The file is a Price Breakdown template (Attachment 06) for a federal contract opportunity to install electrical outlets at Shaw Air Force Base. The solicitation (FA480325R0017) requires a contractor to provide management, transportation, tools, supplies, equipment, labor, and necessary permits to complete electrical work in Building 1947, with specific compliance requirements including International Building Code, National Electric Code, and other relevant standards. The template includes line items for electrical components such as breakers, conduit, outlet boxes, conductors, and cover plates, with sections for material costs, labor costs, direct costs, overhead, profit, and bonding. A mandatory site visit is scheduled for 20 March 2025 at 0900 in the B1947 East Parking Lot, with contractor questions due by 24 March 2025 at 1400. The project is being issued by the Department of the Air Force Air Combat Command, with an anticipated contract performance period beginning after the Notice to Proceed (NTP).
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE
| FOR OFFICE USE ONLY | |||
| Project: | Outlet Instal, B1947 | Christopher Poythress | Attachment 06 |
FA480325R0017
| Location: | Shaw AFB | 20 CES | |||||||
| Contractor: | 16-Jan-25 | ||||||||
| Address: | |||||||||
| PR No.: | VLSB 25-2501 | ||||||||
| For Official Use Only | |||||||||
| Line No. | Item | Unit of Measure | Quantity | Material Costs | Labor | Labor | Direct Cost | Line Total | |
| Unit Cost | Total | Hourly Rate | Total | ||||||
| ELECTRICAL | |||||||||
| 1 | Breakers | EA | |||||||
| 2 | Conduit | LF | |||||||
| 3 | Outlet boxex / pull boxex | EA | |||||||
| 4 | Conductors | LF | |||||||
| 5 | Cover Plates | EA | |||||||
| 6 | Through wall sealat | EA | |||||||
| Totals: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Material Cost: | $0.00 |
| Total Labor Cost: | $0.00 |
| Direct Cost: | $0.00 |
| Total Line Item Cost: | $0.00 |
| Overhead: | $0.00 |
| Profit: | $0.00 |
| Bond: | $0.00 |
| Total Contract Price: |