Attachment 05 - Submittal Register.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Eielson AFB CHPP Phase B Electrical Panels and Circuits Federal contract opportunity
- Solicitation number
- FA500422B0008
About this file
This document contains a submittal register and solicitation for a federal construction contract. The submittal register outlines 128 items requiring approval from the Air Force related to the replacement of electrical panels and circuits at Eielson Air Force Base in Alaska. Key submittals include plans for safety, demolition, asbestos and lead abatement, lighting fixtures, conduit, wire, and panelboards. The solicitation seeks bids for the 360-day project with a value between $1,000,000 and $5,000,000. Bids are due electronically by June 23, 2022 to the contracting officer and contract specialist at the Air Force. The NAICS code is 238210 for electrical contractors and bonding will be required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers for FTQW 19-0504 Site visit.pdf | ||
| Questions and Answers for FTQW 19-0504 Site visit.pdf | ||
| Solicitation Amendment FA500422B00080001 SF 30.pdf | ||
| Solicitation - FA500422B0008.pdf | ||
| Attachment 02 - Electrical Phase B Specs.pdf | ||
| Attachment 04 - Wage Determination - AK20220001.pdf | ||
| Attachment 03 - Electrical Phase B Drawings.pdf | ||
| Attachment 01 - Electrical Phase B Synopsis of Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UFGS4288
| TITLE: | Submittal Register | SUBMITTAL REGISTER | ||||||||||||||||
| JOB NAME: | REPAIR CH&PP ELECTRICAL PANELS/CIRCUITS | |||||||||||||||||
| LOCATION: | Eielson AFB, Alaska | |||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) |
| Line | Activity # | Transmittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Reviewer | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Reviewer | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 01 14 00 | 1 | Preconstruction Submittals | List of Contact Personnel | 1.3.3.1 | G | ||||||||||||||
| 2 | 01 19 30 | 1 | Preconstruction Submittals | Storage Site Photos: Before | 1.12 | G | ||||||||||||||
| 3 | 01 19 30 | 1 | Preconstruction Submittals | Work Clearance Request | 1.6 | G | ||||||||||||||
| 4 | 01 19 30 | 1 | Preconstruction Submittals | Licenses and Permits | 1.3 | G | ||||||||||||||
| 5 | 01 19 30 | 1 | Preconstruction Submittals | FAA Form 7460-1 Notice of Proposed Construction or Alteration (if applicable) | 1.16 | G | ||||||||||||||
| 6 | 01 19 30 | 1 | Closeout Submittals | Warranty Letter | 1.9 | G | ||||||||||||||
| 7 | 01 22 00.00 10 | 1 | Preconstruction Submittals | Project Schedule | 1.4 | G | ||||||||||||||
| 8 | 01 22 00.00 10 | 1 | Preconstruction Submittals | Project Schedule Updates | 1.6.7 | G | ||||||||||||||
| 9 | 01 22 00.00 10 | 1 | Preconstruction Submittals | Contract Cost Breakdown | 1.3 | G | ||||||||||||||
| 10 | 01 33 00 | 1 | Preconstruction Submittals | Submittal Register | 1.9 | G | ||||||||||||||
| 11 | 01 35 26 | 1 | Preconstruction Submittals | Construction Operation and Safety Plan | 1.7 | G | ||||||||||||||
| 12 | 01 35 26 | 1 | Preconstruction Submittals | Accident Prevention Plan (APP) | 1.8 | G | ||||||||||||||
| 13 | 01 35 26 | 1 | Preconstruction Submittals | Request for use of Ionizing Radiation (if required) | 1.14 | G | ||||||||||||||
| 14 | 01 35 26 | 1 | Preconstruction Submittals | Request for use of Lasers (if required) | 1.15 | G | ||||||||||||||
| 15 | 01 35 26 | 1 | Preconstruction Submittals | Request for use of Radioactive Materials (if required) | 1.16 | G | ||||||||||||||
| 16 | 01 35 26 | 1 | Preconstruction Submittals | Request for use of Radio Frequency Radiation (if required) | 1.17 | G | ||||||||||||||
| 17 | 01 35 26 | 1 | Preconstruction Submittals | Request for use of Ultraviolet Radiation (if required) | 1.18 | G | ||||||||||||||
| 18 | 01 35 26 | 6 | Test Reports | Notifications and Reports | 1.13 | |||||||||||||||
| 19 | 01 35 26 | 6 | Test Reports | Accident Reports | 1.13.2 | G | ||||||||||||||
| 20 | 01 35 26 | 7 | Certificates | Activity Hazard Analysis (AHA) | 1.9 | |||||||||||||||
| 21 | 01 35 26 | 7 | Certificates | Confined Space Entry Permit | 1.19 | |||||||||||||||
| 22 | 01 35 26 | 7 | Certificates | License Certificates | ||||||||||||||||
| 23 | 01 45 00.00 10 | 1 | Preconstruction Submittals | Contractor Quality Control (CQC) Plan | 3.2 | G | ||||||||||||||
| 24 | 01 45 00.00 10 | 6 | Test Reports | Daily Reports | 3.9.2 | |||||||||||||||
| 25 | 01 57 19 | 1 | Preconstruction Submittals | Safety and Health Program | 1.18 | G | ||||||||||||||
| 26 | 01 57 19 | 1 | Preconstruction Submittals | Environmental Protection Plan | 1.5 | G | ||||||||||||||
| 27 | 01 57 19 | 6 | Test Reports | Solid Waste Weight Tickets | 1.5 | G | ||||||||||||||
| 28 | 01 57 19 | 6 | Test Reports | Hazardous Materials Inventory (Initial, quarterly & final) | 1.6 | G | ||||||||||||||
| 29 | 01 57 19 | 6 | Test Reports | Hazardous Waste Accumulation Log (Initial, quarterly & final) | 1.6 | G | ||||||||||||||
| 30 | 01 57 19 | 6 | Test Reports | Laboratory Test Results (as applicable) | G | |||||||||||||||
| 31 | 01 57 19 | 6 | Test Reports | NOI for asbestos abatement (if required) | 1.11 | G | ||||||||||||||
| 32 | 01 57 19 | 10 | Operation and Maintenance Data | Report indicating nature and extent of abatement | 1.11 | G | ||||||||||||||
| 33 | 01 78 00 | 11 | Closeout Submittals | As-Built Drawings | 3.1 | G | ||||||||||||||
| 34 | 01 78 00 | 11 | Closeout Submittals | Record Drawings | 3.3 | G | ||||||||||||||
| 35 | 02 41 00 | 1 | Preconstruction Submittals | Demolition Plan | 1.2.1 | G | ||||||||||||||
| 36 | 02 41 00 | 1 | Preconstruction Submittals | Deconstruction Plan | 1.2.1 | G | ||||||||||||||
| 37 | 02 41 00 | 1 | Preconstruction Submittals | Existing Conditions | 1.1 | |||||||||||||||
| 38 | 02 41 00 | 7 | Certificates | Notification | 1.7 | G | ||||||||||||||
| 39 | 02 82 16.00 20 | 3 | Product Data | Local Exhaust Equipment | 3.1.4 | G | ||||||||||||||
| 40 | 02 82 16.00 20 | 3 | Product Data | Vacuums | 3.1.5 | G | ||||||||||||||
| 41 | 02 82 16.00 20 | 3 | Product Data | Respirators | 3.1.1.1 | G | ||||||||||||||
| 42 | 02 82 16.00 20 | 3 | Product Data | Pressure Differential Automatic Recording Instrument | 3.1.4 | G | ||||||||||||||
| 43 | 02 82 16.00 20 | 3 | Product Data | Amended Water | 1.2.2 | G | ||||||||||||||
| 44 | 02 82 16.00 20 | 3 | Product Data | Glovebags | 3.1.7 | G | ||||||||||||||
| 45 | 02 82 16.00 20 | 3 | Product Data | Safety Data Sheets (SDS) For All Materials | 1.3.8 | G | ||||||||||||||
| 46 | 02 82 16.00 20 | 3 | Product Data | Encapsulants | 2.1 | G | ||||||||||||||
| 47 | 02 82 16.00 20 | 6 | Test Reports | Air Sampling Results | 1.5.5 | G | ||||||||||||||
| 48 | 02 82 16.00 20 | 6 | Test Reports | Pressure Differential Recordings For Local Exhaust System | 1.5.6 | G | ||||||||||||||
| 49 | 02 82 16.00 20 | 6 | Test Reports | Asbestos Disposal Quantity Report | 3.3.3.2 | G | ||||||||||||||
| 50 | 02 82 16.00 20 | 6 | Test Reports | Encapsulation Test Patches | 3.2.6.2 | G | ||||||||||||||
| 51 | 02 82 16.00 20 | 6 | Test Reports | Clearance Sampling | 3.2.7.3 | G | ||||||||||||||
| 52 | 02 82 16.00 20 | 7 | Certificates | Asbestos Hazard Abatement Plan | 1.3.9 | G | ||||||||||||||
| 53 | 02 82 16.00 20 | 7 | Certificates | Testing Laboratory | 1.3.10 | G | ||||||||||||||
| 54 | 02 82 16.00 20 | 7 | Certificates | Private Qualified Person Documentation | 1.5.1 | G | ||||||||||||||
| 55 | 02 82 16.00 20 | 7 | Certificates | Contractor's License | 1.5.4 | G | ||||||||||||||
| 56 | 02 82 16.00 20 | 7 | Certificates | Competent Person | 1.5.2 | G | ||||||||||||||
| 57 | 02 82 16.00 20 | 7 | Certificates | Worker's License | 1.5.3 | G | ||||||||||||||
| 58 | 02 82 16.00 20 | 7 | Certificates | Landfill Approval | 1.3.11 | G | ||||||||||||||
| 59 | 02 82 16.00 20 | 7 | Certificates | Employee Training | 1.3.3 | G | ||||||||||||||
| 60 | 02 82 16.00 20 | 7 | Certificates | Medical Certification | 1.3.12 | G | ||||||||||||||
| 61 | 02 82 16.00 20 | 7 | Certificates | Waste Shipment Records | 1.3.11 | G | ||||||||||||||
| 62 | 02 82 16.00 20 | 7 | Certificates | Respiratory Protection Program | 1.3.6 | G | ||||||||||||||
| 63 | 02 82 16.00 20 | 7 | Certificates | Delivery Tickets | 1.3.11 | G | ||||||||||||||
| 64 | 02 82 16.00 20 | 7 | Certificates | Vacuums | 3.1.5 | G | ||||||||||||||
| 65 | 02 82 16.00 20 | 7 | Certificates | Water Filtration Equipment | 3.1.2.3 | G | ||||||||||||||
| 66 | 02 82 16.00 20 | 7 | Certificates | Ventilation Systems | 3.1.5 | G | ||||||||||||||
| 67 | 02 82 16.00 20 | 7 | Certificates | Equipment Used To Contain Airborne Asbestos Fibers | 3.1 | G | ||||||||||||||
| 68 | 02 82 16.00 20 | 7 | Certificates | Encapsulants | 2.1 | G | ||||||||||||||
| 69 | 02 82 16.00 20 | 7 | Certificates | Notifications | 1.3.4 | |||||||||||||||
| 70 | 02 82 16.00 20 | 11 | Closeout Submittals | Notifications | 1.3.4 | G | ||||||||||||||
| 71 | 02 82 16.00 20 | 11 | Closeout Submittals | Rental Equipment | 1.6.1 | G | ||||||||||||||
| 72 | 02 82 16.00 20 | 11 | Closeout Submittals | Respirator Program Records | G | |||||||||||||||
| 73 | 02 82 16.00 20 | 11 | Closeout Submittals | Permits and Licenses | 1.3.4 | G | ||||||||||||||
| 74 | 02 82 16.00 20 | 11 | Closeout Submittals | Protective Clothing Decontamination Quality Control Records | 1.5.7 | G | ||||||||||||||
| 75 | 02 82 16.00 20 | 11 | Closeout Submittals | Protective Clothing Decontamination Facility Notification | 1.5.8 | G | ||||||||||||||
| 76 | 02 83 13.00 20 | 1 | Preconstruction Submittals | Occupational and Environmental Assessment Data Report | 1.5.2.3 | G | ||||||||||||||
| 77 | 02 83 13.00 20 | 1 | Preconstruction Submittals | Lead Compliance Plan | 1.5.2.2 | G | ||||||||||||||
| 78 | 02 83 13.00 20 | 1 | Preconstruction Submittals | Competent Person | 1.5.1.1 | G | ||||||||||||||
| 79 | 02 83 13.00 20 | 1 | Preconstruction Submittals | Training Certification | 1.5.1.2 | G | ||||||||||||||
| 80 | 02 83 13.00 20 | 1 | Preconstruction Submittals | Lead Waste Management Plan | 1.5.2.8 | G | ||||||||||||||
| 81 | 02 83 13.00 20 | 1 | Preconstruction Submittals | Written Evidence | 3.5.2.1 | G | ||||||||||||||
| 82 | 02 83 13.00 20 | 1 | Preconstruction Submittals | Medical Examinations | 1.5.2.4 | G | ||||||||||||||
| 83 | 02 83 13.00 20 | 6 | Test Reports | Sampling Results | 1.5.2.3 | G | ||||||||||||||
| 84 | 02 83 13.00 20 | 6 | Test Reports | Occupational and Environmental Assessment Data Report | 1.5.2.3 | G | ||||||||||||||
| 85 | 02 83 13.00 20 | 7 | Certificates | Testing Laboratory | 1.5.1.3 | G | ||||||||||||||
| 86 | 02 83 13.00 20 | 7 | Certificates | Occupant Notification | G | |||||||||||||||
| 87 | 02 83 13.00 20 | 7 | Certificates | Third Party Consultant Qualifications | 1.5.1.4 | G | ||||||||||||||
| 88 | 02 83 13.00 20 | 7 | Certificates | Clearance Certification | 3.5.1.1 | G | ||||||||||||||
| 89 | 02 83 13.00 20 | 11 | Closeout Submittals | hazardous waste manifest | 3.5.2.1 | G | ||||||||||||||
| 90 | 02 83 13.00 20 | 11 | Closeout Submittals | turn-in documents or weight tickets | 3.5.2.1 | G | ||||||||||||||
| 91 | 02 84 16 | 7 | Certificates | Qualifications of CIH | 1.8.1 | G | ||||||||||||||
| 92 | 02 84 16 | 7 | Certificates | Training Certification | 1.8.1 | G | ||||||||||||||
| 93 | 02 84 16 | 7 | Certificates | PCB and Lamp Removal Work Plan | 1.8.2 | G | ||||||||||||||
| 94 | 02 84 16 | 7 | Certificates | PCB and Lamp Disposal Plan | 1.8.3 | G | ||||||||||||||
| 95 | 02 84 16 | 11 | Closeout Submittals | Transporter certification | 3.5.2 | G | ||||||||||||||
| 96 | 02 84 16 | 11 | Closeout Submittals | Certification of Decontamination | 3.2.4 | |||||||||||||||
| 97 | 02 84 16 | 11 | Closeout Submittals | Certificate of Disposal and/or recycling | 3.5.2.1 | |||||||||||||||
| 98 | 02 84 16 | 11 | Closeout Submittals | Testing results | 3.3.1 | |||||||||||||||
| 99 | 26 05 48.00 10 | 2 | Shop Drawings | Lighting Fixtures Seismic Supports | 1.2.3 | G | ||||||||||||||
| 100 | 26 05 48.00 10 | 2 | Shop Drawings | Panelboard Seismic Supports | 1.2.3 | G | ||||||||||||||
| 101 | 26 05 48.00 10 | 2 | Shop Drawings | Contractor Designed Seismic Bracing | 1.2.3 | G | ||||||||||||||
| 102 | 26 05 48.00 10 | 2 | Shop Drawings | Contractor Designed Raceway Supports | 1.2.3 | G | ||||||||||||||
| 103 | 26 05 48.00 10 | 3 | Product Data | Lighting Fixtures Seismic Supports | 1.2.3 | G | ||||||||||||||
| 104 | 26 05 48.00 10 | 3 | Product Data | Panelboard Seismic Supports | 1.2.3 | G | ||||||||||||||
| 105 | 26 05 48.00 10 | 3 | Product Data | Contractor Designed Seismic Bracing | 1.2.3 | G | ||||||||||||||
| 106 | 26 05 48.00 10 | 3 | Product Data | Contractor Designed Raceway Supports | 1.2.3 | G | ||||||||||||||
| 107 | 26 20 00 | 2 | Shop Drawings | Wireways | 2.11 | G | ||||||||||||||
| 108 | 26 20 00 | 3 | Product Data | Conduits & Fittings | 2.2 | G | ||||||||||||||
| 109 | 26 20 00 | 3 | Product Data | Wire and Cables | 2.5 | G | ||||||||||||||
| 110 | 26 20 00 | 3 | Product Data | Junction Boxes | 2.3 | G | ||||||||||||||
| 111 | 26 20 00 | 3 | Product Data | Supports | 3.1.3.1 | G | ||||||||||||||
| 112 | 26 20 00 | 3 | Product Data | Wire Labels | 2.15 | G | ||||||||||||||
| 113 | 26 20 00 | 6 | Test Reports | 600-volt wiring test | 3.4.2 | G | ||||||||||||||
| 114 | 26 24 16.00 40 | 2 | Shop Drawings | Detail Drawings | 2.1.1 | G | ||||||||||||||
| 115 | 26 24 16.00 40 | 3 | Product Data | Panelboards | 2.1.1 | G | ||||||||||||||
| 116 | 26 24 16.00 40 | 3 | Product Data | Manufacturers Installation Instructions | 1.2 | |||||||||||||||
| 117 | 26 24 16.00 40 | 6 | Test Reports | Test Report | 3.2 | G | ||||||||||||||
| 118 | 26 24 16.00 40 | 11 | Closeout Submittals | Warranty | 1.3 | |||||||||||||||
| 119 | 26 51 00 | 2 | Shop Drawings | Luminaire Drawings | 1.5.1 | G | ||||||||||||||
| 120 | 26 51 00 | 3 | Product Data | Luminaires | 2.2 | G | ||||||||||||||
| 121 | 26 51 00 | 6 | Test Reports | LED Luminaire Manufacturers Test Reports | 1.5 | G | ||||||||||||||
| 122 | 26 51 00 | 7 | Certificates | Luminaire Useful Life Certificate | 1.6.1.1 | G | ||||||||||||||
| 123 | 26 51 00 | 11 | Closeout Submittals | Luminaire Warranty | 1.6 | G | ||||||||||||||
| 124 | 26 56 00 | 2 | Shop Drawings | Luminaire Drawings | 1.5.1.1 | G | ||||||||||||||
| 125 | 26 56 00 | 3 | Product Data | LED Luminaires | 2.1 | G | ||||||||||||||
| 126 | 26 56 00 | 6 | Test Reports | LED Luminaire Manufacturers Test Reports | 1.5 | G | ||||||||||||||
| 127 | 26 56 00 | 7 | Certificates | Luminaire Useful Life Certificate | 1.4 | G | ||||||||||||||
| 128 | 26 56 00 | 11 | Closeout Submittals | Luminaire Warranty | 1.6 |