP111

RCP AJK DWH

SCALE: 1/8" = 1'-0"

0 4'-0" 8'-0" 16'-0"

FIRST FLOOR PLAN - AREA A1

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

B

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

STAIR

1S3

STORAGE

189H

STORAGE

189G

OFFICE

189F

OFFICE

189E

OFFICE

189D

OFFICE

188B

OFFICE

188A

OPEN

OFFICE

OPEN

OFFICE

OFFICE

189B

OFFICE

189C

UPUP

DN

PP111

1. DO NOT ROUTE PIPING OVER THIS AREA

KEYNOTES

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

FI

RS

T

FL

OO

R

PL

AN

- A

RE

A B

PP112

RCP AJK DWH

SCALE: 1/8" = 1'-0"

0 4'-0" 8'-0" 16'-0"

FIRST FLOOR PLAN - AREA B1

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

C

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

UP

MEN

1M1

MEN

OFFICE

180A

OFFICE

180B

OFFICE

180C

OPEN

OFFICE

CORRIDOR

1C1

OPEN

OFFICE

179B

MECHANICAL

1H2

TELECOM

1T3

OFFICE

179A

RECYCLING

STAIR

1S4

ELEC/TELE

1E1

CONFERENCE

1D1

LOBBY

1L1

OPEN

OFFICE

179JANITOR

MECHANICAL

1H3

OFFICE

175B

VESTIBULE

1V1

OPEN

OFFICE

SERVER

175C

OPEN

OFFICE

175A

OFFICE

179C

TEAM ROOM

180D

STORAGE

PP111

P-403

SAN

4"

2" CW UP FROM BELOW

3" SAN DN ALONG COLUMN

EX WH

EX WH

EX WH

3/4" CW DN IN WALL,

RECONNECT TO EXISTING WHSAN ABV CLG

4" SAN UP TO

FIXTURES ABV

1 1/2" CW UP TO

FIXTURES ABV

3" SAN DN ALONG

COLUMN

3/4" CW DN IN WALL,

RECONNECT TO

EXISTING WH

3/4" CW ABV CLG

1" CW ABV CLG

3" SAN UP TO WC ABV

1/2" CW UP TO LAV ABV

1" CW ABV CLG TIGHT TO

UNDER SIDE OF DECK

4" SAN UP TO FIXTURES ABV

4" SAN DN ALONG COLUMN IN CHASE

3/4" CW DN IN WALL,

RECONNECT TO EXISTING WH

1" CW UP TO

FIXTURES ABV

(KITCHEN AREA)

2" CW ABV CLG

3" UP TO

MR-1 ABV 2" V UP

2" W UP

3/4"

2" W UP TO LAV ABV

1" CW UP TO WC ABV

4" SAN AT FLOOR LINE &

EXTEND UP TO SAFEWASTE

2" V UP

AP

4" SAFEWASTE IN WALL

(TO RECIEVE CONDENSATE)

CO

3" SAN

OFFSET PIPING AS

REQUIRED AROUND

STRUCTURE, DUCWORK

& CABLE TRAYS (TYP)

1. CONTRACTOR TO FIELD LOCATE EXISTING TUNNEL

WITH NEW SANITARY CONNECTION, CONTRACTOR

CAN ELECT TO RUN PIPING IN TUNNEL OR

REMOVE CONCRETE FLOORING TO INSTALL

REQUIRED LINES.

NOTES

1. DO NOT ROUTE PIPING OVER THIS AREA

KEYNOTES

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

FI

RS

T

FL

OO

R

PL

AN

- A

RE

A C

PP113

RCP AJK DWH

SCALE: 1/8" = 1'-0"

0 4'-0" 8'-0" 16'-0"

FIRST FLOOR PLAN - AREA C1

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

C

B A

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

1H R

1H R

1H R

1HR

1HR

1H R

1H R

1H R

1H R

1H R 1H

R 2H

R

2H R

2HR

SP

SP

SP

1HR

1HR

SP

K-3346-4TO CCATASINKSSTAINLESS STEEL

STAIR

2S3

OFFICE

293N

OFFICE

293M

OFFICE

293L

OFFICE

293K

OFFICE

293J

OFFICE

293H

OFFICE

293G

OFFICE

293F

OFFICE

293E

OPEN

OFFICE

OFFICE

293D

OFFICE

293C

STORAGE

293Q

STORAGE

293P

OFFICE

293R

OFFICE

293B

OFFICE

293ATELECOM

2T2

MEN

2M3

WOMEN

2W2

JANITOR

2J1

STAIR

2S2CONFERENCE

2D1

ELECTRICAL

2E2

STORAGE

290A

OFFICE

290OFFICE

289A

OPEN

OFFICE

OFFICE

289C

OPEN

OFFICE

CORRIDOR

2C4

OPEN

OFFICE

OFFICE

289D

WORK ROOM

285D

OFFICE

OFFICE

286A

OPEN

OFFICE

OFFICE

286B

WORK ROOM

285E

OPEN

OFFICE

OPEN

OFFICE

STAIR

2S1

STORAGE

285B

MECHANICAL

2H1

OFFICE

285A

OFFICE

285C

OFFICE

283A

MEN

2M2

VESTIBULE

2V1

OFFICE

OFFICE

CONFERENCE

278D

KITCHEN

278B

OFFICE

278E

CORRIDOR

2C2

OFFICE

277C

OFFICE

278F

OFFICE

277BOFFICE

277D

OFFICE

277A

TOILET

276G

RECEPTION

OFFICE

276E

OFFICE

276D

CONFERENCE

275N

OFFICE

275M

OFFICE

275J

OFFICE

275H

OFFICE

275E

OFFICE

275D

OPEN

OFFICE

OFFICE

275C OFFICE

275F

OFFICE

275A

OFFICE

275B

WOMEN

2W1

STORAGE

275P

OFFICE

STORAGE

274A

STAIR

2S4

TELECOM

2T1

CORRIDOR

2C1

OFFICE

276A

RECYCLING

OFFICE

CLOSET

276F

CLOSET

276C

TOILET

276B

ELEC

2E1

MEN

2M1

OFFICE

275G

OFFICE

275K

OFFICE

275L

HALL

HALL

278A

KITCHEN

STORAGE

278C

CORRIDOR

2C3

STORAGE

283B

OPEN

OFFICE

289B

CORRIDOR

2C5

HALL

2C6

ENTRY

278 JANITOR

2J2

OFFICE

291B

OFFICE

291A

WAITING

274.1

REFRIGERATOR

215A

DN DN

DN

DN

DN

DN

PP123

PP121

PP122PP121

A4

AREA

JAG

AREA

COMMAND GROUP

AREA

A4

AREA

A4

AREA

A3

AREA

9TH DO

AREA

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

SE

CO

ND

F

LO

OR

P

LA

N

- O

VE

RA

LL

PP120

RCP AJK DWH

SCALE: 1/16" = 1'-0"

SECOND FLOOR PLAN - OVERALL1

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

A

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

OFFICE

293B

OFFICE

293ATELECOM

2T2

MEN

2M3

WOMEN

2W2

JANITOR

2J1

STAIR

2S2CONFERENCE

2D1

ELECTRICAL

2E2

STORAGE

290A

OFFICE

290OFFICE

289A

OPEN

OFFICE

OFFICE

289C

OPEN

OFFICE

CORRIDOR

2C4

OPEN

OFFICE

OFFICE

289D

WORK ROOM

285D

OFFICE

OFFICE

286A

OPEN

OFFICE

OFFICE

286B

WORK ROOM

285E

OPEN

OFFICE

OPEN

OFFICE

STAIR

2S1

STORAGE

285B

MECHANICAL

2H1

OFFICE

285A

OFFICE

285C

OFFICE

283A

MEN

2M2

VESTIBULE

2V1

OFFICE

OFFICE

RECYCLING

OFFICE

CORRIDOR

2C3

STORAGE

283B

OPEN

OFFICE

289B

CORRIDOR

2C5

HALL

2C6OFFICE

291B

OFFICE

291A

DN

DN

PP123

PP122

P-401

P-402

AIR INTAKE ON ROOF ABOVE, KEEP

VENT TERMINALS ON ROOF AT

LEAST 25'-0" AWAY FROM INTAKE

FD-2

4" SAN DN

3" V UP

2" V UP FROM

BELOW

SEE NOTE 1SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

EXISTING STORM

TO REMAIN

EXISTING STORM

TO REMAIN

EXISTING STORM

TO REMAIN

EXISTING STORM

TO REMAIN

EXISTING STORM

TO REMAIN

EXISTING STORM

TO REMAIN

2 2 2

3" VTR

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

1. DO NOT ROUTE PIPING OVER THIS AREA.

2. UP TO EXISTING ROOF DRAIN.

3. REINSULATE HORIZONTAL PORTIONS OF STORM

PIPING.

KEYNOTES

1. ALL EXISTING ROOF DRAINS TO HAVE DOME AND

EXTENSION COLLAR REPLACED TO ACCOMODATE

NEW THICKER ROOF INSULATION, SEE

ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION. STORM PIPING FROM RD BODY TO

CONDUCTOR TO BE REINSULATED TYPICAL

THROUGHOUT BUILDING.

NOTES

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

SE

CO

ND

F

LO

OR

P

LA

N

- A

RE

A

A

PP121

RCP AJK DWH

163SCALE: 1/8" = 1'-0"

SECOND FLOOR PLAN - AREA A1

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

B

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

STAIR

2S3

OFFICE

293N

OFFICE

293M

OFFICE

293L

OFFICE

293K

OFFICE

293J

OFFICE

293H

OFFICE

293G

OFFICE

293F

OFFICE

293E

OPEN

OFFICE

OFFICE

293D

OFFICE

293C

STORAGE

293Q

STORAGE

293P

OFFICE

293R

E

DN

PP121

SEE NOTE 1

SEE NOTE 1

2 2 2

EXISTING STORM

TO REMAIN

EXISTING STORM

TO REMAIN

EXISTING STORM

TO REMAIN

EXISTING STORM

TO REMAIN

ST

ST

ST

ST

ST

ST

ST

1. DO NOT ROUTE PIPING OVER THIS AREA.

2. UP TO EXISTING ROOF DRAIN.

3. REINSULATE HORIZONTAL PORTION OF STORM

PIPING.

KEYNOTES

1. ALL EXISTING ROOF DRAINS TO HAVE DOME AND

EXTENSION COLLAR REPLACED TO ACCOMODATE

NEW THICKER ROOF INSULATION, SEE

ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION. STORM PIPING FROM RD BODY TO

CONDUCTOR TO BE REINSULATED TYPICAL

THROUGHOUT BUILDING.

NOTES

EXISTING PIPING

TO BE REMOVED

NEW PIPING

EXISTING PIPING

TO REMAIN

PIPE LEGEND

AS NOTED

SE

CO

ND

F

LO

OR

P

LA

N

- A

RE

A

B

PP122

RCP AJK DWH

SCALE: 1/8" = 1'-0"

SECOND FLOOR PLAN - AREA B1

(412) 269-6300

100 AIRSIDE DRIVE

R

EP

AI

R

U

SA

FC

EN

T H

Q

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N

03-11-2016

PLAN

NORTH

N

VLSB 12-0009

143384

C

KEYPLAN

ANNEX

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

OF

A/E PROJECT NO.:

Sh aw

A ir F or ce

B as e Su mt er

, S ou th Ca ro lin a

K-3346-4TO CCATASINKSSTAINLESS STEEL

CONFERENCE

278D

KITCHEN

278B

OFFICE

278E

CORRIDOR

2C2

OFFICE

277C

OFFICE

278F

OFFICE

277BOFFICE

277D

OFFICE

277A

TOILET

276G

RECEPTION

OFFICE

276E

OFFICE

276D

CONFERENCE

275N

OFFICE

275M

OFFICE

275J

OFFICE

275H

OFFICE

275E

OFFICE

275D

OPEN

OFFICE

OFFICE

275C OFFICE

275F

OFFICE

275A

OFFICE

275B

WOMEN

2W1

STORAGE

275P

OFFICE

STORAGE

274A

STAIR

2S4

TELECOM

2T1

CORRIDOR

2C1

OFFICE

276A

CLOSET

276F

CLOSET

276C

TOILET

276B

ELEC

2E1

MEN

2M1

OFFICE

275G

OFFICE

275K

OFFICE

275L

HALL

HALL

278A

KITCHEN

STORAGE

278C

ENTRY

278 JANITOR

2J2

WAITING

274.1

215A

DN

PP121

P-403

P-403

P-403

P-403

3" VTR

4" V UP

4" VTR

3" V UP

3" VTR

2" V UP & DN

ARCH TO PROVIDE

ENCLOSURE

3" V ABOVE CLG

4"…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .