This is a Presolicitation document for an HVAC Improvements Project at the BLM Rawlins Field Office in Rawlins, Wyoming. The project involves replacing and upgrading heating, ventilation, and air conditioning systems in a 32,000-square-foot facility located at 1300 North 3rd Street, Rawlins, Wyoming 82301.
The base bid scope includes replacing two rooftop HVAC units, two Variable Frequency Drives (VFDs), 32 Variable Air Volume (VAV) units with reheat coils, 32 thermostats, two boilers, two boiler pumps, two hot water pumps, one in-line exhaust fan, and three split HVAC units (indoor and outdoor units). Additional work includes upgrading electrical panel labeling and performing tabulation and commissioning of the entire HVAC system. The contractor will be responsible for equipment selection, submittal of equipment specifications for government approval, construction, and submission of as-constructed drawings. Existing drawings in PDF and AutoCAD formats will be provided. Option #1 allows for replacement of the 32 VAV units and 32 thermostats with JCI VMA1832S and JCI TEC thermostats respectively. The project must comply with the 2021 International Building Code (IBC), 2021 International Plumbing Code (IPC), 2021 International Mechanical Code (IMC), ASHRAE standards, National Electrical Code (NEC) NFPA 70, and ABA Accessibility Guidelines. The BLM serves as the Authority Having Jurisdiction (AHJ). The facility will remain occupied during construction, requiring an approved phasing plan. Work plans identify specific locations for VAV replacements on both floors, thermostat locations, boiler and pump replacements in the mechanical room, split HVAC unit installations, and rooftop RTU placements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U S D E
PA
RT
ME
NT OF THE
INT
E R
IO
R
March 3,184
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Date:
BLM Job #:
U ni te d
St at es D ep ar tm en t o f t he In te rio r / B ur ea u of
L an d M an ag em en t
Checked by:
R ev is io ns
D es cr ip tio n
D at e
D es cr ip tio n
D at e
SC
H
EM
A
TI
C
D
ES
IG
N
D O
C U
M
EN
TS
4/ 1/
0:
:4
AM
G000
COVERSHEET
BL
M
R
AW
LI
N
S
FO
H
VA
C
IM
PR
O
VE
M
EN
TS
BLM RAWLINS
FO - HVAC
IMPROVEMENTS
01 APRIL 2025
R
D S
TR
EE
T R
AW
LI
N S, W
YO
M
IN
G
NOC A&E
SHEET INDEX
Sheet Number Sheet Name
G000 COVERSHEET
G100 SITE PLAN
M101 FIRST FLOOR WORK PLAN
M102 SECOND FLOOR WORK PLAN
M103 ROOF WORK PLAN
BLM RAWLINS FIELD OFFICE
HVAC IMPROVEMENTS PROJECT
1300 N. 3RD ST, RAWLINS, WY 82301
HIGH DESERT DISTRICT OFFICE
PROJECT SUMMARY (BASE BID):
THE PROJECT IS TO REPLACE TWO ROOFTOP HVAC UNITS, 2 VFDS, 32 VAVS WITH REHEAT COILS, 32 THERMOSTATS, 2 BOILERS, 2 BOILER PUMPS, 2 HOT WATER PUMPS, 1 IN-LINE EXHAUST FAN, 3 SPLIT HVAC UNITS (INDOOR AND OUTDOOR UNITS), UPGRADE THE ELECTRICAL PANEL LABELING, AND TO TAB AND COMMISSION THE ENTIRE HVAC SYSTEM AT THE RAWLINS FIELD OFFICE. THE CONTRACTOR WILL MAKE EQUIPMENT SELECTIONS, SUBMIT EQUIPMENT SUBMITTALS FOR GOVERNMENT APPROVAL, CONSTRUCT THE PROJECT, AND SUBMIT AS-CONSTRUCTED DRAWINGS TO THE GOVERNMENT. EXISTING DRAWINGS (IN PDF AND AUTOCAD FORMATS) WILL BE PROVIDED TO THE CONTRACTOR. THE BUILDING IS APPROXIMATELY 32,000 SQUARE FEET.
LIST OF OPTIONS:
OPTION #1: REPLACE 32 VAV VMAS AND 32 THERMOSTATS WITH JCI VMA1832S AND JCI TEC THERMOSTATS RESPECTIVELY.
LOCATION:
BLM RAWLINS FIELD OFFICE
1300 NORTH 3RD STREET
RAWLINS, WYOMING 82301
APPLICABLE BUILDING CODES AND REGULATIONS:
2021 INTERNATIONAL BUILDING CODE (IBC)
2021 INTERNATIONAL PLUMBING CODE (IPC)
2021 INTERNATIONAL MECHANICAL CODE (IMC)
ASHRAE
NATIONAL ELECTRICAL CODE (NEC), NFPA 70
ABA ACCESSIBILITY GUIDELINES
JURISDICTION:
THE BLM IS THE AUTHORITY HAVING JURISDICTION (AHJ), HOWEVER, CONTRACTOR WILL PROVIDE A COURTESY SET TO THE LOCAL FIRE DEPARTMENT IF
REQUESTED.
SITE MAPPROJECT VICINITY MAP - RAWLINS, WY
PROJECT SITE
PROJECT SITE
Date:
BLM Job #:
U ni te d
St at es D ep ar tm en t o f t he In te rio r / B ur ea u of
L an d M an ag em en t
Checked by:
R ev is io ns
D es cr ip tio n
D at e
D es cr ip tio n
D at e
SC
H
EM
A
TI
C
D
ES
IG
N
D O
C U
M
EN
TS
4/ 1/
:0
4:
P M
G100
SITE PLAN
BL
M
R
AW
LI
N
S
FO
H
VA
C
IM
PR
O
VE
M
EN
TS
BLM RAWLINS
FO - HVAC
IMPROVEMENTS
01 APRIL 2025
R
D S
TR
EE
T R
AW
LI
N S, W
YO
M
IN
G
NOC A&E
GENERAL NOTES:
• All work is to occur at the Field Office building
• The facility will remain occupied during construction (a Phasing Plan, approved by the Government, will be required)
SITE PLAN KEY NOTES:
1. BLM Rawlins Field Office
2. Anticipated crane location
3. Anticipated Contractor parking area
4. Anticipated Contractor staging area
BLM RAWLINS CAMPUS SITE MAP
ELEC.
(Room
124)
MECHANICAL
(Room 123) WORK STATIONS
EXERCISE
BREAK MUD AV STOR. CONFERENCE
CENTER
LOBBY
MEN
WOMEN
PUBLIC
ROOM
INTERVIEW
RANGER
RECEPTION
WORKSTATIONS
FMFM CONF.WORKSTATIONSMAIL
COPY
STORAGE
(Room 127)
LAB
CENTRAL FILES
WORK / FILE / COPYSETUP
COMPUTER
(Room 117)
TELECOM
(Room 118)
AFWACCT TECH
MEN WOMEN
ELEV.
EQUIP.ELEV.
JANITOR
SHOWER
SHOWER
HALL
VEST.
GENERAL NOTES:
• Repair / replace any structural, mechanical, and / or architectural elements damaged / changed during construction
• Furnish and install new appurtenances, valves, insulation, electrical, etc. as needed for equipment replacement
• New system shall follow ASHRAE Guideline 36 control sequencing and logic
• As-build the new electrical systems and 480V MDP and 208V LDP
• TAB and Commission the entire HVAC system
• Fully integrate new system into existing
MetaSys network and monitoring
• Option #1: Replace VAV VMAs and thermostats with JCI
FIRST FLOOR WORK PLAN KEY NOTES:
1. Replace 15 VAVs and reheat valves at locations throughout the first floor
2. Replace 15 thermostats at locations throughout the first floor
3. Replace VFDs in Room 123
4. Re-label electrical panels (MDP, H1, and H2) with engraved phenolic nameplates in Room
5. Replace two boilers in Room 123
6. Replace two boiler pumps in Room 123
7. Replace two hot water pumps in Room 123
8. Replace two split HVAC units (indoor fan coil units) in Rooms 117 and 118
9. Replace in-line exhaust fan in Room 124
5 6 7 3
2 1
Date:
BLM Job #:
U ni te d
St at es D ep ar tm en t o f t he In te rio r / B ur ea u of
L an d M an ag em en t
Checked by:
R ev is io ns
D es cr ip tio n
D at e
D es cr ip tio n
D at e
SC
H
EM
A
TI
C
D
ES
IG
N
D O
C U
M
EN
TS
4/ 1/
:0
6:
P M
M101
FIRST FLOOR WORK
PLAN
BL
M
R
AW
LI
N
S
FO
H
VA
C
IM
PR
O
VE
M
EN
TS
BLM RAWLINS
FO - HVAC
IMPROVEMENTS
01 APRIL 2025
R
D S
TR
EE
T R
AW
LI
N S, W
YO
M
IN
G
NOC A&E
3/32" = 1'-0"1 FIRST FLOOR WORK PLAN
0 16 248
Graphic Scale (Feet)
WORKSTATIONS
WORKSTATIONS
TELECOM
(Room 207)
WORKROOM
AFM
ELEV.
WOMEN
MEN
WORKROOM
OVERLAY
CONFERENCE
WORKSTATIONS
AFM
WORK /
COPY
PROP FILES
CONFERENCE
PLOT
CONF. / WORK
WORKSTATIONS
GENERAL NOTES:
• Repair / replace any structural, mechanical, and / or architectural elements damaged / changed during construction
• Furnish and install new appurtenances, valves, insulation, electrical, etc. as needed for equipment replacement
• New system shall follow ASHRAE Guideline 36 control sequencing and logic
• As-build the new electrical systems and 480V MDP and 208V LDP
• TAB and Commission the entire HVAC system
• Fully integrate new system into existing
MetaSys network and monitoring
• Option #1: Replace VAV VMAs and thermostats with JCI
SECOND FLOOR WORK PLAN KEY NOTES:
1. Replace 17 VAVs and reheat valves at locations throughout the second floor
2. Replace 17 thermostats at locations throughout the second floor
3. Replace one split HVAC unit (indoor fan coil unit) in Room 207
1 2
Date:
BLM Job #:
U ni te d
St at es D ep ar tm en t o f t he In te rio r / B ur ea u of
L an d M an ag em en t
Checked by:
R ev is io ns
D es cr ip tio n
D at e
D es cr ip tio n
D at e
SC
H
EM
A
TI
C
D
ES
IG
N
D O
C U
M
EN
TS
4/ 1/
:0
9:
P M
M102
SECOND FLOOR
WORK PLAN
BL
M
R
AW
LI
N
S
FO
H
VA
C
IM
PR
O
VE
M
EN
TS
BLM RAWLINS
FO - HVAC
IMPROVEMENTS
01 APRIL 2025
R
D S
TR
EE
T R
AW
LI
N S, W
YO
M
IN
G
NOC A&E
3/32" = 1'-0"1 SECOND FLOOR WORK PLAN
APPROX. RTU LOCATION
APPROX. RTU LOCATION
PARAPET WALL
ENTRY CANOPY
GENERAL NOTES:
• Repair / replace any structural, mechanical, and / or architectural elements damaged / changed during construction
• Furnish and install new appurtenances, valves, insulation, electrical, etc. as needed for equipment replacement
• New system shall follow ASHRAE Guideline 36 control sequencing and logic
• As-build the new electrical systems and 480V MDP and 208V LDP
• TAB and Commission the entire HVAC system
• Fully integrate new system into existing
MetaSys network and monitoring
• Option #1: Replace VAV VMAs and thermostats with JCI
ROOF WORK PLAN KEY NOTES:
1. Replace two rooftop HVAC units
2. Replace two roof curb adapters for rooftop
HVAC units
3. Replace three split HVAC units (outdoor condensing units)
1 2 3
Date:
BLM Job #:
U ni te d
St at es D ep ar tm en t o f t he In te rio r / B ur ea u of
L an d M an ag em en t
Checked by:
R ev is io ns
D es cr ip tio n
D at e
D es cr ip tio n
D at e
SC
H
EM
A
TI
C
D
ES
IG
N
D O
C U
M
EN
TS
4/ 1/
:1
1:
P M
M103
ROOF WORK PLAN
BL
M
R
AW
LI
N
S
FO
H
VA
C
IM
PR
O
VE
M
EN
TS
BLM RAWLINS
FO - HVAC
IMPROVEMENTS
01 APRIL 2025
R
D S
TR
EE
T R
AW
LI
N S, W
YO
M
IN
G
NOC A&E3/32" = 1'-0"1 ROOF WORK PLAN
| Rawlins FO HVAC Project_Mechanical Model - Sheet - G000 - COVERSHEET |
| Sheets |
| G000 - COVERSHEET |
| Rawlins FO HVAC Project_Mechanical Model - Sheet - G100 - SITE PLAN |
| Sheets |
| G100 - SITE PLAN |
| Rawlins FO HVAC Project_Mechanical Model - Sheet - M101 - FIRST FLOOR WORK PLAN |
| Sheets |
| M101 - FIRST FLOOR WORK PLAN |
| Rawlins FO HVAC Project_Mechanical Model - Sheet - M102 - SECOND FLOOR WORK PLAN |
| Sheets |
| M102 - SECOND FLOOR WORK PLAN |
| Rawlins FO HVAC Project_Mechanical Model - Sheet - M103 - ROOF WORK PLAN |
| Sheets |
| M103 - ROOF WORK PLAN |
File details come from the government source that posted it. Updated .