Attachment 05 - CD Drawings - Volume 3.pdf

PDF 17 MB Posted

Attached to
#568-21-701 EHRM Infrastructure Upgrades Construction Fort Meade, SD Federal contract opportunity
Solicitation number
36C77625B0015
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

The file is a comprehensive set of architectural and engineering drawings for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project at the Black Hills VA Healthcare System in Fort Meade, South Dakota. The project encompasses infrastructure improvements across 18 buildings, including electrical system upgrades, telecommunications infrastructure enhancements, mechanical system modifications, and physical renovations. Specific improvements include electrical panel upgrades, power system reconfigurations, communication infrastructure updates (such as new data outlets and CAT 6A cabling), physical security upgrades, fiber infrastructure backbone improvements, and hazardous material abatement.

The project involves detailed electrical, telecommunications, mechanical, and architectural modifications to buildings 40, 46, 48, 50, 53, 88, 89, 90, 103, 110, 113, 137, 144, 145, 146, 147, 148, T171, and T296. Key technical requirements include reconfiguring electrical systems, upgrading building management system interfaces, assessing and upgrading HVAC systems, renovating existing spaces, and implementing comprehensive infrastructure improvements. The drawings provide extensive technical specifications for electrical panels, rack installations, mechanical equipment connections, and telecommunications room reconfigurations across multiple buildings in the healthcare system's campus.

View the file

Other files for this federal contract opportunity

Other files attached to #568-21-701 EHRM Infrastructure Upgrades Construction Fort Meade, SD, newest first.
File Type Posted
Amendment 4 - Abstract of Bids - Ft Meade SD.pdf PDF
36C77625B0015 0004.pdf PDF
Amendment 0003 - ATT 1 - RFI Responses_updated 073025.pdf PDF
36C77625B0015 0003.pdf PDF
Amendment 0003 - ATT 3 - Drawing Index.xlsx XLSX spreadsheet
Amendment 0003 - ATT 4 Ft. Meade VA Addition Geotech Report.pdf PDF
Amendment 0003 - ATT 2- Ft Meade - Addendum 1 - Drawing Set.pdf PDF
36C77625B0015 0002.pdf PDF
Amendment 0002 - Attachment 01 - RFI Responses - Fort Meade.pdf PDF
36C77625B0015 0001.pdf PDF
Amendment 0001 - ATT 01 - EHRM Site Visit Sign In Sheet.pdf PDF
Attachment 01 - CD Specs Vol 1.pdf PDF
Attachment 04 - CD Drawings - Volume 2.pdf PDF
Attachment 06 - Wage Rate Determination - Fort Meade.pdf PDF
Attachment 08 - Fort Meade Site Visit with Maps.pdf PDF
Attachment 14 - Addendum 148-TD-014A 148-TN-014A.pdf PDF
Attachment 02 - CD Specs Vol 2.pdf PDF
Attachment 03 - CD Drawings - Volume 1.pdf PDF
Attachment 10 - VHA PCRA Template 5 19 25.pdf PDF
Attachment 11 - VHA ICRA-Sample for EHRM 5 19 25.pdf PDF
Attachment 09 - Fort Meade Campus Map.pdf PDF
Attachment 12 - Brand Name Justification_Redacted.pdf PDF
Attachment 13 - Limitations on Subcontracting - Construction.pdf PDF
36C77625B0015_1.pdf PDF
Attachment 07 - Fort Meade - Hazardous Materials Report.pdf PDF
Attachment 15 - SOW 568 21 701 EHRM Infra Upgrades Bldg.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THE SCOPE OF THIS PROJECT INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING INFRASTRUCTURE IMPROVEMENTS: ELECTRICAL (ELECTRICAL PANEL UPGRADE, POWER [NORMAL, EMERGENCY]), BONDING, UPS, BUILDING MANAGEMENT SYSTEM INTERFACES, ASSESS FOR NEW AND UPGRADES TO EXISTING HVAC, RECONFIGURATION, EXPANSION AND RENOVATION OF EXISTING SPACE (DEMO, NEW CONSTRUCTION, FINISHES), COMMUNICATION INFRASTRUCTURE (NEW DATA OUTLETS, PATCH PANELS, UPGRADE TO CAT 6A CABLE) IN BUILDINGS AS NECESSARY, PHYSICAL SECURITY UPGRADES, ASSESS AND UPGRADE FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN BUILDINGS, HAZARDOUS MATERIAL ABATEMENT. PROJECT BUILDING LOCATION INCLUDE: BUILDINGS 40, 46, 48, 50, 53, 88, 89, 90, 103, 110, 113, 137, 144, 145, 146, 147, 148, T171, AND T296.

PROJECT DESCRIPTION

1. THE CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATION AND RELATED CONTRACT DOCUMENTS, VISIT SITE OF WORK, AND RESEARCH ALL EXISTING CONDITIONS, FACILITIES, RESTRICTIONS AND OTHER MATTERS WHICH CAN AFFECT THE WORK, IN TIMELINE, QUALITY OR COST, THEREOF; FAILURE OR OMISSION OF ANY CONTRACTOR TO VISIT THE SITE AND ACQUAINT THEMSELVES WITH THE EXISTING CONDITIONS, SHALL IN NO WAY RELIEVE THEM FROM ANY OBLIGATION WITH RESPECT TO THEIR CONTRACT AND NO EXTRA TIME OR COMPENSATION WILL BE ALLOWED BY REASON OF ANY THING OR MATTER CONCERNING WHICH THE CONTRACTOR COULD HAVE FULLY INFORMED THEMSELVES PRIOR TO BIDDING. GENERAL CONTRACTOR SHALL COORDINATE ALL ASPECTS OF THE BUILDING CONSTRUCTION.

2. THE CONTRACTOR SHALL NOT CONSIDER CONSTRUCTION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH AREA AND TO FULFILL THE INTENT OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL COORDINATE ARCHITECTURAL CONSTRUCTION DRAWING AND NOTES WITH CIVIL, STRUCTURAL AND MECHANICAL, ELECTRICAL & PLUMBING NOTES AND DRAWINGS.

3. THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE TECHNICAL SPECIFICATIONS AND CONDITIONS OF THE PROJECT INCLUDED IN THE PROJECT MANUAL WHICH FORM A PART OF THE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL INFORMATION REQUIRED TO CONSTRUCT THE WORK OF THIS CONTRACT. IN THE EVENT OF A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATION NOTIFY THE COR FOR CLARIFICATION SEVEN DAYS BEFORE BEGINNING WORK ON THE AFFECTED ACTIVITIES.

4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF THE WORK. NOTIFY THE COR OF ANY SIGNIFICANT CHANGES IN

DIMENSIONS OR CONDITIONS.

5. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY DESCRIPTION AS REQUIRED TO COMPLETE THE SCOPE OF WORK DEFINED ON THE DRAWINGS AND SPECIFICATIONS WITHIN THE AGREED TIMELINES.

6. THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS (HOTWORK, ICRA, WEEKENDS, HOLIDAYS, SHUTDOWN, ETC), CERTIFICATES, INSPECTIONS, DEPARTMENT APPROVAL, ETC. FOR WORK PERFORMED UNDER THIS CONTRACT. PROVIDE COPIES OF ALL REQUIRED PERMITS, CERTIFICATES, INSPECTIONS AND AGENCY

APPROVALS TO THE COR PRIOR TO THE COMMENCEMENT OF THE SCOPE.

7. FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, ALL APPLICABLE STATE AND LOCAL CODES, AND THE GENERAL AND

SUPPLEMENTARY CONDITIONS OF THE CONTRACT.

8. U.L. ASSEMBLIES DESCRIBED ARE FOR REFERENCE ONLY. THE GENERAL CONTRACTOR SHALL COORDINATE AND VERIFY THE INSTALLATION OF THE DESCRIBED

SYSTEM(S) .

9. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR THE PROPER PERFORMANCE OF THEIR WORK, COORDINATING WITH OTHER TRADES, MEANS AND METHODS OF CONSTRUCTION, SAFETY AND SECURITY ON SITE.

10. CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR THE PERFORMANCE AND INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE PERFORMED IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS FOR FINISHES AND SUBSTRATES AFFECTED.

11. THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN SECURITY DURING ALL CONSTRUCTION WORK.

12. PROTECT EXISTING PROPERTY DURING CONSTRUCTION. REPAIR OR REPLACE AT THE DISCRETION AND TO THE SATISFACTION OF THE C.O.R., WITHOUT ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING WORK DAMAGED DURING THE COURSE OF CONSTRUCTION.

13. THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE COR AND ALL GOVERNMENT EMPLOYEES 14 DAYS IN ADVANCE OF BEGINNING EACH CONSTRUCTION

ACTIVITY.

14. UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE PROVIDED OR FURNISHED BY OTHERS, THEY SHALL BE PROVIDED UNDER THIS

CONTRACT BY THE CONTRACTOR.

15. ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND PROFESSIONAL MANNER CONSISTENT WITH INDUSTRY STANDARDS AND/OR AS DIRECTED

BY THE C.O.R..

16. THE CONTRACTOR SHALL LEAVE THE SITE AND ALL BUILDINGS AND STRUCTURES IN PROPER WORKING ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE, REPLACE ANY WORK, MATERIALS, OR EQUIPMENT FURNISHED AND INSTALLED UNDER THE CONTRACT WHICH DEVELOPS DEFECTS, DUE TO A POSSIBLE WORKMANSHIP ISSUE, WITHIN ONE

(1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER. THIS IS NOT TO LIMIT OR EXCLUDE ANY OTHER WARRANTY OR WARRANTY PERIOD OTHERWISE

DESCRIBED.

17. CONTRACTOR SHALL SCHEDULE, COORDINATE, AND FACILITATE ALL POWER, WATER, OR TELECOMMUNICATIONS OUTAGES AND SHUTDOWNS. ALL OUTAGES AND

SHUTDOWNS MUST BE SCHEDULED WITH THE COR ONE (1) WEEK PRIOR TO OUTAGE.

18. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO REGULATED MATERIALS ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, EQUIPMENT, AND ALL OTHER EXISTING SYSTEMS. MAKE NECESSARY PROVISIONS TO MAINTAIN THE INTEGRITY OF SAID SYSTEMS PRIOR TO THE COMMENCEMENT OF DEMOLITION, IF ANY. SEE MECHANICAL, ELECTRICAL, TELECOMMUNICATIONS, AND ARCHITECTURAL DRAWINGS FOR ANY SYSTEM OR PORTIONS THEREOF TO BE REMOVED, RELOCATED, REVISED OR ABANDONED.

19. ANY CONSTRUCTION INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO EXPENSE TO THE OWNER.

20. ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST BE MAINTAINED AT ALL TIMES. ESTABLISH PROCEDURES TO MINIMIZE CIRCULATION OF CONSTRUCTION PERSONNEL AND MATERIALS THROUGH OCCUPIED PORTIONS OF THE BUILDING. KEEP ALL AREAS ADJACENT TO THE WORK AREA CLEAN.

21. PRIOR TO DELIVERY OF MATERIALS TO THE CONSTRUCTION ZONE AND REMOVAL OF WASTE FROM THE SITE, VERIFY WITH THE COR FOR AN ACCEPTABLE ACCESS ROUTE AND TIME. UNDER NO CIRCUMSTANCES SHALL ANY AREA OUTSIDE THE CONSTRUCTION ZONE BE USED WITHOUT PRIOR APPROVAL FROM THE COR. ALL BUILDING INTERIOR STAGING AREAS SHALL BE PROTECTED WITH FIRE RESISTANT PLYWOOD ENCLOSURES. ALL TRASH SHALL BE REMOVED FROM THE BUILDING DAILY. CONSTRUCTION MATERIALS SHALL NOT BE STORED IN CORRIDORS OR ANY OTHER UNAUTHORIZED LOCATION AT ANY TIME.

22. FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES, AND POINTS OF CONNECTION PRIOR TO START OF WORK.

23. THE DESIGN ADEQUACY, SAFETY, AND ERECTION OF BRACING, SHORING, SCAFFOLDING, AND TEMPORARY SUPPORTS AND RESTRAINS IS THE SOLE RESPONSIBILITY OF THE

CONTRACTOR.

24. NOTIFY THE FACILITY OF TIMES WHEN THE CONSTRUCTION NOISE WILL BE IN EXCESS OF 80 DB. RESCHEDULE SUCH WORK IF SO REQUIRED BY THE FACILITY.

25. NOTIFY THE COR OF ANY DISCREPANCIES DISCOVERED IN THE FIELD THAT REQUIRE CORRECTIVE ACTION PRIOR TO TAKING ANY ACTION.

26. FOR EXISTING FLOORS, CEILINGS, PARTITIONS, AND SERVICES TO REMAIN, PROTECT ALL FINISHES AND MATERIALS, AND REPAIR OR REPLACE ALL ITEMS THAT ARE DAMAGED OR SOILED DURING THE COURSE OF CONSTRUCTION. ALL FINISHES AND MATERIALS SHALL BE PROPERLY INTEGRATED TO INSTITUTE A UNIFORM APPEARANCE

AND SEAMLESS TRANSITION.

27. ALL ITEMS TO BE REMOVED AND REPLACED SHALL BE HANDLED WITH PROPER CARE AND STORED IN SUCH A MANNER AS TO PREVENT DAMAGE; WHEN DAMAGED, REPLACE

AT NO EXPENSE TO THE OWNER.

28. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED OR BRACED IN ACCORDANCE WITH PROVISIONS OF THE TECHNICAL SPECIFICATIONS.

29. ALL DRAWINGS, THOUGH NOTED TO SCALE, ARE FOR ILLUSTRATION ONLY. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS. ITEMS WRONGLY LOCATED BY

DRAWINGS SCALING SHALL BE CORRECTED.

30. SIGNAGE CONSTRUCTION, FONT AND SIZE SHALL BE CONSISTENT WITH THE FACILITY'S EXISTING SIGNAGE SYSTEMS. REFER TO SPECIFICATIONS FOR CODE REQUIRED SIGNAGE. PROVIDE ADDITIONAL SIGNAGE AS MAY BE REQUIRED BY REQUEST OF THE FIRE MARSHAL AND/OR BUILDING CODE OFFICIAL OR C.O.R..

31. EXERCISE CARE DURING CONSTRUCTION TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER ROUTINE, COORDINATE SEQUENCE OF WORK AND PHASING WITH THE COR TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER. MANY OF THE WORK ITEMS REQUIRE THE WORK TO BE PERFORMED ONLY AT NIGHT, WEEKENDS, OR HOLIDAYS WITH PRIOR

APPROVAL OF THE C.O.R. AT NO ADDITIONAL COST TO THE GOVERNMENT.

32. PRIOR TO DRILLING OR CORING EXISTING CONCRETE, CONTRACTOR SHALL LOCATE EXISTING REINFORCEMENT TO MAINTAIN ADEQUATE CLEARANCES FROM AND AVOID DAMAGE TO EXISTING REINFORCEMENT. CONTRACTOR SHALL USE NON-DESTRUCTIVE TESTING (NDT) TO LOCATE REINFORCEMENT. WHENEVER FEASIBLE, CONTRACTOR SHALL USE GROUND PENETRATING RADAR (GPR) OR MEANS OTHER THAN X-RAY. WHERE X-RAY IS REQUIRED, CONTRACTOR SHALL PROVIDE WRITTEN REQUEST AT LEAST THREE (3) WEEKS PRIOR TO EVENT: WORK MAY BE REQUIRED TO BE PERFORMED OUTSIDE NORMAL WORK HOURS AND SHALL BE DOCUMENTED ON THE THREE (3) WEEK

LOOK-AHEAD SCHEDULE.

33. PROTECT EXISTING FIRE SUPPRESSION SYSTEMS DURING CONSTRUCTION.

34. IN THE EVENT THE CONTRACTOR DISCOVERS HAZARDOUS MATERIALS WHICH ARE NOT AVOIDABLE BY REROUTING THE WORK AND HAVE NOT BEEN DESCRIBED IN THE CONTRACT, THE CONTRACTOR IS TO NOTIFY THE COR AND THE A/E FOR DIFFERING SITE CONDITION ACKNOWLEDGEMENT. REMEDIATION WOULD BE COMPENSATED BY

ADDITIONAL MONEY AND ADDITIONAL TIME FOR CRITICAL PATH ACTIVITIES.

35. CONTRACTOR SHALL PROVIDE STAFF THAT WILL UNDERGO TRAINING AND CERTIFICATION TO ALLOW UN-ESCORTED ACCESS TO IT CLOSETS. THE CONTRACTOR SHALL CERTIFY SUFFICIENT NUMBER OF STAFF TO ACCOMMODATE PROPOSED SCHEDULE WITHOUT RELYING ON VA STAFF TO ACCOMPANY AS ESCORTS. THIS WILL REQUIRE PIV BADGING REQUIREMENT INCLUDING BACKGROUND INVESTIGATIONS. SEE "CONTRACTOR BACKGROUND INVESTIGATIONS REQUEST" FORM. COORDINATE WITH CO/CS

REGARDING SUBMITTING THE FORM.

36. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING ANY REQUIRED THIRD PART INSPECTORS.

37. CONTRACTOR TO PAINT ANY EXISTING SPRINKLER PIPING LEFT EXPOSED BY CEILING REMOVAL & PAINT ANY NEW SPRINKLER PIPING EXPOSED IN FINISHED AREAS

WITHOUT CEILINGS. PAINT COLOR TO BE RED.

GENERAL PROJECT NOTES

"OWNER": THE OWNER IS UNITED STATES GOVERNMENT - DEPARTMENT OF VETERANS AFFAIRS AND IS REFERRED TO THROUGHOUT THE CONTACT DOCUMENTS AS IF SINGULAR IN NUMBER. THE TERM "OWNER"

MEANS THE OWNER OR THE OWNER'S CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE.

"CONTRACTING OFFICER" OR "C.O.": THE OWNER'S AUTHORIZED REPRESENTATIVE RESPONSIBLE FOR ADMINISTRATING THE CONTRACT BETWEEN THE GENERAL CONTRACTOR AND OWNER. THE TERM INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER ACTING WITHIN THE LIMITS OF

THEIR AUTHORITY AS DELEGATED BY THE CONTRACTING OFFICER.

"WORK": THE TERM "WORK" MEANS THE CONSTRUCTION AND SERVICES REQUIRED BY THE CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR TO FULFILL THE CONTRACTOR'S

OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE OR A PART OF THE PROJECT.

"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE CONTRACT

DOCUMENTS

"DRAWINGS", "SHOP DRAWINGS", OR "PLANS": THE GRAPHIC AND PICTORIAL PORTIONS OF CONTRACT DOCUMENTS, WHENEVER LOCATED AND WHEREVER ISSUED, SHOWING DESIGN, LOCATION AND DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS, SECTIONS, DETAILS, SCHEDULES AND DIAGRAMS.

"PROJECT SUPERVISOR" OR "SUPERVISOR": MEANS THE ON-SITE SUPERVISION REPRESENTATIVE OF THE

PROJECT.

"ARCHITECT" OR "ENGINEER": MEANS THE VA'S ARCHITECTS, ENGINEERS AND OTHER DESIGN AND ENGINEERS PROFESSIONALS FOR THIS PROJECT, AND REFERRED THROUGHOUT THE DRAWINGS AS IF

SINGULAR IN NUMBER.

"TRADE CONTRACTOR" OR "CONTRACTORS": MEANS THE ENTITY UNDER CONTRACT AGREEMENT WITH THE GENERAL CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND OR SPECIALTY WORK IN CONNECTION

WITH THIS PROJECT.

"FURNISHED" OR "FURNISHED": MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS, TRANSPORTATION INSURANCE, FIELD MEASUREMENTS,EXPEDITING, SHIPPING, HANDLING, PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND ANY OTHER ACCESSORIES REQUIRED FOR A COMPLETE

INSTALLATION.

"INSTALL" OR "INSTALLED": MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH UNLOADING, UNPACKING, HOISTING, STORAGE, HANGERS, SUPPORTS, SLEEVES, SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL, DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLEAN-UP, INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL

ACCESSORIES, SERVICE AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.

"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT

LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND OTHER ITEMS REQUIRED

TO COMPLETE THE REFERENCED TASK.

"BY OWNER", "BY VAMC" OR "BY VA": MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED TO THE

JOB SITE AND INSTALLED BY THE OWNER.

"NOT IN CONTRACT" OR "N.I.C.": MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT, BUT MAY REQUIRE PROVISIONS IN THE CONSTRUCTION FOR FUTURE INSTALLATION AS SPECIFIC OR SHOWN.

OTHER DEFINITIONS OF WORDS AND TERMS USED IN THE DRAWINGS AND SPECIFICATIONS CAN BE FOUND IN THE LEGENDS AND SYMBOLS DRAWINGS FOR EACH DISCIPLINE AND IN DIVISIONS 0 AND 1 OF THE PROJECT

MANUAL.

BASIC DEFINITIONS

TEMPORARY FIRE & SMOKE PROTECTION

IF MULTIPLE CEILING TILES MUST BE REMOVED AND CANNOT BE REPLACED AT THE END OF THE WORK SHIFT, A 1-HOUR FIRE BARRIER WILL NEED TO BE CONSTRUCTED. IF CONTRACTOR IDENTIFIES UPCOMING WORK RESULTING IN A LONG-TERM CEILING REMOVAL, NOTIFY THE COR IMMEDIATELY WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTION OR TEMPORARY UPRIGHT SPRINKLER HEADS INSTALLED. THIS

WORK IS TO BE PART OF THE SUBMITTED SCOPE OF WORK.

IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD

THROUGH THE UNSEALED PENETRATION.

WHERE EXISTING CEILINGS ARE TEMPORARILY REMOVED FOR LONGER THAN ONE WORKING SHIFT, PROVIDE TEMPORARY UPRIGHT SPRINKLER HEADS.

WHERE EXISTING CEILINGS ARE PERMANENTLY REMOVED, COORDINATE INSTALLATION OF UPRIGHT

HEADS WITHIN ONE WORKING SHIFT TO AVOID LOSS OF SPRINKLER PROTECTION.

BLACK HILLS VA HEALTHCARE SYSTEM

ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES - FORT MEADE, SD

PROJECT NO.: 568-21-701

CONTRACT NO.: 36C77621C0078

100% CONSTRUCTION DOCUMENTS SUBMITTAL

BLACK HILLS VA HEALTHCARE SYSTEM

BLACK HILLS NETWORK ##

113 COMANCHE ROAD | FORT MEADE, SD 57741

BLACK HILLS VA HEALTHCARE SYSTEM

BLACK HILLS NETWORK ##

113 COMANCHE ROAD | FORT MEADE, SD 57741

NORTH

PROJECT KEY PLAN

OWNER

ARCHITECT

TELECOMMUNICATIONS

ENGINEER, PROJECT LEAD

MECHANICAL ENGINEER

ELECTRICAL ENGINEER

A&E ARCHITECTS

124 NORTH 29th STREET, SUITE 100

BILLINGS, MT 59101

406.248.2633

BLACK HILLS VA HEALTHCARE SYSTEM

FORT MEADE VAMC

113 COMANCHE ROAD

FORT MEADE, SD 57741

GDM - PUGET SOUND DISTRICT OFFICE

4317 6Th AVE SE, SUITE 300

LACEY, WA 98503

360.318.7095

GDM - PUGET SOUND DISTRICT OFFICE

4317 6Th AVE SE, SUITE 300

LACEY, WA 98503

360.318.7095

GDM - VANCOUVER DISTRICT OFFICE

1308 NW 134TH STREET, SUITE A

VANCOUVER, WA 98685

541.436.4723

PROJECT TEAM

GDM - PUGET SOUND DISTRICT OFFICE

4317 6Th AVE SE, SUITE 300

LACEY, WA 98503

360.318.7095

STRUCTURAL

GDM - VANCOUVER DISTRICT OFFICE

1308 NW 134TH STREET, SUITE A

VANCOUVER, WA 98685

541.436.4723

GDM - ARCTIC DISTRICT OFFICE

1401 W 34TH AVE, SUITE 200

ANCHORAGE, ALASKA 99503

907.917.2957

CIVIL ENGINEER

GDM - VANCOUVER DISTRICT OFFICE

1308 NW 134TH STREET, SUITE A

VANCOUVER, WA 98685

541.436.4723

INDUSTRIAL HYGIENEFIRE PROTECTION ENGINEER

GDM - VANCOUVER DISTRICT OFFICE

1308 NW 134TH STREET, SUITE A

VANCOUVER, WA 98685

541.436.4723

AB ANCHOR BOLT

ABV ABOVE

A/C AIR CONDITIONING

ACT ACOUSTICAL CEILING

TILE

ADDL ADDITIONAL

ADJ ADJUSTABLE

AFF ABOVE FINISH FLOOR

ALT ALTERNATE

ALUM ALUMINUM

ARCH ARCHITECT(URAL)

AWN AWNING

B/ BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM OR BENCHMARK

BRG BEARING

BTWN BETWEEN

BUR BUILT-UP ROOF

CAB CABINET

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CMU CONCRETE MASONRY

UNIT

CO CLEAN OUT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

CONST CONSTRUCTION

CG CORNER GUARD

CPT CARPET

CSMT CASEMENT

CT CERAMIC TILE

D DEEP

DF DRINKING FOUNTAIN

DH DOUBLE HUNG

DIM(S) DIMENSIONS

DISP DISPENSER

DN DOWN

DR DOOR

DS DOWNSPOUT

DTL DETAIL

DWG DRAWING

ID INSIDE DIAMETER

INFO INFORMATION

ISO ISOCYANURATE

INSUL INSULATE / INSULATED /

INSULATION

INT INTERIOR

INV INVERT

JT JOINT

J-BOX JUNCTION BOX

KIT KITCHEN

L LONG / LENGTH

LAM LAMINATE(D)

LAV LAVATORY

LF LINEAR FEET

LT LIGHT

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MECH MECHANIC(AL)

MEZZ MEZZANINE

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER OR

OVERFLOW DRAIN

OPNG OPENING

OPP OPPOSITE

OSB ORIENTED STRAND BOARD

OVHD OVERHEAD

PL PLATE

PLAM PLASTIC LAMINATE

PLUMBPLUMBING

PLYWD PLYWOOD

PNL PANEL

PNT PAINT

POLY POLYESTER OR

POLYOLEFIN

PSF POUNDS PER SQUARE

FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED OR

POINT

PVMT PAVEMENT

QT QUARRY TILE

QTR QUARTER

QTY QUANTITY

R RADIUS

RA RETURN AIR

RB RUBBER BASE

RD ROOF DRAIN

RECY RECYCLE(D)

REF REFERENCE

REFRIG REFRIGERATOR

OR REFRIGERATION

REINF REINFORCE

REQD REQUIRED

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

S SOUTH

SC SOLID CORE

SCH SCHEDULE

SCHED SCHEDULED

SECT SECTION

SF SQUARE FEET

SFRM SPRAY APPLIED FIRE

RESISTIVE MATERIAL

SGL SINGLE

SHT SHEET

SHTG SHEATHING

SIM SIMILAR

SPECSSPECIFICATIONS

SOD SLAB ON DECK

SOG SLAB ON GRADE

SOH SAME OPPOSITE HAND

SS STAINLESS STEEL

ST STONE TILE

STD STANDARD

STND STANDARD

STL STEEL

STRUCT STRUCTURAL

TEMP TEMPERED

THK THICK

THRESH THRESHOLD

T.O. TOP OF

TOBM TOP OF BEAM

T.O.BM. TOP OF BEAM

T.O.P. TOP OF PLATE

T.O.S. TOP OF STEEL

T/ TOP OF

T&G TONGUE AND GROOVE

TEL TELEPHONE

THK THICK

TRANSTRANSOM

TV TELEVISION

TYP TYPICAL

E EAST

EA EACH

EC EXISTING COLUMN

EJ EXPANSION JOINT

ELEC ELECTRICAL

EL ELEVATION

ELEV ELEVATOR

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER

COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR

EXPOSED

EXT EXTERIOR

FACP FIRE ALARM CONTROL

PANEL

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

F.F. FINISH FLOOR

FIN FINISH

FIXT FIXTURE

FLR FLOOR

FND FOUNDATION

FP FIRE PROTECTION

FR FRAME

FRMG FRAMING

FT FEET/FOOT OR FIRE

TREATED

FTG FOOTING

FTNG FOOTING

FRP FIBERGLASS

REINFORCED PANEL

FRT FIRE RETARDANT

TREATED

GA GAUGE

GALV GALVANIZED

GB GYPSUM BOARD

GC GENERAL

CONTRACTOR

GL GLASS, GLAZING

GWB GYPSUM WALL BOARD

GYP GYPSUM

HC HANDICAP

HDR HEADER

HDW HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR

HT HEIGHT

HTD HEATED

HVAC HEATING/VENTILATION

& AIR CONDITIONING

UL UNDERWRITERS

LABORATORY

UNO UNLESS NOTED

OTHERWISE

VB VINYL BASE

VCT VINYL COMPOSITION

TILE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VP VENEER PLASTER

VR VAPOR RETARDER

VT VINYL TILE

VWC VINYL WALL COVERING

W WIDE OR WEST

W/ WITH

WC WATER CLOSET

WD WOOD

WDW WINDOW

WG WALL GUARD

WH WATER HEATER

W/IN WITHIN

W/O WITHOUT

WP WATERPROOF

WR WATER RESISTANT

WT WEIGHT

WWF WELDED WIRE FABRIC

# NUMBER OR POUND

@ AT

ARCHITECTURAL ABBREVIATIONS

WINDOW TAG

ROOM TAG

DOOR TAG

KEYNOTE TAG ASSEMBLY TAG

MATERIAL TAG

REVISION TAGREVISION CLOUD

XXX

X

XX-XX

X

CEILING TAG VIEW REFERENCE

BUILDING

SECTION

WALL

SECTION

ELEVATION

GRID LINE

DETAIL

CALL OUT

INTERIOR

ELEVATION

EXTERIOR

ELEVATION

DETAIL

SECTION

#1

#2

#3

#4

POSITION OF VIEW ON SHEET

VIEW NAME

1 1/2" = 1'-0"

VIEW SCALE

VIEW NAME

A6.#

A3.#

A3.#

A3.#

A4.#

A3.#

ROOM NAME

101.1

X

X'-X"

XXX-X

XXX

W D

HT

CASEWORK TAG

CABINET DESIGN SERIES NO.

EXPLANATION OF SYMBOLS

TYPICAL SHEET VIEW NUMBERING LAYOUT

NUMBERING STARTS IN BOTTOM LEFT

CORNER, MOVING UPWARDS, SKIPPING

NONE

ARCH E1 (30"x42")

2 3 4

PROJECT SITE

VA MEDICAL CENTER

FORT MEADE, SD

PROJECT LOCATION MAP

STURGIS, SD

VOLUME 3

• ELECTRICAL

• FIRE PROTECTION

THE A/E HAS PARTITIONED THE DRAWINGS INTO SECTIONS.

THE PRIME CONTRACTOR IS TO PROVIDE COORDINATION

AMONG THE TRADES AND DRAWING SECTIONS TO ENSURE

ALL MATERIALS, LABOR, EQUIPMENT, AND OTHER SERVICES

ARE PROVIDED TO FULFILL THE ENTIRE CONTRACT. FOR

EXAMPLE, DOOR HARDWARE REQUIRES ELECTRICAL,

ARCHITECTURAL, AND FIRE PROTECTION SECTION REVIEW.

PROVIDE A WORKING OUTCOME FOR ALL MULTI-

DISCIPLINARY DEFINABLE FEATURES OF WORK.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

FOR OFFICIAL USE ONLY (FOUO) 00-GI-000.V3

COVER AND PROJECT GENERAL

INFORMATION - VOLUME 3GDM of Oregon

1308 NE 134th St., Suite A

VANCOUVER, WA 98685

P: 541.426.4723

ADAM GODDIN, PE

A&E DESIGN

124 NORTH 29TH STREET, #100

BILLINGS, MONTANA 59101

406.248.2633

PAUL SIDERIUS, AIA

EHRM INFRASTRUCTURE

UPGRADES

FORT MEADE, SOUTH DAKOTA

568-21-701

GEN INFO

Project Director

JPRPSS11/05/2024

100% CONSTRUCTION

DOCUMENTSARCHITECT A/E:

FULLY SPRINKLERED

WWW.GDM-AE.COMhttps://www.ae.design/

Revisions: Date:

DRAWING INDEX

VOLUME 1

GENERAL INFORMATION

VOLUME 1 (Continued)

CIVIL

SHEET NO. SHEET NAME

CI0001 CIVIL - GENERAL NOTES

RC0001 CIVIL - EXISTING PLANS

CU0100 CIVIL - OVERALL PRIMARY FIBER OPTICS SITE PLAN

CU0101 CIVIL - PRIMARY FIBER OPTICS PLAN

CU0102 CIVIL - PRIMARY FIBER OPTICS PLAN

CU0103 CIVIL - PRIMARY FIBER OPTICS PLAN

CU0104 CIVIL - PRIMARY FIBER OPTICS PLAN

CU0105 CIVIL - PRIMARY FIBER OPTICS PLAN

CU0106 CIVIL - PRIMARY FIBER OPTICS PLAN

CU0107 CIVIL - PRIMARY FIBER OPTICS PLAN

CU0108 CIVIL - PRIMARY FIBER OPTICS PLAN

CU0109 CIVIL - PRIMARY FIBER OPTICS PLAN

CU0110 CIVIL - PRIMARY FIBER OPTICS PLAN

CU0111 CIVIL - PRIMARY FIBER OPTICS PLAN

CU0300 CIVIL - PRIMARY FIBER OPTICS PROFILES

CU0301 CIVIL - PRIMARY FIBER OPTICS PROFILES

CU0302 CIVIL - PRIMARY FIBER OPTICS PROFILES

CU0303 CIVIL - PRIMARY FIBER OPTICS PROFILES

CU0304 CIVIL - PRIMARY FIBER OPTICS PROFILES

CU0305 CIVIL - PRIMARY FIBER OPTICS PROFILES

CJ0001 CIVIL - DETAILS

CJ0002 CIVIL - DETAILS

CE0100 CIVIL - OVERALL ELECTRICAL SITE PLAN

CE0101 CIVIL - ELECTRICAL SITE PLAN

CG0100 GRADING PLAN - BLDG 145

CG0200 GRADING PLAN - BLDG T-296

STRUCTURAL

SHEET NO. SHEET NAME

SN001 STRUCTURAL NOTES

SN001 STRUCTURAL NOTES

145-SF-101 FOUNDATION PLAN - BUILDING 145

145-SF-102 FIRST FLOOR FRAMING PLAN - BUILDING 145

145-SD-101 STRUCTURAL DETAILS - BUILDING 145

T296-SF-101 FOUNDATION & ROOF FRAMING PLANS- BUILDING T296

ARCHITECTURAL

MECHANICAL

SHEET NO. SHEET NAME

MG-001 MECHANICAL LEGENDS & ABBREVIATIONS

MG-002 MECHANICAL SCHEDULES

MG-003 MECHANICAL SCHEDULES

MG-004 MECHANICAL SITE PLAN

MG-005 MECHANICAL DETAILS

MG-006 MECHANICAL DETAILS

000-MH-001 MECHANICAL SITE PLAN

040-MD-011 040 - MECHANICAL DEMOLITION - OVERALL

040-MH-011 040 - MECHANICAL REMODEL - OVERALL

046-MD-011 046 - MECHANICAL DEMOLITION - OVERALL

046-MH-011 046 - MECHANICAL REMODEL - OVERALL

048-MD-011 048 - MECHANICAL DEMOLITION - OVERALL

048-MH-011 048 - MECHANICAL REMODEL - OVERALL

050-MD-011 050 - MECHANICAL DEMOLITION - OVERALL

050-MH-011 050 - MECHANICAL REMODEL - OVERALL

053-MD-011 053 - MECHANICAL DEMOLITION - OVERALL

053-MH-011 053 - MECHANICAL REMODEL - OVERALL

088-MD-011 088 - MECHANICAL DEMOLITION - OVERALL

088-MH-011 088 - MECHANICAL REMODEL - OVERALL

089-MD-011 089 - MECHANICAL DEMOLITION - OVERALL

089-MH-011 089 - MECHANICAL REMODEL - OVERALL

090-MD-011 090 - MECHANICAL DEMOLITION - OVERALL

090-MH-011 090 - MECHANICAL REMODEL - OVERALL

110-MD-011 110 - MECHANICAL DEMOLITION - OVERALL

110-MH-011 110 - MECHANICAL REMODEL - OVERALL

113-MD-001 113 - MECHANICAL DEMOLITION - BASEMENT - OVERALL

113-MD-011 113 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL

113-MD-012 113 - MECHANICAL DEMOLITION - SECOND FLOOR - OVERALL

113-MD-013 113 - MECHANICAL DEMOLITION - UPPER ROOF - OVERALL

113-MD-014 113 - ENLARGED DEMOLITION PLANS

113-MD-015 113 - ENLARGED DEMOLITION PLANS

113-MH-001 113 - MECHANICAL REMODEL - BASEMENT - OVERALL

113-MH-011 113 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL

113-MH-012 113 - MECHANICAL REMODEL - SECOND FLOOR - OVERALL

113-MH-013 113 - MECHANICAL REMODEL - UPPER ROOF - OVERALL

113-MH-014 113 - ENLARGED REMODEL PLANS

113-MH-015 113 - ENLARGED REMODEL PLANS

137-MD-011 137 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL

137-MH-011 137 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL

144-MH-011 144 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL

145-MD-011 145 - MECHANICAL DEMOLITION - OVERALL

145-MD-012 145 - ENLARGED DEMOLITION PLANS

145-MD-013 145 - ENLARGED DEMOLITION PLAN

145-MD-014 145 - ENLARGED DEMOLITION PLAN

145-MD-015 145 - ENLARGED DEMOLITION PLAN

145-MH-011 145 - MECHANICAL REMODEL - OVERALL

145-MH-012 145 - ENLARGED REMODEL PLANS

145-MH-013 145 - ENLARGED REMODEL PLANS

145-MH-014 145 - ENLARGED REMODEL PLANS

145-MH-015 145 - ENLARGED REMODEL PLANS

145-MH-016 145 - ENLARGED REMODEL PLANS

145-MH-017 145 - ENLARGED REMODEL PLANS

145-MH-020 145 - MECHANICAL REMODEL OVERALL

145-MH-021 145 - ENLARGED REMODEL PLANS

146-MD-011 146 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL

146-MH-011 146 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL

147-MD-011 147 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL

147-MH-011 147 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL

147-MH-012 147 - MECHANICAL REMODEL - ROOF - OVERFLOW

148-MD-011 148 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL

148-MD-012 148 - ENLARGED MECHANICAL DEMOLITION PLANS

148-MH-011 148 - MECHANICAL REMODEL - ROOF - OVERALL

148-MH-012 148 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL

148-MH-013 148 - ENLARGED MECHANICAL REMODEL PLANS

T171-MD-011 T171 - MECHANICAL DEMOLITION - OVERALL

T171-MH-011 T171 - MECHANICAL REMODEL - OVERALL

T296-MD-011 T296 - MECHANICAL DEMOLITION - OVERALL

T296-MH-011 T296 - MECHANICAL REMODEL - OVERALL

ELECTRICAL

SHEET NO. SHEET NAME

000-EG-001 LEGEND, ABBREVIATION LIST, AND GENERAL NOTES

000-ES-001 POWER SITE PLAN

040-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR

040-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR

046-ED-0B1 ELECTRICAL DEMOLITION PLAN - BASEMENT

046-EP-0B1 ELECTRICAL REMODEL PLAN - BASEMENT

048-ED-0B1 ELECTRICAL DEMOLITION PLAN

048-EP-0B1 ELECTRICAL REMODEL PLANS

050-ED-011 ELECTRICAL DEMOLITION PLAN

050-EP-011 ELECTRICAL REMODEL PLAN

053-ED-0B1 ELECTRICAL DEMOLITION PLANS

053-EP-0B1 ELECTRICAL REMODEL PLAN - BASEMENT AND FIRST FLOOR

053-EP-021 ELECTRICAL REMODEL PLAN - SECOND FLOOR AND ATTIC

088-ED-011 ELECTRICAL DEMOLITION PLAN

088-EP-011 ELECTRICAL REMODEL PLAN

089-ED-011 ELECTRICAL DEMOLITION PLAN

089-EP-011 ELECTRICAL REMODEL PLAN

090-ED-011 ELECTRICAL DEMOLITION PLAN

090-EP-011 ELECTRICAL REMODEL PLAN

110-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR

110-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR

113-ED-001 ELECTRICAL DEMOLITION PLAN - BASEMENT LAYOUT

113-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR LAYOUT

113-ED-012 ELECTRICAL DEMOLITION PLAN - 1ST FLOOR ENLARGED PLANS

113-ED-021 ELECTRICAL DEMOLITION PLAN - SECOND FLOOR LAYOUT

113-EP-001 ELECTRICAL REMODEL PLAN - BASEMENT LAYOUT

113-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR LAYOUT

113-EP-012 ELECTRICAL REMODEL PLAN - FIRST FLOOR ENLARGED PLANS

113-EP-021 ELECTRICAL REMODEL PLAN - SECOND FLOOR LAYOUT

137-ED-011 ELECTRICAL DEMOLITION PLANS

137-EP-011 ELECTRICAL REMODEL PLANS

145-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR

145-ED-012 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR ENLARGED ROOMS

145-ED-021 ELECTRICAL DEMOLITION PLAN - SECOND & THIRD FLOORS

145-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR

145-EP-012 ELECTRICAL REMODEL PLAN - FIRST FLOOR ENLARGED PLANS

145-EP-013 ELECTRICAL REMODEL PLAN - FIRST FLOOR ENLARGED PLANS

145-EP-021 ELECTRICAL REMODEL PLAN - SECOND & THIRD FLOORS

145-EP-100 DATA CENTER ELECTRICAL DETAILS

146-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR

146-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR

147-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR

147-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR

148-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR

148-ED-012 ELECTRICAL DEMOLITION PLAN - ENLARGED ROOMS

148-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR

148-EP-012 ELECTRICAL REMODEL PLAN - ENLARGED ROOMS

T171-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR

T171-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR

T296-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR

T296-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR

000-EK-001 POWER AND ELEVATION SCHEMATIC FOR TR RACK

000-EK-002 POWER AND ELEVATION SCHEMATIC FOR TR RACK

040-EJ-001 BUILDING 40 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED

046-EJ-001 BUILDING 46 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED

048-EJ-001 BUILDING 48 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED

050-EJ-001 BUILDING 50 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED

053-EJ-001 BUILDING 53 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED

088-EJ-001 BUILDING 88 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED

089-EJ-001 BUILDING 89 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED

090-EJ-001 BUILDING 90 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED

110-EJ-001 BUILDING 110 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED

113-EJ-001 BUILDING 113 ELECTRICAL ONE-LINE DIAGRAM

113-EJ-002 BUILDING 113 ELECTRICAL PANEL SCHEDULES

137-EJ-001 BUILDING 137 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED

VOLUME 3

GENERAL INFORMATION

VOLUME 2 (Continued)

TELECOMMUNICATIONS (Continued)

SHEET NO. SHEET NAME

T171-TD-011 T171 - TELECOM DEMOLITION PLAN - FIRST FLOOR

T171-TN-010 T171 - TELECOM DISTANCE ASSESSMENT

T171-TN-011 T171 - TELECOM REMODEL PLAN - FIRST FLOOR

T296-TD-011 T296 - TELECOM DEMOLITION PLANS

T296-TN-010 T296 - TELECOM DISTANCE ASSESSMENT

T296-TN-011 T296 - TELECOM REMODEL PLANS

TJ-001 EXISTING TELECOMM RACK ELEVATIONS

TJ-002 EXISTING TELECOMM RACK ELEVATIONS

TJ-003 EXISTING TELECOMM RACK ELEVATIONS

TJ-004 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-005 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-006 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-007 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-008 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-009 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-010 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-011 FIBER ONE LINE DIAGRAM

TJ-012 COPPER ONE LINE DIAGRAM

TJ-013 TELECOMM CABINET ELEVATIONS - MDA and ER

TJ-014 TELECOMM CABINET ELEVATIONS - HDA

TJ-015 MCR MDA HDA CABLE ONE LINE

TJ-016 TELECOMM DETAILS

TJ-017 TELECOMM DETAILS

TJ-018 TELECOMM DETAILS

TJ-019 TELECOMM MCR CABINET DETAILS

TJ-020 TELECOMM J-HOOK DETAILS

TJ-021 TELECOMM BONDING DETAILS

TJ-022 TELECOMM BONDING DETAILS

TJ-023 TELECOMM BONDING DETAILS

TJ-024 TELECOMM BONDING DETAILS

TJ-025 TELECOMM BONDING DETAILS

TJ-026 TELECOMM RACK ELEVATIONS

TJ-027 TELECOMM RACK ELEVATIONS

TJ-028 TELECOMM RACK ELEVATIONS

TJ-029 TELECOMM CABLE SCHEDULES

TJ-030 TELECOMM CABLE SCHEDULES

VOLUME 2

GENERAL INFORMATION

TELECOMMUNICATIONS

SHEET NO. SHEET NAME

00-TG-001 LEGEND, ABBREVIATIONS, AND GENERAL NOTES

00-TS-000 TELECOMMUNICATIONS OVERALL SITE PLAN

00-TS-001 TELECOMMUNICATIONS SITE PLAN

00-TS-002 TELECOMMUNICATIONS SITE PLAN

00-TS-003 TELECOMMUNICATIONS SITE PLAN

00-TS-004 TELECOMMUNICATIONS SITE PLAN

00-TS-005 TELECOMMUNICATIONS SITE PLAN

00-TS-006 TELECOMMUNICATIONS SITE PLAN

040-TD-011 040 - TELECOM DEMOLITION PLAN - FIRST FLOOR

040-TN-010 040 - TELECOM DISTANCE ASSESSMENT

040-TN-011 040 - TELECOM REMODEL PLAN - FIRST FLOOR

046-TD-0B1 046 - TELECOM DEMOLITION PLANS

046-TN-0B0 046 - TELECOM DISTANCE ASSESSMENT

046-TN-0B1 046 - TELECOM REMODEL PLANS

048-TD-0B1 048 - TELECOM DEMOLITION PLANS

048-TN-0B0 048 - TELECOM DISTANCE ASSESSMENT

048-TN-0B1 048 - TELECOM REMODEL PLANS

050-TD-011 050 - TELECOM DEMOLITION PLAN

050-TN-010 050 - TELECOM DISTANCE ASSESSMENT

050-TN-011 050 - TELECOM REMODEL PLAN

053-TD-0B1 053 - TELECOM DEMOLITION PLAN - BASEMENT AND FIRST FLOOR

053-TD-021 053 - TELECOM DEMOLITION PLAN - SECOND FLOOR AND ATTIC

053-TN-0B0 053 - TELECOM DISTANCE ASSESSMENT

053-TN-0B1 053 - TELECOM REMODEL PLAN - BASEMENT AND FIRST FLOOR

053-TN-021 053 - TELECOM REMODEL PLAN - SECOND FLOOR

088-TD-011 088 - TELECOM DEMOLITION PLAN

088-TN-010 088 - TELECOM DISTANCE ASSESSMENT

088-TN-011 088 - TELECOM REMODEL PLAN

089-TD-011 089 - TELECOM DEMOLITION PLAN

089-TN-010 088 - TELECOM DISTANCE ASSESSMENT

089-TN-011 089 - TELECOM REMODEL PLAN

090-TD-011 090 - TELECOM DEMOLITION PLAN

090-TN-010 090 -TELECOM DISTANCE ASSESSMENT

090-TN-011 090 -TELECOM REMODEL PLAN

110-TD-011 110 - TELECOM DEMOLITION PLAN - FIRST FLOOR

110-TN-011 110 - TELECOM REMODEL PLAN - FIRST FLOOR

113-TD-001 113 - TELECOM DEMOLITION PLAN - BASEMENT LAYOUT

113-TD-002 113 - TELECOM DEMOLITION PLAN - BASEMENT NORTH

113-TD-003 113 - TELECOM DEMOLITION PLAN - BASEMENT EAST

113-TD-004 113 - TELECOM DEMOLITION PLAN - BASEMENT SOUTH

113-TD-011 113 - TELECOM DEMOLITION PLAN - FIRST FLOOR LAYOUT

113-TD-012 113 - TELECOM DEMOLITION - FIRST FLOOR NORTH

113-TD-013 113 - TELECOM DEMOLITION - FIRST FLOOR CENTRAL

113-TD-014 113 - TELECOM DEMOLITION - FIRST FLOOR EAST

113-TD-015 113 - TELECOM DEMOLITION - FIRST FLOOR SOUTH

113-TD-021 113 - TELECOM DEMOLITION - SECOND FLOOR LAYOUT

113-TD-022 113 - TELECOM DEMOLITION - SECOND FLOOR NORTH

113-TN-000 113 - TELECOM REMODEL - BASEMENT FIBER PLAN

113-TN-001 113 - TELECOM DISTANCE ASSESSMENT - BASEMENT

113-TN-002 113 - TELECOM REMODEL - BASEMENT NORTH

113-TN-003 113 - TELECOM REMODEL - BASEMENT EAST

113-TN-004 113 - TELECOM REMODEL - BASEMENT SOUTH

113-TN-010 113 - TELECOM REMODEL - FIRST FLOOR FIBER PLAN

113-TN-011 113 - TELECOM DISTANCE ASSESSMENT - FIRST FLOOR

113-TN-012 113 - TELECOM REMODEL - FIRST FLOOR NORTH

113-TN-013 113 - TELECOM REMODEL - FIRST FLOOR CENTRAL

113-TN-014 113 - TELECOM REMODEL - FIRST FLOOR EAST

113-TN-015 113 - TELECOM REMODEL - FIRST FLOOR SOUTH

113-TN-021 113 - TELECOM REMODEL - SECOND FLOOR FIBER PLAN

113-TN-022 113 - TELECOM REMODEL - SECOND NORTH

137-TD-011 137 - TELECOM DEMOLITION PLANS

137-TN-010 137 - TELECOM DISTANCE ASSESSMENT

137-TN-011 137 - TELECOM REMODEL PLANS

144-TD-011 144 - TELECOM DEMOLITION PLAN - FIRST FLOOR

144-TN-011 144 - TELECOM REMODEL PLAN - FIRST FLOOR

145-TD-011 145 - TELECOM DEMOLITION PLAN - FIRST FLOOR SOUTH

145-TD-012 145 - TELECOM DEMOLITION PLAN - FIRST FLOOR NORTH

145-TD-021 145 - TELECOM DEMOLITION PLAN - SECOND FLOOR SOUTH

145-TD-022 145 - TELECOM DEMOLITION PLAN - SECOND FLOOR NORTH

145-TD-031 145 - TELECOM DEMOLITION PLAN - THIRD FLOOR SOUTH

145-TD-032 145 - TELECOM DEMOLITION PLAN - THIRD FLOOR NORTH

145-TN-010 145 - TELECOM DISTANCE ASSESSMENT - FIRST FLOOR

145-TN-011 145 - TELECOM REMODEL PLAN - FIRST FLOOR FIBER ROUTING -

A SIDE

145-TN-012 145 - TELECOM REMODEL PLAN - FIRST FLOOR FIBER ROUTING -

B SIDE

145-TN-013 145 - TELECOM REMODEL PLAN - FIRST FLOOR SOUTH

145-TN-014 145 - TELECOM REMODEL PLAN - FIRST FLOOR NORTH

145-TN-015 145 - MCR DETAILS

145-TN-021 145 - TELECOM DISTANCE ASSESSMENT - SECOND & THIRD FLRS

145-TN-022 145 - TELECOM REMODEL PLAN - SECOND FLOOR SOUTH

145-TN-023 145 - TELECOM REMODEL PLAN - SECOND FLOOR NORTH

145-TN-031 145 - TELECOM REMODEL PLAN - THIRD FLOOR SOUTH

145-TN-032 145 - TELECOM REMODEL PLAN - THIRD FLOOR NORTH

146-TD-011 146 - TELECOM DEMOLITION PLAN - FIRST FLOOR

146-TN-0B1 146 - TELECOM REMODEL PLAN - BASEMENT

146-TN-010 146 - TELECOM DISTANCE ASSESSMENT

146-TN-011 146 - TELECOM REMODEL PLAN - FIRST FLOOR

147-TD-011 147 - TELECOM DEMOLITION PLAN - FIRST FLOOR

147-TN-010 147 - TELECOM DISTANCE ASSESSMENT

147-TN-011 147 - TELECOM REMODEL PLAN - FIRST FLOOR

148-TD-011 148 - TELECOM DEMOLITION PLAN - FIRST FLOOR

148-TD-012 148 - TELECOM DEMOLITION PLAN - FIRST FLOOR SECTOR A

148-TD-013 148 - TELECOM DEMOLITION PLAN - FIRST FLOOR SECTOR B

148-TD-014 148 - TELECOM DEMOLITION PLAN - FIRST FLOOR SECTOR C

148-TD-015 148 - TELECOM DEMOLITION PLAN - FIRST FLOOR SECTOR E

148-TD-016 148 - TELECOM DEMOLITION PLAN - FIRST FLOOR SECTOR G

148-TN-010 148 - TELECOM DISTANCE ASSESSMENT

148-TN-011 148 - TELECOM REMODEL PLAN - FIRST FLOOR FIBER PLAN

148-TN-012 148 - TELECOM REMODEL PLAN - FIRST FLOOR SECTOR A

148-TN-013 148 - TELECOM REMODEL PLAN - FIRST FLOOR SECTOR B

148-TN-014 148 - TELECOM REMODEL PLAN - FIRST FLOOR SECTOR D

148-TN-015 148 - TELECOM REMODEL PLAN - FIRST FLOOR SECTOR E

148-TN-016 148 - TELECOM REMODEL PLAN - FIRST FLOOR SECTOR G

ARCHITECTURAL (Continued) ELECTRICAL (Continued)

145-EJ-001 BUILDING 145 ELECTRICAL ONE-LINE DIAGRAM

145-EJ-002 BUILDING 145 ELECTRICAL ONE-LINE DIAGRAM

145-EJ-003 BUILDING 145 ELECTRICAL PANEL SCHEDULES

145-EJ-004 BUILDING 145 ELECTRICAL PANEL SCHEDULES

146-EJ-001 BUILDING 146 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED

147-EJ-001 BUILDING 145 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED

148-EJ-001 BUILDING 148 ELECTRICAL ONE-LINE-DIAGRAM & PANEL SCHED

T171-EJ-001 BUILDING T171 ELECTRICAL ONE-LINE-DIAGRAM & PANEL SCHED

T296-EJ-001 BUILDING T296 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED

FIRE PROTECTION

SHEET NO. SHEET NAME

00-FP-001 FIRE PROTECTION GENERAL GDM NOTES, DIAGRAM, AND LEGEND

00-FP-002 FIRE EXTINGUISHER SIGNAGE REQUIREMENTS

MCR-FP-101 MCR FIRE ALARM FLOOR PLAN

MCR-FP-102 FIRE BARRIER PLAN – MCR

MCR-FP-103 FIRE SPRINKLER HAZARD CLASSIFICATION PLAN – MCR

MCR-FP-104 CLEAN AGENT PLAN - MCR

MCR-FP-105 HYDRANT FLOW TEST INFORMATION

VOLUME 3 (Continued)

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

FOR OFFICIAL USE ONLY (FOUO) 00-GI-001.V3

DRAWING INDEX - VOLUME 3

GDM of Oregon

1308 NE 134th St., Suite A

VANCOUVER, WA 98685

P: 541.426.4723

ADAM GODDIN, PE

A&E DESIGN

124 NORTH 29TH STREET, #100

BILLINGS, MONTANA 59101

406.248.2633

PAUL SIDERIUS, AIA

EHRM INFRASTRUCTURE

UPGRADES

FORT MEADE, SOUTH DAKOTA

568-21-701

GEN INFO

Project Director

JPRPSS11/05/2024

100% CONSTRUCTION

DOCUMENTSARCHITECT A/E:

FULLY SPRINKLERED

WWW.GDM-AE.COMhttps://www.ae.design/

SHEET NO. SHEET NAME

40-AE-201 40-FLOOR PLANS

46-AE-201 46-FLOOR PLANS

48-AE-201 48-FLOOR PLANS

50-AE-201 50-FLOOR PLANS

53-AD-201 53-DEMOLITION FLOOR PLANS

53-AE-201 53-BASEMENT AND LEVEL 1 FLOOR PLANS

53-AE-202 53-LEVEL 2 AND ATTIC FLOOR PLANS

53-AE-301 53-ENLARGED PLANS AND ELEVATIONS

88-AE-201 88-LEVEL 1 FLOOR PLANS AND ELEVATIONS

88-AE-202 88-LEVEL 2 FLOOR PLANS

89-AD-201 89-DEMOLITION FLOOR PLANS

89-AE-200 89-FLOOR PLANS

89-AE-301 89-ENLARGED PLANS AND ELEVATIONS

90-AD-201 90-DEMOLITION FLOOR PLANS

90-AE-201 90-LEVEL 1 PLANS AND ELEVATIONS

90-AE-202 90-LEVEL 2 FLOOR PLAN

103-AE-201 103-LEVEL 1 FLOOR PLAN

110-AE-201 110-FLOOR PLANS

113-AD-200 113-BASEMENT DEMOLITION PLAN

113-AD-201 113-LEVEL 1 DEMOLITION PLAN

113-AD-202 113-LEVEL 2 DEMOLITION PLAN

113-AE-200 113-BASEMENT FLOOR PLAN

113-AE-201 113-LEVEL 1 FLOOR PLAN

113-AE-202 113-LEVEL 2 FLOOR PLAN

113-AE-203 113-ROOF AND PENTHOUSE FLOOR PLAN

113-AE-204 CONNECTOR CORRIDORS FLOOR PLANS

113-AE-301 113-ENLARGED PLANS AND ELEVATIONS

113-AE-302 113-ENLARGED PLANS AND ELEVATIONS

113-AE-303 113-ENLARGED PLANS AND ELEVATIONS

137-AE-200 137-FLOOR PLANS

145-AD-201 145-DEMOLITION FLOOR PLAN

145-AD-202 145-DEMOLITION 2ND AND 3RD LEVEL PLANS

145-AE-201 145-LEVEL 1, LEVEL 2, AND LEVEL 3 FLOOR PLANS

145-AE-202 145-ROOF / PENTHOUSE AND TUNNEL FLOOR PLANS

145-AE-301 145-ENLARGED MCR PLANS

145-AE-302 145-ENLARGED OIT PLANS

145-AE-303 145-ENLARGED TR PLANS AND ELEVATIONS

145-AE-305 145-ENLARGED TR PLANS AND ELEVATIONS

145-AE-306 145-ENLARGED OFFICE / MAILROOM PLANS & ELEVS

145-AE-601 145-MCR ELEVATIONS

145-AE-602 145-SECTIONS AND DETAILS

145-AE-801 145-VERTICAL CIRCULATION

145-AE-802 145-STAIR, RAMP AND RAILING DETAILS

146-AE-201 146-FLOOR PLANS

SHEET NO. SHEET NAME

00-GI-000.V1 COVER AND PROJECT GENERAL INFORMATION - VOLUME 1

00-GI-001.V1 DRAWING INDEX AND PROJECT GENERAL NOTES - VOLUME 1

00-GI-002 PROJECT CODE SUMMARY & SCHEDULE FOR FINISHES

00-GI-003 PROJECT LOCATION MAPS & CAMPUS PLAN

00-GI-004 ICRA CLASSIFICATION PROCESS

00-GI-005 PROJECT ASSEMBLY TYPES

00-GI-006 DOOR SCHEDULE, TYPICAL CEILING AND DOOR DETAILS

00-GI-007 PARTITION DETAILS

00-GI-008 FIRE PROTECTION NOTES

SHEET NO. SHEET NAME

00-GI-000.V2 COVER AND PROJECT GENERAL INFORMATION - VOLUME 2

00-GI-001.V2 DRAWING INDEX- VOLUME 2

SHEET NO. SHEET NAME

00-GI-000.V3 COVER AND PROJECT GENERAL INFORMATION - VOLUME 3

00-GI-001.V3 DRAWING INDEX - VOLUME 3

SHEET NO. SHEET NAME

146-AE-301 146-ENLARGED PLANS AND ELEVATIONS

148-AD-201 148-LEVEL 1 DEMOLITION PLAN

148-AE-201 148-LEVEL 1 FLOOR PLAN

148-AE-202 148 ROOF PLAN

148-AE-301 148-ENLARGED PLANS AND TR ELEVATIONS

148-AE-302 148-ENLARGED PLANS AND TR ELEVATIONS

148-AE-303 148-ENLARGED PLANS AND TR ELEVATIONS

T171-AE-201 T171-FLOOR PLANS

T296-AD-201 T296-LEVEL 1 DEMOLITION PLAN

T296-AE-201 T296-FLOOR PLANS AND ELEVATIONS

T296-AE-501 T296-BUILDING ELEVATIONS AND DETAILS

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

FOR OFFICIAL USE ONLY (FOUO) 000-EG-001

LEGEND, ABBREVIATIONS, AND

GENERAL REQUIREMENTSGDM

1308 NE 134TH ST SUITE A

VANCOUVER, WA 98685

541.436.4723

MICHAEL REBSTOCK, PE

GDM

1308 NE 134TH ST SUITE A

VANCOUVER, WA 98685

541.436.4723

ADAM GODDIN, PE

EHRM INFRASTRUCTURE

UPGRADES

FORT MEADE, SOUTH DAKOTA

568-21-701

Project Director

AJWMER11/05/2024

100% CONSTRUCTION

DOCUMENTSA/EELECTRICAL ENGINEER

FULLY SPRINKLERED

SYMBOL

SYMBOL

LEGEND

DESCRIPTION

S

S

S

T

S

P

K

G

1. PROVIDE COMPLETE WORK FOR REQUIREMENTS AS DESCRIBED

ON LEGEND.

2. ALL FLUSH MOUNT EQUIPMENT, CABINETS, AND PANELBOARDS

SHALL HAVE FACTORY TYPE FLUSH MOUNT TRIM KIT FOR

COMPLETE INSTALLATION.

3. PROVIDE ALL MATERIAL AND LABOR RELATED TO THE

INSTALLATION OF ELECTRICAL DEVICES PENETRATING INTO OR

THROUGH FIRE RATED WALLS, FLOORS, OR CEILINGS SUCH THAT

THE FIRE RATING OF THE WALL IS MAINTAINED.

4. DO NOT TAKE MEASUREMENTS FROM PLANS FOR DEVICE

LOCATIONS. FIELD VERIFY EXACT DEVICE, EQUIPMENT

LOCATIONS, AND MOUNTING HEIGHTS WITH OWNER'S

REPRESENTATIVE FOR PROPER INSTALLATION.

5. BRANCH CIRCUIT HOME RUNS ARE NOT INDICATED WITH

NUMBER OF CONDUCTORS/ WIRES. PROVIDE ALL BRANCH

CIRCUIT CONDUCTORS/ WIRES AS REQUIRED FOR COMPLETE

OPERATION OF ALL DEVICES AND EQUIPMENT INDICATED.

PROVIDE INDIVIDUAL NEUTRALS FOR EACH CIRCUIT.

6. REFER TO EQUIPMENT SCHEDULES FOR WIRING

REQUIREMENTS NOT INDICATED ON POWER PLANS.

7. PROVIDE ALL WIRING TO PANELS AND POWER DISTRIBUTION

EQUIPMENT IN ACCORDANCE WITH ONE-LINE POWER DIAGRAM.

8. INCLUDE COST OF PROVIDING ALL ELECTRICAL CONNECTIONS

AS REQUIRED FOR FULL OPERATION OF ALL OWNER FURNISHED,

CONTRACTOR INSTALLED EQUIPMENT. SEE ARCHITECTURAL

DRAWINGS TO VERIFY LOCATIONS.

9. COORDINATE PAINTING WORK OF ELECTRICAL ITEMS WITH

GENERAL CONTRACTOR. SEE PAINTING SPECIFICATIONS FOR

REQUIREMENTS.

10. PROVIDE SEPARATE NEUTRALS FOR ALL BRANCH CIRCUITS.

11. WIRING SYSTEMS SHALL BE CONCEALED WHERE POSSIBLE,

EXCEPT IN ELECTRICAL ROOM, MECHANICAL ROOM, AND UTILITY

AREAS, OR AS OTHERWISE NOTED.

12. PROVIDE SURFACE METAL RACEWAY AS WIRING METHOD

WHERE OUTLETS AND WIRING CANNOT BE CONCEALED.

13. EXTERIOR MOUNTED ELECTRICAL DEVICES (SUCH AS

DISCONNECT SWITCH, STARTER, SPEAKER, FIRE ALARM HORN,

ETC.) AND COVERS SHALL BE NEMA-3R WEATHERPROOF RATED.

14. PROVIDE CONDUIT AND WIRE FROM ALL HVAC UNITS 2000 CFM

OR ABOVE TO FIRE ALARM PANEL FOR HVAC UNIT CONTROL.

CONDUIT AND WIRE MAY NOT BE INDICATED IN ELECTRICAL

DRAWINGS.

15. PROVIDE TEMPORARY POWER FOR CONSTRUCTION.

TEMPORARY POWER MAY BE IN THE FORM OF PORTABLE

GENERATOR SET; CONNECTION TO UTILITIES COMPANY'S

POWER POLE OR EXISTING FACILITY'S ELECTRICAL SYSTEM.

16. VERIFY WITH CABINET INSTALLER FOR ALL CABINET

LOCATIONS, DIMENSIONS, AND COUNTER HEIGHTS PRIOR TO

OUTLET ROUGH-IN. OUTLETS LOCATED ABOVE COUNTER SHALL

BE INSTALLED TO CENTERLINE ABOVE COUNTERTOP

BACKSPLASH, AS DIRECTED OR INDICATED IN SPECIFICATIONS.

VERIFY HEIGHT WITH OWNER'S REPRESENTATIVE OF ANY

LOCATION THAT CANNOT ACCOMMODATE MOUNTING HEIGHT.

17. INSTALLATION OF UNDERGROUND WIRING SYSTEMS SHALL

INCLUDE EXCAVATION, CUTTING, PATCHING, BACKFILL, AND

COMPACTION. DO NOT CUT OR DAMAGE ANY EXISTING UTILITIES,

STRUCTURAL MEMBERS, OR BUILDING FOUNDATIONS. VERIFY

EXISTING CONDITIONS PRIOR TO EXCAVATION WORK. INCLUDE

COST FOR UNDERGROUND LOCATOR SERVICE TO IDENTIFY

LOCATIONS OF EXISTING COMPONENTS. HAND EXCAVATE IN

LOCATIONS WHERE EXISTING UNDERGROUND COMPONENTS

ARE SUBJECT TO DAMAGE. REPAIR DAMAGE TO EXISTING

UTILITIES OR BUILDING STRUCTURE TO OWNER'S SATISFACTION

AT THE CONTRACTORS EXPENSE.

18. ALL ONE-LINE DIAGRAMS AND RACEWAY ROUTING ARE

SCHEMATIC AND DO NOT SHOW EXACT PHYSICAL

ARRANGEMENT OF EQUIPMENT ON DRAWINGS. ALL JUNCTION

BOXES, AND PULLBOXES SHOWN ARE MINIMUM REQUIREMENTS.

PROVIDE FITTINGS AND PULLBOXES OF ADEQUATE SIZE IN

RACEWAY SYSTEMS WHEREVER NECESSARY OR REQUIRED BY

NATIONAL ELECTRICAL CODE. PROVIDE EXPANSION JOINT

FITTINGS FOR RACEWAY PASSING THROUGH NEW OR EXISTING

EXPANSION JOINTS INSTALLED BETWEEN BUILDINGS. VERIFY

EXACT LOCATIONS AND DETAILS OF EXPANSION JOINTS PRIOR

TO WORK. COORDINATE ALL RACEWAY ROUTING, PULLBOXES,

AND EQUIPMENT LOCATIONS WITH OTHER TRADES TO AVOID

CONFLICTS OF EQUIPMENT INSTALLATIONS. ALL EMPTY

CONDUITS SHALL HAVE PULL WIRES.

19. CONDUIT OR OTHER ELECTRICAL COMPONENTS SHALL NOT BE

INSTALLED IN STRUCTURAL CONCRETE UNLESS SPECIFICALLY

INDICATED ON THE DRAWINGS OR APPROVED BY STRUCTURAL

ENGINEER.

20. PROVIDE ELECTRICAL CONNECTION FOR ALL FAN SPEED

SWITCHES. COORDINATE LOCATION OF CONNECTIONS WITH

MECHANICAL CONTRACTOR.

C

C

WAP

CR

C

A

A

F

OC

LV

ATS

(N)MH-#X

(E)MH-#X

AHU-01

A

A

ABBREVIATION LIST GENERAL REQUIREMENTS GENERAL REQUIREMENTS - CONT.

IS

IH

SD

S

REX

J

GAP

A, AMPAMPERE

ACP ACCESSIBLE CARD PATH

ADA AMERICAN DISABILITY ACT

AF AMP FRAME

AFC AVAILABLE FAULT CURRENT

AFCI ARC FAULT CIRCUIT INTERRUPTER

AFF ABOVE FINISHED FLOOR

AG ABOVE GROUND

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AL ALUMINUM

BCT BONDING CONDUCTOR FOR TLECOMMUNICATIONS

BKR BREAKER

C CONDUIT

CKT CIRCUIT

CO CONDUIT AND PULL-ROPE ONLY

COMM COMMUNICATION

CTRL CONTROL

CU COPPER

(E) EXISTING

EC, E.C. ELECTRICAL CONTRACTOR

ELEC ELECTRICAL

EM EMERGENCY

EQPT EQUIPMENT

(F) FUTURE

FA FIRE ALARM

FDR FEEDER

G, GND GROUND

GC, G.C. GENERAL CONTRACTOR

HH HANDHOLE

IDF INTERMEDIATE DISTRIBUTION FRAME

J-BOX JUNCTION BOX

LCP LIGHTING CONTROL PANEL

LIU LINE INTERFACE UNIT

LTG LIGHTING

LTS LIGHTS

LV LOW-VOLTAGE

MH MANHOLE

MM MULTI-MODE

N NEUTRAL

NEC NATIONAL ELECTRICAL CODE

OC ON-CENTER

OFCI OWNER-FURNISHED CONTRACTOR-INSTALLED

OFOI OWNER-FURNISHED OWNER-INSTALLED

OL OVERLOAD

P POLE

PB PULLBOX, PUSHBUTTON

POS POINT OF SERVICE

PRI PRIMARY

(G) REVISED

REF REFERENCE, REFRIGERATOR

SEC SECONDARY

SM SINGLE-MODE

SOW SCOPE OF WORK

SPECSSPECIFICATIONS

SS STAINLESS STEEL

SW SWITCH

TEL TELEPHONE

TC TELECOMMUNICATION

TGB TELECOMMUNICATIONS BUS BAR

TMGB TELECOMMUNICATIONS MAIN GROUNDING BUS BAR

THRU THROUGH

(TYP) TYPICAL

UG UNDERGROUND

UNO UNLESS NOTED OTHERWISE

VLT VAULT

W WIRE, WATT

WP WEATHERPROOF

(X) EXISTING TO BE REMOVED

21. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND

RETURN FURNITURE, FIXTURES, AND EQUIPMENT WITHIN SPACES AS

REQUIRED TO COMPLETE EACH DAY'S WORK. THE VA WILL REMOVE,

OR SECURE, PHI, PPI, AND PERSONAL PROPERTY. COORDINATE THIS

WORK WITH THE COR.

22. PARTICULAR ATTENTION SHALL BE GIVEN TO THE PROTECTION OF

EXISTING STRUCTURE AND FINISHES TO PREVENT ANY DAMAGE OF

EXISTING FINISHES. ANY ACCIDENTAL DAMAGE INCURRED TO

EXISTING CONDITIONS WILL BE THE RESPONSIBILITY OF THE

CONTRACTOR TO REPAIR OR CORRECT.

23. COORDINATE ALL ELECTRICAL WORK WITH OTHER TRADES TO

INSURE PROPER AND ADEQUATE INTERFACE OF THEIR WORK WITH

THE WORK SHOWN ON THESE DOCUMENTS. CONTRACTOR SHALL

PROVIDE COORDINATED SHOP DRAWINGS FOR APPROVAL PRIOR TO

FABRICATION AND INSTALLATION.

NEW MANHOLE

EXISTING MANHOLE

SITE PLAN OVERHEAD POWER LINE

TELECOMMUNICATIONS OUTLET, SUBNUMBER=QUANTITY OF DROPS

TELECOMMUNICATIONS OUTLET, WIRELESS ACCESS POINT

SECURITY SYSTEM CARD READER/KEYPAD

INERGEN SYSTEM SMOKE DETECTOR

INERGEN SYSTEM HEAD

FIRE ALARM SMOKE DETECTOR

PAGING SYSTEM

SPEAKER

CAMERA

EXISTING REQUEST

TO

EXIT

TR ROOM

FIRE ALARM STROBE LIGHT

XXX-X-XX-PX

RACK NUMBER

PATCH PANEL LOCATON (RU#)

PORT NUMBER

TYPICAL TELECOMM OUTLET IDENTIFIERS:

TELECOMM OUTLET MOUNTED IN

FLOORBOX.

TELECOMMUNICATIONS OUTLET, VOICE ONLY

EQUIPMENT CALLOUT.

EQUIPMENT CONNECTION, SEE EQUIPMENT

CONNECTION SCHEDULES FOR SPECIFIC

REQUIREMENTS.

HOME RUN

SPECIAL PURPOSE RECEPTACLE

4 PLEX RECEPTACLE

LIGHTING OR POWER PANEL

CONDUIT CONCEALED IN GROUND OR FLOOR

CONDUIT CONCEALED IN CEILING OR WALL

FLUSH FLOOR BOX WITH DEVICES AS INDICATED

CODE SIZED JUNCTION BOX WITH COVER PLATE

DUPLEX RECEPTACLE, ISOLATED GROUND TYPE,

A = ABOVE COUNTER, E = EMERGENCY

DUPLEX RECEPTACLE, A = ABOVE COUNTER

DUPLEX RECEPTACLE, GFCI TYPE, A = ABOVE

COUNTER, E = EMERGENCY, IG = ISOLATED GROUND.

CONDUIT DOWN

4 PLEX RECEPTACLE, GFCI TYPE, A = ABOVE

COUNTER, E = EMERGENCY, IG = ISOLATED GROUND.

CONDUIT UP

FUSED DISCONNECT SWITCH

DISCONNECT SWITCH

SINGLE-POLE SWITCH

LIGHT FIXTURE, SEE SCHEDULE FOR TYPE

LIGHT FIXTURE, SEE SCHEDULE FOR TYPE

LIGHT FIXTURE, SHADING INDICATES EMERGENCY BATTERY BACKUP

EXIT LIGHT, SHADING INDICATES SIGN DIRECTION

WALL MOUNTED LIGHT, SEE SCHEDULE FOR TYPE

EXIT LIGHT WITH ARROWS, SHADING INDICATES SIGN DIRECTION

WALL MOUNT OCCUPANCY SENSOR SWITCH

LOW-VOLTAGE SWITCH

CEILING STRIP LIGHT FIXTURE, SEE SCHEDULE FOR TYPE

SITE PLAN PAD-MOUNTED TRANSFORMER

SITE PLAN LOOP FEED PAD-MOUNTED OIL SWITCH

SITE PLAN POWER POLE

SITE PLAN EXISTING UNDERGROUND ELECTRICAL DUCT

SITE PLAN PRIMARY UNDERGROUND ELECTRICAL DUCT

KIRK KEY INTERLOCK

GENERATOR ANNUNCIATOR PANEL

SPECIAL EQUIPMENT CONNECTION

MOTOR CONNECTION

AUTOMATIC TRANSFER SWITCH

GENERATOR

Revisions: Date:

[33-2000] 5-SETS [4"C, 3-600KCM, 250KCM G] 2000 [750L] 6-SETS [4"C, 4-600KCM, 250KCM G] 2500

[33-1600] 4-SETS [4"C, 3-600KCM, #4/0G] 1600 [500L] 4-SETS [4"C, 4-600KCM, #4/0G] 1600

[33-1200] 4-SETS [3"C, 3-350KCM, #3/0G] 1200 [300L] 3-SETS [4"C, 4-500KCM, #3/0G] 1000

[33-1000] 3-SETS [3"C, 3-500KCM, #2/0G] 1000 [225L] 3-SETS [3"C, 4-300KCM, #2/0G] 800

[33-800] 3-SETS [3"C, 3-300KCM, #1/0G] 800 [150L] 2-SETS [3"C, 4-350KCM, #2/0G] 600

[33-700] 2-SETS [3"C, 3-500KCM, #1/0G] 700 [112L] 2-SETS [2-1/2"C, 4#3/0, #1/0G] 400

[33-600] 2-SETS [3"C, 3-350KCM, #1G] 600 [75L] 2-1/2"C, 4#4/0, #2G 225

[33-500] 2-SETS [2-1/2"C, 3-250KCM, #2G] 500 [45L] 2"C, 4#1/0, #6G 150

[33-400] 2-SETS [2"C, 3#3/0, #3G] 400 [30L] 2"C, 4#1, #6G 100

[33-300] 2-1/2"C, 3-350KCM, #4G 300 [15L] 1-1/4"C, 4#4, #10G 60

[33-250] 2-1/2"C, 3-250KCM, #4G 250 CKT ID CONDUIT AND WIRE CKT...

[33-225] 2"C, 3#4/0, #4G 225 208Y/120V, 3 ɸ, TRANSFORMER SECONDARY (4W+G)

[33-200] 2"C, 3#3/0, #6G 200 [500H] 3-SETS [3"C, 3-300KCM, #1/0G] 800

[33-175] 2"C, 3#2/0, #6G 175 [300H] 2-SETS [3"C, 3-350KCM, #1G] 600

[33-150]…