BLACK HILLS VA HEALTHCARE SYSTEM
ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES - FORT MEADE, SD
PROJECT NO.: 568-21-701
CONTRACT NO.: 36C77621C0078
100% CONSTRUCTION DOCUMENTS SUBMITTAL
BLACK HILLS VA HEALTHCARE SYSTEM
BLACK HILLS NETWORK ##
113 COMANCHE ROAD | FORT MEADE, SD 57741
THE SCOPE OF THIS PROJECT INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING INFRASTRUCTURE IMPROVEMENTS: ELECTRICAL (ELECTRICAL PANEL UPGRADE, POWER [NORMAL, EMERGENCY]), BONDING, UPS, BUILDING MANAGEMENT SYSTEM INTERFACES, ASSESS FOR NEW AND UPGRADES TO EXISTING HVAC, RECONFIGURATION, EXPANSION AND RENOVATION OF EXISTING SPACE (DEMO, NEW CONSTRUCTION, FINISHES), COMMUNICATION INFRASTRUCTURE (NEW DATA OUTLETS, PATCH PANELS, UPGRADE TO CAT 6A CABLE) IN BUILDINGS AS NECESSARY, PHYSICAL SECURITY UPGRADES, ASSESS AND UPGRADE FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN BUILDINGS, HAZARDOUS MATERIAL ABATEMENT. PROJECT BUILDING LOCATION INCLUDE: BUILDINGS 40, 46, 48, 50, 53, 88, 89, 90, 103, 110, 113, 137, 144, 145, 146, 147, 148, T171, AND T296.
PROJECT DESCRIPTION
1. THE CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATION AND RELATED CONTRACT DOCUMENTS, VISIT SITE OF WORK, AND RESEARCH ALL EXISTING CONDITIONS, FACILITIES, RESTRICTIONS AND OTHER MATTERS WHICH CAN AFFECT THE WORK, IN TIMELINE, QUALITY OR COST, THEREOF; FAILURE OR OMISSION OF ANY CONTRACTOR TO VISIT THE SITE AND ACQUAINT THEMSELVES WITH THE EXISTING CONDITIONS, SHALL IN NO WAY RELIEVE THEM FROM ANY OBLIGATION WITH RESPECT TO THEIR CONTRACT AND NO EXTRA TIME OR COMPENSATION WILL BE ALLOWED BY REASON OF ANY THING OR MATTER CONCERNING WHICH THE CONTRACTOR COULD HAVE FULLY INFORMED THEMSELVES PRIOR TO BIDDING. GENERAL CONTRACTOR SHALL COORDINATE ALL ASPECTS OF THE BUILDING CONSTRUCTION.
2. THE CONTRACTOR SHALL NOT CONSIDER CONSTRUCTION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH AREA AND TO FULFILL THE INTENT OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL COORDINATE ARCHITECTURAL CONSTRUCTION DRAWING AND NOTES WITH CIVIL, STRUCTURAL AND MECHANICAL, ELECTRICAL & PLUMBING NOTES AND DRAWINGS.
3. THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE TECHNICAL SPECIFICATIONS AND CONDITIONS OF THE PROJECT INCLUDED IN THE PROJECT MANUAL WHICH FORM A PART OF THE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL INFORMATION REQUIRED TO CONSTRUCT THE WORK OF THIS CONTRACT. IN THE EVENT OF A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATION NOTIFY THE COR FOR CLARIFICATION SEVEN DAYS BEFORE BEGINNING WORK ON THE AFFECTED ACTIVITIES.
4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF THE WORK. NOTIFY THE COR OF ANY SIGNIFICANT CHANGES IN
DIMENSIONS OR CONDITIONS.
5. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY DESCRIPTION AS REQUIRED TO COMPLETE THE SCOPE OF WORK DEFINED ON THE DRAWINGS AND SPECIFICATIONS WITHIN THE AGREED TIMELINES.
6. THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS (HOTWORK, ICRA, WEEKENDS, HOLIDAYS, SHUTDOWN, ETC), CERTIFICATES, INSPECTIONS, DEPARTMENT APPROVAL, ETC. FOR WORK PERFORMED UNDER THIS CONTRACT. PROVIDE COPIES OF ALL REQUIRED PERMITS, CERTIFICATES, INSPECTIONS AND AGENCY
APPROVALS TO THE COR PRIOR TO THE COMMENCEMENT OF THE SCOPE.
7. FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, ALL APPLICABLE STATE AND LOCAL CODES, AND THE GENERAL AND
SUPPLEMENTARY CONDITIONS OF THE CONTRACT.
8. U.L. ASSEMBLIES DESCRIBED ARE FOR REFERENCE ONLY. THE GENERAL CONTRACTOR SHALL COORDINATE AND VERIFY THE INSTALLATION OF THE DESCRIBED
SYSTEM(S) .
9. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR THE PROPER PERFORMANCE OF THEIR WORK, COORDINATING WITH OTHER TRADES, MEANS AND METHODS OF CONSTRUCTION, SAFETY AND SECURITY ON SITE.
10. CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR THE PERFORMANCE AND INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE PERFORMED IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS FOR FINISHES AND SUBSTRATES AFFECTED.
11. THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN SECURITY DURING ALL CONSTRUCTION WORK.
12. PROTECT EXISTING PROPERTY DURING CONSTRUCTION. REPAIR OR REPLACE AT THE DISCRETION AND TO THE SATISFACTION OF THE C.O.R., WITHOUT ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING WORK DAMAGED DURING THE COURSE OF CONSTRUCTION.
13. THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE COR AND ALL GOVERNMENT EMPLOYEES 14 DAYS IN ADVANCE OF BEGINNING EACH CONSTRUCTION
ACTIVITY.
14. UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE PROVIDED OR FURNISHED BY OTHERS, THEY SHALL BE PROVIDED UNDER THIS
CONTRACT BY THE CONTRACTOR.
15. ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND PROFESSIONAL MANNER CONSISTENT WITH INDUSTRY STANDARDS AND/OR AS DIRECTED
BY THE C.O.R..
16. THE CONTRACTOR SHALL LEAVE THE SITE AND ALL BUILDINGS AND STRUCTURES IN PROPER WORKING ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE, REPLACE ANY WORK, MATERIALS, OR EQUIPMENT FURNISHED AND INSTALLED UNDER THE CONTRACT WHICH DEVELOPS DEFECTS, DUE TO A POSSIBLE WORKMANSHIP ISSUE, WITHIN ONE
(1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER. THIS IS NOT TO LIMIT OR EXCLUDE ANY OTHER WARRANTY OR WARRANTY PERIOD OTHERWISE
DESCRIBED.
17. CONTRACTOR SHALL SCHEDULE, COORDINATE, AND FACILITATE ALL POWER, WATER, OR TELECOMMUNICATIONS OUTAGES AND SHUTDOWNS. ALL OUTAGES AND
SHUTDOWNS MUST BE SCHEDULED WITH THE COR ONE (1) WEEK PRIOR TO OUTAGE.
18. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO REGULATED MATERIALS ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, EQUIPMENT, AND ALL OTHER EXISTING SYSTEMS. MAKE NECESSARY PROVISIONS TO MAINTAIN THE INTEGRITY OF SAID SYSTEMS PRIOR TO THE COMMENCEMENT OF DEMOLITION, IF ANY. SEE MECHANICAL, ELECTRICAL, TELECOMMUNICATIONS, AND ARCHITECTURAL DRAWINGS FOR ANY SYSTEM OR PORTIONS THEREOF TO BE REMOVED, RELOCATED, REVISED OR ABANDONED.
19. ANY CONSTRUCTION INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO EXPENSE TO THE OWNER.
20. ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST BE MAINTAINED AT ALL TIMES. ESTABLISH PROCEDURES TO MINIMIZE CIRCULATION OF CONSTRUCTION PERSONNEL AND MATERIALS THROUGH OCCUPIED PORTIONS OF THE BUILDING. KEEP ALL AREAS ADJACENT TO THE WORK AREA CLEAN.
21. PRIOR TO DELIVERY OF MATERIALS TO THE CONSTRUCTION ZONE AND REMOVAL OF WASTE FROM THE SITE, VERIFY WITH THE COR FOR AN ACCEPTABLE ACCESS ROUTE AND TIME. UNDER NO CIRCUMSTANCES SHALL ANY AREA OUTSIDE THE CONSTRUCTION ZONE BE USED WITHOUT PRIOR APPROVAL FROM THE COR. ALL BUILDING INTERIOR STAGING AREAS SHALL BE PROTECTED WITH FIRE RESISTANT PLYWOOD ENCLOSURES. ALL TRASH SHALL BE REMOVED FROM THE BUILDING DAILY. CONSTRUCTION MATERIALS SHALL NOT BE STORED IN CORRIDORS OR ANY OTHER UNAUTHORIZED LOCATION AT ANY TIME.
22. FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES, AND POINTS OF CONNECTION PRIOR TO START OF WORK.
23. THE DESIGN ADEQUACY, SAFETY, AND ERECTION OF BRACING, SHORING, SCAFFOLDING, AND TEMPORARY SUPPORTS AND RESTRAINS IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
24. NOTIFY THE FACILITY OF TIMES WHEN THE CONSTRUCTION NOISE WILL BE IN EXCESS OF 80 DB. RESCHEDULE SUCH WORK IF SO REQUIRED BY THE FACILITY.
25. NOTIFY THE COR OF ANY DISCREPANCIES DISCOVERED IN THE FIELD THAT REQUIRE CORRECTIVE ACTION PRIOR TO TAKING ANY ACTION.
26. FOR EXISTING FLOORS, CEILINGS, PARTITIONS, AND SERVICES TO REMAIN, PROTECT ALL FINISHES AND MATERIALS, AND REPAIR OR REPLACE ALL ITEMS THAT ARE DAMAGED OR SOILED DURING THE COURSE OF CONSTRUCTION. ALL FINISHES AND MATERIALS SHALL BE PROPERLY INTEGRATED TO INSTITUTE A UNIFORM APPEARANCE
AND SEAMLESS TRANSITION.
27. ALL ITEMS TO BE REMOVED AND REPLACED SHALL BE HANDLED WITH PROPER CARE AND STORED IN SUCH A MANNER AS TO PREVENT DAMAGE; WHEN DAMAGED, REPLACE
AT NO EXPENSE TO THE OWNER.
28. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED OR BRACED IN ACCORDANCE WITH PROVISIONS OF THE TECHNICAL SPECIFICATIONS.
29. ALL DRAWINGS, THOUGH NOTED TO SCALE, ARE FOR ILLUSTRATION ONLY. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS. ITEMS WRONGLY LOCATED BY
DRAWINGS SCALING SHALL BE CORRECTED.
30. SIGNAGE CONSTRUCTION, FONT AND SIZE SHALL BE CONSISTENT WITH THE FACILITY'S EXISTING SIGNAGE SYSTEMS. REFER TO SPECIFICATIONS FOR CODE REQUIRED SIGNAGE. PROVIDE ADDITIONAL SIGNAGE AS MAY BE REQUIRED BY REQUEST OF THE FIRE MARSHAL AND/OR BUILDING CODE OFFICIAL OR C.O.R..
31. EXERCISE CARE DURING CONSTRUCTION TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER ROUTINE, COORDINATE SEQUENCE OF WORK AND PHASING WITH THE COR TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER. MANY OF THE WORK ITEMS REQUIRE THE WORK TO BE PERFORMED ONLY AT NIGHT, WEEKENDS, OR HOLIDAYS WITH PRIOR
APPROVAL OF THE C.O.R. AT NO ADDITIONAL COST TO THE GOVERNMENT.
32. PRIOR TO DRILLING OR CORING EXISTING CONCRETE, CONTRACTOR SHALL LOCATE EXISTING REINFORCEMENT TO MAINTAIN ADEQUATE CLEARANCES FROM AND AVOID DAMAGE TO EXISTING REINFORCEMENT. CONTRACTOR SHALL USE NON-DESTRUCTIVE TESTING (NDT) TO LOCATE REINFORCEMENT. WHENEVER FEASIBLE, CONTRACTOR SHALL USE GROUND PENETRATING RADAR (GPR) OR MEANS OTHER THAN X-RAY. WHERE X-RAY IS REQUIRED, CONTRACTOR SHALL PROVIDE WRITTEN REQUEST AT LEAST THREE (3) WEEKS PRIOR TO EVENT: WORK MAY BE REQUIRED TO BE PERFORMED OUTSIDE NORMAL WORK HOURS AND SHALL BE DOCUMENTED ON THE THREE (3) WEEK
LOOK-AHEAD SCHEDULE.
33. PROTECT EXISTING FIRE SUPPRESSION SYSTEMS DURING CONSTRUCTION.
34. IN THE EVENT THE CONTRACTOR DISCOVERS HAZARDOUS MATERIALS WHICH ARE NOT AVOIDABLE BY REROUTING THE WORK AND HAVE NOT BEEN DESCRIBED IN THE CONTRACT, THE CONTRACTOR IS TO NOTIFY THE COR AND THE A/E FOR DIFFERING SITE CONDITION ACKNOWLEDGEMENT. REMEDIATION WOULD BE COMPENSATED BY
ADDITIONAL MONEY AND ADDITIONAL TIME FOR CRITICAL PATH ACTIVITIES.
35. CONTRACTOR SHALL PROVIDE STAFF THAT WILL UNDERGO TRAINING AND CERTIFICATION TO ALLOW UN-ESCORTED ACCESS TO IT CLOSETS. THE CONTRACTOR SHALL CERTIFY SUFFICIENT NUMBER OF STAFF TO ACCOMMODATE PROPOSED SCHEDULE WITHOUT RELYING ON VA STAFF TO ACCOMPANY AS ESCORTS. THIS WILL REQUIRE PIV BADGING REQUIREMENT INCLUDING BACKGROUND INVESTIGATIONS. SEE "CONTRACTOR BACKGROUND INVESTIGATIONS REQUEST" FORM. COORDINATE WITH CO/CS
REGARDING SUBMITTING THE FORM.
36. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING ANY REQUIRED THIRD PART INSPECTORS.
37. CONTRACTOR TO PAINT ANY EXISTING SPRINKLER PIPING LEFT EXPOSED BY CEILING REMOVAL & PAINT ANY NEW SPRINKLER PIPING EXPOSED IN FINISHED AREAS
WITHOUT CEILINGS. PAINT COLOR TO BE RED.
GENERAL PROJECT NOTES
"OWNER": THE OWNER IS UNITED STATES GOVERNMENT - DEPARTMENT OF VETERANS AFFAIRS AND IS REFERRED TO THROUGHOUT THE CONTACT DOCUMENTS AS IF SINGULAR IN NUMBER. THE TERM "OWNER"
MEANS THE OWNER OR THE OWNER'S CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE.
"CONTRACTING OFFICER" OR "C.O.": THE OWNER'S AUTHORIZED REPRESENTATIVE RESPONSIBLE FOR ADMINISTRATING THE CONTRACT BETWEEN THE GENERAL CONTRACTOR AND OWNER. THE TERM INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER ACTING WITHIN THE LIMITS OF
THEIR AUTHORITY AS DELEGATED BY THE CONTRACTING OFFICER.
"WORK": THE TERM "WORK" MEANS THE CONSTRUCTION AND SERVICES REQUIRED BY THE CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR TO FULFILL THE CONTRACTOR'S
OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE OR A PART OF THE PROJECT.
"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE CONTRACT
DOCUMENTS
"DRAWINGS", "SHOP DRAWINGS", OR "PLANS": THE GRAPHIC AND PICTORIAL PORTIONS OF CONTRACT DOCUMENTS, WHENEVER LOCATED AND WHEREVER ISSUED, SHOWING DESIGN, LOCATION AND DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS, SECTIONS, DETAILS, SCHEDULES AND DIAGRAMS.
"PROJECT SUPERVISOR" OR "SUPERVISOR": MEANS THE ON-SITE SUPERVISION REPRESENTATIVE OF THE
PROJECT.
"ARCHITECT" OR "ENGINEER": MEANS THE VA'S ARCHITECTS, ENGINEERS AND OTHER DESIGN AND ENGINEERS PROFESSIONALS FOR THIS PROJECT, AND REFERRED THROUGHOUT THE DRAWINGS AS IF
SINGULAR IN NUMBER.
"TRADE CONTRACTOR" OR "CONTRACTORS": MEANS THE ENTITY UNDER CONTRACT AGREEMENT WITH THE GENERAL CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND OR SPECIALTY WORK IN CONNECTION
WITH THIS PROJECT.
"FURNISHED" OR "FURNISHED": MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS, TRANSPORTATION INSURANCE, FIELD MEASUREMENTS,EXPEDITING, SHIPPING, HANDLING, PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND ANY OTHER ACCESSORIES REQUIRED FOR A COMPLETE
INSTALLATION.
"INSTALL" OR "INSTALLED": MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH UNLOADING, UNPACKING, HOISTING, STORAGE, HANGERS, SUPPORTS, SLEEVES, SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL, DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLEAN-UP, INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL
ACCESSORIES, SERVICE AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.
"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT
LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND OTHER ITEMS REQUIRED
TO COMPLETE THE REFERENCED TASK.
"BY OWNER", "BY VAMC" OR "BY VA": MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED TO THE
JOB SITE AND INSTALLED BY THE OWNER.
"NOT IN CONTRACT" OR "N.I.C.": MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT, BUT MAY REQUIRE PROVISIONS IN THE CONSTRUCTION FOR FUTURE INSTALLATION AS SPECIFIC OR SHOWN.
OTHER DEFINITIONS OF WORDS AND TERMS USED IN THE DRAWINGS AND SPECIFICATIONS CAN BE FOUND IN THE LEGENDS AND SYMBOLS DRAWINGS FOR EACH DISCIPLINE AND IN DIVISIONS 0 AND 1 OF THE PROJECT
MANUAL.
BASIC DEFINITIONS
TEMPORARY FIRE & SMOKE PROTECTION
IF MULTIPLE CEILING TILES MUST BE REMOVED AND CANNOT BE REPLACED AT THE END OF THE WORK SHIFT, A 1-HOUR FIRE BARRIER WILL NEED TO BE CONSTRUCTED. IF CONTRACTOR IDENTIFIES UPCOMING WORK RESULTING IN A LONG-TERM CEILING REMOVAL, NOTIFY THE COR IMMEDIATELY WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTION OR TEMPORARY UPRIGHT SPRINKLER HEADS INSTALLED. THIS
WORK IS TO BE PART OF THE SUBMITTED SCOPE OF WORK.
IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD
THROUGH THE UNSEALED PENETRATION.
WHERE EXISTING CEILINGS ARE TEMPORARILY REMOVED FOR LONGER THAN ONE WORKING SHIFT, PROVIDE TEMPORARY UPRIGHT SPRINKLER HEADS.
WHERE EXISTING CEILINGS ARE PERMANENTLY REMOVED, COORDINATE INSTALLATION OF UPRIGHT
HEADS WITHIN ONE WORKING SHIFT TO AVOID LOSS OF SPRINKLER PROTECTION.
BLACK HILLS VA HEALTHCARE SYSTEM
BLACK HILLS NETWORK ##
113 COMANCHE ROAD | FORT MEADE, SD 57741
NORTH
PROJECT KEY PLAN
OWNER
ARCHITECT
TELECOMMUNICATIONS
ENGINEER, PROJECT LEAD
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
A&E ARCHITECTS
124 NORTH 29th STREET, SUITE 100
BILLINGS, MT 59101
406.248.2633
BLACK HILLS VA HEALTHCARE SYSTEM
FORT MEADE VAMC
113 COMANCHE ROAD
FORT MEADE, SD 57741
GDM - PUGET SOUND DISTRICT OFFICE
4317 6Th AVE SE, SUITE 300
LACEY, WA 98503
360.318.7095
GDM - PUGET SOUND DISTRICT OFFICE
4317 6Th AVE SE, SUITE 300
LACEY, WA 98503
360.318.7095
GDM - VANCOUVER DISTRICT OFFICE
1308 NW 134TH STREET, SUITE A
VANCOUVER, WA 98685
541.436.4723
PROJECT TEAM
GDM - PUGET SOUND DISTRICT OFFICE
4317 6Th AVE SE, SUITE 300
LACEY, WA 98503
360.318.7095
STRUCTURAL
GDM - VANCOUVER DISTRICT OFFICE
1308 NW 134TH STREET, SUITE A
VANCOUVER, WA 98685
541.436.4723
GDM - ARCTIC DISTRICT OFFICE
1401 W 34TH AVE, SUITE 200
ANCHORAGE, ALASKA 99503
907.917.2957
CIVIL ENGINEER
GDM - VANCOUVER DISTRICT OFFICE
1308 NW 134TH STREET, SUITE A
VANCOUVER, WA 98685
541.436.4723
INDUSTRIAL HYGIENEFIRE PROTECTION ENGINEER
GDM - VANCOUVER DISTRICT OFFICE
1308 NW 134TH STREET, SUITE A
VANCOUVER, WA 98685
541.436.4723
AB ANCHOR BOLT
ABV ABOVE
A/C AIR CONDITIONING
ACT ACOUSTICAL CEILING
TILE
ADDL ADDITIONAL
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT(URAL)
AWN AWNING
B/ BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM OR BENCHMARK
BRG BEARING
BTWN BETWEEN
BUR BUILT-UP ROOF
CAB CABINET
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONRY
UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CG CORNER GUARD
CPT CARPET
CSMT CASEMENT
CT CERAMIC TILE
D DEEP
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIM(S) DIMENSIONS
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
ID INSIDE DIAMETER
INFO INFORMATION
ISO ISOCYANURATE
INSUL INSULATE / INSULATED /
INSULATION
INT INTERIOR
INV INVERT
JT JOINT
J-BOX JUNCTION BOX
KIT KITCHEN
L LONG / LENGTH
LAM LAMINATE(D)
LAV LAVATORY
LF LINEAR FEET
LT LIGHT
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANIC(AL)
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER OR
OVERFLOW DRAIN
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OVHD OVERHEAD
PL PLATE
PLAM PLASTIC LAMINATE
PLUMBPLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
POLY POLYESTER OR
POLYOLEFIN
PSF POUNDS PER SQUARE
FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED OR
POINT
PVMT PAVEMENT
QT QUARRY TILE
QTR QUARTER
QTY QUANTITY
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RD ROOF DRAIN
RECY RECYCLE(D)
REF REFERENCE
REFRIG REFRIGERATOR
OR REFRIGERATION
REINF REINFORCE
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
S SOUTH
SC SOLID CORE
SCH SCHEDULE
SCHED SCHEDULED
SECT SECTION
SF SQUARE FEET
SFRM SPRAY APPLIED FIRE
RESISTIVE MATERIAL
SGL SINGLE
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SPECSSPECIFICATIONS
SOD SLAB ON DECK
SOG SLAB ON GRADE
SOH SAME OPPOSITE HAND
SS STAINLESS STEEL
ST STONE TILE
STD STANDARD
STND STANDARD
STL STEEL
STRUCT STRUCTURAL
TEMP TEMPERED
THK THICK
THRESH THRESHOLD
T.O. TOP OF
TOBM TOP OF BEAM
T.O.BM. TOP OF BEAM
T.O.P. TOP OF PLATE
T.O.S. TOP OF STEEL
T/ TOP OF
T&G TONGUE AND GROOVE
TEL TELEPHONE
THK THICK
TRANSTRANSOM
TV TELEVISION
TYP TYPICAL
E EAST
EA EACH
EC EXISTING COLUMN
EJ EXPANSION JOINT
ELEC ELECTRICAL
EL ELEVATION
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER
COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR
EXPOSED
EXT EXTERIOR
FACP FIRE ALARM CONTROL
PANEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
F.F. FINISH FLOOR
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FND FOUNDATION
FP FIRE PROTECTION
FR FRAME
FRMG FRAMING
FT FEET/FOOT OR FIRE
TREATED
FTG FOOTING
FTNG FOOTING
FRP FIBERGLASS
REINFORCED PANEL
FRT FIRE RETARDANT
TREATED
GA GAUGE
GALV GALVANIZED
GB GYPSUM BOARD
GC GENERAL
CONTRACTOR
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
GYP GYPSUM
HC HANDICAP
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HTD HEATED
HVAC HEATING/VENTILATION
& AIR CONDITIONING
UL UNDERWRITERS
LABORATORY
UNO UNLESS NOTED
OTHERWISE
VB VINYL BASE
VCT VINYL COMPOSITION
TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VENEER PLASTER
VR VAPOR RETARDER
VT VINYL TILE
VWC VINYL WALL COVERING
W WIDE OR WEST
W/ WITH
WC WATER CLOSET
WD WOOD
WDW WINDOW
WG WALL GUARD
WH WATER HEATER
W/IN WITHIN
W/O WITHOUT
WP WATERPROOF
WR WATER RESISTANT
WT WEIGHT
WWF WELDED WIRE FABRIC
# NUMBER OR POUND
@ AT
ARCHITECTURAL ABBREVIATIONS
WINDOW TAG
ROOM TAG
DOOR TAG
KEYNOTE TAG ASSEMBLY TAG
MATERIAL TAG
REVISION TAGREVISION CLOUD
XXX
X
XX-XX
X
CEILING TAG VIEW REFERENCE
BUILDING
SECTION
WALL
SECTION
ELEVATION
GRID LINE
DETAIL
CALL OUT
INTERIOR
ELEVATION
EXTERIOR
ELEVATION
DETAIL
SECTION
#1
#2
#3
#4
POSITION OF VIEW ON SHEET
VIEW NAME
1 1/2" = 1'-0"
VIEW SCALE
VIEW NAME
A6.#
A3.#
A3.#
A3.#
A4.#
A3.#
ROOM NAME
101.1
X
X'-X"
XXX-X
XXX
W D
HT
CASEWORK TAG
CABINET DESIGN SERIES NO.
EXPLANATION OF SYMBOLS
TYPICAL SHEET VIEW NUMBERING LAYOUT
NUMBERING STARTS IN BOTTOM LEFT
CORNER, MOVING UPWARDS, SKIPPING
NONE
ARCH E1 (30"x42")
2 3 4
PROJECT SITE
VA MEDICAL CENTER
FORT MEADE, SD
PROJECT LOCATION MAP
STURGIS, SD
VOLUME 2
• TELECOMMUNICATION
THE A/E HAS PARTITIONED THE DRAWINGS INTO SECTIONS.
THE PRIME CONTRACTOR IS TO PROVIDE COORDINATION
AMONG THE TRADES AND DRAWING SECTIONS TO ENSURE
ALL MATERIALS, LABOR, EQUIPMENT, AND OTHER SERVICES
ARE PROVIDED TO FULFILL THE ENTIRE CONTRACT. FOR
EXAMPLE, DOOR HARDWARE REQUIRES ELECTRICAL,
ARCHITECTURAL, AND FIRE PROTECTION SECTION REVIEW.
PROVIDE A WORKING OUTCOME FOR ALL MULTI-
DISCIPLINARY DEFINABLE FEATURES OF WORK.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
FOR OFFICIAL USE ONLY (FOUO) 00-GI-000.V2
COVER AND PROJECT GENERAL
INFORMATION - VOLUME 2GDM of Oregon
1308 NE 134th St., Suite A
VANCOUVER, WA 98685
P: 541.426.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
PAUL SIDERIUS, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
GEN INFO
Project Director
JPRPSS11/05/2024
100% CONSTRUCTION
DOCUMENTSARCHITECT A/E:
FULLY SPRINKLERED
WWW.GDM-AE.COMhttps://www.ae.design/
Revisions: Date:
DRAWING INDEX
VOLUME 1
GENERAL INFORMATION
VOLUME 1 (Continued)
CIVIL
SHEET NO. SHEET NAME
CI0001 CIVIL - GENERAL NOTES
RC0001 CIVIL - EXISTING PLANS
CU0100 CIVIL - OVERALL PRIMARY FIBER OPTICS SITE PLAN
CU0101 CIVIL - PRIMARY FIBER OPTICS PLAN
CU0102 CIVIL - PRIMARY FIBER OPTICS PLAN
CU0103 CIVIL - PRIMARY FIBER OPTICS PLAN
CU0104 CIVIL - PRIMARY FIBER OPTICS PLAN
CU0105 CIVIL - PRIMARY FIBER OPTICS PLAN
CU0106 CIVIL - PRIMARY FIBER OPTICS PLAN
CU0107 CIVIL - PRIMARY FIBER OPTICS PLAN
CU0108 CIVIL - PRIMARY FIBER OPTICS PLAN
CU0109 CIVIL - PRIMARY FIBER OPTICS PLAN
CU0110 CIVIL - PRIMARY FIBER OPTICS PLAN
CU0111 CIVIL - PRIMARY FIBER OPTICS PLAN
CU0300 CIVIL - PRIMARY FIBER OPTICS PROFILES
CU0301 CIVIL - PRIMARY FIBER OPTICS PROFILES
CU0302 CIVIL - PRIMARY FIBER OPTICS PROFILES
CU0303 CIVIL - PRIMARY FIBER OPTICS PROFILES
CU0304 CIVIL - PRIMARY FIBER OPTICS PROFILES
CU0305 CIVIL - PRIMARY FIBER OPTICS PROFILES
CJ0001 CIVIL - DETAILS
CJ0002 CIVIL - DETAILS
CE0100 CIVIL - OVERALL ELECTRICAL SITE PLAN
CE0101 CIVIL - ELECTRICAL SITE PLAN
CG0100 GRADING PLAN - BLDG 145
CG0200 GRADING PLAN - BLDG T-296
STRUCTURAL
SHEET NO. SHEET NAME
SN001 STRUCTURAL NOTES
SN001 STRUCTURAL NOTES
145-SF-101 FOUNDATION PLAN - BUILDING 145
145-SF-102 FIRST FLOOR FRAMING PLAN - BUILDING 145
145-SD-101 STRUCTURAL DETAILS - BUILDING 145
T296-SF-101 FOUNDATION & ROOF FRAMING PLANS- BUILDING T296
ARCHITECTURAL
MECHANICAL
SHEET NO. SHEET NAME
MG-001 MECHANICAL LEGENDS & ABBREVIATIONS
MG-002 MECHANICAL SCHEDULES
MG-003 MECHANICAL SCHEDULES
MG-004 MECHANICAL SITE PLAN
MG-005 MECHANICAL DETAILS
MG-006 MECHANICAL DETAILS
000-MH-001 MECHANICAL SITE PLAN
040-MD-011 040 - MECHANICAL DEMOLITION - OVERALL
040-MH-011 040 - MECHANICAL REMODEL - OVERALL
046-MD-011 046 - MECHANICAL DEMOLITION - OVERALL
046-MH-011 046 - MECHANICAL REMODEL - OVERALL
048-MD-011 048 - MECHANICAL DEMOLITION - OVERALL
048-MH-011 048 - MECHANICAL REMODEL - OVERALL
050-MD-011 050 - MECHANICAL DEMOLITION - OVERALL
050-MH-011 050 - MECHANICAL REMODEL - OVERALL
053-MD-011 053 - MECHANICAL DEMOLITION - OVERALL
053-MH-011 053 - MECHANICAL REMODEL - OVERALL
088-MD-011 088 - MECHANICAL DEMOLITION - OVERALL
088-MH-011 088 - MECHANICAL REMODEL - OVERALL
089-MD-011 089 - MECHANICAL DEMOLITION - OVERALL
089-MH-011 089 - MECHANICAL REMODEL - OVERALL
090-MD-011 090 - MECHANICAL DEMOLITION - OVERALL
090-MH-011 090 - MECHANICAL REMODEL - OVERALL
110-MD-011 110 - MECHANICAL DEMOLITION - OVERALL
110-MH-011 110 - MECHANICAL REMODEL - OVERALL
113-MD-001 113 - MECHANICAL DEMOLITION - BASEMENT - OVERALL
113-MD-011 113 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL
113-MD-012 113 - MECHANICAL DEMOLITION - SECOND FLOOR - OVERALL
113-MD-013 113 - MECHANICAL DEMOLITION - UPPER ROOF - OVERALL
113-MD-014 113 - ENLARGED DEMOLITION PLANS
113-MD-015 113 - ENLARGED DEMOLITION PLANS
113-MH-001 113 - MECHANICAL REMODEL - BASEMENT - OVERALL
113-MH-011 113 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL
113-MH-012 113 - MECHANICAL REMODEL - SECOND FLOOR - OVERALL
113-MH-013 113 - MECHANICAL REMODEL - UPPER ROOF - OVERALL
113-MH-014 113 - ENLARGED REMODEL PLANS
113-MH-015 113 - ENLARGED REMODEL PLANS
137-MD-011 137 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL
137-MH-011 137 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL
144-MH-011 144 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL
145-MD-011 145 - MECHANICAL DEMOLITION - OVERALL
145-MD-012 145 - ENLARGED DEMOLITION PLANS
145-MD-013 145 - ENLARGED DEMOLITION PLAN
145-MD-014 145 - ENLARGED DEMOLITION PLAN
145-MD-015 145 - ENLARGED DEMOLITION PLAN
145-MH-011 145 - MECHANICAL REMODEL - OVERALL
145-MH-012 145 - ENLARGED REMODEL PLANS
145-MH-013 145 - ENLARGED REMODEL PLANS
145-MH-014 145 - ENLARGED REMODEL PLANS
145-MH-015 145 - ENLARGED REMODEL PLANS
145-MH-016 145 - ENLARGED REMODEL PLANS
145-MH-017 145 - ENLARGED REMODEL PLANS
145-MH-020 145 - MECHANICAL REMODEL OVERALL
145-MH-021 145 - ENLARGED REMODEL PLANS
146-MD-011 146 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL
146-MH-011 146 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL
147-MD-011 147 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL
147-MH-011 147 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL
147-MH-012 147 - MECHANICAL REMODEL - ROOF - OVERFLOW
148-MD-011 148 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL
148-MD-012 148 - ENLARGED MECHANICAL DEMOLITION PLANS
148-MH-011 148 - MECHANICAL REMODEL - ROOF - OVERALL
148-MH-012 148 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL
148-MH-013 148 - ENLARGED MECHANICAL REMODEL PLANS
T171-MD-011 T171 - MECHANICAL DEMOLITION - OVERALL
T171-MH-011 T171 - MECHANICAL REMODEL - OVERALL
T296-MD-011 T296 - MECHANICAL DEMOLITION - OVERALL
T296-MH-011 T296 - MECHANICAL REMODEL - OVERALL
ELECTRICAL
SHEET NO. SHEET NAME
000-EG-001 LEGEND, ABBREVIATION LIST, AND GENERAL NOTES
000-ES-001 POWER SITE PLAN
040-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
040-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR
046-ED-0B1 ELECTRICAL DEMOLITION PLAN - BASEMENT
046-EP-0B1 ELECTRICAL REMODEL PLAN - BASEMENT
048-ED-0B1 ELECTRICAL DEMOLITION PLAN
048-EP-0B1 ELECTRICAL REMODEL PLANS
050-ED-011 ELECTRICAL DEMOLITION PLAN
050-EP-011 ELECTRICAL REMODEL PLAN
053-ED-0B1 ELECTRICAL DEMOLITION PLANS
053-EP-0B1 ELECTRICAL REMODEL PLAN - BASEMENT AND FIRST FLOOR
053-EP-021 ELECTRICAL REMODEL PLAN - SECOND FLOOR AND ATTIC
088-ED-011 ELECTRICAL DEMOLITION PLAN
088-EP-011 ELECTRICAL REMODEL PLAN
089-ED-011 ELECTRICAL DEMOLITION PLAN
089-EP-011 ELECTRICAL REMODEL PLAN
090-ED-011 ELECTRICAL DEMOLITION PLAN
090-EP-011 ELECTRICAL REMODEL PLAN
110-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
110-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR
113-ED-001 ELECTRICAL DEMOLITION PLAN - BASEMENT LAYOUT
113-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR LAYOUT
113-ED-012 ELECTRICAL DEMOLITION PLAN - 1ST FLOOR ENLARGED PLANS
113-ED-021 ELECTRICAL DEMOLITION PLAN - SECOND FLOOR LAYOUT
113-EP-001 ELECTRICAL REMODEL PLAN - BASEMENT LAYOUT
113-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR LAYOUT
113-EP-012 ELECTRICAL REMODEL PLAN - FIRST FLOOR ENLARGED PLANS
113-EP-021 ELECTRICAL REMODEL PLAN - SECOND FLOOR LAYOUT
137-ED-011 ELECTRICAL DEMOLITION PLANS
137-EP-011 ELECTRICAL REMODEL PLANS
145-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
145-ED-012 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR ENLARGED ROOMS
145-ED-021 ELECTRICAL DEMOLITION PLAN - SECOND & THIRD FLOORS
145-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR
145-EP-012 ELECTRICAL REMODEL PLAN - FIRST FLOOR ENLARGED PLANS
145-EP-013 ELECTRICAL REMODEL PLAN - FIRST FLOOR ENLARGED PLANS
145-EP-021 ELECTRICAL REMODEL PLAN - SECOND & THIRD FLOORS
145-EP-100 DATA CENTER ELECTRICAL DETAILS
146-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
146-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR
147-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
147-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR
148-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
148-ED-012 ELECTRICAL DEMOLITION PLAN - ENLARGED ROOMS
148-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR
148-EP-012 ELECTRICAL REMODEL PLAN - ENLARGED ROOMS
T171-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
T171-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR
T296-ED-011 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
T296-EP-011 ELECTRICAL REMODEL PLAN - FIRST FLOOR
000-EK-001 POWER AND ELEVATION SCHEMATIC FOR TR RACK
000-EK-002 POWER AND ELEVATION SCHEMATIC FOR TR RACK
040-EJ-001 BUILDING 40 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED
046-EJ-001 BUILDING 46 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED
048-EJ-001 BUILDING 48 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED
050-EJ-001 BUILDING 50 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED
053-EJ-001 BUILDING 53 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED
088-EJ-001 BUILDING 88 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED
089-EJ-001 BUILDING 89 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED
090-EJ-001 BUILDING 90 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED
110-EJ-001 BUILDING 110 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED
113-EJ-001 BUILDING 113 ELECTRICAL ONE-LINE DIAGRAM
113-EJ-002 BUILDING 113 ELECTRICAL PANEL SCHEDULES
137-EJ-001 BUILDING 137 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED
VOLUME 3
GENERAL INFORMATION
VOLUME 2 (Continued)
TELECOMMUNICATIONS (Continued)
SHEET NO. SHEET NAME
T171-TD-011 T171 - TELECOM DEMOLITION PLAN - FIRST FLOOR
T171-TN-010 T171 - TELECOM DISTANCE ASSESSMENT
T171-TN-011 T171 - TELECOM REMODEL PLAN - FIRST FLOOR
T296-TD-011 T296 - TELECOM DEMOLITION PLANS
T296-TN-010 T296 - TELECOM DISTANCE ASSESSMENT
T296-TN-011 T296 - TELECOM REMODEL PLANS
TJ-001 EXISTING TELECOMM RACK ELEVATIONS
TJ-002 EXISTING TELECOMM RACK ELEVATIONS
TJ-003 EXISTING TELECOMM RACK ELEVATIONS
TJ-004 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-005 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-006 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-007 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-008 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-009 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-010 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-011 FIBER ONE LINE DIAGRAM
TJ-012 COPPER ONE LINE DIAGRAM
TJ-013 TELECOMM CABINET ELEVATIONS - MDA and ER
TJ-014 TELECOMM CABINET ELEVATIONS - HDA
TJ-015 MCR MDA HDA CABLE ONE LINE
TJ-016 TELECOMM DETAILS
TJ-017 TELECOMM DETAILS
TJ-018 TELECOMM DETAILS
TJ-019 TELECOMM MCR CABINET DETAILS
TJ-020 TELECOMM J-HOOK DETAILS
TJ-021 TELECOMM BONDING DETAILS
TJ-022 TELECOMM BONDING DETAILS
TJ-023 TELECOMM BONDING DETAILS
TJ-024 TELECOMM BONDING DETAILS
TJ-025 TELECOMM BONDING DETAILS
TJ-026 TELECOMM RACK ELEVATIONS
TJ-027 TELECOMM RACK ELEVATIONS
TJ-028 TELECOMM RACK ELEVATIONS
TJ-029 TELECOMM CABLE SCHEDULES
TJ-030 TELECOMM CABLE SCHEDULES
VOLUME 2
GENERAL INFORMATION
TELECOMMUNICATIONS
SHEET NO. SHEET NAME
00-TG-001 LEGEND, ABBREVIATIONS, AND GENERAL NOTES
00-TS-000 TELECOMMUNICATIONS OVERALL SITE PLAN
00-TS-001 TELECOMMUNICATIONS SITE PLAN
00-TS-002 TELECOMMUNICATIONS SITE PLAN
00-TS-003 TELECOMMUNICATIONS SITE PLAN
00-TS-004 TELECOMMUNICATIONS SITE PLAN
00-TS-005 TELECOMMUNICATIONS SITE PLAN
00-TS-006 TELECOMMUNICATIONS SITE PLAN
040-TD-011 040 - TELECOM DEMOLITION PLAN - FIRST FLOOR
040-TN-010 040 - TELECOM DISTANCE ASSESSMENT
040-TN-011 040 - TELECOM REMODEL PLAN - FIRST FLOOR
046-TD-0B1 046 - TELECOM DEMOLITION PLANS
046-TN-0B0 046 - TELECOM DISTANCE ASSESSMENT
046-TN-0B1 046 - TELECOM REMODEL PLANS
048-TD-0B1 048 - TELECOM DEMOLITION PLANS
048-TN-0B0 048 - TELECOM DISTANCE ASSESSMENT
048-TN-0B1 048 - TELECOM REMODEL PLANS
050-TD-011 050 - TELECOM DEMOLITION PLAN
050-TN-010 050 - TELECOM DISTANCE ASSESSMENT
050-TN-011 050 - TELECOM REMODEL PLAN
053-TD-0B1 053 - TELECOM DEMOLITION PLAN - BASEMENT AND FIRST FLOOR
053-TD-021 053 - TELECOM DEMOLITION PLAN - SECOND FLOOR AND ATTIC
053-TN-0B0 053 - TELECOM DISTANCE ASSESSMENT
053-TN-0B1 053 - TELECOM REMODEL PLAN - BASEMENT AND FIRST FLOOR
053-TN-021 053 - TELECOM REMODEL PLAN - SECOND FLOOR
088-TD-011 088 - TELECOM DEMOLITION PLAN
088-TN-010 088 - TELECOM DISTANCE ASSESSMENT
088-TN-011 088 - TELECOM REMODEL PLAN
089-TD-011 089 - TELECOM DEMOLITION PLAN
089-TN-010 088 - TELECOM DISTANCE ASSESSMENT
089-TN-011 089 - TELECOM REMODEL PLAN
090-TD-011 090 - TELECOM DEMOLITION PLAN
090-TN-010 090 -TELECOM DISTANCE ASSESSMENT
090-TN-011 090 -TELECOM REMODEL PLAN
110-TD-011 110 - TELECOM DEMOLITION PLAN - FIRST FLOOR
110-TN-011 110 - TELECOM REMODEL PLAN - FIRST FLOOR
113-TD-001 113 - TELECOM DEMOLITION PLAN - BASEMENT LAYOUT
113-TD-002 113 - TELECOM DEMOLITION PLAN - BASEMENT NORTH
113-TD-003 113 - TELECOM DEMOLITION PLAN - BASEMENT EAST
113-TD-004 113 - TELECOM DEMOLITION PLAN - BASEMENT SOUTH
113-TD-011 113 - TELECOM DEMOLITION PLAN - FIRST FLOOR LAYOUT
113-TD-012 113 - TELECOM DEMOLITION - FIRST FLOOR NORTH
113-TD-013 113 - TELECOM DEMOLITION - FIRST FLOOR CENTRAL
113-TD-014 113 - TELECOM DEMOLITION - FIRST FLOOR EAST
113-TD-015 113 - TELECOM DEMOLITION - FIRST FLOOR SOUTH
113-TD-021 113 - TELECOM DEMOLITION - SECOND FLOOR LAYOUT
113-TD-022 113 - TELECOM DEMOLITION - SECOND FLOOR NORTH
113-TN-000 113 - TELECOM REMODEL - BASEMENT FIBER PLAN
113-TN-001 113 - TELECOM DISTANCE ASSESSMENT - BASEMENT
113-TN-002 113 - TELECOM REMODEL - BASEMENT NORTH
113-TN-003 113 - TELECOM REMODEL - BASEMENT EAST
113-TN-004 113 - TELECOM REMODEL - BASEMENT SOUTH
113-TN-010 113 - TELECOM REMODEL - FIRST FLOOR FIBER PLAN
113-TN-011 113 - TELECOM DISTANCE ASSESSMENT - FIRST FLOOR
113-TN-012 113 - TELECOM REMODEL - FIRST FLOOR NORTH
113-TN-013 113 - TELECOM REMODEL - FIRST FLOOR CENTRAL
113-TN-014 113 - TELECOM REMODEL - FIRST FLOOR EAST
113-TN-015 113 - TELECOM REMODEL - FIRST FLOOR SOUTH
113-TN-021 113 - TELECOM REMODEL - SECOND FLOOR FIBER PLAN
113-TN-022 113 - TELECOM REMODEL - SECOND NORTH
137-TD-011 137 - TELECOM DEMOLITION PLANS
137-TN-010 137 - TELECOM DISTANCE ASSESSMENT
137-TN-011 137 - TELECOM REMODEL PLANS
144-TD-011 144 - TELECOM DEMOLITION PLAN - FIRST FLOOR
144-TN-011 144 - TELECOM REMODEL PLAN - FIRST FLOOR
145-TD-011 145 - TELECOM DEMOLITION PLAN - FIRST FLOOR SOUTH
145-TD-012 145 - TELECOM DEMOLITION PLAN - FIRST FLOOR NORTH
145-TD-021 145 - TELECOM DEMOLITION PLAN - SECOND FLOOR SOUTH
145-TD-022 145 - TELECOM DEMOLITION PLAN - SECOND FLOOR NORTH
145-TD-031 145 - TELECOM DEMOLITION PLAN - THIRD FLOOR SOUTH
145-TD-032 145 - TELECOM DEMOLITION PLAN - THIRD FLOOR NORTH
145-TN-010 145 - TELECOM DISTANCE ASSESSMENT - FIRST FLOOR
145-TN-011 145 - TELECOM REMODEL PLAN - FIRST FLOOR FIBER ROUTING -
A SIDE
145-TN-012 145 - TELECOM REMODEL PLAN - FIRST FLOOR FIBER ROUTING -
B SIDE
145-TN-013 145 - TELECOM REMODEL PLAN - FIRST FLOOR SOUTH
145-TN-014 145 - TELECOM REMODEL PLAN - FIRST FLOOR NORTH
145-TN-015 145 - MCR DETAILS
145-TN-021 145 - TELECOM DISTANCE ASSESSMENT - SECOND & THIRD FLRS
145-TN-022 145 - TELECOM REMODEL PLAN - SECOND FLOOR SOUTH
145-TN-023 145 - TELECOM REMODEL PLAN - SECOND FLOOR NORTH
145-TN-031 145 - TELECOM REMODEL PLAN - THIRD FLOOR SOUTH
145-TN-032 145 - TELECOM REMODEL PLAN - THIRD FLOOR NORTH
146-TD-011 146 - TELECOM DEMOLITION PLAN - FIRST FLOOR
146-TN-0B1 146 - TELECOM REMODEL PLAN - BASEMENT
146-TN-010 146 - TELECOM DISTANCE ASSESSMENT
146-TN-011 146 - TELECOM REMODEL PLAN - FIRST FLOOR
147-TD-011 147 - TELECOM DEMOLITION PLAN - FIRST FLOOR
147-TN-010 147 - TELECOM DISTANCE ASSESSMENT
147-TN-011 147 - TELECOM REMODEL PLAN - FIRST FLOOR
148-TD-011 148 - TELECOM DEMOLITION PLAN - FIRST FLOOR
148-TD-012 148 - TELECOM DEMOLITION PLAN - FIRST FLOOR SECTOR A
148-TD-013 148 - TELECOM DEMOLITION PLAN - FIRST FLOOR SECTOR B
148-TD-014 148 - TELECOM DEMOLITION PLAN - FIRST FLOOR SECTOR C
148-TD-015 148 - TELECOM DEMOLITION PLAN - FIRST FLOOR SECTOR E
148-TD-016 148 - TELECOM DEMOLITION PLAN - FIRST FLOOR SECTOR G
148-TN-010 148 - TELECOM DISTANCE ASSESSMENT
148-TN-011 148 - TELECOM REMODEL PLAN - FIRST FLOOR FIBER PLAN
148-TN-012 148 - TELECOM REMODEL PLAN - FIRST FLOOR SECTOR A
148-TN-013 148 - TELECOM REMODEL PLAN - FIRST FLOOR SECTOR B
148-TN-014 148 - TELECOM REMODEL PLAN - FIRST FLOOR SECTOR D
148-TN-015 148 - TELECOM REMODEL PLAN - FIRST FLOOR SECTOR E
148-TN-016 148 - TELECOM REMODEL PLAN - FIRST FLOOR SECTOR G
ARCHITECTURAL (Continued) ELECTRICAL (Continued)
145-EJ-001 BUILDING 145 ELECTRICAL ONE-LINE DIAGRAM
145-EJ-002 BUILDING 145 ELECTRICAL ONE-LINE DIAGRAM
145-EJ-003 BUILDING 145 ELECTRICAL PANEL SCHEDULES
145-EJ-004 BUILDING 145 ELECTRICAL PANEL SCHEDULES
146-EJ-001 BUILDING 146 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED
147-EJ-001 BUILDING 145 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED
148-EJ-001 BUILDING 148 ELECTRICAL ONE-LINE-DIAGRAM & PANEL SCHED
T171-EJ-001 BUILDING T171 ELECTRICAL ONE-LINE-DIAGRAM & PANEL SCHED
T296-EJ-001 BUILDING T296 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHED
FIRE PROTECTION
SHEET NO. SHEET NAME
00-FP-001 FIRE PROTECTION GENERAL GDM NOTES, DIAGRAM, AND LEGEND
00-FP-002 FIRE EXTINGUISHER SIGNAGE REQUIREMENTS
MCR-FP-101 MCR FIRE ALARM FLOOR PLAN
MCR-FP-102 FIRE BARRIER PLAN – MCR
MCR-FP-103 FIRE SPRINKLER HAZARD CLASSIFICATION PLAN – MCR
MCR-FP-104 CLEAN AGENT PLAN - MCR
MCR-FP-105 HYDRANT FLOW TEST INFORMATION
VOLUME 3 (Continued)
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
FOR OFFICIAL USE ONLY (FOUO) 00-GI-001.V2
DRAWING INDEX- VOLUME 2
GDM of Oregon
1308 NE 134th St., Suite A
VANCOUVER, WA 98685
P: 541.426.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
PAUL SIDERIUS, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
GEN INFO
Project Director
JPRPSS11/05/2024
100% CONSTRUCTION
DOCUMENTSARCHITECT A/E:
FULLY SPRINKLERED
WWW.GDM-AE.COMhttps://www.ae.design/
SHEET NO. SHEET NAME
40-AE-201 40-FLOOR PLANS
46-AE-201 46-FLOOR PLANS
48-AE-201 48-FLOOR PLANS
50-AE-201 50-FLOOR PLANS
53-AD-201 53-DEMOLITION FLOOR PLANS
53-AE-201 53-BASEMENT AND LEVEL 1 FLOOR PLANS
53-AE-202 53-LEVEL 2 AND ATTIC FLOOR PLANS
53-AE-301 53-ENLARGED PLANS AND ELEVATIONS
88-AE-201 88-LEVEL 1 FLOOR PLANS AND ELEVATIONS
88-AE-202 88-LEVEL 2 FLOOR PLANS
89-AD-201 89-DEMOLITION FLOOR PLANS
89-AE-200 89-FLOOR PLANS
89-AE-301 89-ENLARGED PLANS AND ELEVATIONS
90-AD-201 90-DEMOLITION FLOOR PLANS
90-AE-201 90-LEVEL 1 PLANS AND ELEVATIONS
90-AE-202 90-LEVEL 2 FLOOR PLAN
103-AE-201 103-LEVEL 1 FLOOR PLAN
110-AE-201 110-FLOOR PLANS
113-AD-200 113-BASEMENT DEMOLITION PLAN
113-AD-201 113-LEVEL 1 DEMOLITION PLAN
113-AD-202 113-LEVEL 2 DEMOLITION PLAN
113-AE-200 113-BASEMENT FLOOR PLAN
113-AE-201 113-LEVEL 1 FLOOR PLAN
113-AE-202 113-LEVEL 2 FLOOR PLAN
113-AE-203 113-ROOF AND PENTHOUSE FLOOR PLAN
113-AE-204 CONNECTOR CORRIDORS FLOOR PLANS
113-AE-301 113-ENLARGED PLANS AND ELEVATIONS
113-AE-302 113-ENLARGED PLANS AND ELEVATIONS
113-AE-303 113-ENLARGED PLANS AND ELEVATIONS
137-AE-200 137-FLOOR PLANS
145-AD-201 145-DEMOLITION FLOOR PLAN
145-AD-202 145-DEMOLITION 2ND AND 3RD LEVEL PLANS
145-AE-201 145-LEVEL 1, LEVEL 2, AND LEVEL 3 FLOOR PLANS
145-AE-202 145-ROOF / PENTHOUSE AND TUNNEL FLOOR PLANS
145-AE-301 145-ENLARGED MCR PLANS
145-AE-302 145-ENLARGED OIT PLANS
145-AE-303 145-ENLARGED TR PLANS AND ELEVATIONS
145-AE-305 145-ENLARGED TR PLANS AND ELEVATIONS
145-AE-306 145-ENLARGED OFFICE / MAILROOM PLANS & ELEVS
145-AE-601 145-MCR ELEVATIONS
145-AE-602 145-SECTIONS AND DETAILS
145-AE-801 145-VERTICAL CIRCULATION
145-AE-802 145-STAIR, RAMP AND RAILING DETAILS
146-AE-201 146-FLOOR PLANS
SHEET NO. SHEET NAME
00-GI-000.V1 COVER AND PROJECT GENERAL INFORMATION - VOLUME 1
00-GI-001.V1 DRAWING INDEX AND PROJECT GENERAL NOTES - VOLUME 1
00-GI-002 PROJECT CODE SUMMARY & SCHEDULE FOR FINISHES
00-GI-003 PROJECT LOCATION MAPS & CAMPUS PLAN
00-GI-004 ICRA CLASSIFICATION PROCESS
00-GI-005 PROJECT ASSEMBLY TYPES
00-GI-006 DOOR SCHEDULE, TYPICAL CEILING AND DOOR DETAILS
00-GI-007 PARTITION DETAILS
00-GI-008 FIRE PROTECTION NOTES
SHEET NO. SHEET NAME
00-GI-000.V2 COVER AND PROJECT GENERAL INFORMATION - VOLUME 2
00-GI-001.V2 DRAWING INDEX- VOLUME 2
SHEET NO. SHEET NAME
00-GI-000.V3 COVER AND PROJECT GENERAL INFORMATION - VOLUME 3
00-GI-001.V3 DRAWING INDEX - VOLUME 3
SHEET NO. SHEET NAME
146-AE-301 146-ENLARGED PLANS AND ELEVATIONS
148-AD-201 148-LEVEL 1 DEMOLITION PLAN
148-AE-201 148-LEVEL 1 FLOOR PLAN
148-AE-202 148 ROOF PLAN
148-AE-301 148-ENLARGED PLANS AND TR ELEVATIONS
148-AE-302 148-ENLARGED PLANS AND TR ELEVATIONS
148-AE-303 148-ENLARGED PLANS AND TR ELEVATIONS
T171-AE-201 T171-FLOOR PLANS
T296-AD-201 T296-LEVEL 1 DEMOLITION PLAN
T296-AE-201 T296-FLOOR PLANS AND ELEVATIONS
T296-AE-501 T296-BUILDING ELEVATIONS AND DETAILS
Revisions: Date:
DJC RES
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
U.S. Department of Veterans Affairs
PHASEARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
FLS
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
FOR OFFICIAL USE ONLY (FOUO)
GDM
4317 6TH AVE SE, SUITE 300
LACEY, WA 98503
541.436.4723
DAVE CLEM, RCDD
GDM
1308 NE 134TH ST SUITE A
VANCOUVER, WA 98685
541.436.4723
ADAM GODDIN, PE
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
Project Director
11/05/2024
A/ELOW VOLTAGE
FULLY SPRINKLERED
100% CONSTRUCTION
DOCUMENTS
Revisions: Date:
A, AMP AMPERE
ACP ACCESSIBLE CARD PATH
ADA AMERICAN DISABILITY ACT
AF AMP FRAME
AFC AVAILABLE FAULT CURRENT
AFCI ARC FAULT CIRCUIT INTERRUPTER
AFF ABOVE FINISHED FLOOR
AG ABOVE GROUND
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AL ALUMINUM
BCT BONDING CONDUCTOR FOR TLECOMMUNICATIONS
BKR BREAKER
C CONDUIT
CKT CIRCUIT
CO CONDUIT AND PULL-ROPE ONLY
COMM COMMUNICATION
CTRL CONTROL
CU COPPER
(E) EXISTING
EC, E.C. ELECTRICAL CONTRACTOR
ELEC ELECTRICAL
EM EMERGENCY
EQPT EQUIPMENT
(F) FUTURE
FA FIRE ALARM
FDR FEEDER
G, GND GROUND
GC, G.C. GENERAL CONTRACTOR
HH HANDHOLE
IDF INTERMEDIATE DISTRIBUTION FRAME
J-BOX JUNCTION BOX
LCP LIGHTING CONTROL PANEL
LIU LINE INTERFACE UNIT
LTG LIGHTING
LTS LIGHTS
LV LOW-VOLTAGE
MH MANHOLE
MM MULTI-MODE
N NEUTRAL
NEC NATIONAL ELECTRICAL CODE
OC ON-CENTER
OFCI OWNER-FURNISHED CONTRACTOR-INSTALLED
OFOI OWNER-FURNISHED OWNER-INSTALLED
OL OVERLOAD
P POLE
PB PULLBOX, PUSHBUTTON
PRI PRIMARY
PBB PRIMARY BONDING BUSBAR
PRI PRIMARY
(G) REVISED
RBB RACK BONDING BUSBAR
REF REFERENCE, REFRIGERATOR
SEC SECONDARY
SBB SECONDARY BONDING BUSBAR
SM SINGLE-MODE
SOW SCOPE OF WORK
SPECS SPECIFICATIONS
SS STAINLESS STEEL
SW SWITCH
TBB TELECOM BONDING BACKBONE
TC TELECOMMUNICATION
TEBC TELECOMMUNICATIONS EQUIPMENT BONDING BUSBAR
TEL TELEPHONE
THRU THROUGH
(TYP) TYPICAL
UG UNDERGROUND
UNO UNLESS NOTED OTHERWISE
VLT VAULT
W WIRE, WATT
WP WEATHERPROOF
(X) EXISTING TO BE REMOVED
ABBREVIATION LIST
1. PROVIDE COMPLETE WORK FOR REQUIREMENTS AS DESCRIBED ON
LEGEND. REFER TO OTHER DISCIPLINE DRAWINGS FOR LOCATIONS OF
EQUIPMENT AND DEVICES REQUIRED TO BE SUPPLIED WITH POWER.
2. INSTALLATION SHALL COMPLY WITH APPLICABLE CODES, INCLUDING,
BUT NOT LIMITED TO THE FOLLOWING: 2017 NATIONAL ELECTRICAL
CODE (NEC), VA STANDARDS AND REQUIREMENTS, LOCAL, STATE, AND
FEDERAL CODES AND ORDINANCES. AS WELL AS ALL BICSI
STANDARDS.
3. PRIOR TO PREPARATION OF BID, VISIT JOBSITE AND EXAMINE EXISTING
CONDITIONS. WORK SCOPE SHALL INCLUDE ALL COSTS FOR CUTTING,
PATCHING AND CORE DRILLING REQUIRED TO INSTALL CONDUIT AND
OTHER WIRING METHODS THROUGH EXISTING WALLS, FLOORS AND
OTHER BUILDING ELEMENTS (NOT SHOWN ON DRAWINGS).
4. PROVIDE SEPARATE AS BUILT SITE DRAWINGS, SHOWING ALL EXISTING
UNDERGROUND UTILITIES, AND ALL NEW UNDERGROUND UTILITIES.
5. PROVIDE TEMPORARY POWER FOR CONSTRUCTION. TEMPORARY
POWER MAY BE IN THE FORM OF PORTABLE GENERATOR SET;
CONNECTION TO UTILITIES COMPANY'S POWER SYSTEM OR EXISTING
FACILITY'S ELECTRICAL SYSTEM.
6. DO NOT TAKE MEASUREMENTS FROM PLANS FOR DEVICE LOCATIONS.
FIELD VERIFY EXACT DEVICE, EQUIPMENT LOCATIONS, AND MOUNTING
HEIGHTS WITH OWNER'S REPRESENTATIVE FOR PROPER
INSTALLATION.
7. SCHEMATIC DIAGRAMS AND RACEWAY ROUTING ARE SCHEMATIC AND
DO NOT SHOW EXACT PHYSICAL ARRANGEMENT OF EQUIPMENT.
WHERE INDICATED ON DRAWINGS, JUNCTION BOXES AND PULLBOXES
ARE MINIMUM REQUIREMENTS. PROVIDE FITTINGS AND PULLBOXES OF
ADEQUATE SIZE IN RACEWAY SYSTEMS WHEREVER NECESSARY OR
REQUIRED BY THE NEC OR LOCAL CODES. PROVIDE EXPANSION JOINT
FITTINGS FOR RACEWAY PASSING THROUGH NEW OR EXISTING
EXPANSION JOINTS INSTALLED BETWEEN BUILDINGS. VERIFY EXACT
LOCATIONS AND DETAILS OF EXPANSION JOINTS PRIOR TO WORK.
COORDINATE ALL RACEWAY ROUTING, PULLBOXES, AND EQUIPMENT
LOCATIONS WITH OTHER TRADES TO AVOID CONFLICTS OF EQUIPMENT
INSTALLATIONS.
8. RACEWAYS, CABLE SIZES AND ROUTES AS SHOWN REPRESENT INTENT
OF INSTALLATION, BUT MAY NOT NECESSARILY REPRESENT THE
COMPLETE WIRING COUNTS AND MINIMUM SIZES FOR CONNECTING
THE CIRCUITS SHOWN. CONTRACTOR SHALL INCLUDE IN THE BID, ALL
REQUIRED RACEWAY SIZES AND NUMBER OF CABLES IN ORDER TO
PROVIDE ALL CABLES AS SHOWN.
9. REFER TO SCHEDULES FOR CABLING REQUIREMENTS NOT INDICATED
ON PLANS.
10. CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL OBSOLETE,
ABANDONED, DEAD-ENDED, AND CUTOFF CATEGORY CABLES, IN THEIR
ENTIRETY, LOCATED DURING ALL PHASES OF WORK PERFORMED.
11. INSTALLATION OF UNDERGROUND CABLING SYSTEMS SHALL INCLUDE
EXCAVATION, CUTTING, PATCHING, BACKFILL, AND COMPACTION. DO
NOT CUT OR DAMAGE ANY EXISTING UTILITIES, STRUCTURAL
MEMBERS, OR BUILDING FOUNDATIONS. VERIFY EXISTING CONDITIONS
PRIOR TO EXCAVATION WORK. INCLUDE COST FOR UNDERGROUND
LOCATOR SERVICE TO IDENTIFY LOCATIONS OF EXISTING
COMPONENTS. HAND EXCAVATE IN LOCATIONS WHERE EXISTING
UNDERGROUND COMPONENTS ARE SUBJECT TO DAMAGE. REPAIR
DAMAGE TO EXISTING UTILITIES OR BUILDING STRUCTURE TO
OWNER'S SATISFACTION AT THE CONTRACTORS EXPENSE.
12. PROVIDE PULL-ROPES IN ALL EMPTY CONDUITS.
13. CONDUIT OR OTHER ELECTRICAL COMPONENTS SHALL NOT BE
INSTALLED IN STRUCTURAL CONCRETE UNLESS SPECIFICALLY
INDICATED ON THE DRAWINGS OR APPROVED BY A STRUCTURAL
ENGINEER. ALL CORE DRILLING FOR RACEWAY INSTALLATION, SHALL
BE THE RESPONSIBILITY OF THE E.C.
14. COORDINATE PAINTING WORK OF ELECTRICAL ITEMS WITH GENERAL
CONTRACTOR. SEE PAINTING SPECIFICATIONS FOR REQUIREMENTS.
15. CONTRACTOR TO PROVIDE ADDITIONAL CABLE LENGTH, ADDED TO
FIELD MEASURED LENGTH, OF COPPER AND FIBER OPTIC CABLE FOR
ONE 10' SERVICE LOOP AT EACH END WITHIN EACH
TELECOMMUNICATIONS SPACE. IN ADDITION TO THE SERVICE LOOPS,
CONTRACTOR SHALL ALSO SUPPLY ADDITIONAL LENGTH FOR SITE
BACKBONE CABLING AS NOTED IN CABLING SCHEDULES SHOWN ON
TELECOM SHEETS FOR FUTURE RELOCATION OF CABLING TO NEW
BUILDING LOCATION AND SERVICE LOOP IN EACH VAULT OF AT LEAST
16'.
16. ALL NEW INTERIOR AND EXTERIOR EXPOSED CONDUIT, BOXES AND
SUPPORTS TO BE PAINTED TO MATCH EXISTING SURFACE.
17. IT IS THE CONTRACTOR’S SOLE RESPONSIBILITY TO THOROUGHLY
CLEAN EXISTING FIRE STOPPING MATERIAL FROM ALL CONDUIT AND
SLEEVING AFTER REMOVAL OF EXISTING CABLING. CONTRACTOR
SHALL PROVIDE NEW FIRE STOPPING MATERIAL AND ENSURE PROPER
SEALING OF CONDUITS AND SLEEVING AS REQUIRED. SEE
SPECIFICATIONS SECTION 07 84 00 FIRE STOPPING FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
18. CONTRACTOR TO PROVIDE APPROPRIATE TEMPORARY SUPPORT OF
ALL EXISTING CABLING AS REQUIRED IN EXISTING TR'S THAT ARE
BEING REUSED/RESIZED. ONCE ROOM BUILD OUT IS COMPLETE,
CONTRACTOR TO SUPPLY PERMANENT SUPPORT STRUCTURE FOR ALL
EXISTING CABLES IN A MANNER THAT DOES NOT REQUIRE CABLE
REPLACEMENT FOR EXISTING SYSTEMS TO REMAIN.
GENERAL NOTES
(N)MH NEW MANHOLE
(E)MH EXISTING MANHOLE
SYMBOL
SYMBOL LEGEND
DESCRIPTION
A A
B B 'B' FEED FIBER ROUTING
'A' FEED FIBER ROUTING
CAT 6A ROUTING (SITE PLAN)C C
C
TELECOMMUNICATIONS OUTLET, SUBNUMBER=QUANTITY OF DROPS
CJ CJ CAT 6A ROUTING (FLOOR PLANS)
C
WAP
TELECOMMUNICATIONS OUTLET, WIRELESS ACCESS POINT
SECURITY SYSTEM CARD READER/KEYPAD COMBOCR
IS INERGEN SYSTEM SMOKE DETECTOR
IH INERGEN SYSTEM HEAD
SD FIRE ALARM SMOKE DETECTOR
PAGING SYSTEM SPEAKER
SECURITY CAMERA
EXISTING REQUEST TO EXIT
TR ROOM
FIRE ALARM STROBE LIGHT
XXX-X-XX-PX
RACK NUMBER
PATCH PANEL LOCATON (RU#)
PORT NUMBER
TYPICAL TELECOMM OUTLET IDENTIFIERS:
TELECOMM OUTLET MOUNTED IN FLOOR BOX.
C
19. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND
RETURN FURNITURE, FIXTURES, AND EQUIPMENT WITHIN SPACES AS
REQUIRED TO COMPLETE EACH DAY'S WORK. THE VA WILL REMOVE,
OR SECURE, PHI, PPI, AND PERSONAL PROPERTY. COORDINATE THIS
WORK WITH THE COR.
20. PARTICULAR ATTENTION SHALL BE GIVEN TO THE PROTECTION OF
EXISTING STRUCTURE AND FINISHES TO PREVENT ANY DAMAGE OF
EXISTING FINISHES. ANY ACCIDENTAL DAMAGE INCURRED TO
EXISTING CONDITIONS WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO REPAIR OR CORRECT.
21. THE A/E HAS PARTIONED THE DRAWINGS INTO SECTIONS. THE PRIME
CONTRACTOR IS TO PROVIDE COORDINATION AMONG THE TRADES
AND DRAWING SECTIONS TO ENSURE ALL MATERIALS, LABOR,
EQUIPMENT, AND OTHER SERVICES ARE PROVIDED TO FULFILL THE
ENTIRE CONTRACT.
22. REPLACEMENT OF CEILING TILES IS REQUIRED AT THE END OF EACH
WORK SHIFT. IF THE TILES CANNOT BE REPLACED, THE SPRINKLER
SYSTEM MAY BE CONSIDERED OUT OF SERVICE IN THESE AREAS AND
1-HOUR FIRE RATED SEPARATION WILL BE REQUIRED BETWEEN THE
CONSTRUCTION AREA AND THE OCCUPIED PORTIONS OF THE
BUILDING.
23. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED
AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL
ADDITIONAL CABLES, TEMPORARY FIRESTOPPING COMPOSED OF
MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO
PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE
UNSEALED PENETRATION.
24. IF SCOPE OF WORK RESULTS IN LONG-TERM CEILING REMOVAL,
CONTRACTOR TO DISCUSS WITH COR WHETHER A RATED
ENCLOSURE MUS BE CONSTRUCTED OR TEMPORARY UPRIGHT
SPRINKLERS INSTALLED TO MEET NFPA REQUIREMENTS. REFER TO
NFPA 241 (2019) PARAGRAPH 8.6.2.
GENERAL NOTES - CONT.
HILTI FIRE STOP SPEED SLEEVE
1 PLAN NOTE CALL OUT
BV BV
ABAB
V V
'A & B' FIBER ROUTING
25-PAIR COPPER VOICE ROUTING
'B SIDE FIBER & VOICE COPPER' ROUTING
00-TG-001
LEGEND, ABBREVIATIONS, AND
GENERAL NOTES
*ALL DISTANCES ARE APPROXIMATE. IT IS THE CONTRACTORS
RESPONSIBILTY TO CONFIRM ACTUAL DISTANCES PRIOR TO
ORDERING MATERIALS.
*ALL DISTANCES ARE APPROXIMATE. IT IS THE CONTRACTORS
RESPONSIBILTY TO CONFIRM ACTUAL DISTANCES PRIOR TO
ORDERING MATERIALS.
*ALL DISTANCES ARE APPROXIMATE. IT IS THE CONTRACTORS
RESPONSIBILTY TO CONFIRM ACTUAL DISTANCES PRIOR TO
ORDERING MATERIALS.
MD MOTION DETECTOR
NEW CAMPUS FIBER - A FEED
TR SPACE FIBER TYPE TERMINATION POINT
APPROXIMATE
DISTANCE(FT) NOTES
BLDG ROOM
40A1 102A 24-STRAND OS2 B145 MCR RM 132 2450
46A1 B105 24-STRAND OS2 B145 MCR RM 132 2625
48A1 TE 24-STRAND OS2 B145 MCR RM 132 2175
50A1 B102A 24-STRAND OS2 B145 MCR RM 132 2000
53A1 TCB1 24-STRAND OS2 B145 MCR RM 132 2000
85A1 101A 24-STRAND OS2 B145 MCR RM 132 3627
88A…