Attachment_04_-_Rawlins_FO_HVAC_Improvements_Project_Attachment_C_Existing_Conditions_Documents.pdf

PDF 6 MB Posted

Attached to
RFO HVAC UPGRADE, WY
Solicitation number
140L0626R0001
Issued by

About this file

This document is a comprehensive set of architectural and engineering construction drawings for a multi-story institutional building that appears to be a research or office facility. The drawings include mechanical, electrical, plumbing, structural, and fire/life safety plans across multiple sheets.

The mechanical systems include custom rooftop air handling units with variable air volume capability, heating and cooling systems with boiler and pump schedules, fan schedules for exhaust and ventilation, radiation schedules, grille/register/diffuser specifications, and cabinet unit heater schedules. Electrical systems encompass first and second floor power plans, lighting plans for both floors, fire alarm and special systems diagrams, and a comprehensive electrical legend with detailed symbols and specifications. The electrical infrastructure includes a 480/277V main distribution with multiple panels, circuit schedules showing load calculations, voltage drop reports, and dimming control systems with detailed control diagrams. Plumbing systems detail first and second floor plans with fixtures, equipment schedules for water heaters and domestic water systems, roof plumbing, waste and vent diagrams for multiple toilet rooms, and specifications for gas-fired domestic water heaters with fire entry details. Structural documentation provides foundation and first floor slab plans, second floor framing plans, roof framing plans, entry bridge designs, foundation sections and details, footing schedules, and typical connection details for steel beam and column assemblies, retaining walls, and masonry elements. Fire/life safety plans identify smoke detector and fire alarm locations on both floors with special systems coordination notes. The drawings include comprehensive schedules for equipment specifications, luminaires, mechanical equipment, plumbing fixtures, and structural steel connections with standard architectural details and notations throughout.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rawlins FO Mechanical Plans

Rawlins FO Electrical Plans
6235E001
6235E100
6235E101
6235E102
6235E201
6235E202
6235E301
6235E302
6235E801
6235E802
6235E803
6235E804
6235E805
6235E806
6235E807
Rawlins FO Plumbing Plans
6235P101
6235P102
6235P103
6235P801
6235P802
Rawlins FO Structrual Plans
S101
S102
S103
S104
S105
S201
S202
S203
S204
S205
S301

File details come from the government source that posted it. Updated .